Loading...
HomeMy WebLinkAboutReso 049-86 DoughertyRdClosure RESOLUTION NO. 49-86 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF DUBLIN ORDERING THE TEMPORARY CLOSURE OF A PORTION OF DOUGHERTY ROAD WHEREAS, Dougherty Road is to be reconstructed; and WHEREAS, the developer who is responsible for the reconstruction has requested the temporary closure of Dougherty Road from Amador Valley Blvd. north to the Dublin City Limit; and WHERE,, the City's Traffic Engineer has identified pros and cons related to the proposed closure of Dougherty Road as follows: "Temporary closure would have measurable and noticeable primary and secondary impacts on (1) motorists presently using the segment of roadway planned for closure; and (2) emergency vehicles. The absence of closure, however, could result in (1) hazardous conditions for construction personnel; (2) hazardous conditions for through traffic on Dougherty Road; and (3) an extended construction schedule."; and WHEREAS, the developer's engineer has indicated that the construction work could be done in fifteen weeks with the road remaining open for the first nine weeks and closed the remaining six weeks; and WHEREAS, the City feels that the temporary closure of Dougherty Road is necessary for the safety and protection of motorists and construction personnel; NOW, THEREFORE, BE IT RESOLVED that Dougherty Road may be temporarily closed for the completion of the reconstruction work for a period of approximately six consecutive weeks during the months of August and September, 1986, with provision of an emergency access through the site for fire protection. PASSED, APPROVED, AND ADOPTED this 27th day of May, 1986. AYES: Councilmembers Hegarty, Jeffery, Moffatt, Vonheeder, and Mayor Snyder NOES: None ABSENT: None Mayor ATTEST: City Clerk