Loading...
HomeMy WebLinkAboutPC Reso 21-11 PLPA-2021-00035 Regional Street Residential ProjectRESOLUTION NO. 21-11 A RESOLUTION OF THE PLANNING COMMISSION OF THE CITY OF DUBLIN APPROVING A SITE DEVELOPMENT REVIEW PERMIT FOR THE REGIONAL STREET RESIDENTIAL PROJECT AT 6541-6543 REGIONAL STREET IN DOWNTOWN DUBLIN APN: 941-1500=025 PLPA-2021-00035 WHEREAS, the Applicant, Eden Housing is seeking to develop a 1.33-acre site located at the corner of Regional Street and the future extension of St. Patrick Way west of the West Dublin/ Pleasanton BART station at 6541-6543 Regional Street. The proposed project is a 113- unit affordable senior housing development intended for independent living, and includes indoor and outdoor amenity spaces, property management offices, and a surface parking lot; and WHEREAS, the 113 residential units are permitted in the Transit -Oriented District of the Downtown Dublin Specific Plan; and WHEREAS, pursuant to the requirements of the California Environmental Quality Act (CEQA), a Final Environmental Impact Report (State Clearinghouse No. 2010022005) was prepared for the Downtown Dublin Specific Plan and certified by the City Council on February 11 2011 (Resolution No. 08-11); and WHEREAS, the DDSP EIR and subsequent Addendums analyzed development of approximately 2.2 million square feet of non-residential development and 2,500 residential dwelling units, and the project's 113 units are within the already contemplated residential development activity in the DDSP; and WHEREAS, the project was examined to determine if any of the standards contained in CEQA Guidelines Section 15162 requiring preparation of supplemental environmental review would be met. The analysis concluded that the project is within the scope of development analyzed by the DDSP EIR and subsequent Addendums and, therefore, exempt from further environmental review under Government Code Section 65457 and CEQA Guidelines Section 15182. In addition, under CEQA Guidelines Section 15168, the residential project is in conformity with the DDSP and within the scope of the project analyzed in the DDSP EIR and, therefore, no further CEQA review or document is required; and WHEREAS, a Staff Report, dated November 23, 2021, and incorporated herein by reference, described and analyzed the proposed Regional Street Residential Project, including the Site Development Review Permit application; and WHEREAS, the Planning Commission held a properly noticed public hearing on the Regional Street Residential Project on November 23, 2021, at which time all interested parties had the opportunity to be heard; and WHEREAS, the Planning Commission did hear and use independent judgment and considered all said reports, recommendations, and testimony hereinabove set forth. NOW, THEREFORE, BE IT RESOLVED that the foregoing recitals are true and correct and made a part of this resolution. BE IT FURTHER RESOLVED THAT THE City of Dublin Planning Commission does hereby make the following findings and determinations regarding the Site Development Review Permit: A. The proposal is consistent with the purposes of Chapter 8.104 of the Zoning Ordinance, with the General Plan and any applicable Specific Plans and design guidelines because: 1) the project is compatible with the architectural character and scale of development in the immediate area in which the proposed project is to be located; 2) the project is utilizing traditional building forms with contemporary, high -quality materials and finishes in compliance with the design guidelines of the DDSP; 3) the project will provide affordable housing opportunities in an area where the City of Dublin has made efforts to incentivize higher -density housing; 4) the proposed project also supports the more specific vision for the Transit -Oriented District to encourage the development of the area with land uses that support and complement transit uses, particularly the West Dublin/Pleasanton BART Station; and 5) the project is consistent with the General Plan land use designation of DDSP — Transit -Oriented District, B. The proposal is consistent with the provisions of Title 8, Zoning Ordinance because: 1) the project contributes to the orderly, attractive, and harmonious site and architectural development that is compatible with the architectural style, intensity of development — either in place or approved for future development, and context of surrounding and adjacent properties; and 2) the project complies with the development standards of the Downtown Dublin zoning district, as outlined in the DDSP. C. The design of the project is appropriate to the City, the vicinity, surrounding properties, and the lot in which the project is proposed because: 1) the project is consistent with the DDSP in that it provides additional housing opportunities in close proximity to the West Dublin/Pleasanton BART Station; 2) the size and mass of the proposed buildings are consistent with other residential development in the immediate vicinity and in compliance with the minimum and maximum development density/intensity permitted; 3) the development of the subject property is an important incremental change to advance the vision of the DDSP to make Downtown Dublin a vibrant and dynamic mixed -use center; and 4) the proposed buildings in conjunction with the completion of the property's frontage along St. Patrick's Way will provide a more complete street scene. D. The subject site is suitable for the type and intensity of the approved development because: 1) the project provides residential development in an area that can support residential uses; 2) the project is consistent with the Downtown Dublin zoning district in which it is located; 3) the project site will be fully served by a network of existing and planned infrastructure of public roadways, services, and facilities; and 4) the proposed project meets all of the development standards established to regulate development in the DDSP Transit -Oriented District and is consistent and compatible with other residential development projects in the immediate vicinity. E. Impacts to existing slopes and topographic features are addressed because: 1) the project site is generally flat; and 2) landscaping along St. Patrick Way and throughout the project will be complete. F. Architectural considerations including the character, scale and quality of the design, site layout, the architectural relationship with the site and other buildings, screening of unsightly uses, lighting, building materials and colors and similar elements result in a project that is harmonious with its surroundings and compatible with other developments in the vicinity because: 1) the project provides a high degree of design and landscaping to provide a unique, urban, contemporary-themed housing opportunity in the DDSP; 2) the structures reflect the architectural styles and development standards for other higher - density residential projects within the DDSP; 3) the materials proposed will be high. quality and long-lasting; 4) the colors and materials proposed are appropriate to the contemporary architectural design proposed for the project and complementary to other buildings in the project vicinity; 5) the architectural style and materials will be consistent and compatible with the contemporary architectural style, colors, and materials being utilized on other multi -family projects in the immediate vicinity; 6) the project is utilizing traditional building forms with contemporary, high -quality materials and finishes in compliance with the design guidelines of the DDSP; and 7) the size and scale of the development will be similar to multi -family projects in the immediate project vicinity. G. Landscape considerations, including the location, type, size, color, texture and coverage of plant materials, and similar elements have been incorporated into the project to ensure visual relief, adequate screening and an attractive environment for the public because: 1) all perimeter landscaping, streetscape enhancements, fences, and hardscape are proposed for construction in accordance with the DDSP; 2) the project perimeter and interior landscaping are consistent with other developments in the vicinity; and 3) the project will conform to the requirements of the City's Water Efficient Landscape Ordinance. H. The site has been adequately designed to ensure the proper circulation for bicyclist, pedestrians, and automobiles because all infrastructure including streets, sidewalks, and street lighting are proposed for construction in accordance with the project plans and have been reviewed for safety and adequate circulation. BE IT FURTHER RESOLVED that the Planning Commission of the City of Dublin hereby approves the Site Development Review Permit for the Regional Street Residential Project, subject to the conditions included below, and in accordance with the Project Plans, incorporated herein by reference and attached as Exhibit A to this Resolution. CONDITION TEXT RESPON. WHEN REQ'D AGENCY Prior to: GENERAL 1. Approval. This Site Development Review Permit approval is for the Regional Street Residential Project (PLPA-2021-00035). This approval shall be as generally depicted and indicated on the project plans prepared by PL On -going BAR Architects dated received November 8, 20213 attached as Exhibit A, and other plans, text, and diagrams relating to this Site Development Review Permit, unless modified by the Conditions of Approval contained herein. 2. Permit Expiration. Construction shall commence within one (1) year of the effective date of this Site Development Review Permit or the Permit shall lapse and become null PL One Year After and void. If there is a dispute as to whether the Permit has Effective Date expired, the City may hold a noticed public hearing to determine the matter. Such a determination may be processed concurrently with revocation proceedings in appropriate circumstances. If a Permit expires, a new application must be made and processed according to the re uirements of the Zoning Ordinance. 3. Time Extension. The Community Development Director may grant an extension of the approval for a period not to exceed twelve (12) months, upon the Applicant's written PL Expiration Date request prior to expiration, and the determination that all Conditions of Approval remain adequate and all applicable findings of approval will continue to be met. 4. Effective Date. This Site Development Review Permit approval shall become effective only after the Community Benefit Agreement is approved by the City Council. If the PL On -going Community Benefit Agreement is not approved, the Site Development Review Permit approval shall become null and void. 5. Revocation of Permit. The Site Development Review Permit approval shall be revocable for cause in accordance with Dublin Municipal Code Section PL On -going 8.96.020.1. Any violation of the terms or conditions of this permit shall be subject to citation. 6. Compliance. Applicant/Developer shall comply with the Subdivision Map Act, the City of Dublin Subdivision and Zoning Ordinances, City of Dublin Title 7 Public Works Ordinance, which includes the Grading Ordinance, the City of Dublin Public Works Standards and Policies, the most current requirements of the State Code Title 24 and the Americans with Disabilities Act with regard to accessibility, and all building and fire codes and PL, PW On -going ordinances in effect at the time of building permit issuance. All public improvements constructed by Developer and to be dedicated to the City are hereby identified as "public works" under Labor Code section 1771. Accordingly, Developer, in constructing such improvements, shall comply with the Prevailing Wage Law Labor Code. Sects. 1720 and following). 7. Requirements and Standard Conditions. Applicant/ Developer shall comply with applicable City of Dublin Fire Prevention Bureau, Dublin Public Works Department, Dublin Building and Safety Division, Dublin Police Services, Alameda County Flood Control and Water Conservation District (Zone 7), Livermore Amador Valley Transit Authority, Alameda County Public and Environmental Health, Dublin San Ramon Services Various Building Permit District, Bay Area Rapid Transit and the California Issuance Department of Health Services requirements and standard conditions. Prior to issuance of building permits or the installation of any improvements related to this project, the Applicant/Developer shall supply written statements from each such agency or department to the Planning Division, indicating that all applicable conditions required have been or will be met. 8. Required Permits. Applicant/Developer shall obtain all permits required by other agencies which may include, PW Building Permit but are not limited, to Alameda County Environmental Issuance Health, Alameda County Flood Control and Water Conservation District (Zone 7), California Department of Fish and Wildlife, Army Corps of Engineers, Regional Water Quality Control Board, Caltrans, or other regional/state agencies as required by law, as applicable. Copies of the permits shall be provided to the Public Works Department, 9. Fees. Applicant/Developer shall pay all applicable fees in effect at the time of building permit issuance, including, but not limited to: Planning fees; Building fees; Dublin Grading Permit San Ramon Services District fees; Public Facilities fees; Various and/or Building City of Dublin Fire fees; Noise Mitigation fees; Permit Issuance Inclusionary House In -Lieu fees; and Alameda County Flood and Water Conservation fees. 10. Indemnification. Applicant/Developer shall defend, indemnify, and hold harmless the City of Dublin and its agents, officers, and employees from any claim, action, or proceeding against the City of Dublin or its agents, officers, or employees to attack, set aside, void, or annul an approval of the City of Dublin or its advisory agency, appeal board, Planning Commission, City Council, Community Development Director, Zoning Administrator, or any other department, committee, or agency of the City ADM On -going to the extent such actions are brought within the time period required by Government Code Section 66499.37 or other applicable law; provided, however, that the Applicant's/Developer's duty to so defend, indemnify, and hold harmless shall be subject to the City's promptly notifying the Applicant/Developer of any said claim, action, or proceeding and the City's full cooperation in the defense of such actions or proceedings, 11. Clarification of Conditions. In the event that there needs to be clarification to the Conditions of Approval, the Director of Community Development and the City Engineer have the authority to clarify the intent of these Conditions of Approval to the Applicant/Developer without going to a public hearing. The Director of Community PL/PW On -going Development and the City Engineer also have the authority to make minor modifications to these conditions without going to a public hearing in order for the Applicant/Developer to fulfill needed improvements or mitigations resulting from impacts of this project. 12. Clean-up. Applicant/Developer shall be responsible for clean-up and disposal of project related trash to maintain PL On -going a safe, clean, and litter -free site. 13. Modifications. Modifications or changes to this Site Development Review Permit approval may be considered PL On -going by the Community Development Director in compliance with Dublin Municipal Code Chapter 8.104. 14. Controlling Activities. Applicant/Developer shall control all activities on the project site so as not to create a PL On -going nuisance to the existing or surrounding businesses and residences. 15. Accessory Structures. The use of any accessory Establishment structures, such as storage sheds or trailer/container PL of Temporary units used for storage or for any other purpose during Use construction, shall not be allowed on the site at any time unless a Temporary Use Permit is applied for and approved. PLANNING DIVISION - PROJECT SPECIFIC CONDITIONS 16. Affordable Housing Regulatory Agreement. Applicant/Developer shall record an Affordable Housing Building Permit PL Issuance Regulatory Agreement prior to issuance of a building permit. 17. Equipment Screening. All electrical, fire risers and/or mechanical equipment shall be screened from public view. Any roof -mounted equipment shall be completely Building Permit screened from view by materials architecturally Issuance compatible with the building to the satisfaction of the PL and Community Development Director. Building permit plans On -going shall show the location of all equipment and screening for review and approval of the Director of Community Development. 18. Parking Requirement. The number of required parking Building Permit spaces shall be as allowed under State Density Bonus PL Issuance Law. 19. Community Benefit Agreement. Applicant/Developer shall meet all obligations and requirements of the PL Building Permit Issuance Community Benefit Agreement for the project. 