HomeMy WebLinkAboutReso 049-86 DoughertyRdClosure RESOLUTION NO. 49-86
A RESOLUTION OF THE CITY COUNCIL
OF THE CITY OF DUBLIN
ORDERING THE TEMPORARY CLOSURE OF A PORTION
OF DOUGHERTY ROAD
WHEREAS, Dougherty Road is to be reconstructed; and
WHEREAS, the developer who is responsible for the reconstruction has
requested the temporary closure of Dougherty Road from Amador Valley Blvd. north to
the Dublin City Limit; and
WHERE,, the City's Traffic Engineer has identified pros and cons related
to the proposed closure of Dougherty Road as follows: "Temporary closure would have
measurable and noticeable primary and secondary impacts on (1) motorists presently
using the segment of roadway planned for closure; and (2) emergency vehicles. The
absence of closure, however, could result in (1) hazardous conditions for
construction personnel; (2) hazardous conditions for through traffic on Dougherty
Road; and (3) an extended construction schedule."; and
WHEREAS, the developer's engineer has indicated that the construction
work could be done in fifteen weeks with the road remaining open for the first nine
weeks and closed the remaining six weeks; and
WHEREAS, the City feels that the temporary closure of Dougherty Road is
necessary for the safety and protection of motorists and construction personnel;
NOW, THEREFORE, BE IT RESOLVED that Dougherty Road may be temporarily
closed for the completion of the reconstruction work for a period of approximately
six consecutive weeks during the months of August and September, 1986, with provision
of an emergency access through the site for fire protection.
PASSED, APPROVED, AND ADOPTED this 27th day of May, 1986.
AYES: Councilmembers Hegarty, Jeffery, Moffatt, Vonheeder, and
Mayor Snyder