Loading...
HomeMy WebLinkAbout7.1 Informational Report on Efforts to Facilitate Accessory Dwelling Unit Production STAFF REPORT CITY COUNCIL Page 1 of 4 Agenda Item 7.1 DATE: June 21, 2022 TO: Honorable Mayor and City Councilmembers FROM: Linda Smith, City Manager SUBJECT: Informational Report on Efforts to Facilitate Accessory Dwelling Unit Production Prepared by: Michael P. Cass, Principal Planner EXECUTIVE SUMMARY: The City Council will receive an informational report on City efforts to facilitate the production of Accessory Dwelling Units, including preparation of permit-ready prototype plans and an Accessory Dwelling Unit Manual. STAFF RECOMMENDATION: Receive report. FINANCIAL IMPACT: The costs associated with preparation of the permit-ready prototype plans and Accessory Dwelling Unit Manual were funded by a Senate Bill 2 grant. DESCRIPTION: The City has taken a number of steps to facilitate and incentivize the production of Accessory Dwelling Units (ADUs). This includes the creation of a ADU webpage, permit-ready prototype plans, ADU Manual, and fee waivers, which are summarized below. ADU Webpage The City launched an ADU webpage as a one-stop-shop for information and resources to assist residents with building an ADU on their property. Two key features of the webpage include permit-ready prototype plans and an ADU Manual. This webpage also includes a summary of the City’s efforts to incentivize ADUs, information on impact fee and permit fee waivers, and other resources. 738 Page 2 of 4 Permit-Ready Prototype Plans Staff worked with RRM Design Group, an architectural consulting firm, to prepare permit- ready prototype plans to help facilitate the construction of ADUs. Use of these prototype plans eliminates the cost and time for homeowners to prepare their own plans. These plans are estimated to save homeowners approximately $15,000 in architectural/design services, structural engineering services, and energy document preparation, as well as time. There are eight different plans, including five ADUs designed to be either attached to the primary residence or detached, and three plans for converting a garage to an ADU. The prototype plans include studio, one-bedroom, and two-bedroom ADUs that range in size from 224 to 909 square feet. The attached/detached ADUs are each available in three different architectural styles: Spanish, Traditional, and Modern. This gives homeowners options for choosing the style, color, and materials most compatible with the primary structure. To limit the construction costs of ADUs, the prototype plans are designed with a simple design. Figure 1 provides example renderings of an ADU in the three architectural styles. Figure 1: Renderings of ADU Prototype No. 2 The permit-ready prototype plans include floor plans, elevations, electrical and plumbing plans, structural calculations, and preliminary energy calculations that have been reviewed for compliance with all required construction codes and will be provided by the City to homeowners at no charge. The homeowner is responsible for preparing site-specific plans, such as a site plan and geotechnical report. The prototype plans are also designed with some customizable features, such as selecting a window or door in a particular location. Figure 2 provides an example floor plan. 739 Page 3 of 4 Figure 2: Floor Plan for ADU Prototype No. 4 To view the ADU prototype floor plans, elevations, and renderings, please click the links in Table 1 below: Table 1: ADU Prototype Plans Plan No. Description and Link 1 Studio, 384 square feet, Attached or Detached 2 One Bedroom, 518 square feet, Attached or Detached 3 One Bedroom, 763 square feet, Attached or Detached 4 One Bedroom, 508 square feet, Attached or Detached 5 Two Bedrooms, 909 square feet, Attached or Detached 6 Studio, 224 square feet, One-Car Garage Conversion 7 One Bedroom, 428 square feet, Two-Car Garage Conversion 8 Two Bedroom, 649 square feet, Three-Car Garage Conversion Accessory Dwelling Unit Manual To help facilitate the construction of ADUs, Staff prepared an ADU Manual (Attachment 1), which is a how-to guide for ADUs. The ADU Manual is designed for homeowners who are not familiar with the development process or are looking for information about ADUs. Contents of the ADU Manual include: an explanation about ADUs, process timelines, design concepts, summary of building codes and zoning standards, cost considerations, the permitting process, definitions, and resources. Fee Waivers to Facilitate ADUs Per State law, effective January 1, 2020, through January 1, 2025, ADUs less than 750 square feet are not subject to impact fees and ADUs 750 square feet or larger are subject to impact fees proportional to the primary residence. 