20. Final Building and Site Development Plans shall be reviewed and approved by the Community Development Department staff prior to the issuance of a building permit. All such plans shall insure: a. That standard residential security requirements as established by the Dublin Police Department are provided. b. That ramps, special parking spaces, signing, and other appropriate physical features for the disabled, are provided throughout the site for all publicly used facilities. c. That exterior lighting of the building and site is not directed onto adjacent properties and the light source is shielded from direct off -site viewing. d. That all mechanical equipment, including air conditioning condensers, electrical and gas meters, PL Building Permit are architecturally screened from view, and that Issuance electrical transformers are either underground or architecturally screened. e. That all vents, gutters, downspouts, flashings, etc., are painted to match the color of adjacent surface. f. That all materials and colors are as approved by the Community Development Department. Once constructed or installed, all improvements shall be maintained in accordance with the approved plans. Any changes, which affect the exterior character, shall be resubmitted to the Community Development Department for approval. g. That all exterior architectural elements not detailed on the plans are finished in a style and in materials in harmony with the exterior of the building. All materials shall wrap to the inside corners and terminate at a perpendicular wall plane. h. That all other public agencies that require review of the project are supplied with copies of the final building and site plans and that compliance is obtained with at least their minimum code requirements. LANDSCAPING 21. Final Landscape and Irrigation Plans. Final landscape plans, irrigation system plans, tree preservation techniques, and guarantees shall be reviewed and approved by the Planning Division prior to the issuance of a building permit. All such submittals shall be reviewed and approved by the City Engineer and the Community Development Director. Plans shall be generally consistent with the Preliminary Landscape drawings included in the Project Plans (Exhibit A), except as modified by the Conditions of Approval listed below or as required by the Community Development Director to address specific site constraints or conditions. The Final Landscape Plans shall insure: a. That plant material is utilized which will be capable of healthy growth within the given range of soil and climate. b. That proposed landscape screening is of a height and density so that it provides a positive visual impact within three years from the time of planting. Landscape Plan c. That unless unusual circumstances prevail, all trees PL Approval and on the site shall be a minimum of 15 gallons in size. Installation All trees that are on the exterior building perimeter shall be 24-inch box minimum, with at least 30% at 36- inch box or greater. All shrubs shall be five gallon minimum. d. That a plan for an automatic irrigation system be provided which assures that all plants get adequate water. In unusual circumstances, and if approved by Staff, a manual or quick coupler system may be used. e. That concrete curbing is used at the edges of all planters and paving surfaces where applicable. f. That all cut and fill slopes conform to the conditions detailed in the Site Development Review packet. g. That a guarantee from the owners or contractors is required guaranteeing all shrubs and ground cover, all trees, and the irrigation system for one year. h. That a permanent maintenance agreement on all landscaping will be required from the owner ensuring regular irrigation, fertilization and weed abatement, if applicable. 22. Landscaping at Street/Drive Aisle Intersections. Landscaping shall not obstruct the sight distance of motorists, pedestrians or bicyclists. Except for trees, landscaping (and/or landscape structures such as walls) PL On -going at drive aisle intersections shall not be taller than 30 inches above the curb. Landscaping shall be kept at a minimum height and fullness giving patrol officers and the general public surveillance capabilities of the area. 23. Plant Clearances. All trees planted shall meet the following clearances: a. Six feet from the face of building walls or roof eaves. b. Seven feet from fire hydrants, storm drains, sanitary Landscape Plan sewers and/or gas lines. PL Approval and c. Five feet from top of wing of driveways, mailboxes, Installation water, telephone and/or electrical mains d. Fifteen feet from stop signs, street or curb sign returns. e. Fifteen feet from either side of street lights. 24. Landscaping. Applicant/Developer shall construct all Landscape Plan landscaping within the site and along the project frontage. PL, PW Approval and Installation 25. Backflow Prevention Devices. The Landscape Plan shall show the location of all backflow prevention devices. Landscape Plan The location and screening of the backflow prevention PL, PW, F Approval and devices shall be reviewed and approved by Community Installation Development Department Staff. 26. Root Barriers and Tree Staking. The Landscape Plan Landscape Plan shall provide details showing root barriers and tree PL, PW Approval and staking will be installed which meet current City Installation specifications, DOWNTOWN DUBLIN SPECIFIC PLAN MITIGATION MEASURES 27. Mitigation Monitoring Program. Applicant/ Developer shall comply with the Downtown Dublin Specific Plan (DDSP) Final Environmental Impact Report (EIR) certified by City Council Resolution No. 08-11, including all Building Permit mitigation measures, action programs, and PL and/or Grading implementation measures contained therein. The EIR is Permit Issuance on file with the Community Development Department. Project specific mitigation measures are provided in Conditions of Approval 29-31. 28. Mitigation Measure 3.3-1. Project applicants shall consult with a registered geotechnical engineer to prepare a design level geotechnical report that addresses the affects [sic] of seismic ground shaking and includes a quantitative evaluation of liquefaction and liquefaction. induced lateral spreading for future development in the PL Building Permit DDSP project area. The design level geotechnical report Issuance shall specify foundations and structural elements that are designed to resist forces and potential ground settlement for liquefaction and lateral spreading. This report shall be submitted in conjunction with a building permit application. 29. Mitigation Measure 3.4-2. Future development or substantial redevelopment within the project area shall prepare a Phase I Environmental Site Assessment to determine whether or not a particular development site contains any hazardous materials as a result of historic Building Permit contamination within the project area subject to review PL Issuance and approval by the City of Dublin. In the event that the Phase I recommends subsequent testing, the potential health risks shall be evaluated and a work plan prepared to remediate the soil and/or groundwater in accordance with all applicable federal, state, and local regulations. This assessment shall be submitted to the City in conjunction with the building and grading/site work permit and shall be found acceptable by the City prior to ground disturbance. 30. Mitigation Measure 3.5-1a. Prior to issuance of grading permit, the project proponent shall file a Notice of Intent as required by Regional Water Quality Control Board regarding storm water discharges associated with construction activities. Upon completion of construction activities, a Notice of Termination shall be filed. Mitigation Measure 3.5-1 b. Prior to issuance of any building or grading permits, a Storm Water Pollution Prevention Plan (SWPPP) shall be prepared by the project contractors and submitted to the Regional Water Quality Control Board for review and comment and to the City of Dublin in conjunction with the Site Work Building/Grading/Site work permit and shall be found to PL/PW (Grading) be acceptable by the City prior to ground disturbance. The Permit SWPPP shall be prepared to Regional Water Quality Control Board standards and Alameda Countywide Clean Water Program requirements, and shall identify erosion minimization and control provisions, pollution detection provisions, and pollution elimination/ minimization provisions appropriate to the development project and its site for construction and post -construction activities. The SWPPP shall include best available technology, engineering, and design solutions such as the use of silt screens, hay bales, modern trash screens, energy dissipaters, and/or absorbent devices. Stormwater runoff water quality monitoring procedures shall be clearly detailed in the SWPPP. 31. Mitigation Measure 3.7-1a. Project applicants within the project area shall prepare a construction noise management plan that identifies measures to be taken to minimize construction noise on surrounding sensitive receptors (e.g.,_ residential uses and schools) and includes specific noise management measures to be included into project plans and specifications subject to review and approval by the City. These measures shall include, but are not be limited to the following: • Construction activities, including the maintenance and PL/PW Building Permit warming of equipment, shall be limited to Monday Issuance through Friday, and non -City holidays, between the hours of 7:30 AM and 5:30 PM except as otherwise approved by the City Engineer. • All construction equipment shall be equipped with mufflers and sound control devices (e.g., intake silencers and noise shrouds) no less effective than those provided on the original equipment and no equipment shall have an un-muffled exhaust. • The City shall require that the contractor maintain and tune-up all construction equipment to minimize noise emissions. • Stationary equipment shall be placed so as to maintain the greatest possible distance to the sensitive receptors. • All equipment servicing shall be performed so as to maintain the greatest possible distance to the sensitive receptors. • The construction contractor shall provide an on -site name and telephone number of a contact person. In the event that construction noise is intrusive to an educational process, the construction liaison will revise the construction schedule to preserve the learning environment. • Select demolition methods to minimize vibration, where possible (e.g., sawing masonry into sections rather than demolishing it by pavement breakers). Mitigation Measure 3.7-1 b. Should the proposed project require off -site import/export of fill material during construction, trucks shall utilize a route that is least disruptive to sensitive receptors, preferably major roadways (Interstate 580, Interstate 680, San Ramon Road, Dublin Boulevard, and Amador Valley Boulevard). Construction trucks should, to the extent practical, avoid the weekday and Saturday a.m. and p.m. peak hours 7:00 a.m. to 9:00 a.m. and 4:00 p.m. to 6:00 p.m.). BUILDING & SAFETY DIVISION 32. Building Codes and Ordinances. All project Through construction shall conform to all building codes and B Completion ordinances in effect at the time of building permit. 33. Construction Drawings. Construction plans shall be fully dimensioned (including building elevations) accurately drawn (depicting all existing and proposed conditions on site) and prepared and signed by a B Issuance of California licensed architect or engineer. All structural Building Permits calculations shall be prepared and signed by a California licensed architect or engineer. The site plan, landscape tans and details shall be consistent with each other. 34. Building Permits. To apply for building permits, Applicant/Developer shall submit electronic drawings and specifications for plan check. An annotated copy of these Conditions of Approval shall be included in the submittal. The notations shall clearly indicate how all Conditions of B Issuance of Approval will or have been complied with. Construction Building Permits plans will not be accepted without the annotated resolutions. Applicant/Developer will be responsible for obtaining the approvals of all non -City agencies prior to the issuance of building permits. 35. As -Built Drawings. All revisions made to the building plans during the project shall be incorporated into an "As B Occupancy Built" electronic file and submitted prior to the issuance of the final occupancy. 36. Addressing. B a. Provide plan for display of addresses. The Building Issuance of Official shall approve addressing plan prior to Building Permits issuance of the first building permit. (Prior to Issuance permitting) of b. Exterior address numbers shall be backlight and be Building Permits and Through posted in such a way that they may be seen from the Completion street. c. Provide address application and floor plans for Addresses to be addressing of apartment units. released prior to permitting. 37. Engineer Observation. The Engineer of Record shall be retained to provide observation services for all components of the lateral and vertical design of the Scheduling the building, including nailing, hold-downs, straps, shear, roof B Final Frame diaphragm and structural frame of building. A written Inspection report shall be submitted to the City Inspector prior to scheduling the final frame inspection. 38. Foundation, Geotechnical Engineer for the soils report shall review and approve the foundation design. A letter B Issuance of shall be submitted to the Building and Safety Division on Building Permits the approval. 39. Phased Occupancy Plan. If occupancy is requested to occur in phases, then all physical improvements within each phase shall be required to be completed prior to occupancy of any buildings within that phase except for items specifically excluded in an approved Phased Occupancy Plan, or minor handwork items, approved by the Community Development Director. The Phased Occupancy Plan shall be submitted to the Directors of Community Development and Public Works for review and approval a minimum of 90 days prior to the Occupancy of request for occupancy of any building covered by said B any Affected Phased Occupancy Plan. Building No individual building shall be occupied until the adjoining area is finished, safe, accessible, and provided with all reasonable expected services and amenities, and separated from remaining additional construction activity. Subject to approval of the Community Development Director, the completion of landscaping may be deferred due to inclement weather with the posting of a bond for the value of the deferred landscaping and associated improvements, 40. Accessory Structures. Building permits are required for all trash enclosures and associated amenities/structures B Through and are required to meet the accessibility and building Completion codes. 41. Retaining Walls. All retaining walls over 30 inches in height and adjacent to a walkway shall be provided with guardrails. All retaining walls with a surcharge or B Through retaining walls over 36 inches in height shall obtain Completion permits and inspections from the Building and Safety Division. 42. Air Conditioning Units. Air conditioning units and Occupancy of ventilation ducts shall be screened from public view with B Building/Unit materials compatible to the main building. 43. Temporary Fencing. Temporary construction fencing Through shall be installed along the perimeter of all work under B Completion construction. 44. Cool Roofs — CA Energy Code. Flat roof areas shall have their roofing material coated with light colored gravel B Through or painted with light colored or reflective material Completion designed for cool roofs. 45. Parking. The required number of parking stalls, and the design and location of the accessible parking stalls shall be as required by the CA Building Code. B Through Completion The design and number of clean air/EV ready stalls shall be as required by the CA Green Building Standards Code, 46. Emergency Access — Vehicle Gates. Private roads and parking areas or structures controlled by unmanned mechanical parking type gates shall be provided with police emergency access by Opticom LED Emitter and the gate access code for distribution to emergency responders. The control box for the code device shall be mounted on a control pedestal consisting of a metal post/pipe, which shall be installed at a height of 36 to 42 inches to the center of the keypad and a minimum of 15 feet (4.6m) from the entry/exit gate. It shall be located on the driver's side of the road or driveway and accessible in such a manner as to not require a person to exit their vehicle to Occupancy and reach it, nor to drive on the wrong side of the road or B Through the Life driveway, nor to require any back-up movements in order of the Project to enter/exit the gate. The gate access devices shall be designed and installed to allow for entry through the vehicular gate under three different and unique situations: a. The system is in services and under normal operations. b. A power failure has occurred and battery powered convenience open systems are employed. c. A power failure has occurred and the convenience open system has failed (dead or low charged battery). 47. Standards for Construction Site Fire Safety. Applicant/Developer shall provide a Fire Protection Plan B Issuance of (FPP) conforming to the City's policy on providing Building Permits minimum safeguards for new building construction. 48. Copies of Approved Plans. Within 30 days of issuance, 30 days After Applicant/Developer shall provide City with one reduced B Permit and (1/2 size) copy of the City of Dublin stamped approved Each Revision Ian. Issuance 49. CASp Reports. Applicant/Developer shall obtain the B Issuance of services of a Certified Access Specialist for the review of Building Permits the construction drawings and inspections for the building and Occupancy interior and site exterior. A written report shall be submitted to the City prior to approval of the permit application. Additionally, a written report shall be submitted to the City Building Inspector prior to scheduling the final inspection, 50. Demolition Permit Required. A demolition permit to remove the existing building is required. Prior to approval Issuance of of the demolition permit, Applicant/Developer shall submit B Demolition documentation showing compliance of the City 's Permit Management of PCBs During Building Demolition Projects Ordinance. 