HomeMy WebLinkAbout4.4 Project Funding Agreements with Alameda County Transportation Commission for Various Crosswalk and Traffic Signal Modification ImprovementsSTAFF REPORT
CITY COUNCIL
Page 1 of 3
Agenda Item 4.4
DATE:July 19, 2022
TO:Honorable Mayor and City Councilmembers
FROM:Linda Smith, City Manager
SUBJECT:Project Funding Agreement s with Alameda County Transportation Commission for Various Crosswalk and Traffic Signal ModificationImprovementsPreparedby:Oliver Castillo,Assistant Civil Engineer
EXECUTIVE SUMMARY:The City Council will consider approving project funding agreements with Alameda County Transportation Commission to fund crosswalk improvements and traffic signal modifications as part of Dublin’s Citywide Bicycle and Pedestrian Improvements project (CIP No. ST0517).
STAFF RECOMMENDATION:Adopt the Resolution Approving Project Funding Agreements with Alameda County Transportation Commission for Crosswalk Improvement Projects.
FINANCIAL IMPACT:The City will receive grants of $135,000 from Measure B funds and $726,000 from Vehicle Registration Fee funds allocated by Alameda County Transportation Commission for the Citywide Bicycle and Pedestrian Improvements project (CIP No. ST0517). The grants require local matching funds of $260,000, which are already included in the project budget. There is no impact to the General Fund.
DESCRIPTION:The 2022-2027 Capital Improvement Program includes the Citywide Bicycle and Pedestrian Improvements project (CIP No. ST0517, Attachment 5), which provides for planning, design, and construction of improvements to various pedestrian and bicycle facilities throughout the City. The project includes updates to the Bicycle and Pedestrian Master Plan and Americans with Disabilities Act (ADA) Transition Plan, maintenance and repair of sidewalks, and other focused bicycle and pedestrian projects, which may include crosswalk, sidewalk, and related
45
Page 2 of 3
improvements at various locations throughout the City.Alameda County Transportation Commission (Alameda CTC) is responsible for planning, funding, and delivering transportation projects and programs within Alameda County. This includes the programming of federal, state, regional, and local transportation funding, which is distributed to local jurisdictions and transit agencies directly and through competitive discretionary grantprograms. In response to recent Alameda CTC grant funding programs, Staff submitted grant applications and has been awarded funding for bicycle and pedestrian improvements associated with the Safe Routes to School program, and traffic signal modifications and pedestrian improvements related to the Downtown Dublin Streetscape Plan. These improvement projects, which will be completed under the umbrella of the City’s Citywide Bicycle and Pedestrian Improvements project, are described below.Safe Routes to School - Crosswalk Improvements ProjectIn early 2021, Alameda CTC announced the availability of $1.7 million in Measure B and Congestion Management Agency Transportation Improvement Program funds for their Safe Routes to School Mini-Grant Program, to support capital improvements that enhance conditions for pedestrians, bicyclists, and transit riders traveling to and from school. The Safe Routes to School Mini-Grant Program funds are discretionary and distributed using a formula based on student population. Using the formula, Staff applied for grant funding and Alameda CTC allocated $94,000 in Measure B funds via Agreement No. A22-0010 (Attachment 2) for final design costs for the Safe Routes to School – Crosswalk Improvements Project. The City is required to provide matching funds in the amount of $21,000 for final design and $100,000 for construction, totaling $121,000.Also in early 2021, Alameda CTC issued a notice of funding opportunity as part of their 2022 Comprehensive Investment Plan. Discretionary grant funds of up to $26 million of combined Measure B, Vehicle Registration Fee (VRF), and Transportation Fund for Clean Air (TFCA) weremade available for bicycle, pedestrian, and transit related projects. Staff applied for grant funding and Alameda CTC allocated VRF funds via Agreement No. A22-0026 (Attachment 3) in the amount of $110,000 for final design costs and $390,000 for construction costs for the Safe Routes to School – Crosswalk Improvements Project. The City is required to provide matching funds in the amount of $40,000 for final design and $10,000 for construction, totaling $50,000.The Safe Routes to School project includes various improvements near 12 schools in the City and will create safer crossings, improve accessibility, and encourage more students