740 Page 4 of 4 To further incentivize ADUs, the City waived permitting fees for building permits for ADUs applied for between January 1, 2022, and December 31, 2026. This fee waiver excludes State surcharges for SMIP and Green Building Fees, and Zone 7 fees, and does not apply to ADUs built to satisfy obligations under the Inclusionary Zoning Regulations. Permit fees are waived for ADUs less than 750 square feet and ADUs 750 square feet or larger that are deed restricted as lower-income units for a period of 55 years. This results in a savings of approximately $2,500 to $6,000 depending on the valuation of the ADU. Public Outreach Staff is in the process of implementing a public awareness campaign to promote these tools and incentives outlined in this Staff Report to encourage the construction of ADUs. The public awareness campaign is being promoted using social media, the City’s website, newsletters, push notifications, and e-mail. STRATEGIC PLAN INITIATIVE: Strategy 3: Create more affordable housing opportunities. Objective C: Facilitate the production of accessory dwelling units throughout the community. NOTICING REQUIREMENTS/PUBLIC OUTREACH: The City Council Agenda was posted. ATTACHMENTS: 1) ADU Manual 741 STEP-BY-STEP GUIDE TO CONSTRUCTING ACCESSORY DWELLING UNITS APRIL 29, 2022 ACCESSORY DWELLING UNIT MANUAL Attachment 1 742 743 3ACCESSORY DWELLING UNIT MANUAL ACKNOWLEDGMENTS CITY COUNCIL Melissa Hernandez - Mayor Jean Josey - Vice Mayor Shawn Kumagai Sherry Hu Michael McCorriston PLANNING COMMISSION Dawn Benson Catheryn Grier Kashef Qaadri Janine Thalblum Renata Tyler Stephen Wright CITY STAFF Jeff Baker - Community Development Director Kristie Wheeler - Assistant Community Development Director Michael P. Cass – Principal Planner 744 745 5ACCESSORY DWELLING UNIT MANUAL CONTENTS CHAPTER 1: WHERE TO START 07 Introduction and Purpose 07 How to Use this Manual 08 What is an ADU? 08 What is a JADU? 08 Examples of ADU Configurations 09 ADU Considerations for Typical Residential Properties 09 Tips for Selecting a Design Professional or Contractor 10 ADU Process 07 CHAPTER 2: DESIGN CONSIDERATIONS 12 Compatibility and Neighborhood Character 13 Design Compatibility 13 Architectural Consistency 14 Design Concepts 15 Zoning Ordinance Requirements 17 Parking Requirements 17 Exceptions to ADU Parking Requirements 11 CHAPTER 4: IMPLEMENTATION 23 Financing - Where to Start 23 Cost Considerations 24 Cost Saving Opportunities 25 Permitting 22 CHAPTER 5: GLOSSARY AND RESOURCES 27 Terms and Definitions 29 Resources 26 CHAPTER 3: ADU CONCEPTS AND TYPES 19 Garage Conversions: Freestanding 19 Garage Conversions: Attached 20 Detached ADU 20 Attached ADU 21 ADU Addition to Garage 21 JADU 18 TABLE OF CONTENTS 1 2 3 4 5 746 CHAPTER 1: WHERE TO START 747 CHAPTER 1: WHERE TO START 7ACCESSORY DWELLING UNIT MANUAL CHAPTER 1: WHERE TO START HOW TO USE THIS MANUAL This Manual is organized in the following chapters: Where to Start, Design Considerations, ADU Concepts and Types, Implementation, and Glossary and Resources. Begin by reviewing this Manual and determine the following: • Can I add an ADU or JADU to my lot? • Where can I construct an ADU or JADU? • What can my ADU look like? • What is the process to build an ADU? INTRODUCTION AND PURPOSE If you have any questions regarding ADU requirements, contact the Planning Division at (925) 833-6610 or visit the ADU webpage at https://dublin.ca.gov/2428/ The City of Dublin is dedicated to promoting the development of Accessory Dwelling Units (ADUs) to increase the availability of affordable housing choices within the community. This Manual has been developed to assist homeowners with the process of developing an ADU. This includes information about ADU design, construction, and permitting, as well as resources to assist with creating an ADU in one easy to use location. The City has developed a range of permit ready ADU prototype plans to save the property owner money, expedite the permit process, and result in well-designed ADUs. To view the prototype plans, please refer to the link in Chapter 4 or contact the Planning Division. A property owner may also chose to construct a pre- fabricated ADU or design a custom unit. There are many possible options for ADU design, and this Manual is intended to help property owners explore the possibility of adding an ADU or JADU to their lot and guide property owners through the process. CHAPTER 1: WHERE TO START1 748 CHAPTER 1: WHERE TO START 8ACCESSORY DWELLING UNIT MANUAL WHAT IS AN ADU?EXAMPLES OF ADU CONFIGURATIONS An Accessory Dwelling Unit, or ADU, is a residential unit that provides independent living facilities for one or more persons and includes separate kitchen, sleeping, and bathroom facilities. An ADU may be a part of, attached to, or detached from a single-family, two-family, or multi-family residence and is subordinate to the principal residence. Historically, ADUs have been called “Granny units,” “Second Units,” or “Guest Homes.” A Junior Accessory Dwelling Unit, or JADU, is a residential unit that is contained entirely within a principal residence, such as a bedroom