51. Maintenance of Yards for on Over -Sized Building. The B Issuance of parcel includes a no build agreement, recorded March 25, Building Permits 1981, Recorder's Serial Number 1981045676. Prior to approval of the building permit for the new building, the existing Over -Sized Building Agreement shall be vacated. Proof of recording shall be submitted to the City of Dublin for review and acceptance, 52. Funding Source. Plans submitted for building permits Issuance shall list the funding source for the project (private vs. B of Building Permits public), FIRE DEPARTMENT 53. New Fire Sprinkler System and Monitoring Requirements. In accordance with the Dublin Fire Code, fire sprinklers shall be installed in the buildings. The system shall be in accordance with the NFPA 13, the CA Fire Code and CA Building Code. Plans and specifications showing detailed mechanical design, cut sheets, listing sheets and hydraulic calculations shall be submitted to the Fire Department for approval and permit prior to installation. This may be a deferred submittal. a. Sprinkler Plans. (Deferred Submittal Item). Detailed mechanical drawings of all sprinkler modifications, including cut sheets, listing sheets and calculations, shall be submitted to the Fire Department for approval and permit prior to installation. b. All sprinkler system components shall remain in compliance with the applicable NFPA 13 standards, the F Building Permit CA Fire Code and CA Building Code. Issuance c. Underground Plans. (Deferred Submittal Item). Detailed shop drawings for the fire water supply system, including cut sheets, listing sheets and calculations, shall be submitted to the Fire Department for approval and permit prior to installation. All underground and fire water supply system components shall be in compliance with the applicable NFPA 13, 241 20 and 22 standards, the CA Fire Code and CA Building Code. The system shall be hydrostatically tested and inspected prior to being covered. Prior to the system being connected to any fire protection system, a system flush shall be witnessed by the Fire Department. d. Central Station Monitoring. Automatic fire extinguishing systems installed within buildings shall have all control valves and flow devices electrical) supervised and maintained by an approved central alarm station. Zoning and annunciation of central station alarm signals shall be submitted to the Fire Department for approval. e. Fire protection equipment shall be identified with approved signs constructed of durable materials, permanently installed and readily visible. 54. Fire Access During Construction. a. Fire Access. Access roads, turnaround, pullouts, and fire operation areas are fire lanes shall be maintained clear and free of obstructions, including the parking of vehicles. b. Entrances. Entrances to job sites shall not be blocked, including after hours, other than by approved gates/barriers that provide for emergency access. c. Site Utilities. Site utilities that would require the access road to be dug up or made impassible shall be installed prior to construction commencing. During d. Entrance flare, angle of departure, width, turning radii, F Construction grades, turnaround, vertical clearances, road surface, bridges/crossings, gates/key-switch, within a 150400t distance to Fire Lane shall be maintained. e. Personnel Access. Route width, slope, surface and obstructions must be considered for the approved route to furthermost portion of the exterior wall. f. All -Weather Access. Fire access is required to be all- weather access. The location of the all-weather access and a description of the construction shall be shown on plans. Access roads must be designed to support the imposed loads of fire apparatus. 55. Fire Alarm (Detection) System. A Fire Alarm -Detection System shall be installed throughout the buildings so as to provide full property protection, including combustible concealed spaces, as required by NFPA 72. The system shall be installed in accordance with NFPA 72, CA Fire, Building, Electrical, and Mechanical Codes. If the system is intended to serve as an evacuation system, compliance with the horn/strobe requirements for the entire building must also be met. All automatic fire extinguishing systems shall be interconnected to the fire alarm system so as to activate an alarm if activated and to monitor control valves. Delayed egress locks shall meet F Occupancy requirements of the CA Fire Code. a. Fire Alarm Plans. (Deferred Submittal Item). Detailed drawings of the fire alarm system, including floor plan showing all rooms, device locations, ceiling height and construction, cut sheets, listing sheets and battery and voltage drop calculations, shall be submitted to the Fire Department for review and permit prior to the installation. Where employee work areas have audible alarm coverage, circuits shall be initially designed with a minimum 20% spare capacity for adding appliances to accommodate hearing impaired employees. b. Central Station Monitored Account. Automatic fire alarm systems shall be monitored by an approved central alarm station. Zoning and annunciation of central station alarm signals shall be approved by the Fire Department. c. Qualified Personnel. The system shall be installed, inspected, tested, and maintained in accordance with the provisions of NFPA 72. Only qualified and experienced persons shall perform this work. Examples of qualified individuals are those who have been factory trained and certified or are NICET Fire Alarm Certified. d. Inspection and Testing Documentation. Performance testing of all initiating and notification devices in the presence of the Fire Inspector shall occur prior to final of the system. Upon this inspection, proof that the specific account is UL Certificated must be provided to the Fire Inspector. 56. Fire Extinguishers. Extinguishers shall be visible and unobstructed. Signage shall be provided to indicate fire extinguisher locations. The number and location of extinguishers shall be shown on the plans. Additional fire extinguishers maybe required by the Fire Inspector. Fire extinguisher shall meet a minimum classification of F Occupancy 2A 1013C. Extinguishers weighing 40 pounds or less shall be mounted no higher than five feet above the floor measured to the top of the extinguisher. Extinguishers shall be inspected monthly and serviced by a licensed concern annually, 57. Fire Department Building Key Box. A Fire Department key box shall be installed at the main entrance to the building. Note this location on the plans. The key box should be installed approximately 5 1/2 feet above grade. The box shall be sized to hold the master key to the facility as well as keys for rooms not accessible by the master F Occupancy key. Specialty keys, such as the fire alarm control box key and elevator control keys shall also be installed in the box. The key box door and necessary keys are to be provided to the Fire Inspector upon the final inspection. The inspector will then lock the keys into the box. 58. Means of Egress. Exit signs shall be visible and illuminated with emergency lighting when building is F Occupancy occupied. 59. Main Entrance Hardware Exception. It is recommended that all doors be provided with exit hardware that allows exiting from the egress side even when the door is in the Occupancy locked condition. However, an exception for A-3, B, F, M, S occupancies and all churches does allow key -locking hardware (no thumb -turns) on the main exit when the F main exit consists of a single door or pair of doors. When unlocked the single door or both leaves of a pair of doors must be free to swing without operation of any latching device. A readily visible, durable sign on or just above the door stating "This door to remain unlocked whenever the building is occupied" shall be provided. The sign shall be in letters not less than one inch high on a contrasting background. This use of this exception may be revoked for cause. 60. Gate Key Box/Switch Manual Gates. Each manually operated gate that serves as a means of fire access shall have installed a Knox Key Box accessible from the entrance side of the gate. Where the locking method of the gate is by a chain a Knox padlock shall be installed on the chain. The key box door and necessary keys are to F Occupancy be provided to the fire inspector upon the final inspection. The inspector will then lock the keys into the box. Automatic Gates. All electrically controlled gates shall be provided with an emergency gate over -ride key switch for fire department access. 61. Maximum Occupant Load. Posting of room capacity is required for any occupant load of 50 or more persons. F Occupancy Submittal of a seating plan on 8.5-inch x 11-inch paper is required prior to final occupancy. 62. Interior Finish. Wall and ceiling interior finish material shall meet the requirements of Chapter 8 of the California Fire Code. Interior finishes will be field verified upon final inspection. If the product is not field marked and the F Occupancy marking visible for inspection, maintain the products cut - sheets and packaging that show proof of the products flammability and flame -spread ratings. Decorative materials shall be fire retardant. 63. General Inspection. Upon inspection of the work for which this submittal was provided, a general inspection of F Occupancy the business and site will be conducted. 64. Addressing. Addressing shall be illuminated or in an illuminated area. The address characters shall be contrasting to their background. If address is placed on glass, the numbers shall be on the exterior of the glass and a contrasting background placed behind the numbers. Building Address. Each building shall be provided with all addresses or the assigned address range so as to be clearly visible from either direction of travel on the street the address references. The address characters shall not be less than five inches in height by one -inch stroke. F Occupancy Larger sizes may be necessary depending on the setbacks and visibility. Multi -Tenants. Where a building has multiple tenants, address shall also be provided near the main entrance door of each tenant space. The address shall be high enough on the building to be clearly visible from the driveway, street or parking area it faces even when vehicles are parked in front of the tenant space. The address shall not be less than five inches in height with a 1/2 inch stroke. Rear Doors. The address shall also be provided on any rear doors to the tenant space with minimum five -inch high characters. Entrance Posting. Where the addressing on the building will not be clearly visible from either direction of travel along the access road the address references. Address posting shall also be provided at the entrance to the property. The address size shall be five inches high and should be on a reflective background. 65. Fire Safety During Construction and Demolition. a. Clearance to combustibles from temporary heating devices shall be maintained. Devices shall be fixed in place and protected from damage, dislodgement or overturning in accordance with the manufacturer's instructions. b. Smoking shall be prohibited except in approved areas. On -going Signs shall be posted "NO SMOKING" in a F During conspicuous location in each structure or location in Construction which smoking is prohibited. and Demolition c. Combustible debris, rubbish and waste material shall be removed from buildings at the end of each shift of work. d. Flammable and combustible liquid storage areas shall be maintained clear of combustible vegetation and waste materials. DUBLIN SAN RAMON SERVICES DISTRICT DSRSD 66. The regulations that apply to development projects are codified in: the Dublin San Ramon Services District Code; the DSRSD "Standard Procedures, Specifications and Drawings for Design and Installation of Water and Issuance of Wastewater Facilities" as amended from time to time; all DSRSD Building Permits applicable DSRSD Master Plans and all DSRSD policies. Prior to issuance of any building permit, complete improvement plans shall be submitted to DSRSD that conform to the pertinent documents. 67. Planning and review fees, inspection fees, and fees associated with a wastewater discharge permit shall be paid to DSRSD in accordance with the rates and schedules and at time of payment as established in the Issuance of DSRSD Code. Planning and review fees are due after the DSRSD Building Permit 1st submittal of plans. Construction Permit and Inspection or Improvement Plans Fees are due prior to the issuance of a Construction Permit. Capacity Reserve Fees are due before the water meter can be set or the connection to the sewers stem. 68. All improvement plans for DSRSD facilities shall be signed by the District Engineer. Each drawing of improvement plans for DSRSD facilities shall contain a Issuance any signature block for the District Engineer indicating building permit approval of the sanitary sewer and/or water facilities by the City; or shown. Prior to approval by the District Engineer, the DSRSD any Building Permit applicant shall pay all required DSRSD fees, and provide or Construction an engineer's estimate of construction costs for the sewer Permit by the and water systems, a faithful performance bond, and a DSRSD comprehensive general liability insurance policy in the amounts and forms that are acceptable to DSRSD. The applicant shall allow at least 15 working days for final improvement drawing review by DSRSD before signature by the District En ineer. 69. All easement dedications for DSRSD facilities shall be by separate instrument irrevocably offered to DSRSD or by offer of dedication on the Final Map. Prior to approval by DSRSD Approval of the City for Recordation, the Final Map shall be submitted Final Map to and approved by DSRSD for easement locations, widths, and restrictions. 70. Where the narrow width of a proposed alley or cul-de-sac is so restrictive that the standard separation requirements for water mains and sewer mains cannot be maintained, the water and sewer mains shall be installed within main Issuance of thoroughfares, outside of alleyways or cui-de-sacs. Water DSRSD Improvement and sewer mains may not be installed within courtyards. Plans Water meters shall be installed around the outer perimeter of buildings. Installation of water lines from the meter to each unit shall be documented and submitted to the District. 712 All mains shall be sized to provide sufficient capacity to accommodate future flow demands in addition to each Issuance of development project's demand. Layout and sizing of DSRSD Improvement mains shall be in conformance with DSRSD utility master Plans planning. 72. The locations and widths of all proposed easement Issuance of dedications for water and sewer lines shall be submitted DSRSD Improvement to and approved by DSRSD. Plans 73. Water and sewer mains shall be located in public streets rather than in off-street locations to the fullest extent possible. If unavoidable, then sewer or water easements Issuance of must be established over the alignment of each sewer or DSRSD Improvement water main in an off-street or private street location to Plans provide access for future maintenance and/or replacement. 74. Domestic and fire protection waterline systems for Tracts or Commercial Developments shall be designed to be Issuance of looped or interconnected to avoid dead end sections in DSRSD Improvement accordance with requirements of the DSRSD Standard Plans Specifications and sound engineering ractice, 75. Sewers shall be designed to operate by gravity flow to DSRSD's existing sanitary sewer system. Pumping of sewage is discouraged and may only be allowed under extreme circumstances following a case by case review with DSRSD staff. Any pumping station will require Issuance specific review and approval by DSRSD of preliminary DSRSD Improvement design reports, design criteria, and final plans and Plans specifications. The DSRSD reserves the right to require payment of present worth 30-year maintenance costs as well as other conditions within a separate agreement with the applicant for any project that requires a pumping station. 76. This project includes mixed use and/or multi -family residential units and is subject to the requirement of SIB 7 Issuance of (2016, Walk) as a condition of water service. Each Improvement individual residential unit shall be metered or submetered Plans to measure water used by each unit. Water meters for each unit shall be shown on improvement plans. Exemptions may be made only for exempted uses listed in the legislation. Phase A is exempt per CA Health & Safety Code § 17922.14(c)(2)(B). If submetering is proposed in lieu or individual meters, plans reflecting the submeters and associated residential unit shall be submitted. DSRSD may not approve applications and issue construction permits without this submittal. 77. This project will be analyzed by DSRSD to determine if it represents additional water and/or sewer capacity demands on the District. Applicant will be required to pay all incremental capacity reserve fees for water and sewer services as required by the project demands. All capacity DSRSD Issuance of reserve fees must be paid prior to installation of a water Building Permit meter for water. If a water meter is not required, the capacity reserve fee shall be paid prior to issuance of a building permit. The District may not approve the building permit until capacity reserve fees are paid. 78. No sewer line or waterline construction shall be permitted unless the proper utility construction permit has been Any issued by DSRSD. A construction permit will only be DSRSD construction issued after all of the items in the condition immediately permit above have been satisfied. 79. Above ground backflow prevention devices/double detector check valves shall be installed on fire protection Issuance of systems connected to the DSRSD water main. The DSRSD Improvement applicant shall collaborate with the Fire Department and Plans with DSRSD to size and configure its fires stem. 80. Any proposed irrigation for this project shall be designed for and connected to potable water. Unless Issuance of explicitly stated otherwise by DSRSD, recycled DSRSD Improvement water irrigation is unavailable for use for this project Plans per DERWA recycled water moratorium Resolution No. 19.3 dated 3/24/2019, 81. If trash enclosures are required to drain to the sanitary sewer system, grease interceptors shall be installed Issuance of within the trash enclosure area. The trash enclosure shall DSRSD Improvement be roofed and graded to minimize rain water or Plans stormwater from entering the trash enclosure. PUBLIC WORKS = GENERAL' CONDITIONS 82. Conditions of Approval. Applicant/Developer shall comply with the City of Dublin Public Works Standard Conditions of Approval contained below ("Standard PW On -going Condition") unless specifically modified by Project Specific Conditions of Approval below. 