Loading...
HomeMy WebLinkAboutReso 85-05 Maintenance Services RESOLUTION NO. 85 - 05 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF DUBLIN *11:***~*** APPROVING AMENDMENT TO AGREEMENT WITH MCE CORPORATION FOR MAINTENANCE SERVICES WHEREAS, the City Council approved an agreement with MCE Corporation for Public Works Maintenance Services effective July 1,2003; and WHEREAS, said agreement provided a detailed scope of work and labor rates for Fiscal Year 2003-2004 and was amended with updated rates for Fiscal Year 2004-2005; and WHEREAS, said agreement entitled MCE Corporation to request a rate adjustment during the second and third years; and WHEREAS, MCE Corporation is requesting an adjustment of rates for Fiscal Year 2005-2006, which has been reviewed in conjunction with preparation of the budget for Fiscal Year 2005-2006, NOW, THEREFORE, BE IT RESOLVED that the City Council of the City of Dublin does hereby approve the amendment to the agreement with MCE Corporation, attached hereto as "Exhibit A " with an effective date of July 1,2005, BE IT FURTHER RESOLVED that the Mayor is authorized to execute the amendment. PASSED, APPROVED AND ADOPTED this 7th day.of June, 2005, AYES: Councilmembers Hildenbrand, McCormick, Oravetz and Zika, and Mayor Lockhart NOES: None ABSENT: None 'ABSTAIN: None ATT~ ~. \ \h.. Jw...o IJ . - Deputy City Clerk G:\CC-MTGS\200~-qtr'2\Jun\06-07"()S\r-eso 85-05 mcc amend agml..doc (Item 4.8) EXHIBIT "A" OF RESOLUTION _-os d~33 AMENDMENT TO AGREEMENT BETWEEN CITY OF DUBLIN AND MCE CORPORATION FOR PUBLIC WORKS MAINTENANCE SERVICES WHEREAS, .effective July 1, 2003, the City of Dublin (hereinafter referred to as "CITY" and MCE Corporation (hereinafter referred to as "CONTRACTOR") entered into an agreement to provide Public Works Maintenance Services to CITY (hereinafter referred to as' "AGREEMENT); and WHEREAS, said AGREEMENT provided a schedule of rates for Fiscal Year 2003-04 and was amended with updated rates for Fiscal Year 2004-2005; and W}iEREAS, MCE, has requested an adjustment of rates for Fisca1 Year 2005-2006; NOW, THEREFORE, the parties hereto agree as follows: . Section 1. ExhibitB, "Payment Sohedule,t! of the Agreement shall be replaced with the rates indicated on Attachment 1 of this Amendment, "Proposed Rates and Unit Costs Revised May 24, 2005." Section 2. Said Amendment shall be effective as of July 1, 2005.. CITY OF DUBLIN MCE CORPORATION Mayor ' Lf? ~/ President , ATTEST: City Clerk AAL J)~ Secrei8ry / g: icontractimce\amndment mce 2005 ~x h.'1 h,'t: - 'A I( ~ A ftac~ lI\N!.I\...-r I T ABL.E III CITY OF DUBLIN PROPOSED RATES AND UNIT COSTS AS OF MAY 24, 2005 :3 0033 2004 . 2005 RATES 2005 . 2006 PROPOSED RATES CHANGE PERCENT CHANGE MCE CREW EQUIPMENT RATES GILCREST ASPHALT PAVER $120.00 HR . $123.60 HR $3.60 3.0% SLAW KNOX ASPHALT PAVER 75.00 HR 77.25 HR 2.25 3.0% BACKHOE 47.50 HR 48.90 HR 1.40 2.9% LOADER 44.25 HR 45.60 HR 1.35 3.1% ROLLER-VIBRATORY 5-8 TON 40.75 HR 41.97 HR 1.22 3.0% ROLLER-VIBRATORY 3-5 TON 40.75 HR 41.97 HR 1.22 3.0% DUMP TRUCK 8-12 C.Y. 44.25 HR 45.60 HR. 1.35 3.1% DUMP TRUCK 4-6 C.Y. 40.75 HR 41.97 HR 1.22 3.0% TRANSIT TRUCK 3 C.Y. 40.75 HR 41.97 HR 1.22 3.0% SAW TRUCK 34.00 HR 35.00 HR 1.00 2.9% PICKUP 13.25 HR 13.65 HR OAO 3.0% CONCRETE SAW-SELF PROP. 35.00 HR 36.05 HR 1.05 3.0% CONCRETE SAW-SMALL 6.75 HR 6.90 HR 0.15 2.2% AiR