or garage. A JADU includes a small effi ciency kitchen with a sink, and a separate entrance from the main entry of the principal residence. JADUs may share an existing bathroom and central systems, and do not require fi re separation. Add a detached ADU to your lot A “white” building represents existing principal residence “green” building represents potential ADU and JADU locations Add an attached ADU to your principal residence B Add an attached ADU to your detached garage C Convert part of your existing principal residence to an ADU or JADU D Convert your existing attached garage to an ADU or JADU E Convert your existing detached garage to an ADU F WHAT IS A JADU? 749 CHAPTER 1: WHERE TO START 9ACCESSORY DWELLING UNIT MANUAL ADUs are permitted on lots with a single- family or multi-family dwelling unit. Below are examples of typical residential lots with either a detached or an attached ADU. ADU CONSIDERATIONS FOR TYPICAL RESIDENTIAL PROPERTIES existing home existing home street frontage rear yard front yard front yard rear yard street frontage detached ADU attached ADU property line front setback rear setback property line 5’ setback 4’ setback Important considerations when locating an ADU include required setbacks, street frontage, yard space, and lot coverage. Additionally, attempt to maintain existing healthy and established trees if possible. 4’ setback When selecting an architect/ designer or contractor, consider the following: • Verify the professional is licensed, bonded, and insured • Ask for references with similar ADU and JADU projects When selecting a contractor, consider obtaining three or more bids. TIPS FOR SELECTING A DESIGN PROFESSIONAL OR CONTRTACTOR • Research existing easements and utilities on your lot. • Consider placing your ADU where there is easy access to utilities to avoid digging long trenches. • Engage a civil engineer to assist with utility connections. • Obtain a geotechnical report to understand the soil conditions on your lot. RECOMMENDATIONS FOR ADU DESIGN 750 CHAPTER 1: WHERE TO START 10ACCESSORY DWELLING UNIT MANUAL ADU PROCESS STEP #1 STEP #2 STEP #3 STEP #4 STEP #5 STEP #6 STEP #7 Defi ne your needs and budget Apply for a building permit, pay applicable fees, and construct your ADU upon issuance of a building permit Hire a contractor and defi ne construction costs Complete fi nal inspection and enjoy!! Evaluate your lot and neighborhood for compatibility Determine if an ADU or JADU is allowed on your property Design your ADU using the City’s permit-ready prototype plans (refer to Chapter 4), a pre- fabricated ADU, or hire a design professional Consult with the Planning Division if you have questions about completing these steps. Refer to Chapter 5 for a list of City contacts. 751 CHAPTER 2: DESIGN CONSIDERATIONS 752 12CHAPTER 2: DESIGN CONSIDERATIONSACCESSORY DWELLING UNIT MANUAL CHAPTER 2: DESIGN STANDARDS & CONSIDERATIONS COMPATIBILITY AND NEIGHBORHOOD CHARACTER ADUs provide a number of benefi ts, such as including additional housing choices and affordable rental housing. One key consideration when designing an ADU is to incorporate design elements and architectural features from the principal residence into the ADU. It is important to maintain neighborhood character and be compatible with surrounding development. See examples of design elements to the right and on the following page, and look for opportunities to integrate these elements into your ADU design. Communities with HOAs If your property is within a Home Owners Association (HOA), make sure to work with the HOA and review the HOA guidelines for design standards that may affect your specifi c community. Brick veneer Front facing gable Lap siding High, steep pitch roof Lap-siding Contrasting trim Roof pitch Stucco siding Simple posts and covered porch Examples of Design Elements CHAPTER 2: DESIGN CONSIDERATIONS2 753 13CHAPTER 2: DESIGN CONSIDERATIONSACCESSORY DWELLING UNIT MANUAL DESIGN COMPATIBILITY ARCHITECTURAL CONSISTENCY GOOD: consistent roof slope, massing, entry feature, and architectural style. BAD: different roof slope, massing, entry feature, and architectural style. What are elements that help defi ne compatibility? • Architectural style and details • Roof style, pitch, and material • Number of stories • Building massing • Distance between adjacent residences • Setback and yard areas • Building colors and materials • Light fi xtures • Entry feature design and location • Window placement and detailing How can you maintain privacy for yourself and your neighbors? Be a good neighbor by discussing your project with adjacent property owners to understand their concerns and design your ADU to reduce visual and privacy impacts. For example: • Locate windows to not overlook adjacent yards or into adjacent residences • Orient frequently used portions of the ADU away from adjacent property • Provide landscape screening • Shield parking and above