83. Compliance. Applicant/Developer shall comply with the PW On -going Subdivision Map Act, the City of Dublin Subdivision and Zoning Ordinances, City of Dublin Title 7 Public Works Ordinance, which includes the Grading Ordinance, the City of Dublin Public Works Standards and Policies, the most current requirements of the State Code Title 24 and the Americans with Disabilities Act with regard to accessibility, and all building and fire codes and ordinances in effect at the time of building permit. All public improvements constructed by Applicant/Developer and to be dedicated to the City are hereby identified as "public works" under Labor Code section 1771. Accordingly, Applicant/Developer, in constructing such improvements, shall comply with the Prevailing Wage Law Labor Code. Sects. 1720 and following). 84. Clarifications and Changes to the Conditions. In the PW On -going event that there needs to be clarification to these Conditions of Approval, the City Engineer has the authority to clarify the intent of these Conditions of Approval to the Applicant/Developer without going to a public hearing. The City Engineer also has the authority to make minor modifications to these conditions without going to a public hearing in order for the Applicant/Developer to fulfill needed improvements or mitigations resulting from impacts of this project. 85. Hold Harmless/Indemnification. Applicant/Developer PW On -going shall defend, indemnify, and hold harmless the City of Dublin and its agents, officers, and employees from any claim, action, or proceeding against the City of Dublin or its advisory agency, appeal board, Planning Commission, City Council, Community Development Director, Zoning Administrator, or any other department, committee, or agency of the City to the extent such actions are brought within the time period required by Government Code Section 66499.37 or other applicable law: provided, however, that the Applicant/Developer's duty to so defend, indemnify, and hold harmless shall be submitted to the City's promptly notifying or proceeding and the City's full cooperation in the defense of such actions or proceedings. 86. Fees. Applicant/Developer shall pay all applicable fees in effect at the time of building permit issuance, including, but not limited to: Planning fees; Building fees; Dublin Various Grading Permit San Ramon Services District fees; Public Facilities fees; Depts or Building City of Dublin Fire fees; Noise Mitigation fees; permit Issuance Inclusionary House In -Lieu fees; Alameda County Flood and Water Conservation fees. 87. Zone 7 Impervious Surface Fees. Applicant/Developer shall complete a "Zone 7 Impervious Surface Fee Application" and submit an accompanying exhibit for PW Grading Permit or Building review by the Public Works Department. Fees generated Permit Issuance by this application will be due at issuance of building permit. PUBLIC WORKS — AGREEMENTS'' 88. Stormwater Management Maintenance Agreement. Applicant/Developer or Property Owner shall enter into an Agreement with the City of Dublin that guarantees the property owner's perpetual maintenance obligation for all stormwater management measures installed as part of the project, including those on -site and within the public Building Permit right-of-way. In addition to stormwater management PW/ESD measures, drainage v-ditches, mitigation areas, and Issuance existing wetlands shall be included for reference, as applicable. Said agreement is required pursuant to Provision C.3 of the Municipal Regional Stormwater NPDES Permit, Order No. R2-2009-0074. Said permit requires the City to provide verification and assurance that all treatment devices will be properly operated and maintained. The agreement shall be recorded against the property and shall run with the land. 89. Improvement Agreement. Applicant/Developer shall Building Permit enter into an Improvement Agreement with the City for all Issuance public improvements including any required off -site storm PW drainage or roadway improvements that are needed to serve the development, as determined by the City Engineer, PUBLIC WORKS - PERMITS AND BONDS 90. Encroachment Permit. Applicant/Developer shall obtain an Encroachment Permit from the Public Works Department for all construction activity within the public PW Permit Issuance right-of-way. At the discretion of the City Engineer, an encroachment permit for work specifically included in an Improvement Agreement may not be required. 91. Grading Permit. Applicant/Developer shall obtain a Grading Permit from the Public Works Department for all PW Permit Issuance grading. 92. Security. Applicant/Developer shall provide faithful performance security to guarantee the improvements, as well as payment security, as determined by the City PW Permit Issuance Engineer. (Note: The performance security shall remain in effect until one year after final inspection.) 93. Permits from Other Agencies. Applicant/Developer shall obtain all permits and/or approvals required by other agencies including, but not limited to: • Army Corps of Engineers • US Fish and Wildlife • Regional Water Quality Control Board • Federal Emergency Management Agency • California Department of Fish and Wildlife PW Permit Issuance • California Dept. of Transportation (Caltrans) • Bay Area Rapid Transit (BART) • Livermore-Amador Valley Transit Authority (LAVTA) • Tri4alley-San Joaquin Valley Regional Rail Authority • Dublin San Ramon Services District (DSRSD) • Alameda County Flood Control and Water Conservation District Zone 7 Zone 7 PUBLIC WORKS ='SUBMITTALS 94. Improvement Plan Submittal Requirements. All submittal of plans shall comply with the requirements of the "City of Dublin Public Works Department Improvement Plan Submittal Requirements," the "City of Dublin Improvement Plan Review Check List," and current Public Works and industry standards. A complete PW Grading Permit submittal of improvement plans shall include all civil Issuance improvements, joint trench, street lighting and on -site safety lighting, landscape plans, and all associated documents as required. Applicant/Developer shall not piecemeal the submittal by submitting various components separately, 95. Improvement Plan Requirements from Other Agencies. Applicant/Developer will be responsible for submittals and reviews to obtain the approvals of all PW Grading Permit participating non -City agencies, including but not limited Issuance to: the Alameda County Fire Department and the Dublin San Ramon Services District. 96. Composite Exhibit. Construction plan set shall include a Composite Exhibit showing all site improvements, Grading Permit utilities, landscaping improvements and trees, etc. to be PW Issuance constructed to ensure that there are no conflicts among the proposed and existing improvements. 97. Geotechnical Report. Applicant/Developer shall submit a Design Level Geotechnical Report, which includes street pavement sections, grading, construction within liquefaction zone as well as subsurface construction and PW Grading Permit water table elevation. Report shall also address potential Issuance foundation surcharges on adjacent utilities, and additional information and/or clarifications as determined by the City Engineer. 98. Ownership and Maintenance of Improvements. Applicant/Developer shall submit an Ownership and Maintenance Exhibit for review and approval by Planning PL, PW Grading Permit Division and Public Works Department. Exhibit. Terms Issuance of maintenance are subject to review and approval by the City Engineer. 99. Building Pads, Slopes and Walls. Applicant/Developer shall provide the Public Works Department with a letter from a registered civil engineer or surveyor stating that Acceptance of the building pad has been graded to within 0.1 feet of the PW Improvements grades shown on the approved Grading Plans, and that the top and toe of banks and retaining walls are at the locations shown on the approved Grading Plans. 100. Approved Plan Files. Applicant/Developer shall provide the Public Works Department a PDF format file of PW Grading Permit approved site plans, including grading, improvement, Issuance landscaping and irrigation, joint trench and lighting. 101. Master Files. Applicant/Developer shall provide the Public Works Department a digital vectorized file of the "master" files for the project, in a format acceptable to the City Engineer. Digital raster copies are not acceptable. The digital vectorized files shall be in AutoCAD 14 or PW Acceptance of higher drawing format. All objects and entities in layers Improvements shall be colored by layer and named in English. All submitted drawings shall use the Global Coordinate System of USA, California, NAD 83 California State Plane, Zone III, and U.S. foot. 102. Environmental Services Files. Applicant/Developer shall provide to the Public Works Department GIS shape files, provided in a format acceptable to the City, all MRP PW/ESD Acceptance of Provision C.3 stormwater features, trash capture devices, Improvements mitigation measures, wetlands, v-ditches and public waste containers. 103. SB 1383 Compliance Reporting. To comply with SB 1383, Applicant shall provide to the Public Works PW Acceptance of Department records indicating where SB 1383 compliant Improvements mulch or compost was applied in the project, the source and type of product, quantity of each product, and invoices demonstrating procurement. Specifically, compost must be produced at a permitted composting facility; digestate, biosolids, manure and mulch do not qualify as compost. Eligible mulch must be derived from organic materials and be produced at a permitted transfer station, landfill, or composting facility. Examples of allowed compost include arbor mulch and composted mulch. PUBLIC WORKS = EASEMENTS AND ACCESS RIGHTS 104. Emergency Vehicle Access Easements. Applicant/Developer shall dedicate Emergency Vehicle Acceptance of Access Easements (EVAE) over the clear pavement PW Improvements width of all drive aisles as required by the Alameda County Fire Department and City Engineer, 105. Abandonment of Easements. Applicant/Developer shall obtain abandonment from all applicable public agencies of existing easements and rights -of -way within the project site that will no longer be used. Prior to PW Acceptance of completion of abandonment, the improvement plans may Improvements be approved if the Applicant/Developer can demonstrate to the satisfaction of the City Engineer that the abandonment process has been initiated. 106. Acquisition of Easements. Applicant/Developer shall be responsible for obtaining all on -site and off -site easements, and/or obtain rights -of -entry from the adjacent property owners for any improvements not Acceptance of located on their property. Applicant/Developer shall PW Improvements prepare all required documentation for dedication of all easements on -site and off -site. The easements and/or rights -of -entry shall be in writing and copies furnished to the Public Works Department, 107. Approval by Others. Applicant/Developer will be responsible for submittals and reviews to obtain the PW Acceptance of approvals of all applicable non -City agencies, Improvements PUBLIC WORKS = GRADING 108. Grading Plan. The Grading Plan shall be in conformance with the recommendation of the Geotechnical Report, Site Development Review, and the City design standards and PW Grading Permit ordinances. In case of conflict between the soil Issuance engineer's recommendation and the City ordinances, the City Engineer shall determine which shall apply. 109. Geotechnical Engineer Review and Approval. The Project Geotechnical Engineer shall be retained to review Grading Permit all final grading plans and specifications. The Project PW Issuance/ Geotechnical Engineer shall approve all grading plans Sitework Permit prior to City approval. 110. Grading Off -Haul. The disposal site and haul truck route for any off -haul dirt materials shall be subject to the review and approval by the City Engineer prior to the issuance of Grading Permit a Grading Permit. If the Applicant/Developer does not PW Issuance/ own the parcel on which the proposed disposal site is Sitework Permit located, the Applicant/Developer shall provide the City with a Letter of Consent signed by the current owner, approving the placement of off -haul material on their parcel. A Grading Plan may be required for the placement of the off -haul material. 111. Erosion Control Plan. A detailed Erosion and Sediment Control Plan shall be included with the Grading Plan submittal. The plan shall include detailed design, location, PW Grading Permit and maintenance criteria of all erosion and sedimentation Issuance control measures. The plan shall also address site housekeeping best management practices, 112. Demolition Plan. Applicant/Developer's Civil Engineer shall prepare a demolition plan for the project, which shall be submitted concurrent with the improvement plan package. The demolition plan shall address the following: • Pavement demolition, including streetlights and Grading Permit landscaped median islands PW Issuance • Landscaping and irrigation • Fencing to be removed and fencing to remain • Any items to be saved in place and or protected, such as trees, water meters, sewer cleanouts, drainage inlets or backflow prevention devices. PUBLIC WORKS — STORM DRAINAGE AND OTHER UTILITIES 113. On -site Storm Drain System. Storm drainage for the 10- year storm event shall be collected on -site and conveyed through storm drains to the public storm drain system. Grading Permit Show the size and location of existing and proposed PW Issuance storm drains and catch basins on the site plan. Show the size and location of public storm drain lines and the points of connection for the on -site storm drains stem. 114. Overland Release. Grading and drainage shall be designed so that surplus drainage (above and beyond Grading Permit that of the 10-year storm event) not collected in site catch PW Issuance basins is directed overland so as not to cause flooding of existing or proposed buildings. 115. Storm Drain Easements. Private storm drain easements and maintenance roads shall be provided for all private storm drains or ditches that are located on private property. Applicant/Developer shall be PW Grading Permit responsible for the acquisition of all storm drain Issuance easements from offsite property owners which are required for the connection and maintenance of all offsite storm drainage improvements. 116. Storm Drain Inlet Markers. All public and private storm drain inlets must be marked with storm drain markers that "No Acceptance of read: dumping, drains to creek," and a note shall be PW Improvements shown on the improvement plans. The markers may be purchased from the Public Work Department. 117. Fire Hydrants. Fire hydrant locations shall be approved by the Alameda County Fire Department. A raised Acceptance of reflector blue traffic marker shall be installed in the street PW Improvements opposite each hydrant and shown on the signing and striping Ian. 118. Dry Utilities. Applicant/Developer shall construct gas, Certificate of electric, telephone, cable TV, and communication PW Occupancy or improvements within the fronting streets and as Acceptance of necessary to serve the project and the future adjacent Improvements parcels as approved by the City Engineer and the various Public Utility agencies. 119. Dry Utility Locations. All electric, telephone, cable TV, and communications utilities, shall be placed Certificate of underground in accordance with the City policies and PW Occupancy or ordinances. All utilities shall be located and provided Acceptance of within public utility easements or public services Improvements easements and sized to meet utility company standards. 120. Utility Vaults and Boxes. All utility vaults, boxes, and structures, unless specifically approved otherwise by the City Engineer, shall be underground and placed in landscaped areas and screened from public view. Certificate of Occupancy or Landscape drawings shall be submitted to the City PW Acceptance of showing the location of all utility vaults, boxes, and Improvements structures and adjacent landscape features and plantings. The Joint Trench Plans shall be submitted along with the grading and/or improvement plans, PUBLIC WORKS - STREET IMPROVEMENTS 121. Public Improvements. The public improvements shall be constructed generally as shown on plans submitted for Site Development Review. However, the approval of the Grading Permit Site Development Review is not an approval of the PW or Encroachment specific design of the drainage, traffic circulation, parking, Permit Issuance stormwater treatment, sidewalks and street improvements. 122. Public Improvement Conformance. All public Grading Permit improvements shall conform to the City of Dublin PW or Standard Plans, current practices, and design Encroachment re uirements and as approved by the City Engineer, Permit Issuance 123. Public Street Slopes. Public streets shall be a minimum Grading Permit 1 % slope with minimum gutter flow of 0.7% around bulb PW or outs. Encroachment Permit Issuance 124. Pavement Structural Sections. Asphalt concrete pavement sections within the public right-of-way shall be designed using the Caltrans method for flexible pavement Grading Permit design (including the asphalt factor of safety), an PW or Encroachment assumed R-Value of 5. Final pavement sections shall be Permit Issuance based on the actual R-Value obtained from pavement subgrade. 