and residents to use active transportation modes. The proposed improvements were developed through walk audits funded by Alameda CTC and coordinated by the Safe Routes to Schools program. Walk audits included in-field observations as well as feedback from numerous stakeholders, including representatives from Dublin Unified School District, Dublin Police Services, City Staff, school administrators, parents, students, and traffic engineering/transportation planning professionals. Major recommendations from the walk audits, refined by guidelines provided in the City’s Bicycle and Pedestrian Master Plan and by site specific engineering review, form the foundation of the proposed improvements.The funding from Alameda CTC will offset the costs of designing and installing Rectangular Rapid
46
Page 3 of 3
Flashing Beacons (RRFB) and other crosswalk improvements including ADA curb ramp upgrades, signing, and striping improvements at Amador Valley Boulevard at Burton Street, Central Parkwayat Aspen Street, and Grafton Street at Antone Way, and traffic signal modification at the intersection of Central Parkway at Hibernia Drive.Downtown Dublin Streetscape Plan Implementation – Regional Street Mid-Block CrosswalkThe Downtown Dublin Streetscape Plan includes several pedestrian and bicycle improvements in the Downtown area. The City Council, Staff, and members of the community have been actively engaged in the City’s efforts to create a cohesive, unique, and walkable Downtown. Installation of a mid-block crosswalk on Regional Street has been identified as a high-priority improvement in the Downtown Dublin Streetscape Plan. Staff applied to Alameda CTC under the same $26 million 2022 Comprehensive Investment Plan grant mentioned above. The City was allocated discretionary funds via Agreement No. A22-0027 (Attachment 4) in the amount of $41,000 in Measure B funds for final design and $226,000 in VRF funds for the construction of the Downtown Streetscape Plan Implementation project. The City is required to provide matching funds in the amount of $14,000 for final design and $75,000 for construction, totaling $89,000. The project will install an RRFB, a mid-block crosswalk, bulbouts, and signing and striping improvements on Regional Street between Dublin Boulevard and Amador Valley Boulevard.
STRATEGIC PLAN INITIATIVE:None.
NOTICING REQUIREMENTS/PUBLIC OUTREACH:A copy of this report has been provided to the Alameda County Transportation Commission Citizen Watchdog Committee. The City Council Agenda was posted.
ATTACHMENTS:1) Resolution Approving Project Funding Agreements with Alameda County Transportation Commission for Crosswalk Improvement Projects2) Exhibit A to the Resolution – Project Funding Agreement No. A22-00103) Exhibit B to the Resolution – Project Funding Agreement No. A22-00264) Exhibit C to the Resolution – Project Funding Agreement No. A22-0027
5)CIP No. ST0517
47
Attachment 1
Reso. No. XX-22, Item X.X, Adopted XX/XX/2022 Page 1 of 2
RESOLUTION NO. XX – 22
A RESOLUTION OF THE CITY COUNCIL
OF THE CITY OF DUBLIN
APPROVING PROJECT FUNDING AGREEMENTS WITH ALAMEDA COUNTY
TRANSPORTATION COMMISSION FOR CROSSWALK IMPROVEMENT PROJECTS
WHEREAS,the 2022-2027 Capital Improvement Program includes the Citywide Bicycle
and Pedestrian Improvements project (CIP No. ST0517), which includes planning, design, and
construction of improvements to various pedestrian and bicycle facilities throughout the City,
such as crosswalk improvements at the intersections of Amador Valley Boulevard at Burton
Street, Central Parkway at Aspen Street, Grafton Street at Antone Way, traffic signal
modification at Central Parkway and Hibernia Drive, and a mid-block crosswalk on Regional
Street between Dublin Boulevard and Amador Valley Boulevard (collectively known as the
Crosswalk Improvements Project) of; and
WHEREAS,Alameda County Transportation Commission (Alameda CTC) allocated
$94,000 in Measure B grant funding to the City of Dublin for the design of the Crosswalk
Improvements Project, further described in Project Funding Agreement No. A22-0010, attached
hereto as Exhibit A, and
WHEREAS, Alameda CTC allocated $500,000 in Vehicle Registration Fee grant funding
to the City of Dublin for the design and construction of the Crosswalk Improvements Project,
further described in Project Funding Agreement No. A22-0026, attached hereto as Exhibit B;
and
WHEREAS, Alameda CTC allocated $267,000 in Measure B and Vehicle Registration
Fee grant funding to the City of Dublin for the design and construction of the Crosswalk
Improvements Project, further described in Project Funding Agreement No. A22-0027, attached
hereto as Exhibit C.