ground utilities from view 754 14CHAPTER 2: DESIGN CONSIDERATIONSACCESSORY DWELLING UNIT MANUAL DESIGN CONCEPTS ADUs come in a variety of shapes and sizes and can be: • Detached • Attached • Conversion of an existing space • Minimum 150 SF • Maximum 1,200 SF (ADU)/ 500 SF (JADU) One of the fi rst considerations with your ADU design will be to think about who will live there, and how it will be used. • Different users have different needs when it comes to living space, accessibility, privacy, connectivity, and storage • Note that short term rentals (30 days or less) are not allowed To streamline the process and help reduce costs for the property owner, the City has created permit-ready prototype plans. See Cost Saving Opportunities in Chapter 4 for more additional information. 150 Square Foot ADU Design - Studio 1,200 Square Foot ADU Design - 2 Bedroom existing houseexisting house detached ADU street frontagestreet frontage detached ADU 755 15CHAPTER 2: DESIGN CONSIDERATIONSACCESSORY DWELLING UNIT MANUAL ZONING ORDINANCE REQUIREMENTS ISSUE/QUESTION STANDARD Which Zones Allow ADUs?ADUs and JADUs are permitted in all Residential zoning districts and Planned Development zoning districts that permit residential development, including: A, R-1, R-2, R-M, and PD. ADUs are also permitted in the C-1 zoning district. Is Design Review Required?Discretionary design review is not required. ADUs are subject to ministerial building permit review process. Ownership ADUs: Owner-occupancy of the principal residence and/ or ADU is not required. JADUs: Owner-occupancy of the principal residence is required. ADUs and JADUs may not be sold or otherwise conveyed separately from the lot or principal residence. Short-Term Rentals ADUs and JADUs may not be rented for terms of 30 days or less. Setbacks ADUs are not permitted within the front setback. Newly constructed attached and detached ADUs must be a minimum of four feet from any side and rear property lines. Conversions of existing spaces and garages do not have setback requirements, as long as the original space is legally permitted. Building Separation If the ADU is detached from the principal residence, the distance between the structures must comply with DMC Chapter 7.34. Number of Units/ Density: Single-Family Residence A maximum of one ADU and one JADU are allowed per property, except no ADU or JADU is permitted on a lot created by an Urban Lot Split created in accordance with DMC Chapters 8.81 and 9.54 involving a previously vacant parcel. The JADU may be in addition to a detached ADU. Number of Units/ Density: Multi-Family Residence 1) A maximum of two detached new ADUs per property, or 2) The maximum number of ADUs within multi-family zoning districts may not exceed 25% of the number of legally established dwelling units within the structure. ADUs and JADUs are subject to ministerial approval if they comply with the requirements contained in Dublin Municipal Code (DMC) summarized below and on the following page. Links to the DMC sections referenced in this table are provided within Chapter 5 of this Manual. Please refer to DMC Chapter 8.80 for the complete list of ADU regulations. 756 16CHAPTER 2: DESIGN CONSIDERATIONSACCESSORY DWELLING UNIT MANUAL ISSUE/QUESTION STANDARD Lot Size/ Coverage Single-family and multi-family residential parcels are not subject to a minimum lot size for ADU projects. The principal residence and ADU combined shall not cover more tan 60% of the lot. For lot coverage requirements, refer to Chapter 4 of this Manual. Size per Unit: ADU and JADU Size ADUs: 150 SF to 1,200 SF* JADUs: 150 SF to 500 SF** * Attached ADUs may not exceed 50% of the existing principal residence ** Excluding any shared sanitation facility within the principal residence Building Height The maximum height of a detached ADU may not exceed 16 feet. The maximum height for an attached ADU must conform to the height requirements of the zoning district where the lot is located. Balconies and Decks ADUs may not have balconies on an elevation directly facing the side lot line. Allowed balconies must be located a minimum of 10 feet from side and rear property lines. ADUs may not contain any rooftop terraces or roof top decks. Design Compatibility ADUs must incorporate the same or similar design features, building materials, colors, and landscaping as the principal residence. Allowed Number of Bedrooms There is no maximum number of bedrooms allowed in an ADU, as long as the ADU complies with maximum ADU size requirements and minimum bedroom sizes per the California Building Code (CBC). Windows, Doors and Egress Emergency egress must be provided from all habitable spaces as defi ned per the CBC. Egress windows and doors must be operable and meet the size requirements per the CBC. Fire Sprinklers Fire sprinklers are not required in an ADU or JADU unless they are required for the principal residence. ZONING ORDINANCE REQUIREMENTS 757 