125. Decorative Pavement. Any decorative pavers/paving installed within City right-of-way shall be done to the satisfaction of the City Engineer. Where decorative paving is installed at signalized intersections, pre -formed traffic signal loops shall be put under the decorative pavement. Decorative pavements shall not interfere with Grading Permit the placement of traffic control devices, including PW or Encroachment pavement markings. All turn lane stripes, stop bars and Permit Issuance crosswalks shall be delineated with concrete bands or colored pavers to the satisfaction of the City Engineer. Maintenance costs of the decorative paving shall be the responsibility of the Applicant/Developer or future property owner. 126. Curb, Gutter and Sidewalk. Applicant/Developer shall Grading Permit remove and replace damaged, hazardous, or PW nonstandard curb, gutter and sidewalk along the project or frontage. Contact the Public Works Department to mark Encroachment the existing curb, gutter and sidewalk that will need to be Permit Issuance removed and replaced. 127. Curb Ramps. City standard curb ramps are required at all intersections. All curb ramps shall include truncated domes and meet the most current City and ADA design Grading Permit standards. Curb ramp locations shall be shown on the PW or plans. Please note that all curb returns on public streets Encroachment shall have directional or dual ADA ramps — one for each Permit Issuance crosswalk and oriented to align parallel with the crosswalk. 128. Traffic Signing and Striping. Applicant/Developer shall install all traffic signage, striping, and pavement markings as required by the City Engineer. Signing plans shall show street name and stop signs and any other regulatory Grading Permit signage appropriate for the project. Striping plans shall PW or Encroachment show stop bars, lane lines and channelization as Permit Issuance necessary. Striping plans shall distinguish between existing striping to be removed and new striping to be installed. All striping shall be thermoplastic. 129. Street Lighting. Street light standards and luminaries Grading Permit shall be designed and installed or relocated as PW or determined by the City Engineer. Encroachment Permit Issuance PUBLIC WORKS - CONSTRUCTION 130. Erosion Control Implementation. The Erosion and Sediment Control Plan shall be implemented between October 1st and April 30th unless otherwise allowed in Start of writing by the City Engineer. Applicant/Developer will be PW Construction responsible for maintaining erosion and sediment control and On -going measures for one year following the City's acceptance of the improvements. 131. Archaeological Finds. If archaeological materials are encountered during construction, construction within 100 feet of these materials shall be halted until a professional archaeologist certified by the Society of California PW Start of Construction Archaeology (SCA) or the Society of Professional and On -going Archaeology (SOPA) has had an opportunity to evaluate the significance of the find and suggest appropriate mitigation measures. 132. Construction Activities. Construction activities, including the idling, maintenance, and warming up of equipment, shall be limited to Monday through Friday, and non -City holidays, between the hours of 7:30 a.m. and Start of 6:00 p.m. except as otherwise approved by the City PW Construction Engineer. Extended hours or Saturday work will be and On -going considered by the City Engineer on a case -by -case basis. Note that the construction hours of operation within the public right-of-way are more restrictive. 133. Temporary Fencing. Temporary construction fencing shall be installed along the construction work perimeter to Start of separate the construction area from the public. All PW Construction construction activities shall be confined within the fenced and On -going area. Construction materials and/or equipment shall not be operated/stored outside of the fenced area or within the public right-of-way unless approved in advance by the City Engineer, 134. Construction Noise Management Plan. Applicant/Developer shall prepare a construction noise management plan that identifies measures to minimize construction noise on surrounding developed properties. Start of The plan shall include hours of construction operation, PW Construction use of mufflers on construction equipment, speed limit for and On -going construction traffic, haul routes and identify a noise monitor. Specific noise management measures shall be provided prior to project construction. 135. Traffic Control Plan. Closing of any existing pedestrian pathway and/or sidewalk during construction shall be Start of implemented through a City -approved Traffic Control Plan PW Construction and On -going and shall be done with the goal of minimizing the impact as needed on pedestrian circulation. 136. Construction Traffic Interface Plan. Applicant/Developer shall prepare a plan for construction Start of traffic interface with public traffic on any existing public PW Construction street. Construction traffic and parking may be subject to and On -going specific requirements by the City Engineer. 137. Pest Control. Applicant/Developer shall be responsible for controlling any rodent, mosquito, or other pest problem PW On -going due to construction activities. 138. Dust Control Measures. Applicant/Developer shall be responsible for watering or other dust -palliative measures PW Start of Construction to control dust as conditions warrant or as directed by the and On -going City Engineer. 139. Construction Traffic and Parking. All construction - related parking shall be off-street in an area provided by Start of the Applicant/Developer. Construction traffic and parking PW Construction shall be provided in a manner approved by the City and On -going Engineer, 140. Dust Control/Street Sweeping. Applicant/Developer shall provide adequate dust control measures at all times during the grading and hauling operations. All trucks hauling export and import materials shall be provided with tarp cover at all times. Spillage of haul materials and mud- During Grading tracking on the haul routes shall be prevented at all times. PW and Site Work The Applicant/Developer shall be responsible for sweeping of streets within, surrounding and adjacent to the project if it is determined that the tracking or accumulation of material on the streets is due to its construction activities. PUBLIC WORKS = EROSION CONTROL AND STORMWATER QUALITY 141. Stormwater Treatment. Consistent with Provision C.3 of the Municipal Regional Stormwater NPDES Permit (MRP) Order No. R2-2015-0049, the Applicant/Developer shall PW Grading Permit submit documentation including construction drawings Issuance demonstrating all stormwater treatment measures and h dromodification requirements as applicable are met. 142. Maintenance Access. Applicant/Developer shall design and construct maintenance access to all stormwater Grading Permit management measures and mitigation swales, as PW Issuance appropriate. Maintenance access for equipment and personnel to overflow risers, cleanouts and other structures is required. The final number, location, width, and surfacing of maintenance access points from public or private streets is subject to the approval of the City Engineer and GHAD Engineer, as applicable. 143. NOI and SWPPP. Prior to any clearing or grading, Applicant/Developer shall provide the City evidence that a Notice of Intent (NOI) has been sent to the California State Water Resources Control Board per the PW Start of Any Construction requirements of the NPDES. A copy of the Storm Water Activities Pollution Prevention Plan (SWPPP) shall be provided to the Public Works Department and be kept at the construction site. 144. SWPPP. The Storm Water Pollution Prevention Plan (SWPPP) shall identify the Best Management Practices SWPPP to be (BMPs) appropriate to the project construction activities. Prepared Prior The SWPPP shall include the erosion and sediment to Grading control measures in accordance with the regulations Permit outlined in the most current version of the Association of PW Issuance; Bay Area Governments (ABAG) Erosion and Sediment Implementation Control Handbook or State Construction Best Prior to Start of Management Practices Handbook. Applicant/Developer Construction is responsible for ensuring that all contractors implement and On -going all storm water pollution prevention measures in the as needed SWPPP. 145. Stormwater Management Plan. A final Stormwater Management Plan shall be submitted for review and approval by the City Engineer. Approval is subject to Applicant/Developer providing the necessary plans, Building Permit details, and calculations that demonstrate the plan PW Issuance and complies with the standards issued by the San Francisco Grading Permit Bay Regional Water Quality Control Board and Alameda Issuance Countywide Clean Water Program. Landscape Based Stormwater Management Measures shall be irrigated and meet WELO requirements. 146. Trash Capture. The project must include appropriate full trash capture devices for both private and public improvements. Specific details on the trash capture devices selected are required on the construction plan set demonstrating how MRP Provision C,10 (trash capture) Building Permit requirements are met. A list of approved full trash capture Issuance and devices may be found at the City's website at the following PW Grading Permit link: https://dublin.ca.qov/DocumentCenterNiew/28631/ Issuance Full-Trash-Capture-Manufacturer-and-Maintenance- Providers- updated-August-2021. Please note that lead time for trash capture device delivery can be substantial. The applicant/contractor shall plan accordingly. 147. Phased Construction and Stormwater Management Measures. Required stormwater treatment, Building Permit hydromodification management, and trash capture PW and Grading devices shall be installed concurrent with construction of Permit Issuance the first phase of improvements. Temporary facilities are not permitted, PUBLIC WORKS — ON -SITE IMPROVEMENTS 148. Drive Aisle Width. The parking lot drive aisles shall be PW Grading Permit I a minimum of 24 feet wide to allow for ade uate on -site Issuance vehicle circulation for cars, trucks, trash collection vehicles, and emergency vehicles, as applicable. 149. Vehicle Parking. All on -site vehicle parking spaces shall conform to the following: a. All parking spaces shall be double striped using four. inch white lines set two feet apart in accordance with City Standards and DMC 8.76.070.A.17. b. Twelve -inch -wide concrete step -out curbs shall be constructed at each parking space where one or both sides abut a landscaped area or planter. c. Where wheel stops are shown, individual six-foot Grading Permit long wheel stops shall be provided within each PW parking space in accordance with City Standards. Issuance d. A minimum two -foot radius shall be provided at curb returns and curb intersections where applicable. e. Parking stalls next to walls, fences and obstructions to vehicle door opening shall be a minimum of 14 inches in width per DMC 8.76.070.A.16. f. Landscaped strips adjacent to parking stalls shall be unobstructed in order to allow for a minimum two -foot vehicular overhang at front of vehicles. 150. Onsite Signing and Striping Plan. A Traffic Signing and Grading Permit Striping Plan showing all proposed signing and striping PW or within on -site parking lots and drive aisles, shall be Encroachment submitted for review and approval by the City Engineer, Permit Issuance 151. Photometrics. Applicant/Developer shall provide a complete photometrics plan for both onsite and frontage Grading Permit roadways. Include the complete data on photometrics, PW or Encroachment including the High, Average and Minimum values for Permit Issuance illuminance and uniformity ratio. 152. Project Signs. All proposed project monument signs shall be placed on private property. Signs should be located outside of any easement areas unless specifically Grading Permit approved by the City Engineer. Any signage allowed to PW Issuance be located in an easement is subject to removal and replacement at the expense of the Developer/Property Owner if required by the easement holder. 153. Solid Waste Requirements. The project must comply with all requirements in Dublin Municipal Code Chapter 7.98, including the following requirements: • Compactors are not permitted at this time. Applicant/Developer shall continue to work with the Public Works Department on final Waste Management Plan to determine proper staging and Building Permit servicing of bins. PW or Site Work • Sewer and water hook-ups, as applicable. Permit Issuance • Install trash, recycling and organics collection containers in parks and community congregation areas. • Install trash, recycling and organics collection containers along public and private sidewalks. • Install pet waste disposal stations within parks and along pedestrian trails. 154. Garbage Truck Access. Applicant/Developer shall provide plans and details on anticipated garbage truck Building Permit access and routes, in addition to example set -out PW or Site Work diagrams for waste carts/bins placement on garbage day Permit Issuance demonstrating adequate space available for carts/bins. Carts and bins shall not block street or driveway access. PUBLIC WORKS - SPECIAL CONDITIONS 155. The project land use shall be consistent with the Building Permit requirements of the Downtown Dublin Specific Plan and PW and Grading the Downtown Dublin Specific Plan EIR. Permit Issuance 156. Design of grading and all improvements shall conform with the standards set forth in the City of Dublin Municipal Building Permit Code, General Plan, Downtown Dublin Specific Plan, PW and Grading current or adopted Bicycle and Pedestrian Master Plan, Permit Issuance Municipal Regional NPDES Stormwater Permit, ADA re uirements, and City standard details. 157. WilkServe Letter. Applicant/Developer shall verify by Building Permit submitting will -serve letter or similar that the project site PW and Grading is within utility service areas. Permit Issuance 158. Utility Clearance. Locations of utilities and trees shall be Grading Permit such to provide minimum clearances between utilities, PW Issuance street lighting and trees. 159. Adjacent Properties. Applicant/Developer will be responsible to obtain written authorization from adjacent Grading Permit property owners for any access needed through adjacent PW Issuance properties, and any grading and improvements on adjacent properties. 160. Public Access Easement. Applicant/Developer shall dedicate Public Access Easements (PAE) over public sidewalk areas extending into the private property at Acceptance of Regional Street. Applicant shall prepare all PW Improvements documentation for dedication and shall be responsible for all associated costs for recordation. Easements shall be recorded prior to occupancy. 161. Easements. With the proposed project, several existing easements will no longer correspond with the proposed layout. Applicant/Developer will be required to prepare all Building Permit documentation for dedication and quitclaim of easements PW Issuance associated with the project, and shall be responsible for all associated costs for recordation. All easements shall be recorded prior to building permit issuance. 162. Loading Zone. Proposed loading zone along the project frontage at St. Patrick Way shall be a maximum of two PW Grading Permit parallel parking spaces and shall be available for public Issuance use. 163. Visibility Triangle. Comply with the driveway sight distance triangle at the project driveway and the sight Grading Permit distance requirements at the Regional Street and St. PW Issuance Patrick Way intersections per the Dublin Municipal Code and AASHTO guidelines. 164. Sidewalk at Regional Street. The public sidewalk along Grading Permit the Regional Street property frontage shall be a minimum PW Issuance of eight feet wide. 165. Project Driveway. The project driveway at the sidewalk Grading or shall be ADA compliant with a width of 24 feet. The PW Encroachment parkinq lot entrance drive shall be 20 feet minimum width. Permit Issuance 166. Bicycle Parking. Provide a minimum of two bicycle racks or four bicycle parking spaces. Bike racks shall have a PW Grading Permit minimum of two points of contact to support the bike Issuance frame. 167. Parking Lot Entry Gates. Parking lot entry gates shall be located a minimum of 40 feet from the back of sidewalk at Regional Street to provide sufficient vehicular queuing PW Building Permit length in front of the gates without the vehicle encroaching Issuance into the Regional Street sidewalk. 168. On -Site Grading. • Grading adjacent to sidewalks shall have a one -foot overbuild from back of walk to top of slope. PW Grading Permit Issuance • Slopes shall conform to recommendations set forth in the geotechnical report and shall be 2:1 maximum. 169. Low Impact Development (LID) Treatment Reduction Credit. Applicant/Developer shall submit final Special Building Permit Project narrative and worksheet subject to review and PW and Grading approval by the Public Works/Environmental Services Permit Issuance Department. 170. LID Stormwater Treatment Facilities. Bubble -ups at stormwater treatment areas are discouraged. If bubble - ups are unavoidable, they must be located immediately adjacent to the stormwater treatment facility, outside of Building Permit the footprint of the treatment area, and not in the PW and Grading treatment soil. Impermeable membranes in the LID Permit Issuance treatment areas are discouraged unless required for eotechnical reasons. 171. Non -LID Stormwater Treatment Facilities. Non -LID treatment facilities must meet the General Use Level Designation on the Washington Department of Ecology Building Permit TAPE protocol (_https:Hecology.wa.gov/Regulations- PW and Grading Permits/Guidance-technical-assistance/Stormwater- Permit Issuance Perm ittee-guidance-resources/Emerging-stormwater- treatment-technolo ies#ta e). 