Loading...
HomeMy WebLinkAboutReso 168-01 I580SMARTCorridorRESOLUTION NO. 168- 01 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF DUBLIN SUPPORTING THE I-580 SMART CORRIDOR MANAGEMENT PLAN WHEREAS, representatives of the Tri-Valley Cities of Dublin, Livermore and Pleasanton, and Alameda County have jointly developed a staged implementation plan for the 1-580 Smart Corridor, and WHEREAS, all of these jurisdictions stand to benefit from any improvements in safety and reduced congestion. NOW, THEREFORE, BE IT RESOLVED THAT THE CITY OF DUBLIN SUPPORT THE FOLLOWING PHASED ELEMENTS OF THE 1-580 SMART CORRIDOR PLAN: 1) 2) 3) 4) Develop a Center-to-Center communications system that will allow the above jurisdictions to better coordinate signal timing, corridor system management and incident management, as well as allowing coordination between the jurisdictions and Caltrans. Implement Traffic Control Centers in each of the four jurisdictions for the purpose of providing better management of traffic and the sharing of real-time information among the jurisdictions and with incident management operators and the public. Provide critical traffic information to a Tri-Valley WEB site to provide public information on traffic incidents, congestion and planned construction activities. Support the phased implementation ora Ramp Metering Plan on 1-580 from 1-880 to the Altamont Pass. The plan would include the following elements: A) Caltrans commitment to fund and construct the remaining missing meters within a five year timeline, as well as a Central Control System to monitor and manage the operations of the meter signals; B) Inter- jurisdictional agreement on overall metering strategy that would affect the jurisdictions on an equitable basis; C) Incremental systematic implementation of ramp metering as follows: First Phase, eastbound in the Dublin/Pleasanton area from Foothill Road to E1 Charro Road during the PM commute; Second Phase, the remainder of eastbound 1-580 from 1-880 to Altamont Pass during the PM commute; and Third Phase, westbound along the entire segment from Altamont Pass to 1-880 during the AM commute; and D) An annual evaluation report which reviews progress of the Corridor Management Plan, Incident Management and Ramp Metering. PASSED, APPROVED AND ADOPTED this 18th day of September, 2001. AYES: Councilmembers Lockhart, McCormick, Oravetz, Zika and Mayor Houston NOES: None ABSENT: None ABSTAIN: None K2/G/9-18-01/reso-580: ~doc (Item 4.2) G: ~I-580 Smart Corridor~reso plan support, doc Mayor