17CHAPTER 2: DESIGN CONSIDERATIONSACCESSORY DWELLING UNIT MANUAL CHAPTER 3: PARKING REQUIREMENTS Research transit stops and determine distance to your property. BART (https:// www.bart.gov/stations/dubl), and Livermore Amador Valley Transit Authority (https://www.wheelsbus.com/routes-and- schedules/) An ADU must be provided with one off-street parking space per unit or per bedroom, whichever is less, with exceptions provided in the box to the right. Studio ADUs do not require parking. Parking can be either covered or uncovered, and may be in a tandem confi guration and otherwise comply with the requirements of DMC Chapter 8.76. No parking is required for JADUs. However, if parking is provided, the parking space must comply with the requirements of DMC Chapter 8.76, except that the space may be compact or uncovered, and may be in tandem with the required parking of the principal residence. Conversion of an Existing Structure Properties which convert an existing structure or garage into an ADU or JADU are not required to replace parking. Bicycle Parking Bicycle parking is not required to be provided for the construction of an ADU or JADU. Displaced Parking (if Applicable) Any existing required parking that is displaced in order to accommodate a new ADU must be replaced on the project site, except as described on this page. Uncovered ADU parking may share an existing driveway, 9 foot by 18 foot minimum size. ADU parking may share an enclosed garage, 10 foot by 20 foot minimum size. No off-street parking is required for an ADU when one or more of the following is met: 1. The ADU is located within one-half mile walking distance of a public transit stop. 2. The ADU is located within an architecturally and historically signifi cant historic structure. 3. The ADU is within the proposed or existing residence or accessory structure. 4. When on-street parking permits are required, but not offered to the occupant of the ADU. 5. When there is a car share vehicle located within one block of the ADU. PARKING REQUIREMENTS EXCEPTIONS TO ADU PARKING REQUIREMENTS 758 CHAPTER 3:ADU CONCEPTS AND TYPES 759 19CHAPTER 3: ADU CONCEPTS AND TYPES ACCESSORY DWELLING UNIT MANUAL CHAPTER 4: ADU CONCEPTS & TYPES GARAGE CONVERSIONS: FREESTANDING GARAGE CONVERSIONS: ATTACHED Requirements for this alternative include: • Must keep the existing garage door. • Can keep all existing siding, roof, and structure unless required to update for conformance with the California Building Code. • Setback requirements are grandfathered when the ADU is contained within an existing structure. Setback requirements do apply if expanding a structure. Requirements for this alternative include: • Must keep the existing garage door. •Must provide fi re separation between principal residence and ADU. • Can keep all existing siding, roof, and structure unless required to update for conformance with the California Building Code. • Setback requirements are grandfathered when the ADU is contained within an existing structure. Setback requirements do apply if expanding a structure. This chapter includes examples of the varying types of ADUs and notable development requirements. CHAPTER 3 : ADU CONCEPTS AND TYPES3 760 20CHAPTER 3: ADU CONCEPTS AND TYPES ACCESSORY DWELLING UNIT MANUAL DETACHED ADU Requirements for this alternative include: • New construction must comply with four-foot side and rear yard setback requirements and 16-foot height limitations. • Entry porches cannot face side yards. • Separation between the principal residence and ADU are determined by DMC Chapter 7.34. CHAPTER 4: ADU CONCEPTS & TYPES ATTACHED ADU Requirements for this alternative include: • New construction must comply with four-foot side and yard setback requirements and height limits of zoning district where the lot is located. • Fire separation requirements may be required between principal residence and ADU. 761 21CHAPTER 3: ADU CONCEPTS AND TYPES ACCESSORY DWELLING UNIT MANUAL Requirements for this alternative include: • New construction must comply with four-foot side and rear yard setback requirements and height limits of zoning district where the lot is located. • Fire separation between garage and ADU is required. ADU ADDITION TO GARAGE CHAPTER 4: ADU CONCEPTS & TYPES Requirements for this alternative include: • Must be built within the walls of an existing structure. • Must have a separate entrance from the principal residence. • May share an existing bathroom with the principal residence. •May include a small effi ciency kitchen with a sink. • Setback requirements are grandfathered in when the JADU is contained within an existing structure. JADU portion of existing structure converted to JADU 762 CHAPTER 4:IMPLEMENTATION 763 23CHAPTER 4: IMPLEMENTATION ACCESSORY DWELLING UNIT MANUAL CHAPTER 5: IMPLEMENTATION FINANCING - WHERE TO START An ADU can require a large upfront investment, and fi nancing will be an important