172. Source Control Measures. All applicable structural and Building Permit operational stormwater source controls shall be PW and Grading implemented, Permit Issuance 173. Trash Storage and Staging. Applicant/Developer shall Building Permit verify adequate space is available in the trash rooms and PW and Grading staging area to accommodate all the expected bins/carts. Permit Issuance 174. Trash Management Plan. Applicant/Developer shall Building Permit provide a plan and estimated waste generation for the PW and Grading tanned project, Permit Issuance 175. Landscape Features within Public Right -of -Way. Property Owner shall enter into an "Agreement for Long Term Encroachment for Landscape Features" with the City to require the Property Owner to maintain the landscape and decorative features within public right -of- way including frontage landscaping, decorative Grading Permit pavements and special features (i.e., stormwater PW or Encroachment treatment areas, walls, portals, benches, etc.). The Permit Issuance Agreement shall identify the ownership of the special features and maintenance responsibilities. The Property Owner shall take over maintenance responsibilities along the project frontage at St. Patrick Way previously maintained by Avalon West, The Property Owner will be responsible for maintaining the surface of all decorative pavements including restoration required as the result of utility repairs. 176. Bay Friendly Landscape Design. All publicly owned landscape (e.g., parks, right of way, etc.) shall be Building Permit designed and rated to meet Bay Friendly Landscape PW Issuance and standards. Applicant/Developer is encouraged to design Grading Permit all other landscape areas according to Bay Friendly Issuance Landscape standards. 177. Street Moratorium. When the St. Patrick Way extension is complete, the street will be subject to the City's five- PW On -going year street moratorium prohibiting trenching in the street during the moratorium time period, 178. Street Restoration. A pavement treatment, such as slurry seal or grind and overlay, will be required within Regional Street fronting the site as determined by the Certificate of Public Works Department. The type and limits of the Occupancy or pavement treatment shall be determined by the City PW Acceptance of Engineer based upon the number and proximity of trench Improvements cuts, extent of frontage, extent of pavement striping and restriping, excessive wear and tear/damage due to construction traffic, etc. 179. Hydromodification Management Standards. If the project is subject to hydromodification management measures, the Applicant/Developer shall review the Bay Grading Permit Area Hydrology Model (BAHM) Review Worksheet for all projects that must meet Hydromodification Management PW or Encroachment Standards. The worksheet is available on the City's Permit Issuance website at the following webpage: http://dublin.ca.gov/1656/Development-Permits--- Stormwater-Require 180. Waste Enclosure. The waste enclosure shall meet all of the requirements set forth within the Dublin Municipal Code Section 7.98, including but not limited to providing sewer and water hook-ups as applicable. The improvement plans and/or building permit plans shall Building Permit show additional information demonstrating these Issuance requirements are met. A standard plan for the waste PW and Grading Permit enclosure can be downloaded at Issuance https:Hdublin.ca.gov/341/Standard-Plans in the "Stormwater Measures" section. A pedestrian accessible path of travel shall be provided for employees from the building to the waste enclosure in conformance with current accessibility requirements. 181. Mitigation Measures. Applicant/Developer shall provide to the Planning Division and the Public Works Department a copy of the mitigation measures maintenance manual PW Acceptance of and schedule for reference, including maintenance Improvements procedures and protocols to follow after mitigation reporting is complete. PASSED AND ADOPTED BY the Planning Commission of the City of Dublin, on this 23�d day of November 2021 by the following votes: AYES: Benson, Grier, Thalblum, Tyler, Wright NOES: ABSENT: =l'mVe11,a Planning Commission Chair ATTEST: Assistant Community Development Director c BARC O P Y R I G H T architects 11 / 4 / 2 0 2 1 10 : 3 9 : 1 6 A M C: \ 0 R E V I T \ D u b l i n A f f o r d a b l e H o u s i n g - A _ c k i m K J B 5 G . r v t 2021 G000 - COVER SHEET TEL: CONTACT: EMAIL: ARCHITECT: BAR ARCHITECTS 77 GEARY STREET, SUITE 200 SAN FRANCISCO, CA 94108 415.293.5700 PATRICIA CENTENO PCENTENO@BARARCH.COM TEL: CONTACT: EMAIL: OWNER: EDEN HOUSING INC. 22645 GRAND STREET HAYWARD, CA 94541 510.247.8176 WEIJIA SONG WEIJIA.SONG@EDENHOUSING.ORG TEL: CONTACT: EMAIL: CONSULTANT TO OWNER CIVIL ENGINEER CBG 2633 CAMINO RAMON, SUITE 350 SAN RAMON, CA 94583 925.866.0322 RYAN HANSEN RHANSEN@CBANDG.COM TEL: CONTACT: EMAIL: CONSULTANT TO OWNER LANDSCAPE ARCHITECT GATES + ASSOCIATES 2671 CROW CANYON RD SAN RAMON, CA 94583 925.736.8176 KIMMY CHEN KIMMY@DGATES.COM PROJECT TEAM DUBLIN AFFORDABLE HOUSING 6543 REGIONAL STREET DUBLIN CA 94568 ENTITLEMENTS RESUBMITTAL #2 SITE DEVELOPMENT REVIEW (SDR) NOVEMBER 5, 2021 Attachment 2 7,385 SF LEV 2: 420 SFLEV 4: 420 SFLEV 5: 420 SFLEV 3: 420 SF REQUIRED: 8,692 SF PROVIDED: 7,385 + 420 + 420 + 420 + 420 = 9,065 SF BA R architects c BARC O P Y R I G H T architects 11 / 4 / 2 0 2 1 1 0 : 3 9 : 1 7 A M C : \ 0 R E V I T \ D u b l i n A f f o r d a b l e H ou s i n g - A _ c k i m K J B 5 G . r v t 1" = 50'-0" DUBLIN AFFORDABLE HOUSING 6543 REGIONAL STREET, DUBLIN CA 94568 19049 PROJECT INFORMATION 2021 G00111/05/21 SHEET INDEXVICINITY MAP PROJECT SUMMARY & CODE ANALYSIS PROJECT ADDRESS ASSESSOR'S PARCEL NO ZONING LOT AREA PROJECT DESCRIPTION REFERENCE CODES CONSTRUCTION TYPE (CHAPTER 6) SPRINKLER (SECTION 903) OCCUPANCY & OCCUPANT LOAD (CHAPTER 3) HORIZONTAL BUILDING SEPARATION (SECTION 510.2) 6543 REGIONAL ST, DUBLIN, CA 94568 941-1500-25 DDTOD - DOWNTOWN DUBLIN TOD 57,947 SF THE CURRENT SITE CONSISTS OF AN EXISTING 1-STORY COMMERCIAL BUILDING AND SURFACE PARKING. THE PROJECT IS TO REDEVELOP THE SITE WITH CONSTRUCTION OF A NEW 5-STORY AFFORDABLE SENIOR HOUSING BUILDING WITH 113 AFFORDABLE SENIOR HOUSING RESIDENTIAL UNITS, RESIDENT USE COMMUNITY SPACES, AND 57 SURFACE PARKING STALLS. 2019 CBC WITH LOCAL AMENDMENTS (1) LEVEL OF TYPE IA CONSTRUCTION (4) LEVELS OF TYPE VA CONSTRUCTION ABOVE AUTOMATED NFPA 13 SPRINKLER SYSTEM R-2* RESIDENTIAL (200 SF/OC GROSS) B MANAGEMENT OFFICES (150 SF/OCC GROSS) A-2 RESIDENTIAL COMMUNITY SPACE (15 SF/OCC NET) *R-2 OCCUPANCY INCLUDES RESIDENTIAL SPACES SUCH AS LOBBY, MAIL ROOM AREA, AND ACCESSORY OCCUPANCIES (LESS THAN 10% OF TOTAL FLOOR AREA) ONE STORY ABOVE GRADE PLANE (TYPE 1A CONSTRUCTION) SHALL BE CONSIDERED A SEPARATE AND DISTINCT BUILDING FROM THE STORIES ABOVE (TYPE VA CONSTRUCTION) FOR THE FOLLOWING PURPOSES: - DETERMINATION OF AREA LIMITATIONS - LIMITATION OF NUMBER OF STORIES - TYPE OF CONSTRUCTION N ST PATRICK WAY RE G I O N A L S T DUBLIN BLVD INTERSTATE 580 SAN RAMON RD WEST DUBLIN/PLEASANTON BART STATION SITE: 6543 REGIONAL ST GO L D E N G A T E D R ZONING ANALYSIS Private open space...100sf/unit Surface Parking allowed to the rear of the building on-site and can be single loaded along side in specific situations Bicycle Parking Requirements Parking Requirements 1.5:1 and Guest = to 15% of... up to 35% Compact, Shade tree for every 4 cars, see other standards Common Open Space...Min. 15% of Site Area 8,692 > 10' in dimension; if on roof, >7' (found in definitions) Set Building Far away fro...see site and building design requirements for proximity to highway Density Limitation 113.05 Minimum Residential...30 39.9 Allowable Uses Multi-Family Residential subject to Additional Development Standards if located within 1,000' of I-580 Building Frontage must occupy min. 80% of frontage Rear Setback Side Setbacks 5' Front Setback 5' SDB Factor 93,874 FAR Limitation 1.2 69,536 can develop up to max for res use if OPT in to Communi... Bulk Limitation stepbacks on upper floors allowed but not required Height Limit 75' to highest finish floor / 90' maximum CONTROL COMMENT TR1.3 STAGING LOCATION ● TR1.2 RESIDENTIAL UPPER FLOOR TRASH VESTIBULE (LEVEL 2-5)● TR1.1 ● TR1.0 RESIDENTIAL TRASH COLLECTION ROOM- ● TR0.1 SITE PLAN ● 04 - TRASH A401 FACADE MATERIALS ● A303 BUILDING SECTIONS ● A302 BUILDING ELEVATIONS ● A301 BUILDING ELEVATIONS ● A206 ROOF PLAN ● A205 FLOOR PLAN - LEVEL 5 ● A204 FLOOR PLAN - LEVEL 4 ● A203 FLOOR PLAN - LEVEL 3 ● A202 FLOOR PLAN - LEVEL 2 ● A201 FLOOR PLAN - LEVEL 1 ● A101 SITE PLAN ● A002 PERSPECTIVE - MAIN ENTRY ALONG ST PATRICK WAY ● A001 PERSPECTIVE - CORNER OF REGIONAL ST & ST PATRICK WAY ● 03 - ARCHITECTURAL L-7 SITE LIGHTING CONCEPT PLAN ● L-6 OUTDOOR FURNITURE / FENCING ● L-5 UPPER TERRACE ENLARGEMENTS ● L-4 OVERALL SITE PLAN - GROUND LEVEL ● L-3 PLANT PALETTE ● L-2 TREE REMOVAL PLAN ● L-1 COVER SHEET / PLANT LIST / PROJECT INFORMATION ● 02 - LANDSCAPE C8.0 PRELIMINARY FIRE ACCESS PLAN ● C7.0 PRELIMINARY EROSION CONTROL PLAN ● C6.0 PRELIMINARY STORMWATER CONTROL PLAN ● C5.0 GRADING SECTIONS ● C4.0 PRELIMINARY GRADING AND DRAINAGE PLAN ● C3.0 PRELIMINARY UTILITY PLAN ● C2.0 PRELIMINARY SITE PLAN ● C1.0 BOUNDARY & EXISTING CONDITIONS ● 01 - CIVIL G003 EXISTING SITE PHOTOS ● G002 PROJECT DATA ● G001 PROJECT INFORMATION ● G000 COVER SHEET ● 00 - GENERAL NO NAME 08 / 2 0 / 2 1 1" = 50'-0"G001 1 OPEN SPACE DIAGRAM BUILDING LIMITATIONS (TABLE 504.3, 504.4, 506.2) BUILDING AREA CALCULATION FOR TYPE VA CONSTRUCTION EXITING PROVISIONS (CHAPTER 10) CONSTR OCCUPANCY HEIGHT STORIES AREA TYPE 1A R-2, B, A-3 UL UL UL TYPE VA* R-2 60 FT 4 36,000 SF *INCLUDES ALLOWABLE AREA INCREASE IN ADDITION TO THE HEIGHT AND STORY INCREASE ALLOWED PER TABLE 504.3 EXCEPTION J TWO BUILDING AREA COMPARTMENTS PROVIDED, SEPARATED BY A 2-HR FIRE WALL ALLOWABLE BUILDING AREAS PER COMPARTMENT: Sa = 2 Aa = (36,000 SF + 0 SF) x 2 = 72,000 SF PROVIDED: COMPARTMENT A = 40,865 SF COMPARTMENT B = 26,625 SF ALLOWABLE BUILDING AREA PER STORY: Sa = 1 Aa = (24,000 SF + 0 SF) x 1 = 24,000 SF PROVIDED (AT LARGEST STORY, LEVEL 2): COMPARTMENT A = 10,640 SF COMPARTMENT B = 6,870 SF OCCUPANT LOAD EGRESS REQUIREMENTS (TABLE 1006.2.1) R-2 OCCUPANCY (GREATER THAN 10 OCCUPANTS): 2 MEANS OF EGRESS B OCCUPANCY (EACH OFFICE LESS THAN 49 OCCUPANTS): 1 MEANS OF EGRESS A-3 OCCUPANCY (COMMUNITY ROOM GREATER THAN 49 OCCUPANTS): 2 MEANS OF EGRESS NUMBER OF EXITS PER STORY (TABLE 1006.3.2): 2 ACCESSIBLE MEANS OF EGRESS (SECTION 1009.2.1): THE ELEVATOR SHALL NOT BE REQUIRED TO MEET ACCESSIBLE MEANS OF EGRESS ON FLOORS PROVIDED WITH A HORIZONTAL EXIT LOCATED AT OR ABOVE THE LEVELS OF EXIT DISCHARGE EXITING PROVISIONS (CHAPTER 10) [CONTINUED] ACCESSIBILITY THE 2-HR FIRE WALL WILL ALSO BE A HORIZONTAL EXIT EXIT TRAVEL DISTANCE (SECTION 1017): R-2, A-3 250 FT B 300 FT DEAD END CORRIDOR (SECTION 1020.4, EXCEPTION 2): SHALL NOT EXCEED 50 FT MEET THE REQUIREMENTS OF CHAPTER 11B GROUND FLOOR UNITS - TRASH CLOSET LAYOUT LOOSE BIN LAYOUT 6' - 0" 18' - 0" 24' - 0" 17' - 0" 17' - 0" 24' - 0" 18' - 0" 2' - 0" 1' - 0" 6' - 0" 18' - 0" 24' - 0" 20' - 0" LANDSCAPE AREA OVERHANG 8' - 0" TYP 9' - 0" TYP 9' - 0" TYP 9' - 0" TYP 9' - 0" TYP 8' - 0" 3' - 0" 4' - 0" 2' - 0" 2' - 0" 4' - 0" 4' - 0" LANDSCAPE AREA OVERHANG ONE IN EVERY 25 EV SPACES TO HAVE 8' - 0" MIN ACCESS AISLE SIDEWALK OVERHANG UNENCUMBERED WIDTH SIDEWALK OVERHANG UNENCUMBERED WIDTH VEHICULAR ENTRY OPEN SPACE 6543 REGIONAL ST SURFACE PARKING LOT 57 TOTAL STALLS ONE EV STALL ADJACENT TO AN ACCESSIBLE PARKING STALL TO ALLOW USE OF THE EV CHARGER FROM THE ACCESSIBLE SPACE DASHED OUTLINE IS BORDER OF PARKING AREA FOR LANDSCAPE PERCENTAGE CALCULATION VEHICULAR GATE 24' - 0" 18' - 0" 2' - 0" TYP 9' - 0" 5' - 0"8' - 0" R 20' - 0"TYP 6' - 0" REGIONAL ST CUL-DE-SAC BA R architects N c BARC O P Y R I G H T architects 11 / 4 / 2 0 2 1 1 0 : 3 9 : 1 7 A M C : \ 0 R E V I T \ D u b l i n A f f o r d a b l e H ou s i n g - A _ c k i m K J B 5 G . r v t 1/16" = 1'-0" DUBLIN AFFORDABLE HOUSING 6543 REGIONAL STREET, DUBLIN CA 94568 19049 PROJECT DATA 2021 G00211/05/21 1/16" = 1'-0"G002 1 PARKING DIAGRAM PARKING COUNT: 57 STALLS TOTAL FOR 113 DWELLING UNITS: 22 STANDARD STALLS (W/ 2' OVERHANG) 20 COMPACT STALLS 12 EV STALLS (SIZE OF STANDARD STALL) 3 ACCESSIBLE STALLS (INCLUDING 1 VAN ACCESSIBLE) PARKING PLANNING REQUIREMENTS: PARKING REQUIRED (DMC CHAPTER 8.76): 1 STALL/DU PARKING REQUIRED (SPECIFIC PLAN): 1.5 STALL/DU PROVIDED: 0.5 STALL/DU GUEST PARKING REQUIRED (DMC CHAPTER 8.76): 1 STALL/3 DU GUEST PARKING REQUIRED (SPECIFIC PLAN): UP TO 15% PROVIDED: 0 STALLS REQUIRED (AND AS PROVIDED) STALL SIZES: STANDARD - 9' X 18' (W/ 2' OVERHANG) COMPACT - 8' x 17' ALLOWED COMPACT % OF TOTAL: 35% PROVIDED: 35% REQUIRED LANDSCAPE % OF PARKING AREA: 15% PROVIDED (SHOWN IN GREEN): 17% A MINIMUM OF 1 TREE PER 4 STALLS WILL BE PROVIDED PARKING CODE REQUIREMENTS: ACCESSIBLE STALLS (CBC 11B-208.2.3.1): PER TABLE 11B-208.2 PROVIDED: 3 STALLS, AS REQUIRED FOR 51 TO 75 TOTAL STALLS EV STALLS (CITY REQUIRMENT): 20% OF TOTAL PARKING PROVIDED: 11.4 OR 12 STALLS *** Residential Core GSF include corridors, elevator lobbies, stairs, elevators, utility spaces, etc ** Residential Amenity GSF includes entry lobby, offices, community room, fitness room, laundry room, etc * Residential Net Rentable GSF calculation includes exterior, corridor, and party walls NOTES: Total 61,595 4,455 18,910 84,960 1 8,015 4,455 5,000 17,470 2 14,050 3,455 17,505 3 13,620 3,465 17,085 4 13,170 3,490 16,660 5 12,740 3,500 16,240 Level Net Rentable GSF*Amenity GSF**Core GSF***GSF Residential Residential Residential Grand Total PRELIMINARY BUILDING AREA TABULATIONS ** As calculated in the Preliminary Building Area Tabulation * Unit GSF includes exterior, corridor, and party walls Average Unit Size (GSF) 545 Residential GSF** 61,595 AVERAGE UNIT SIZE % 49% 50% 1% 0% 100% 55 57 1 0 TOTAL 55 57 1 0 113 1 9 5 1 15 2 13 13 26 3 12 13 25 4 11 13 24 5 10 13 23 450 GSF typ. 600 GSF typ. 900 GSF typ. w18' x d25' w24' x d25' w36' x d25' TOTAL LEVEL STU 1 BR 2 BR 3 BR UNIT PRELIMINARY UNIT MIX 1 2 3 4 5 BA R architects c BARC O P Y R I G H T architects 11 / 4 / 2 0 2 1 1 0 : 3 9 : 1 8 A M C : \ 0 R E V I T \ D u b l i n A f f o r d a b l e H ou s i n g - A _ c k i m K J B 5 G . r v t 1" = 50'-0" DUBLIN AFFORDABLE HOUSING 6543 REGIONAL STREET, DUBLIN CA 94568 19049 EXISTING SITE PHOTOS 2021 G00311/05/21 VIEW 1 VIEW 2 VIEW 3 VIEW 5VIEW 4 RE G I O N A L S T R E E T FUTURE RESIDENTIAL BUILDING TRACT 8460 FUTURE ST. PATRICK WAY FU T U R E E N T R Y D R I V E DUBLIN AFFORDABLE HOUSING 6543 REGIONAL STREET, DUBLIN CA 94568 JOB No. 3456-00011/05/2021 GRAPHIC SCALE 80'0'40'20'10'20'0' BOUNDARY & EXISTING CONDITIONS C1.0 GENERAL NOTES CONTACTS SHEET INDEX C1.0 BOUNDARY & EXISTING CONDITIONS C2.0 PRELIMINARY SITE PLAN C3.0 PRELIMINARY UTILITY PLAN C4.0 PRELIMINARY GRADING AND DRAINAGE PLAN C5.0 GRADING SECTIONS C6.0 PRELIMINARY STORMWATER CONTROL PLAN C7.0 PRELIMINARY EROSION CONTROL PLAN C8.0 PRELIMINARY FIRE ACCESS PLAN VICINITY MAP SITE LEGEND NOTE: x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x xxxxxxx E.V CHARGING E.V CHARGING E.V CHARGING E.V CHARGING E.V CHARGING E.V CHARGING E.V CHARGING E.V CHARGING E.V CHARGING E.V CHARGING E.V CHARGING E.V CHARGING COMPACT COMPACT COMPACT COMPACT COMPACT COMPACT COMPACT COMPACT COMPACTCOMPACT COMPACT COMPACT COMPACTCOMPACT COMPACT COMPACT COMPACT COMPACT COMPACT COMPACT RE G I O N A L S T R E E T FUTURE ST. PATRICK WAY FU T U R E E N T R Y D R I V E FUTURE RESIDENTIAL BUILDING TRACT 8460 FUTURE 71' ST. PATRICK RIGHT OF WAY WITH PARKING PROPOSED REGIONAL STREET DUBLIN AFFORDABLE HOUSING 6543 REGIONAL STREET, DUBLIN CA 94568 JOB No. 3456-00011/05/2021 GRAPHIC SCALE 80'0'40'20'10'20'0' PRELIMINARY SITE PLAN C2.0 LEGEND: PARKING SUMMARY SITE CALCULATIONS NOTE: E.V CHARGING E.V CHARGING E.V CHARGING E.V CHARGING E.V CHARGING E.V CHARGING E.V CHARGING E.V CHARGING E.V CHARGING E.V CHARGING E.V CHARGING E.V CHARGING COMPACT COMPACT COMPACT COMPACT COMPACT COMPACT COMPACT COMPACT COMPACTCOMPACT COMPACT COMPACT COMPACTCOMPACT COMPACT COMPACT COMPACT COMPACT COMPACT COMPACT RE G I O N A L S T R E E T FUTURE ST. PATRICK WAY FU T U R E E N T R Y D R I V E FUTURE RESIDENTIAL BUILDING TRACT 8460 DUBLIN AFFORDABLE HOUSING 6543 REGIONAL STREET, DUBLIN CA 94568 JOB No. 3456-00011/05/2021 GRAPHIC SCALE 80'0'40'20'10'20'0' PRELIMINARY UTILITY PLAN C3.0 LEGEND UTILITY NOTES: E.V CHARGING E.V CHARGING E.V CHARGING E.V CHARGING E.V CHARGING E.V CHARGING E.V CHARGING E.V CHARGING E.V CHARGING E.V CHARGING E.V CHARGING E.V CHARGING COMPACT COMPACT COMPACT COMPACT COMPACT COMPACT COMPACT COMPACT COMPACTCOMPACT COMPACT COMPACT COMPACTCOMPACT COMPACT COMPACT COMPACT COMPACT COMPACT COMPACT RE G I O N A L S T R E E T FUTURE ST. PATRICK WAY FU T U R E E N T R Y D R I V E FF 354.00 FF 350.00 FF 351.00FF 355.00 B C5.0 D C5.0 F C5.0 H C5.0 A C5.0 FUTURE RESIDENTIAL BUILDING TRACT 8460 G C5.0 E C5.0 C C5.0 DUBLIN AFFORDABLE HOUSING 6543 REGIONAL STREET, DUBLIN CA 94568 JOB No. 3456-00011/05/2021 GRAPHIC SCALE 80'0'40'20'10'20'0' PRELIMINARY GRADING AND DRAINAGE PLAN C4.0 NOTE: LEGEND SECTION A REGIONAL STREET SECTION B REGIONAL STREET SECTION C FUTURE ST. PATRICK STREET SECTION D FUTURE ST. PATRICK STREET SECTION E FUTURE ENTRY DRIVE SECTION F SECTION G SECTION H DUBLIN AFFORDABLE HOUSING 6543 REGIONAL STREET, DUBLIN CA 94568 JOB No. 3456-00011/05/2021 GRADING SECTIONS C5.0 RE G I O N A L S T R E E T FUTURE ST. PATRICK WAY FU T U R E E N T R Y D R I V E FUTURE RESIDENTIAL BUILDING TRACT 8460 DMA 2 DMA 1 MF 1 BR 2 ON-SITE BIO-RETENTION DETAIL DUBLIN AFFORDABLE HOUSING 6543 REGIONAL STREET, DUBLIN CA 94568 JOB No. 3456-00011/05/2021 GRAPHIC SCALE 80'0'40'20'10'20'0' PRELIMINARY STORMWATER CONTROL PLAN C6.0 NOTE DMA 1 C.3 TREATMENT SUMMARY (MEDIA FILTER) DMA TREATMENT TYPE SIZING METHOD TREATMENT DEVICE DESIGNATION TOTAL DMA AREA (SF) IMPERVIOUS AREA (SF) PERVIOUS AREA (SF) EFFECTIVE IMPERVIOUS AREA (A) (SF) (IMPERVIOUS + PERVIOUS X 0.1) COMPOSITE C VALUE (C) INTENSITY (I) (IN/HR) MIN REQUIRED TREATMENT FLOW (CxIxA) (CFS) C.3 TREATMENT SUMMARY DMA TREATMENT TYPE SIZING METHOD TREATMENT DEVICE DESIGNATION TOTAL DMA AREA (SF) IMPERVIOUS