COMPRESSOR 20.00 HR 20AO HE DAD 2.0% BITUMAL POT 18.75 HR 19.10 HR 0.35 1.9% VIBRAPLATE 10.50 HR 10.70 HR 0.20 1.9% WACKER 10.50 HR 10.70 HR 0.20 1.9% POWER BERM MACHINE 20.00 HR 20.40 HR 0.40 2.0% ARROW BOARD 15.00 HR 15.30 HR 0.30 2.0% PAINT STRIPING MACHINE 15.00 HR 15.30 HR 0.30 2.0% UNIT PRICES CHEMICAL WEED CONTROL R.O.W. 161.00 AC 164.22 AC $3.22 2.0% FUNGUS SPRAYING - TREES 6.10 EA 6.21 EA 0.11 1.8% (50 TREE MiNIMUM) FERTILIZE ONLY TURF 0 ALL PARKS 131.80 AC 134.45 AC $2.65 2.0% 0 FIREST A TIONS 28.75 EA 28.75 EA $0.00 0.0% k::\C.M. DOQuments\Dublin\Eludget\Dublin, city of - Tables - 2005-2006 5f2412005 TABL.E III CITY OF DUBLIN PROPOSED RATES AND UNIT COSTS AS OF MAY 24, 2005 tfo~3~ 2005 - 2006 2004 . 2005 P~OPOSED PERCENT RATES RATES CHANGE CHANGE DUBLIN CREW LABOR RATES MAINTENANCE SUPERINTENDENT $55.50 HR $56.60 HR $1.10 2.0% MAINTENANCE SUPERVISOR $48.80 HR $49.80 HR $1.00 2.0% LANDSCAPE FOREPERSON 42.50 HR 43.30 HR 0.80 1.9% LANDSCAPE LABORER J 35.70 HR 36.40 HR 0.70 2.0% LANDSCAPE LABORER II 30.40 HR 31.00 HR 0.60 2.0% LANDSCAPE LABORER III 24.30 HR 24.80 HR 0.50 2.1% DUBLIN CREW EQUIPMENT RATES PICKUPRANGERlSUPERCAB 7.15 HR 7.35 HR $0.20 2.8% F150 PICKUP 8.15 HR 8.40 HR $0.25 3.1% F250 PICKUP/UTILITY BED 8.65 HR 8.90 HR $0.25 2.9% F350 & F450 FLATBED 9.70 HR 10.00 HR 0.30 3.1% CHAIN SAW 5.80 HR 5.90 HR 0.10 1.7% BRUSH CUTTER 5.15 HR 5.25 HR 0.10 1.9% POWER BLOWER ?01~ HR 2.20 HR 0.05 2.3% _. ,0 POWER HEDGE TRIMMER 3.60 HR 3.65 HR 0.05 1.4% TRAILER SMALL (8') 2.60 HR 2.65 HR 0.05 1.9% POWER WASHER 12.60 HR 12.85 HR 0.25 2.0% ELECTRIC WELDER 7.00 HR 7.15 HR 0.15 2.1% PORTABLE GENERATOR 5.60 HR 5.70 HR 0.10 1.8% WATER TRAILER 9.80 HR 10.00 HR 0.20 2.0% UTILITY CART 3.90 HR 4.00 HR 0.10 2.6% HAND HELD MEDIAN SCRUBBER 5.20 HR 5.30 HR 0.10 1.9% MCE CREW LABOR RATES SUPERINTENDENT $85.00 HR $86.70 HR $1.70 ~.O% LOADER/BACKHOE OPERATOR 84.32 HR 86.00 HR 1.68 2.0% ASPHALT PAVER OPERATOR 84.32 HR 86.00 HR 1.68 2.0% ASPHALT PAVER SCREED MAN 81.81 HR 83.45 HR 1.64 2.0% ROLLER OPERATOR 81.81 HR 83.45 HR 1.64 2.0% TRUCK DRIVER 8-12 C.Y. 68.00 HR 69.35 HR 1.35 2.0% TRUCK DRIVER 4-6 C.Y. 69.09 HR 70.50 HR 1.41 2.0% TRUCK DRIVER 3 C.Y. TRANSIT 68.00 HR 69.35 HR 1.35 2.0% CEMENT FINISHER 63.39 HR 64.65 HR 1.26 2.0% LABORER FOREMAN 61.07 HR 62.30 HR 1.23 2.0% RAKER 59.71 HR 60.90 HR 1.19 2.0% LABORER I 59.43 HR 60.60 HR 1.17 2.0% LABORER 2 59.25 HR 60.45 HR 1.20 2.0% k:\C.M. Documents\Dublln\Budget\Dublin, City of - Tables - 2005-2006 512412005 TABLE III CITY OF DUBLIN PROPOSED RATES AND UNIT COSTS AS OF MAY 24, 2005 5663 S 2006 . 2006 2004 . 2005 PROPOSED PERCENT RATES RATES CHANGE CHANGE UNIT PRICES (CONTINUED ...) FERTILIZE I BROADLEAF TURF 0 FIRE STATIONS 28.75 EA 28.75 EA $0.00 0.0% o ALL STREETS 156.60 AC 159.70 AC $3.10 2.0% o ALL PARKS 156.60 AC 159.70 AC 3.10 2.0% AERATION TURF 0 FIRE STATIONS 28.75 EA 28.75 EA $9.00 0.0% 0 STREETS 224.25 AC 228.74 AC $4.49 2.0% o All. PARKS 138.00 AC 140.76 AC 2.76 2.0% MOW TURF 0 STREET, FIRE STATION, 82.87 AC 84.47 AC $1.60 .1.9% STAGECOACH PARK o ALL OTHER PARKS 55.26 AC 56.36 AC 1.10 2.0% EDGING TURF 0 STREETS, FIRE STATION, 17.62 MLF 17.97 MLF $0.35 2.0% STAGECOACH PARK o ALL OTHER PARKS 15.10 MLF 15.41 MLF 0.31 2.1% CONTRACT BEDDlNG (ALL AREAS) 301.53 MO/AC 307.56 MO/AC $6.03 2.0% k:\C.M. Documents\Dublin\Budget\Oublin, city of - Tables - 2005-2006 5/2412005