consideration. Local fi nancial institutions offer a range of ways to fi nance an ADU. If you have owned your property for several years or more, you may be able to leverage your own property’s value to fi nance an ADU. Talk to a fi nance professional to see if one of these options may work for you: • Loan (Renovation, Construction, or Non-Secured) •Cash-Out Refi nance •Cash savings or other Liquid Assets • Home Equity Line of Credit (HELOC) Refer to Chapter 5 of this Manual for a list of fi nancing resources. COST CONSIDERATIONS A complete understanding of the project cost is an important part of your project’s success. There are two main types of construction costs: soft costs and hard costs. Soft Costs may include: • Financing and interest • Architectural/design services • Structural engineering services • Soils engineering services and reports • Energy documents • Permitting and impact fees • Utility connection Potential cost savings of constructing an ADU or JADU within an existing structure include: • Use of the existing roof, structure, windows, and siding • Reduced or eliminated impact fees • No soils report required • Utilities may be easier to connect to the existing structure Potential cost implications of constructing an ADU within a new detached structure include: • The entire structure has to be built, including foundation, structure, siding, roof, and windows • Added square footage may increase property value and earning potential • Impact fees are required for ADUs that are 750 SF or greater in size • Permitting fees are required for ADUs 750 SF or greater in size, except if they are deed restricted as lower-income units for a period of 55 years • Utility connections may require trenching and upgrades • Soils engineering services are required • Civil engineering and landscaping may be required Hard Costs may include: • Demolition • Site preparation • Materials • Construction/ labor • Landscaping CHAPTER 4 : IMPLEMENTATION4 764 24CHAPTER 4: IMPLEMENTATION ACCESSORY DWELLING UNIT MANUAL Prototype Plans The City has prepared permit-ready ADU prototype plans. These include ADUs designed to be either attached or detached, and plans for converting a garage to an ADU. The prototype plans include studios, one- bedroom, and two-bedroom ADUs that range in size from 224 to 909 square feet. The ADU prototypes are available in three different architectural styles: Spanish, Traditional, and Modern; however, the exterior colors, materials, and architectural style of ADUs will be required to match the principal residence. The ADU prototype plans are designed with some ability for customization, such as selecting a window or door in a particular location. The prototype plans are available on the City’s Planning Division webpage at: https://dublin.ca.gov/116/Planning. Water Meters Dublin San Ramon Service District (DSRSD) does not require a separate water meter for ADUs, saving both time, money, and permit fees. Refer to dsrsd.com for additional water meter and utility information. COST SAVING OPPORTUNITIES Impact Fee Waiver and Reduction Effective January 1, 2020, through January 1, 2025, ADUs less than 750 square feet are not subject to impact fees. ADUs 750 square feet or larger are subject to impact fees that are proportional in relation to square footage of the principal residence, or based on the impact fee per ADU, whichever is less. By using one of the prototype ADU plans, you can save on the following soft costs: • Architectural design services • Structural engineering services • Energy documents • Plan submittal preparation time The City will provide homeowners, free of charge, with fl oor plans, elevations, electrical and plumbing plans, structural calculations, and preliminary energy calculations. These plans have been reviewed for compliance with all required building codes. The homeowner is responsible for preparing a site plan and hiring a geotechnical engineer to prepare a geotechnical report. The property owner may prepare the site plan using the aerial imagery of their lot from sources like the City’s GIS Portal (https://dublin.ca.gov/93/Maps-Property- Reports) or hire a design professional to help them. Permit Fee Waiver Effective January 1, 2022, through December 31, 2026, ADUs less than 750 square feet and ADUs 750 square feet or larger that are deed restricted as lower- income units for a period of 55 years are not subject to certain City permit fees. Refer to the City’s Master Fee Schedule and Chapter 5 of this Manual for additional information. 