AREA (SF) PERVIOUS AREA (SF) EFFECTIVE IMPERVIOUS AREA (SF) (IMPERVIOUS + PERVIOUS X 0.1) REQUIRED BIORETENTION AREA (SF) PROVIDED BIORETENTION AREA (SF) ≥ SPECIAL PROJECT NON-LID TREATMENT REDUCTION CREDITS LEGEND RE G I O N A L S T R E E T FUTURE ST. PATRICK WAY FU T U R E E N T R Y D R I V E FUTURE RESIDENTIAL BUILDING TRACT 8460 S F S F S F S F S F S F S F SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSF SF SF SF SF S F S F DUBLIN AFFORDABLE HOUSING 6543 REGIONAL STREET, DUBLIN CA 94568 JOB No. 3456-00011/05/2021 GRAPHIC SCALE 80'0'40'20'10'20'0' PRELIMINARY EROSION CONTROL PLAN C7.0 LEGEND SF E.V CHARGING E.V CHARGING E.V CHARGING E.V CHARGING E.V CHARGING E.V CHARGING E.V CHARGING E.V CHARGING E.V CHARGING E.V CHARGING E.V CHARGING E.V CHARGING COMPACT COMPACT COMPACT COMPACT COMPACT COMPACT COMPACT COMPACT COMPACTCOMPACT COMPACT COMPACT COMPACTCOMPACT COMPACT COMPACT COMPACT COMPACT COMPACT COMPACT RE G I O N A L S T R E E T FUTURE ST. PATRICK WAY FU T U R E E N T R Y D R I V E FUTURE RESIDENTIAL BUILDING TRACT 8460 DUBLIN AFFORDABLE HOUSING 6543 REGIONAL STREET, DUBLIN CA 94568 JOB No. 3456-00011/05/2021 GRAPHIC SCALE 80'0'40'20'10'20'0' PRELIMINARY FIRE ACCESS PLAN C8.0 LEGEND: ALAMEDA COUNTY FIRE TRUCK TURNING TEMPLATE L-111/05/21 COVER SHEET/ PLANT LIST/ PROJECT INFORMATION ARMSTRONG RED MAPLE 24"BOX 5 M L DECIDUOUS CITRUS SPP. ORANGE TREE 24"BOX M L FULL SUN, EVERGREEN LAGERSTROEMIA INDICA `MUSKOGEE` MUSKOGEE CRAPE MYRTLE 24"BOX L L FULL SUN, DECIDUOUS PRUNUS SERRULATA ‘KANZAN’ JAPANESE FLOWERING CHERRY 24"BOX M L FULL SUN TO PT SHADE, DECIDUOUS ROSA FLORIBUNDA `BRILLIANT PINK ICEBERG` ROSE 15 GAL.M L PT TO FULL SUN, DECIDUOUS SHRUBS LEGEND BOTANICAL NAME CONTAINER SIZE AT TIME OF PLANTING QTY. WU C O L S ZO N E NA T I V E ( N ) / L O C A L ( L ) NOTES AGAVE ATTENUATA `KARA'S STRIPES` AGAVE 5 GAL L N SUN OR SHADE, EVERGREEN ARBUTUS UNEDO STRAWBERRY TREE SHRUB 15 GAL L N FULL SUN PT SHADE, EVERGREEN BOUGAINVILLEA SPP. BOUGAINVILLEA 5 GAL L FULL SUN, EVERGREEN VINE CALLISTEMON VIMINALIS "LITTLE JOHN" BOTTLEBRUSH 5 GAL L L FULL SUN PT SHADE, EVERGREEN CAMELLIA SASANQUA CHRISTMAS CAMELLIA 5 GAL M FULL SUN TO PT SHADE, EVERGREEN COLEONEMA PULCHRUM `SUNSET GOLD` GOLDEN BREATH OF HEAVEN 5 GAL M L FULL SUN, EVERGREEN DIETES BICOLOR FORTNIGHT LILY 5 GAL L L FULL SUN PT SHADE, EVERGREEN DIETES GRANDIFLORA `VARIEGATA` STRIPED FORTNIGHT LILY 5 GAL L L SUN OR PT SHADE, EVERGREEN EPILOBIUM CALIFORNICUM `BOWMAN`S #1` CALIFORNIA FUCHSIA 1 GAL L N FULL SUN, DECIDUOUS FESTUCA MAIREI ATLAS FESCUE 1 GAL L SUN OR PT SHADE, EVERGREEN HESPERALOE PARVIFLORA RED YUCCA 5 GAL L L FULL SUN, EVERGREEN HESPERALOE PARVIFLORA `PERPA` BRAKELIGHTS RED YUCCA 5 GAL L L FULL SUN, EVERGREEN HEUCHERA X `ELECTRIC LIME` CORAL BELLS 1 GAL M L FULL SUN, EVERGREEN KNIPHOFIA UVARIA `MALIBU YELLOW` MALIBU YELLOW TORCH LILY 5 GAL L FULL SUN, PERENNIAL LAVANDULA ANGUSTIFOLIA ‘HIDCOTE PINK’ ENGLISH LAVENDER 5 GAL L FULL SUN PT SHADE, EVERGREEN LAVATERA MARITIMA TREE MALLOW 5 GAL L L SUN OR SHADE, EVERGREEN LEUCOSPERMUM CORDIFOLIUM NODDING PINCUSHION 5 GAL L FULL SUN, EVERGREEN LIRIOPE MUSCARI `VARIEGATA` VARIEGATED LILY TURF 1 GAL M FULL SUN TO PT SHADE, EVERGREEN LOMANDRA LONGIFOLIA `BREEZE` BREEZE MAT RUSH 1 GAL L L SUN OR SHADE, EVERGREEN LOMANDRA LONGIFOLIA ‘ROMA13’ PP25962 LOMANDRA PLATINUM BEAUTY 1 GAL L L FULL SUN TO PT SHADE, EVERGREEN MYRTUS COMMUNIS ‘COMPACTA’ MYRTLE 5 GAL L FULL SUN, EVERGREEN NEPETA FAASSENII CATMINT 1GAL L L FULL SUN TO PT SHADE, EVERGREEN OLEA EUROPAEA ‘MONTRA’ LITTLE OLLIE DWARF OLIVE 5 GAL L L FULL SUN, EVERGREEN PITTOSPORUM TOBIRA ‘WHEELER’S DWARF’ DWARF MOCK ORANGE 5 GAL L FULL SUN PT SUN, EVERGREEN PODOCARPUS MACROPHYLLUS `MAKI` MAKI SHRUBBY YEW PODOCARPUS 15 GAL M FULL SUN PT SHADE, EVERGREEN RHAMNUS CALIFORNICA `EVE CASE` CALIFORNIA COFFEEBERRY 5 GAL L N SUN OR SHADE, EVERGREEN ROSA X `FLOWER CARPET APPLEBLOSSOM` ROSE 2 GAL M L FULL SUN, DECIDUOUS SALVIA LEUCANTHA `SANTA BARBARA` MEXICAN BUSH SAGE 5 GAL L L FULL SUN, EVERGREEN SALVIA MICROPHYLLA `HOT LIPS` HOT LIPS SAGE 5 GAL L L FULL SUN TO PT SHADE, EVERGREEN SENECIO SERPENS BLUE CHALKSTICKS 1 GAL L L FULL SUN, EVERGREEN TEUCRIUM CHAMAEDRYS GERMANDER 1 GAL L L FULL SUN TO PT SHADE, EVERGREEN TEUCRIUM FRUTICANS `AZUREUM` AZURE BUSH GERMANDER 5 GAL L L FULL SUN, EVERGREEN STORMWATER TREATMENT AREA LEGEND BOTANICAL NAME CONTAINER SIZE AT TIME OF PLANTING QTY. WU C O L S ZO N E NA T I V E ( N ) / L O C A L ( L ) NOTES LIMONIUM CALIFORNICUM MARSH ROSEMARY 1GAL L N FULL SUN TO PT SHADE, EVERGREEN CAREX TUMULICOLA BERKELEY SEDGE 1 GAL L N SUN OR SHADE, EVERGREEN CHONDROPETALUM TECTORUM `EL CAMPO` CAPE RUSH 5 GAL L L SUN OR SHADE, EVERGREEN JUNCUS PATENS `CARMAN`S GREY` SPREADING RUSH 5 GAL L N SUN OR SHADE, EVERGREEN LEYMUS CONDENSATUS `CANYON PRINCE` NATIVE BLUE RYE 1 GAL L N FULL SUN, EVERGREEN MIMULUS AURANTIACUS STICKY MONKEYFLOWER 5 GAL VL N FULL SUN TO PT SHADE, EVERGREEN 4 ACCENT TREES ORANGE TREE EVERGREENLAGERSTROEMIA INDICA `MUSKOGEE` MUSKOGEE CRAPE MYRTLE 24"BOX L L FULL SUN, DECIDUOUS PRUNUS SERRULATA ‘KANZAN’ JAPANESE FLOWERING CHERRY 24"BOX M L FULL SUN TO PT SHADE, DECIDUOUS ROSA FLORIBUNDA `BRILLIANT PINK ICEBERG` ROSE 15 GAL.M L PT TO FULL SUN, DECIDUOUS SHRUBS LEGEND BOTANICAL NAME CONTAINER SIZE AT TIME OF PLANTING QTY. WU C O L S ZO N E NA T I V E ( N ) / L O C A L ( L ) NOTES AGAVE ATTENUATA `KARA'S STRIPES` AGAVE 5 GAL L N SUN OR SHADE, EVERGREEN ARBUTUS UNEDO STRAWBERRY TREE SHRUB 15 GAL L N FULL SUN PT SHADE, EVERGREEN BOUGAINVILLEA SPP. BOUGAINVILLEA 5 GAL L FULL SUN, EVERGREEN VINE CALLISTEMON VIMINALIS "LITTLE JOHN" BOTTLEBRUSH 5 GAL L L FULL SUN PT SHADE, EVERGREEN CAMELLIA SASANQUA CHRISTMAS CAMELLIA 5 GAL M FULL SUN TO PT SHADE, EVERGREEN COLEONEMA PULCHRUM `SUNSET GOLD` GOLDEN BREATH OF HEAVEN 5 GAL M L FULL SUN, EVERGREEN DIETES BICOLOR FORTNIGHT LILY 5 GAL L L FULL SUN PT SHADE, EVERGREEN DIETES GRANDIFLORA `VARIEGATA` STRIPED FORTNIGHT LILY 5 GAL L L SUN OR PT SHADE, EVERGREEN EPILOBIUM CALIFORNICUM `BOWMAN`S #1` CALIFORNIA FUCHSIA 1 GAL L N FULL SUN, DECIDUOUS FESTUCA MAIREI ATLAS FESCUE 1 GAL L SUN OR PT SHADE, EVERGREEN HESPERALOE PARVIFLORA RED YUCCA 5 GAL L L FULL SUN, EVERGREEN HESPERALOE PARVIFLORA `PERPA` BRAKELIGHTS RED YUCCA 5 GAL L L FULL SUN, EVERGREEN HEUCHERA X `ELECTRIC LIME` CORAL BELLS 1 GAL M L FULL SUN, EVERGREEN KNIPHOFIA UVARIA `MALIBU YELLOW` MALIBU YELLOW TORCH LILY 5 GAL L FULL SUN, PERENNIAL LAVANDULA ANGUSTIFOLIA ‘HIDCOTE PINK’ ENGLISH LAVENDER 5 GAL L FULL SUN PT SHADE, EVERGREEN LAVATERA MARITIMA TREE MALLOW 5 GAL L L SUN OR SHADE, EVERGREEN LEUCOSPERMUM CORDIFOLIUM NODDING PINCUSHION 5 GAL L FULL SUN, EVERGREEN LIRIOPE MUSCARI `VARIEGATA` VARIEGATED LILY TURF 1 GAL M FULL SUN TO PT SHADE, EVERGREEN LOMANDRA LONGIFOLIA `BREEZE` BREEZE MAT RUSH 1 GAL L L SUN OR SHADE, EVERGREEN LOMANDRA LONGIFOLIA ‘ROMA13’ PP25962 LOMANDRA PLATINUM BEAUTY 1 GAL L L FULL SUN TO PT SHADE, EVERGREEN MYRTUS COMMUNIS ‘COMPACTA’ MYRTLE 5 GAL L FULL SUN, EVERGREEN NEPETA FAASSENII CATMINT 1GAL L L FULL SUN TO PT SHADE, EVERGREEN OLEA EUROPAEA ‘MONTRA’ LITTLE OLLIE DWARF OLIVE 5 GAL L L FULL SUN, EVERGREEN PITTOSPORUM TOBIRA ‘WHEELER’S DWARF’ DWARF MOCK ORANGE 5 GAL L FULL SUN PT SUN, EVERGREEN PODOCARPUS MACROPHYLLUS `MAKI` MAKI SHRUBBY YEW PODOCARPUS 15 GAL M FULL SUN PT SHADE, EVERGREEN RHAMNUS CALIFORNICA `EVE CASE` CALIFORNIA COFFEEBERRY 5 GAL L N SUN OR SHADE, EVERGREEN ROSA X `FLOWER CARPET APPLEBLOSSOM` ROSE 2 GAL M L FULL SUN, DECIDUOUS SALVIA LEUCANTHA `SANTA BARBARA` MEXICAN BUSH SAGE 5 GAL L L FULL SUN, EVERGREEN SALVIA MICROPHYLLA `HOT LIPS` HOT LIPS SAGE 5 GAL L L FULL SUN TO PT SHADE, EVERGREEN SENECIO SERPENS BLUE CHALKSTICKS 1 GAL L L FULL SUN, EVERGREEN TEUCRIUM CHAMAEDRYS GERMANDER 1 GAL L L FULL SUN TO PT SHADE, EVERGREEN TEUCRIUM FRUTICANS `AZUREUM` AZURE BUSH GERMANDER 5 GAL L L FULL SUN, EVERGREEN STORMWATER TREATMENT AREA LEGEND BOTANICAL NAME CONTAINER SIZE AT TIME OF PLANTING QTY. WU C O L S ZO N E NA T I V E ( N ) / L O C A L ( L ) NOTES LIMONIUM CALIFORNICUM MARSH ROSEMARY 1GAL L N FULL SUN TO PT SHADE, EVERGREEN CAREX TUMULICOLA BERKELEY SEDGE 1 GAL L N SUN OR SHADE, EVERGREEN CHONDROPETALUM TECTORUM `EL CAMPO` CAPE RUSH 5 GAL L L SUN OR SHADE, EVERGREEN JUNCUS PATENS `CARMAN`S GREY` SPREADING RUSH 5 GAL L N SUN OR SHADE, EVERGREEN LEYMUS CONDENSATUS `CANYON PRINCE` NATIVE BLUE RYE 1 GAL L N FULL SUN, EVERGREEN MIMULUS AURANTIACUS STICKY MONKEYFLOWER 5 GAL VL N FULL SUN TO PT SHADE, EVERGREEN 4 LEGEND PARKING LOT TREES CONTAINER SIZE AT TIME OF PLANTING QTY. WU C O L S Z O N E NA T I V E (N ) / LO C A L NOTES AESCULUS X CARNEA RED HORSECHESTNUT 24"BOX FULL SUN TO PT SHADE, 50'H x 50'W, DECIDUOUS ACER CIRCINATUM VINE MAPLE 24"BOX FULL SUN TO PT SHADE, 25'H x 20'W, DECIDUOUS ULMUS PARVIFOLIA `DRAKE` EVERGREEN ELM 24"BOX 15 L L FULL SUN, 45'H x 50'W, EVERGREEN LEGEND SPECIMEN/ MONUMENT TREE CONTAINER SIZE AT TIME OF PLANTING QTY. WU C O L S ZO N E NA T I V E ( N ) / L O C A L ( L ) NOTES QUERCUS LOBATA VALLEY OAK 72" BOX 1 L N FULL SUN TO PT SHADE, 70'H x 50'W, DECIDUOUS LEGEND ORCHARD TREES CONTAINER SIZE AT TIME OF PLANTING QTY. WU C O L S ZO N E NA T I V E ( N ) / L O C A L ( L ) NOTES CITRUS ‘MEYER LEMON’ MEYER LEMON TREE 15 GAL.M N FULL SUN, 10'H x 4'W, EVERGREEN MALUS PUMILA APPLE TREE 15 GAL.M N FULL SUN, 15'H x 15'W, DECIDUOUS PYRUS PYRIFOLIA PEAR TREE 15 GAL.M N FULL SUN, 30'H x 30'W, DECIDUOUS LEGEND EVERGREEN TREES CONTAINER SIZE AT TIME OF PLANTING QTY. WU C O L S ZO N E NA T I V E ( N ) / L O C A L ( L ) NOTES ARBUTUS X `MARINA` ARBUTUS STANDARD 24"BOX L N FULL SUN, EVERGREEN ELAEOCARPUS DECIPIENS JAPANESE BLUEBERRY TREE 24"BOX M FULL SUN TO PT SHADE, EVERGREEN LAURUS NOBILIS `SARATOGA` SWEET BAY 24"BOX L L FULL SUN TO PT SHADE, EVERGREEN PODOCARPUS MACROPHYLLUS `MAKI` MAKI SHRUBBY YEW PODOCARPUS 15 GAL 5 M FULL SUN PT SHADE, EVERGREEN LEGEND COMMON AREA TREES CONTAINER SIZE AT TIME OF PLANTING QTY. WU C O L S ZO N E NA T I V E ( N ) / L O C A L ( L ) NOTES ULMUS CARPINIFOLIA X PARVIFOLIA `FRONTIER` FRONTIER ELM 24"BOX L L FULL SUN, DECIDUOUS OLEA EUROPAEA `SWAN HILL` SWAN HILL OLIVE MULTI-TRUNK 24"BOX VL L FULL SUN TO PT SHADE, EVERGREEN ACER RUBRUM `ARMSTRONG` ARMSTRONG RED MAPLE 24"BOX 5 M L FULL TO PT SHADE, DECIDUOUS CITRUS SPP. ORANGE TREE 24"BOX M L FULL SUN, EVERGREEN LAGERSTROEMIA INDICA `MUSKOGEE` MUSKOGEE CRAPE MYRTLE 24"BOX L L FULL SUN, DECIDUOUS PRUNUS SERRULATA ‘KANZAN’ JAPANESE FLOWERING CHERRY 24"BOX M L FULL SUN TO PT SHADE, DECIDUOUS ROSA FLORIBUNDA `BRILLIANT PINK ICEBERG` ROSE 15 GAL.M L PT TO FULL SUN, DECIDUOUS SHRUBS LEGEND BOTANICAL NAME CONTAINER SIZE AT TIME OF PLANTING QTY. WU C O L S ZO N E NA T I V E ( N ) / L O C A L ( L ) NOTES AGAVE ATTENUATA `KARA'S STRIPES` AGAVE 5 GAL L N SUN OR SHADE, EVERGREEN ARBUTUS UNEDO STRAWBERRY TREE SHRUB 15 GAL L N FULL SUN PT SHADE, EVERGREEN BOUGAINVILLEA SPP. BOUGAINVILLEA 5 GAL L FULL SUN, EVERGREEN VINE CALLISTEMON VIMINALIS "LITTLE JOHN" BOTTLEBRUSH 5 GAL L L FULL SUN PT SHADE, EVERGREEN CAMELLIA SASANQUA CHRISTMAS CAMELLIA 5 GAL M FULL SUN TO PT SHADE, EVERGREEN COLEONEMA PULCHRUM `SUNSET GOLD` GOLDEN BREATH OF HEAVEN 5 GAL M L FULL SUN, EVERGREEN DIETES BICOLOR FORTNIGHT LILY 5 GAL L L FULL SUN PT SHADE, EVERGREEN DIETES GRANDIFLORA `VARIEGATA` STRIPED FORTNIGHT LILY 5 GAL L L SUN OR PT SHADE, EVERGREEN EPILOBIUM CALIFORNICUM `BOWMAN`S #1` CALIFORNIA FUCHSIA 1 GAL L N FULL SUN, DECIDUOUS FESTUCA MAIREI ATLAS FESCUE 1 GAL L SUN OR PT SHADE, EVERGREEN HESPERALOE PARVIFLORA RED YUCCA 5 GAL L L FULL SUN, EVERGREEN HESPERALOE PARVIFLORA `PERPA` FULL SUN, 4 L COLUMNAR EVERGREEN SHRUB TREE 3 SPECIMEN SHADE TREES ACCENT TREES COLUMNAR TREE 10 8 8 M TOTAL TREES PROPOSED 59 PERCENT OF LANDSCAPING 15.64 % (9065 SF) AREAS OF PROPOSED FOR OUTDOOR USE GROUND LEVEL (COMMON AREA)7385 SF LEVEL 2 TERRACE 420 SF LEVEL 3 TERRACE 420 SF LEVEL 4 TERRACE 420 SF LEVEL 5 TERRACE 420 SF SHRUBS, ORNAMENTAL GRASSES AND GROUNDCOVER L-1 COVER SHEET/ PLANT LIST/ PROJECT INFORMATION L-2 TREE REMOVAL PLAN L-3 PLANT PALETTE L-4 OVERALL SITE PLAN - GROUND LEVEL L-5 UPPER TERRACE ENLARGEMENTS L-6 OUTDOOR FURNITURE/ FENCING L-7 SITE LIGHTING CONCEPT PLAN PLANTING LIST STORMWATER TREATMENT AREA LANDSCAPE PLAN SHEET INDEX TREES STREET TREE BY ST. PATRICK WAY PROJECT STATEMENT OF OVERALL DESIGN THEME The landscape design intent for the Reginal Street Senior Housing Facil- ity is to integrate indoor and outdoor living so that residents can comfort- ably enjoy outdoor activities. The ground level common area along east end of the site is the primary outdoor activity zone with four (4) distinct areas linked by a loop path, allowing the residents to experience and en- joy a number of amenities: 1. Outdoor Lounge/Event Space – The outdoor lounge/event space is an extension of the community room with moveable tables/chairs, self-seat- ing elements, and art panels mounted on the perimeter fence as focal elements. This courtyard can also serve as a space for activities such as outdoor dining events or outdoor fitness groups. 2. Sports Court – The synthetic turf creates a space for active sports such as croquet, or can be used as a putting green. The seating area at the north end and benches along the side are provided for residents to enjoy watching the activities. 3. Garden Area – Stand-up garden plots are at a height that make it easy for the senior residents to enjoy gardening. Orchard trees along the eastern edge emphasize the garden character. 4. Pet Relief Zone – Located at south end of the amenity zone, the pet area includes a gated entry with a pet fountain, sodded turf where the pets can exercise, and a seating node under a large shade tree, where residents can relax and enjoy watching their pets play. Each upper level includes an outdoor terrace with its own theme and plant palette. The distinctive terraces include an orchid garden at Level 2; a scent garden at level 3; a perennial garden at level 4; and an edible garden at level 5. Each terrace will be equipped with comfortable seat- ing, inviting the residents at every level to enjoy these unique outdoor spaces. L-211/05/21 TREE REMOVAL PLAN 0 8 16 32 L-311/05/21 PLANT PALETTE TREES STORMWATER TREATMENT AREASHRUBS, ORNAMENTAL GRASSES AND GROUNDCOVER ULMUS PARVIFOLIA `DRAKE` ROSA FLORIBUNDA `BRILLIANT PINK ICEBERG` PRUNUS SERRULATA ‘KANZAN’ PYRUS PYRIFOLIA ACER RUBRUM `ARMSTRONG GOLD` ACER CIRCINATUM VINE MAPLE ABUTILON PALMERI CALLISTEMON VIMINALIS “LITTLE JOHN” FESTUCA MAIREI SALVIA MICROPHYLLA `HOT LIPS` SENECIO SERPENS TEUCRIUM CHAMAEDRYS TEUCRIUM FRUTICANS ‘AZUREUM’ KNIPHOFIA UVARIA ‘MALIBU YELLOW’ ROSA X `FLOWER CARPET APPLEBLOSSOM` HESPERALOE PARVIFLORA HEUCHERA X `ELECTRIC LIME` LAVATERA MARITIMA HESPERALOE PARVIFLORA `BRAKELIGHT` ARBUTUS UNEDO CAMELLIA SASANQUA AEONIUM ARBOREUM BOUGAINVILLEA SPP. MYRTUS COMMUNIS ‘COMPACTA’ DIETES BICOLOR EPILOBIUM CALIFORNICUM `BOWMAN`S #1` DIETES GRANDIFLORA `VARIEGATA` COLEONEMA PULCHRUM `SUNSET GOLD` ACHILLEA ‘FIREFLY PEACH SKY’ AGAVE ATTENUATA `KARA`S STRIPES` LIMONIUM CALIFORNICUM CAREX TUMULICOLA MIMULUS AURANTIACUS LEYMUS CONDENSATUS `CANYON PRINCE` JUNCUS PATENS ‘CARMEN’S GREY’CHONDROPETALUM TECTO- RUM `EL CAMPO` ARBUTUS X `MARINA` AESCULUS X CARNEA CITRUS SPP. LAURUS NOBILIS `SARATOGA` OLEA EUROPAEA `SWAN HILL` LAGERSTROEMIA INDICA `MUSKOGEE` EVERGREEN ELM JAPANESE FLOWERING CHERRY PEAR TREE ARMSTRONG RED MAPLE INDIAN MALLOW BOTTLEBRUSH ATLAS FESCUE HOT LIPS SAGE CURIO REPENS GERMANDER TREE GERMANDER MALIBU YELLOW POKER ROSE RED YUCCA CORAL BELLS TREE MALLLOW BRAKELIGHTS RED YUCCA STRAWBERRY TREE SHRUB CHRISTMAS CAMELLIA CANARY ISLAND ROSE BOUGAINVILLEA MYRTLE FORTNIGHT LILY CALIFORNIA FUCHSIASTRIPED FORTNIGHT LILYGOLDEN BREATH OF HEAVEN FIREFLY PEACH SKY YARROW AGAVE MARSH ROSEMARY BERKELEY SEDGE STICKY MONKEY FLOWER NATIVE BLUE RYE CALIFORNIA GRAY RUSH CAPE RUSH ROSE MARINA STRAWBERRY TREE RED HORSECHESTNUT ORANGE TREE SARATOGA BAY LAUREL SWAN HILL OLIVE MUSKOGEE CRAPE MYRTLE NEPETA FAASSENII CATMINT ELAEOCARPUS DECIPIENS MALUS PUMILA JAPANESE BLUEBERRY TREE APPLE TREE LAVANDULA ANGUSTIFOLIA ‘HID- COTE PINK’ ENGLISH LAVENDER LEUCOSPERMUM CORDIFOLIUM NODDING PINCUSHION LIRIOPE MUSCARI `VARIEGATA`LOMANDRA LONGIFOLIA `BREEZE`VARIEGATED LILY TURF BREEZE MAT RUSH LOMANDRA LONGIFOLIA ‘ROMA13’ PP25962 LOMANDRA PLATINUM BEAUTY PITTOSPORUM TOBIRA ‘WHEELER’S DWARF’ OLEA EUROPAEA ‘MONTRA’ RHAMNUS CALIFORNICA `EVE CASE` DWARF MOCK ORANGELITTLE OLLIE DWARF OLIVE CALIFORNIA COFFEEBERRY SALVIA LEUCANTHA `SANTA BARBARA` MEXICAN BUSH SAGE ULMUS CARPINIFOLIA X PARVIFOLIA `FRONTIER` FRONTIER ELM PODOCARPUS MACROPHYLLUS `MAKI` SHRUBBY YEW PODOCARPUS QUERCUS LOBATA VALLEY OAK L-411/05/21 0 8 16 32 Outoodr Dining/ Lounge/Event Space Sports Court Garden Pet Relief Area Shade Element Art panel on Fence Panel Gate 6’H Perimeter Privacy Fencing 4’H Pet Fence/Gate 20’ W Vehicular Double Gates Green Screen Panels Pots Bench Stand-up Planters 5’ W Pathway Patio Stormwater Treatment Area Specimen/ Monument Tree Evergreen Tree Parking Lot Tree Columnar Tree Speciment Shade Tree Accent Tree Orchard Tree Transformer/ Pad Bike Rack 1 1 8 7122616 7 8 111115 6 2 24 15 16 23 5 5 3 1413 21 17 9 22 4 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 10 18 25 19 20 20 8 19 St Patrick Way Re g i o n a l S t Street Tree by St. Patrick Way Project OVERALL SITE PLAN - GROUND LEVEL L-511/05/21 UPPER TERRACE ENLARGEMENTS Lounge Seating Raised Planter Tables and Chairs Shelf for Displaying Orchid Planters Raised Planter with Scent themed plant palette Tool Shed Guardrail, S.A.D. Synthetic Turf Pedestal Paver System, S.A.D. Stand-Up Planters 1 2 3 4 5 6 7 8 9 10 KEY PLAN N.T.S. LEVEL 2 - SCENT GARDEN LEVEL 3 - ORCHID GARDEN LEVEL 4 - PERENNIAL GARDEN LEVEL 5 - EDIBLE GARDEN 1/8” = 1’-0” 1 7 7 4 55 9 2 3 10 769 3 8 9 91 10 7 6 9 Lv. 3 Lv. 5 Lv. 4 Lv. 2 1/8” = 1’-0”1/8” = 1’-0”1/8” = 1’-0” L-611/05/21 OUTDOOR FURNITURE/ FENCING COMMON OUTDOOR SPACE UPPER TERRACE FENCING CHARACTER IMAGES ORCHID GARDEN 6’ H GOOD NEIGHBOR FENCE 4’ H PET FENCE AT DOG RUN VEHICULAR DOUBLE GATE SCENT GARDEN PERENNIAL GARDEN/ EDIBLE GARDEN L-711/05/21 SIGHT LIGHTING CONCEPT PLAN St Patrick Way Re g i o n a l S t SYMBOL FIXTURE TYPE POST TOP LIGHT M FR: HADCO OR SIMILAR MODEL: URBAN SWAN LED PENDANT WITH INTEGRAL BUILDING SIDE SHIELD LOUVER, CXF4C POLE HEIGHT: 12’ - 14’ COLOR FINISH: T.B.D. SITE LIGHTING FIXTURE LEGEND: NOTES: 1. THE PERIMETER LIGHTING WILL BE SHIELDED WITH ADEQUATE ANGLE AND WILL BE DIRECTED TO THE INTERIOR. 