765 25CHAPTER 4: IMPLEMENTATION ACCESSORY DWELLING UNIT MANUAL PERMITTING Permitting Procedures A building permit application for an ADU or JADU must be submitted to the Building and Safety Division of the Community Development Department. If there is an existing principal residence on the lot, an application for an ADU or JADU will be subject to ministerial building permit review. Can I receive a building permit for an ADU and principal residence at the same time? If an application for an ADU or JADU is submitted with a building permit application to create a new principal residence on a lot, the application for the ADU or JADU may not be acted upon until the building permit for the new residence is approved. How to get a building permit? Begin by talking to the Planning Division about your project and bring in a rough site plan to discuss submittal requirements. During the building permit process, the City will formally review your application and comment on the plans to ensure all items are complete. Building Permit Submittal Items In addition to the standard submittal requirements for a building permit, the ADU or JADU application shall include the following items: ELEMENTS TO INCLUDE ON THE SITE PLAN drawing scale and north arrow labeled yards minimum dimension between ADU and existing structures labeled streets property lines footprint and square footage of proposed ADU • A site plan drawn to scale, showing the dimensions of the perimeter of the parcel on which the ADU or JADU will be located. The site plan must indicate the location and dimensioned setbacks of all existing and proposed structures on the site. • Lot coverage calculations indicating the square footage of the structures and the lot, including calculations on the plan for the percentage of lot area covered by the foundation of the new and existing dwelling units. • Elevations for ADUs that include modifi cations to the exterior of the principal residence or new construction, showing all openings, exterior fi nishes, original and fi nish grades, stepped footing outline, roof pitch, materials and color board for the existing residence and the proposed ADU. • Existing and proposed utility and service information, such as utility easements, services and connections. Refer to Chapter 5 for a list of local providers and start with the following: 1)Contact a surveyor or civil engineer 2)Review your preliminary title report 3)Visit the Alameda County Public Works Agency’s survey documents website at: http://acgov.org/surveyor/ 4)Contact the Public Works Department at (925)833-6630 Lot coverage = footprint of all structures on the site (SF) / total size of lot (SF) Sample Site Plan PROPOSED ADU(480 SF) EXISTING RESIDENCE (1,100 SF) EXISTING GARAGE(460 SF) DRIVEWAY REAR YARD FRONT YARD MA I N S T R E E T SI D E W A L K 50 ’ P R O P E R T Y L I N E 100’ PROPERTY LINE 100’ PROPERTY LINE north footprint and square footage of existing buildings If you have any questions regarding building permit requirements, contact the Building and Safety Division at (925) 833-6620. For information on applying for a building permit, visit https://www.dublin.ca.gov/586/Building-Permits 766 CHAPTER 5: GLOSSARY AND RESOURCES 767 27CHAPTER 5: GLOSSARY AND RESOURCESACCESSORY DWELLING UNIT MANUAL CHAPTER 6: GLOSSARY & RESOURCES TERMS ACCESSORY DWELLING UNIT (ADU): ATTACHED ADU: DETACHED ADU: EFFICIENCY KITCHEN: JUNIOR ACCESSORY DWELLING UNIT (JADU): DEFINITIONS A residential unit that provides independent living facilities for one or more persons and includes separate kitchen, sleeping, and bathroom facilities. An accessory dwelling unit may be a part of, attached to, or detached from, a single-family, two-family or multi- family residence and is subordinate to the principal residence. Also included: effi ciency unit as defi ned in Section 17958.1 of the Health and Safety Code, and a manufactured home as defi ned in Section 18007 of the Health and Safety Code. An ADU that is attached by at least one wall to the principal residence. A free standing ADU that is separate from the principal residence. Limited kitchen facilities that contains a sink and small electric appliances that do not require electrical service greater than 120 volts, and a limited food preparation counter and storage cabinets. Full-sized electric, gas, or propane cooking appliances are not allowed. A residential unit that is no more than 500 square feet in size that is contained entirely within the walls of a single-family residence, including attached garages and has a separate entrance. At a minimum, a JADU must include an effi ciency kitchen with a food preparation counter, cooking facility with appliances and storage cabinets, and may include separate sanitation facilities or may share sanitation facilities within the existing single-family residence. CHAPTER 5: GLOSSARY AND RESOURCES5 768 28CHAPTER 5: GLOSSARY AND RESOURCESACCESSORY DWELLING UNIT MANUAL TERMS DEFINITIONS LOT COVERAGE: PRINCIPAL RESIDENCE: SETBACK: The maximum lot area which may be covered with buildings and structures. Buildings and structures include all land covered by principal buildings, garages and carports, accessory structures, covered decks and gazebos, and other enclosed and covered areas; but not standard roof overhangs, cornices, eaves, uncovered decks, swimming pools, paved areas such as walkways, driveways, patios, uncovered parking areas or roads. All areas of coverage are computed in terms of net lot area at ground level. A building or structure being occupied by the principal use on the site. In any residential zoning district, any existing dwelling unit must be considered a principal residence on the site. The required distance that a building or structure must be located from a property line. 769 29CHAPTER 5: GLOSSARY AND RESOURCESACCESSORY DWELLING UNIT MANUAL CITY OF DUBLIN PLANNING DIVISION email: planningpermits@dublin.ca.gov phone: (925) 833-6610 BUILDING AND SAFETY DIVISION email: planchecks@dublin.ca.gov phone: (925) 833-6620 PUBLIC WORKS AND ENGINEERING email: public.works@dublin.ca.gov phone: (925) 833-6630 FIRE DEPARTMENT Alameda County Fire Department: https://dublin.ca.gov/22/Fire-Services- Prevention email: dublinfp@acgov.org phone: (925) 833-6606 MASTER FEE SCHEDULE: https://dublin.ca.gov/1330/Fee- Schedule DUBLIN ADU WEBSITE: https://dublin.ca.gov/2428/Accessory- Dwelling-Units ADU PROTOTYPE PLANS: https://dublin.ca.gov/116/Planning PUBLIC UTILITIES ELECTRICITY Pacifi c Gas & Electric (PG&E): https://www.pge.com/ East Bay Community Energy (EBCE): https://ebce.org WASTE Amador Valley Industries (AVI): https://www.amadorvalleyindustries.com/ WATER/SEWER Dublin San Ramon Service District (DSRSD): https://www.dsrsd.com/ RESOURCES DUBLIN MUNICIPAL CODE Chapter 7.34, Residential Code: https://www.codepublishing.com/CA/ Dublin/#!/Dublin07/Dublin0734.html#7.34 Chapter 8.76, Off-Street Parking and Loading Regulations: https://www.codepublishing.com/CA/ Dublin/#!/Dublin08/Dublin0876.html#8.76 Chapter 8.80, Accessory Dwelling Unit Regulations: https://www.codepublishing.com/CA/ Dublin/#!/Dublin08/Dublin0880.html#8.80 PERMIT/ PLAN CHECK FEE WAIVER FORM ADUs with a fl oor area less than 750 square feet, or a fl oor area equal to or greater than 750 square feet that is deed- restricted as a lower-income unit for a period of 55 years, are eligible for the City of Dublin’s Fee Waiver Program: https://www.dublin.ca.gov/ DocumentCenter/View/29300/ADU- Supplemental-Application-form-fee- waiver- 770 30CHAPTER 5: GLOSSARY AND RESOURCESACCESSORY DWELLING UNIT MANUAL RENTAL RESOURCES Alameda County Housing and Community Development Department Rental Housing: https://www.acgov.org/cda/hcd/rhd/ index.htm Alameda County Housing Portal: https://housing.acgov.org/ Housing Choices for Alameda County: https://achousingchoices.org/ City of Dublin Rental Housing Webpage: https://dublin.ca.gov/669/Rental-Housing ADDITIONAL ADU RESOURCES California Department of Housing and Community Development: https://www.hcd.ca.gov/policy-research/ accessorydwellingunits.shtml American Association of Retired People: https://www.aarp.org/livable- communities/housing/info-2019/accessory- dwelling-units-adus.html?CMP=RDRCT-CSN- OTHER-LIVABLE-012819 RESOURCES FINANCING RESOURCES CALHFA ADU GRANT PROGRAM Provides a grant for qualifying low and moderate income homeowners: https://www.calhfa.ca.gov/adu/ THE CASITA COALITION Provides an ADU Finance Guide for Homeowners: https://www.casitacoalition.org/ guidebooks-for-homeowners REGIONAL ORGANIZATIONS AND ADU NONPROFITS The following websites provide technical and/or financial support and may be able to assist low-income homeowners in ADU financing: https://www.hcd.ca.gov/policy-research/ docs/adu_december_2020_handbook.pdf https://www.soup.is/adu-details https://housingtrustsv.org/programs/ homeowner-programs/accessory-dwelling- unit-program/ https://www.smcu.org/Loans/Home-Loans/ ADU-Loan https://keystoequity.org/ 771 772 Informational Report on Efforts to Facilitate Accessory Dwelling Unit Production City Council June 21, 2022 Item 7.1 773 ADU Facilitation Efforts •ADU Webpage •Prototype Plans •ADU Manual •Fee Waivers 774 ADU Webpage •Informational resource: –City Efforts to Incentivize ADUs –Impact Fee and Permit Fee Waivers –Prototype Plans –ADU Manual –Other Resources 775 ADU Prototype Plans •Eight plans, including: –Five attached or detached –Three plans converting garage to ADU •Studios, one-bedroom, and two-bedroom units •224 –909 square feet 776 ADU Prototype Plans •Three Architectural Styles: –Contemporary –Spanish –Traditional 777 ADU Prototype Plans •“Permit Ready” Plans include: –Floor Plans –Elevations –Electrical and Plumbing Plans –Structural Calculations –Preliminary Energy Calculations 778 ADU Prototype Plans 779 ADU Manual •“How-To” Guide for ADUs •Manual includes: –Explanation about ADUs –Process timelines –Design concepts –Summary of building codes and zoning standards –Cost considerations –Permitting process –Definitions and resources 780 Fee Waivers •Impact Fee Waiver (through 1/1/25): –ADUs less than 750 square feet •Permit Fee Waiver (through 12/31/26): –ADUs less than 750 square feet –ADUs 750 square feet or larger that are deed restricted as lower-income units 781