2. THE SITE LIGHITNG PLAN IS SUBJECT TO REVISIONS WHEN A PHOTOMETRIC STUDY IS DONE. 3. PARKING LOT LIGHTING SHALL MEET THE REQUIREMENTS SET FORTH IN THE DUBLIN MUNICIPAL CODE. 0 8 16 32 B A R architects c BARC O P Y R I G H T architects 11 / 4 / 2 0 2 1 1 0 : 3 8 : 3 4 A M C : \ 0 R E V I T \ D u b l i n A f f o r d a b l e H ou s i n g - A _ c k i m K J B 5 G . r v t DUBLIN AFFORDABLE HOUSING 6543 REGIONAL STREET, DUBLIN CA 94568 19049 PERSPECTIVE - CORNER OF REGIONAL ST & ST PATRICK WAY 2021 A00111/05/21 BA R architects c BARC O P Y R I G H T architects 11 / 4 / 2 0 2 1 1 0 : 3 8 : 3 4 A M C : \ 0 R E V I T \ D u b l i n A f f o r d a b l e H ou s i n g - A _ c k i m K J B 5 G . r v t DUBLIN AFFORDABLE HOUSING 6543 REGIONAL STREET, DUBLIN CA 94568 19049 PERSPECTIVE - MAIN ENTRY ALONG ST PATRICK WAY 2021 A00211/05/21 JEN SEN PR E C A ST W H EEL S T O P M O DEL S - 7 2 JEN SEN PR E C A ST W H EEL S T O P M O DEL S - 7 2 JEN SEN PR E C A ST W H EEL S T O P M O DEL S - 7 2 JEN SEN PR E C A ST W H EEL S T O P M O DEL S - 7 2 JEN SEN PR E C A ST W H EEL S T O P M O DEL S - 7 2 JEN SEN PR E C A ST W H EEL S T O P M O DEL S - 7 2 JEN SEN PR E C A ST W H EEL S T O P M O DEL S - 7 2 JEN SEN PR E C A ST W H EEL S T O P M O DEL S - 7 2 JEN SEN PR E C A ST W H EEL S T O P M O DEL S - 7 2 JEN SEN PR E C A ST W H EEL S T O P M O DEL S - 7 2 RELIANCE FOUNDRY BOLLARD POST MODEL R-7902 R10.0000 R22.3373 ESOLCNPOEESOEPOLCNESOLCNPOEESOEPOLCN FEBC O L F86 0 1 . 5" RED UC ED PR ES SU REBAC KF LO W AS SE MB LY ESOLCNPOEESOEPOLCNESOLCNPOEESOEPOLCN E.V CHARGING E.V CHARGING E.V CHARGING E.V CHARGING E.V CHARGING E.V CHARGING E.V CHARGING E.V CHARGING E.V CHARGING E.V CHARGING E.V CHARGING E.V CHARGING COMPACT COMPACT COMPACT COMPACT COMPACT COMPACT COMPACT COMPACT COMPACTCOMPACT COMPACT COMPACT COMPACTCOMPACT COMPACT COMPACT COMPACT COMPACT COMPACT COMPACT MAIN ENTRY FROM STREET MAIN ENTRY FROM PARKING VEHICULAR ENTRY FUTURE ST PATRICK WAY RE G I O N A L S T R E E T FU T U R E E N T R Y D R I V E ( P R I V A T E ) RESIDENTIAL UNITS BACK OF HOUSE ELECTRIC LOBBY, OFFICES, & AMENITY UNIT PATIO, TYP TRANSFORMERS ON CONC PADS CONC PAD FOR TRASH STAGING SURFACE PARKING LOT (57 TOTAL STALLS) VEHICULAR GATE W/ KNOX BOX KEY OUTDOOR AMENITY AREA WHITE CURB "LOADING ZONE" 2 STALLS MAX, SCD RESIDENTIAL UNITS PERIMETER FENCE, SLD FUTURE RESIDENTIAL BUILDING (TRACT 8460) 6513 REGIONAL STREET 6680 REGIONAL STREET 6750 REGIONAL STREET 7884 -7898 DUBLIN BLVD BIKE PARKING, SLD WATER SERVICE BFP PERIMETER FENCE, SLD GATE W/ KNOX BOX KEY GATE W/ KNOX BOX KEY BA R architects N c BARC O P Y R I G H T architects 11 / 4 / 2 0 2 1 1 0 : 3 8 : 3 5 A M C : \ 0 R E V I T \ D u b l i n A f f o r d a b l e H ou s i n g - A _ c k i m K J B 5 G . r v t 1" = 20'-0" DUBLIN AFFORDABLE HOUSING 6543 REGIONAL STREET, DUBLIN CA 94568 19049 SITE PLAN 2021 A10111/05/21 ESOLCNPOEESOEPOLCNESOLCNPOEESOEPOLCN FEBCO LF860 1.5" REDUCED PRESSURE BACKFLOW ASSEMBLY ESOLCNPOEESOEPOLCNESOLCNPOEESOEPOLCN E.V CHARGING E.V CHARGING E.V CHARGING E.V CHARGING E.V CHARGING E.V CHARGING E.V CHARGING COMPACT COMPACT COMPACT COMPACT COMPACT COMPACT COMPACT COMPACT COMPACTCOMPACT COMPACT COMPACT COMPACTCOMPACT COMPACT COMPACT COMPACT COMPACT COMPACT COMPACT FF 351.5± COMMUNITY RM LAUNDRY RM RR RR STAIR 1 ELEV 1 ELEV 2 STUSTUSTUSTUSTUSTUSTU 2 BR (MANAGER'S UNIT) 1 BR1 BR1 BR1 BR 1 BR STAIR 2 MAINT RM TRASH RM ELEC RM / MPOE IDF MECH RM STORAGE 1 A303 ________________________1 A303 ________________________ 2 A303 ________________________ 2 A303 ________________________ 3 A303 ________________________ 3 A303 ________________________ 29' - 3"267' - 7"32' - 5" 6' - 0 " 11 2 ' - 7 " STU STU A301 1 A301 2 A302 1 A302 2 FITNESS RM MAIL SEATING AREA COMMON KITCHEN ASSIST MANAGER'S OFFICE MANAGER'S OFFICE SERVICES OFFICE LOBBY FILE STORAGE COPY / STOR STORAGE ELEC CLOSET ROOM DIVIDER JANITOR'S CLOSET FUTURE ST PATRICK WAY RE G I O N A L S T R E E T SURFACE PARKING LOT (57 TOTAL STALLS) REFERENCE SHEET G002 FOR PARKING LAYOUT & DIMENSIONS OUTDOOR AMENITY AREA TYP 2' - 0" 17' - 0"197' - 7" 41' - 7" 17' - 0" 56' - 0" 7' - 0" 54' - 0" 23' - 0" FF 351.00 FF 355.00 FF 351.00 FF 354.00 FF 350.00 W D W/D W/D W/D W/D W/D W/D W/D TRASH FF 354.00 FF 354.00 BA R architects N c BARC O P Y R I G H T architects 11 / 4 / 2 0 2 1 1 0 : 3 8 : 3 6 A M C : \ 0 R E V I T \ D u b l i n A f f o r d a b l e H ou s i n g - A _ c k i m K J B 5 G . r v t 3/32" = 1'-0" DUBLIN AFFORDABLE HOUSING 6543 REGIONAL STREET, DUBLIN CA 94568 19049 FLOOR PLAN - LEVEL 1 2021 A20111/05/21 1 A303 ________________________1 A303 ________________________ 2 A303 ________________________ 2 A303 ________________________ 3 A303 ________________________ 3 A303 ________________________ STU STU STU STU STU STU 1 BRSTU 1 BR 1 BR 1 BRSTUSTUSTUSTU1 BR1 BR1 BR 1 BR 1 BR STU 1 BR 1 BR ELEV 1 ELEV 2 STAIR 1 TRASH STAIR 2 IDF STU1 BR 1 BR A301 1 A301 2 A302 1 A302 2 268' - 7" 113' - 7" 202' - 7"17' - 5"48' - 7" 48' - 7" 9' - 4" 28' - 1" 58' - 0" 17' - 0"198' - 7" 42' - 7" 17' - 0" 56' - 0" 25' - 0" IDF LOCATION OF 2-HR FIRE WALL OUTDOOR TERRACE BA R architects N c BARC O P Y R I G H T architects 11 / 4 / 2 0 2 1 1 0 : 3 8 : 3 7 A M C : \ 0 R E V I T \ D u b l i n A f f o r d a b l e H ou s i n g - A _ c k i m K J B 5 G . r v t 3/32" = 1'-0" DUBLIN AFFORDABLE HOUSING 6543 REGIONAL STREET, DUBLIN CA 94568 19049 FLOOR PLAN - LEVEL 2 2021 A20211/05/21 1 A303 ________________________1 A303 ________________________ 2 A303 ________________________ 2 A303 ________________________ 3 A303 ________________________ 3 A303 ________________________ STU STU STU STU STU STU 1 BR 1 BR 1 BR 1 BRSTUSTUSTUSTU1 BR1 BR1 BR 1 BR 1 BR STU 1 BR 1 BR ELEV 1 ELEV 2 STAIR 1 TRASH STAIR 2 IDF STU1 BR 1 BR A301 1 A301 2 A302 1 A302 2 268' - 7" 113' - 7" 52' - 7"17' - 5"132' - 7"17' - 5"48' - 7" 48' - 7" 9' - 4" 28' - 1" 58' - 0" 17' - 0"198' - 7" 42' - 7" 17' - 0" 56' - 0" 25' - 0" IDF LOCATION OF 2-HR FIRE WALLOUTDOOR TERRACE 23' - 6" 23' - 6" 23' - 6" 24' - 6" BA R architects N c BARC O P Y R I G H T architects 11 / 4 / 2 0 2 1 1 0 : 3 8 : 3 8 A M C : \ 0 R E V I T \ D u b l i n A f f o r d a b l e H ou s i n g - A _ c k i m K J B 5 G . r v t 3/32" = 1'-0" DUBLIN AFFORDABLE HOUSING 6543 REGIONAL STREET, DUBLIN CA 94568 19049 FLOOR PLAN - LEVEL 3 2021 A20311/05/21 1 A303 ________________________1 A303 ________________________ 2 A303 ________________________ 2 A303 ________________________ 3 A303 ________________________ 3 A303 ________________________ STU STU STU STU STU STU 1 BR 1 BR 1 BR 1 BRSTUSTUSTU1 BR1 BR1 BR 1 BR 1 BR STU 1 BR 1 BR ELEV 1 ELEV 2 STAIR 1 TRASH STAIR 2 IDF STU1 BR 1 BR A301 1 A301 2 A302 1 A302 2 268' - 7" 113' - 7" 52' - 7"17' - 5"132' - 7"17' - 5"48' - 7" 48' - 7" 9' - 4" 28' - 1" 58' - 0" 17' - 0"90' - 7"17' - 5"90' - 7" 42' - 7" 17' - 0" 56' - 0" 25' - 0" IDF LOCATION OF 2-HR FIRE WALL OUTDOOR TERRACE BA R architects N c BARC O P Y R I G H T architects 11 / 4 / 2 0 2 1 1 0 : 3 8 : 3 8 A M C : \ 0 R E V I T \ D u b l i n A f f o r d a b l e H ou s i n g - A _ c k i m K J B 5 G . r v t 3/32" = 1'-0" DUBLIN AFFORDABLE HOUSING 6543 REGIONAL STREET, DUBLIN CA 94568 19049 FLOOR PLAN - LEVEL 4 2021 A20411/05/21 1 A303 ________________________1 A303 ________________________ 2 A303 ________________________ 2 A303 ________________________ 3 A303 ________________________ 3 A303 ________________________ STU STU STU STU STU 1 BR 1 BR 1 BR 1 BRSTUSTUSTU1 BR1 BR1 BR 1 BR 1 BR STU 1 BR 1 BR ELEV 1 ELEV 2 STAIR 1 TRASH STAIR 2 IDF STU1 BR 1 BR A301 1 A301 2 A302 1 A302 2 268' - 7" 113' - 7" 52' - 7"17' - 5"36' - 7"17' - 5"78' - 7"17' - 5"48' - 7" 48' - 7" 9' - 4" 28' - 1" 58' - 0" 17' - 0"90' - 7"17' - 5"90' - 7" 42' - 7" 17' - 0" 56' - 0" 25' - 0" IDF LOCATION OF 2-HR FIRE WALLOUTDOOR TERRACE BA R architects N c BARC O P Y R I G H T architects 11 / 4 / 2 0 2 1 1 0 : 3 8 : 3 9 A M C : \ 0 R E V I T \ D u b l i n A f f o r d a b l e H ou s i n g - A _ c k i m K J B 5 G . r v t 3/32" = 1'-0" DUBLIN AFFORDABLE HOUSING 6543 REGIONAL STREET, DUBLIN CA 94568 19049 FLOOR PLAN - LEVEL 5 2021 A20511/05/21 PR I M A R Y R O O F S L O P E PR I M A R Y R O O F S L O P E PR I M A R Y R O O F S L O P E PRIMARY ROOF SLOPE 1 A303 ________________________1 A303 ________________________ 2 A303 ________________________ 2 A303 ________________________ 3 A303 ________________________ 3 A303 ________________________ MECH STAIR 2 MECH PV PANELS (15% OF ROOF AREA) A301 1 A301 2 A302 1 A302 2 SCUPPERS & DOWNSPOUTS LOCATED ALONG THESE WALLS 268' - 7" 113' - 7" 52' - 7"17' - 5"36' - 7"17' - 5"78' - 7"17' - 5"48' - 7" 48' - 7" 9' - 4" 28' - 1" 58' - 0" 17' - 0"90' - 7"17' - 5"90' - 7" 42' - 7" 17' - 0" 56' - 0" 25' - 0" BA R architects N c BARC O P Y R I G H T architects 11 / 4 / 2 0 2 1 1 0 : 3 8 : 3 9 A M C : \ 0 R E V I T \ D u b l i n A f f o r d a b l e H ou s i n g - A _ c k i m K J B 5 G . r v t 3/32" = 1'-0" DUBLIN AFFORDABLE HOUSING 6543 REGIONAL STREET, DUBLIN CA 94568 19049 ROOF PLAN 2021 A20611/05/21 LEVEL 1 - ST PAT WAY 0' - 0" LEVEL 2 15' - 6" LEVEL 3 25' - 8" LEVEL 4 35' - 10" LEVEL 5 46' - 0" T O ROOF STRUCT 56' - 0 1/2" LEVEL 1 - REGIONAL ST 4' - 0" 11' - 6" 10' - 2" 10' - 2" 10' - 2" 10' - 0 1/2" 4' - 0" LEVEL 2 15' - 6" LEVEL 3 25' - 8" LEVEL 4 35' - 10" LEVEL 5 46' - 0" T O ROOF STRUCT 56' - 0 1/2" LEVEL 1 - REGIONAL ST 4' - 0" 10' - 2" 10' - 2" 11' - 6" 10' - 2" 10' - 0 1/2" 4' - 0" MATERIAL LEGEND C1 - TEXTURED CONCRETE BASE S3 - FIBER CEMENT LAP SIDING (COLOR: NATURAL) M1 - METAL LASER CUT RAILING PANELS W1 - VINYL WINDOW (COLOR: WHITE) M2 - STEEL CANOPY W2 - VINYL WINDOW (COLOR: DARK BRONZE) M3 - PERFORATED METAL WINDOW SURROUND W3 - ALUMINUM STOREFRONT (COLOR: DARK BRONZE) S1 - FIBER CEMENT LAP SIDING (COLOR: GRAY) S2 - FIBER CEMENT LAP SIDING (COLOR: WHITE) BA R architects c BARC O P Y R I G H T architects 11 / 4 / 2 0 2 1 1 0 : 3 8 : 5 0 A M C : \ 0 R E V I T \ D u b l i n A f f o r d a b l e H ou s i n g - A _ c k i m K J B 5 G . r v t 3/32" = 1'-0" DUBLIN AFFORDABLE HOUSING 6543 REGIONAL STREET, DUBLIN CA 94568 19049 BUILDING ELEVATIONS 2021 A30111/05/21 3/32" = 1'-0"A301 1 ELEVATION - NORTH 3/32" = 1'-0"A301 2 ELEVATION - WEST S2W3 M1 S3 C1S1W2S3M2W1 S1 W2 M1 S3 W1S2 S2 W1 S1 W2S3 M3 M3 LEVEL 1 - ST PAT WAY 0' - 0" LEVEL 2 15' - 6" LEVEL 3 25' - 8" LEVEL 4 35' - 10" LEVEL 5 46' - 0" T O ROOF STRUCT 56' - 0 1/2" LEVEL 1 - REGIONAL ST 4' - 0" 10' - 0 1/2" 10' - 2" 10' - 2" 10' - 2" 11' - 6" 4' - 0" LEVEL 1 - ST PAT WAY 0' - 0" LEVEL 2 15' - 6" LEVEL 3 25' - 8" LEVEL 4 35' - 10" LEVEL 5 46' - 0" T O ROOF STRUCT 56' - 0 1/2" LEVEL 1 - REGIONAL ST 4' - 0" 10' - 0 1/2" 10' - 2" 10' - 2" 10' - 2" 11' - 6" 4' - 0" MATERIAL LEGEND C1 - TEXTURED CONCRETE BASE S3 - FIBER CEMENT LAP SIDING (COLOR: NATURAL) M1 - METAL LASER CUT RAILING PANELS W1 - VINYL WINDOW (COLOR: WHITE) M2 - STEEL CANOPY W2 - VINYL WINDOW (COLOR: DARK BRONZE) M3 - PERFORATED METAL WINDOW SURROUND W3 - ALUMINUM STOREFRONT (COLOR: DARK BRONZE) S1 - FIBER CEMENT LAP SIDING (COLOR: GRAY) S2 - FIBER CEMENT LAP SIDING (COLOR: WHITE) BA R architects c BARC O P Y R I G H T architects 11 / 4 / 2 0 2 1 1 0 : 3 9 : 0 2 A M C : \ 0 R E V I T \ D u b l i n A f f o r d a b l e H ou s i n g - A _ c k i m K J B 5 G . r v t 3/32" = 1'-0" DUBLIN AFFORDABLE HOUSING 6543 REGIONAL STREET, DUBLIN CA 94568 19049 BUILDING ELEVATIONS 2021 A30211/05/21 3/32" = 1'-0"A302 2 ELEVATION - EAST 3/32" = 1'-0"A302 1 ELEVATION - SOUTH S1 W2 S3 S2W1 S3M1 S1 M2 W3W2 M2W3S1W2S3S1W2 LEVEL 1 - ST PAT WAY 0' - 0" LEVEL 2 15' - 6" LEVEL 3 25' - 8" LEVEL 4 35' - 10" LEVEL 5 46' - 0" T O ROOF STRUCT 56' - 0 1/2" LEVEL 1 - REGIONAL ST 4' - 0" 4' - 0" 11' - 6" 10' - 2" 10' - 2" 10' - 2" 10' - 0 1/2" 56' - 0 1/2" MECH 1 BR 1 BR 1 BR 1 BR ELEC RM / MPOE 1 BR 1 BR 1 BR 1 BR 1 BR 1 BR 1 BR 1 BR 1 BR 1 BR 1 BR 1 BR 1 BR 1 BR 1 BR 1 BR 1 BR 1 BR 1 BR 1 BR 1 BR 1 BR 1 BR 1 BR 1 BR STU STU STU STU 2 BR (MANAGER'S UNIT) STU STU CORRIDOR CORRIDOR CORRIDOR CORRIDOR LOBBY STAIR 1 STAIR 1 STAIR 1 STAIR 1 STAIR 1 STU STU STU STU LAUNDRY RM FITNESS RM COMMUNITY RM STU STU STU STU 1 BR 1 BR 1 BR 1 BR LEVEL 1 - ST PAT WAY 0' - 0" LEVEL 2 15' - 6" LEVEL 3 25' - 8" LEVEL 4 35' - 10" LEVEL 5 46' - 0" T O ROOF STRUCT 56' - 0 1/2" LEVEL 1 - REGIONAL ST 4' - 0" 10' - 0 1/2" 10' - 2" 10' - 2" 10' - 2" 11' - 6" 52' - 0 1/2" STU STU STU STU STU 1 BR 1 BR 1 BR 1 BR 1 BR 1 BR 1 BR 1 BR 1 BR 1 BR STU STU STU STU 1 BR 1 BR 1 BR 1 BR MECH RM STORAGE LEVEL 1 - ST PAT WAY 0' - 0" LEVEL 2 15' - 6" LEVEL 3 25' - 8" LEVEL 4 35' - 10" LEVEL 5 46' - 0" T O ROOF STRUCT 56' - 0 1/2" LEVEL 1 - REGIONAL ST 4' - 0" 4' - 0" 11' - 6" 10' - 2" 10' - 2" 10' - 2" 10' - 0 1/2" 56' - 0 1/2" STU STU STU STU LOBBY LOBBY LAUNDRY RM BA R architects c BARC O P Y R I G H T architects 11 / 4 / 2 0 2 1 1 0 : 3 9 : 0 4 A M C : \ 0 R E V I T \ D u b l i n A f f o r d a b l e H ou s i n g - A _ c k i m K J B 5 G . r v t 3/32" = 1'-0" DUBLIN AFFORDABLE HOUSING 6543 REGIONAL STREET, DUBLIN CA 94568 19049 BUILDING SECTIONS 2021 A30311/05/21 3/32" = 1'-0"A303 1 LONGITUDINAL SECTION 3/32" = 1'-0"A303 2 CROSS SECTION - WEST 3/32" = 1'-0"A303 3 CROSS SECTION - EAST LEVEL 1 - ST PAT WAY 0' - 0" LEVEL 2 15' - 6" LEVEL 3 25' - 8" LEVEL 4 35' - 10" LEVEL 5 46' - 0" T O ROOF STRUCT 56' - 0 1/2" LEVEL 1 - REGIONAL ST 4' - 0" M1 - METAL LASER CUT RAILING PANELS S1 - FIBER CEMENT LAP SIDING (COLOR: GRAY) S3 - FIBER CEMENT LAP SIDING (COLOR: NATURAL) S2 - FIBER CEMENT LAP SIDING (COLOR: WHITE)C1 - TEXTURED CONCRETE BASEM2- STEEL CANOPY W3 - ALUMINUM STOREFRONT W1 & W2 - VINYL WINDOW M3 - PEFORATED METAL WINDOW SURROUND (COLOR: BRONZE ON GRAY LAP SIDING, SILVER ON WHITE LAP SIDING BA R architects c BARC O P Y R I G H T architects 11 / 4 / 2 0 2 1 1 0 : 3 9 : 1 6 A M C : \ 0 R E V I T \ D u b l i n A f f o r d a b l e H ou s i n g - A _ c k i m K J B 5 G . r v t 3/32" = 1'-0" DUBLIN AFFORDABLE HOUSING 6543 REGIONAL STREET, DUBLIN CA 94568 19049 FACADE MATERIALS 2021 A40111/05/21 3/32" = 1'-0"A401 1 ELEVATION - NORTH E.V CHARGING E.V CHARGING E.V CHARGING E.V CHARGING E.V CHARGING E.V CHARGING E.V CHARGING E.V CHARGING E.V CHARGING E.V CHARGING E.V CHARGING E.V CHARGING COMPACT COMPACT COMPACT COMPACT COMPACT COMPACT COMPACT COMPACT COMPACTCOMPACT COMPACT COMPACT COMPACTCOMPACT COMPACT COMPACT COMPACT COMPACT COMPACT COMPACT R10.00 0 0 R22.33 7 3 ESOLCNPOEESOEPOLCNESOLCNPOEESOEPOLCN FEBCO LF860 1.5" REDUCED PRESSURE BACKFLOW ASSEMBLY ESOLCNPOEESOEPOLCNESOLCNPOEESOEPOLCN AMERICAN TRASH MANAGEMENT 1900 POWELL STREET, SUITE 220 EMERYVILLE, CALIFORNIA 94608 P: 415.292.5400 F: 415.292.5410 SBROWN@TRASHMANAGE.COM DRAWING TITLE Dublin Affordable Housing 6541- 6543 REGIONAL ST DUBLIN, CA PROJECT NO. PROJECT CSDRAWN APPROVED DATE SCALE DRAWING NO. SB 11/08/2021 AS SHOWN CONSULTANT SITE PLAN TR0.1 ARCHITECT OWNER / DEVELOPER NO.DATE ISSUED BYISSUE / REVISION BAR EDEN HOUSING ELECTRIC PALLET JACK 64G COMPOST CART 64G COMPOST CART 64G COMPOST CART 64G COMPOST CART 4CY SPARE LOOSE WASTE 4CY SPARE LOOSE RECYCLE 4CY LOOSE RECYCLE BIN 4CY LOOSE WASTE BIN 8'- 0 " R O L L - U P D O O R 96G RECYCLE CART 96G RECYCLE CART TRASH CLOSET PROJECTED COLLECTION SCHEDULE: LOOSE BIN LAYOUT RESIDENTIAL TRASH ROOM SERVICE:FREQUENCY:CONTAINER VOL / TYPE: WASTE (1) 4CY FL LOOSE BIN 4x/wk RECYCLING (1) 4CY FL LOOSE BIN 4x/wk COMPOST (4) 64G TOTER CARTS 1x/wk (3) 64G TOTER CARTS 1x/wk PROJECTED COLLECTION SCHEDULE: TRASH CLOSET GROUND FLOOR UNITS SERVICE:FREQUENCY:CONTAINER VOL / TYPE: WASTE (2) 96G TOTER CARTS 3x/wk RECYCLING COMPOST 1x/wk (2) 96G TOTER CARTS 3x/wk (1) 64G TOTER CARTS AMERICAN TRASH MANAGEMENT 1900 POWELL STREET, SUITE 220 EMERYVILLE, CALIFORNIA 94608 P: 415.292.5400 F: 415.292.5410 SBROWN@TRASHMANAGE.COM DRAWING TITLE Dublin Affordable Housing 6541- 6543 REGIONAL ST DUBLIN, CA PROJECT NO. PROJECT CSDRAWN APPROVED DATE SCALE DRAWING NO. SB 11/08/2021 AS SHOWN CONSULTANT RESIDENTIAL TRASH COLLECTION ROOM LOOSE BIN LAYOUT TR1.0 ARCHITECT OWNER / DEVELOPER NO.DATE ISSUED BYISSUE / REVISION BAR EDEN HOUSING 96G RECYCLE CART 96G RECYCLE CART 96G WASTE CART 96G WASTE CART 64G COMPOST CART TRASH CLOSET 5' ADA AMERICAN TRASH MANAGEMENT 1900 POWELL STREET, SUITE 220 EMERYVILLE, CALIFORNIA 94608 P: 415.292.5400 F: 415.292.5410 SBROWN@TRASHMANAGE.COM DRAWING TITLE Dublin Affordable Housing 6541- 6543 REGIONAL ST DUBLIN, CA PROJECT NO. PROJECT CSDRAWN APPROVED DATE SCALE DRAWING NO. SB 11/08/2021 AS SHOWN CONSULTANT GROUND FLOOR UNITS TRASH CLOSET LAYOUT TR1.1 ARCHITECT OWNER / DEVELOPER NO.DATE ISSUED BYISSUE / REVISION BAR EDEN HOUSING 5' DIA. RUBBERMAID SLIM JIM FOR COMPOST. TO BE EMPTIED DAILY INTO TRASH COLLECTION ROOM COMPOST CONTAINER. RELEASE FOR OTHER USES AMERICAN TRASH MANAGEMENT 1900 POWELL STREET, SUITE 220 EMERYVILLE, CALIFORNIA 94608 P: 415.292.5400 F: 415.292.5410 SBROWN@TRASHMANAGE.COM DRAWING TITLE Dublin Affordable Housing 6541- 6543 REGIONAL ST DUBLIN, CA PROJECT NO. PROJECT CSDRAWN APPROVED DATE SCALE DRAWING NO. SB 11/08/2021 AS SHOWN CONSULTANT RESIDENTIAL UPPER FLOOR TRASH VESTIBULE (LEVEL 2-5) TR1.2 ARCHITECT OWNER / DEVELOPER NO.DATE ISSUED BYISSUE / REVISION BAR EDEN HOUSING ELECTRIC PALLET JACK 64G COMPOST CART 64G COMPOST CART 4CY SPARE 4CY SPARE 4CY LOOSE RECYCLE BIN 4CY LOOSE WASTE BIN 8'- 0 " R O L L - U P D O O R 96G RECYCLE CART 96G RECYCLE CART 96G WASTE CART 96G WASTE CART 64G COMPOST CART TRASH CLOSET 5' ADA 4CY BIN 4CY BIN 96G CART 96G CART 96G CART 96G CART 64G CART 64G CART 64G CART 64G CART 64G CART ESOLCNPOEESOEPOLCNESOLCNPOEESOEPOLCN AMERICAN TRASH MANAGEMENT 1900 POWELL STREET, SUITE 220 EMERYVILLE, CALIFORNIA 94608 P: 415.292.5400 F: 415.292.5410 SBROWN@TRASHMANAGE.COM DRAWING TITLE Dublin Affordable Housing 6541- 6543 REGIONAL ST DUBLIN, CA PROJECT NO. PROJECT CSDRAWN APPROVED DATE SCALE DRAWING NO. SB 11/08/2021 AS SHOWN CONSULTANT Staging Location TR1.3 ARCHITECT OWNER / DEVELOPER NO.DATE ISSUED BYISSUE / REVISION BAR EDEN HOUSING PATH OF TRALEL