NOW, THEREFORE, BE IT RESOLVED that the City Council of the City of Dublin hereby
approves the Project Funding Agreements with Alameda CTC, attached hereto as Exhibit A,
Exhibit B, and Exhibit C to this Resolution.
BE IT FURTHER RESOLVED that the City Manager is authorized to execute the project
funding agreements and make any necessary, non-substantive changes to carry out the intent
of this Resolution.
{Signatures on the following page}
48
Reso. No. XX-22, Item X.X, Adopted XX/XX/22 Page 2 of 2
PASSED, APPROVED AND ADOPTED this 19th day of July 2022, by the following vote:
AYES:
NOES:
ABSENT:
ABSTAIN:
______________________________
Mayor
ATTEST:
_________________________________
City Clerk
49
Attachment 2
Alameda CTC Agreement No. A22-0010
Project No. 1554000
Page 1 of 16
2021 PFA Version
PROJECT FUNDING AGREEMENT
between
ALAMEDA COUNTY TRANSPORTATION COMMISSION
and the
CITY OF DUBLIN
for the
CITY OF DUBLIN SAFE ROUTES TO SCHOOL – CROSSWALK IMPROVEMENTS PROJECT
This Project Funding Agreement (“AGREEMENT”), dated for reference purposes only as of July 22,
2021, is by and between ALAMEDA COUNTY TRANSPORTATION COMMISSION, a joint powers agency
(“ALAMEDA CTC”), and the CITY OF DUBLIN, a public agency (“PROJECT SPONSOR”).
This AGREEMENT obligates funds from one or more ALAMEDA CTC administered funding programs as
indicated below, and as further specified in Appendix A: Project Control Information and Appendix B:
Alameda CTC Administered Funds Obligated by this AGREEMENT, for the PROJECT, as such term is defined
in Recital K below.
☒ 2000 Measure B
☐ 2014 Measure BB
☐ Vehicle Registration Fee
☐ Transportation Fund for Clean Air
☐ CMA TIP
RECITALS
A. The voters of Alameda County, pursuant to the provisions of the Bay Area County Traffic
and Transportation Funding Act, Public Utilities Code Section 131000, et seq., approved Measure B at the
General Election held in November 1986, authorizing the collection of a one-half cent transaction and use
tax over a fifteen (15)-year period to address major transportation needs and congestion in Alameda County
and giving Alameda County Transportation Authority (“ACTA”) the responsibility for the administration of
the proceeds of the tax. The proceeds from the 1986 Measure B tax have been and continue to be used to
pay for investments as outlined in the 1986 Alameda County Transportation Expenditure Plan (“1986 TEP”),
as it may be amended. Although collection of the 1986 Measure B tax ceased in 2002, capital projects funded
wholly or in part by 1986 Measure B funds are still being delivered using these funds.
B. The voters of Alameda County, pursuant to the provisions of the Local Transportation
Authority and Improvement Act, Public Utilities Code Section 180000, et seq., approved the reauthorization
of Measure B at the General Election held on November 7, 2000, authorizing the collection of a one-half
cent transaction and use tax to be collected for twenty (20) years beginning April 1, 2002 and giving Alameda
County Transportation Improvement Authority (“ACTIA”) responsibility for the administration of the
proceeds of the tax.. The proceeds from the 2000 Measure B tax have been and continue to be used to pay
for investments as outlined in the 2000 Alameda County Transportation Expenditure Plan (“2000 TEP”), as
it may be amended.
50
Attachment 2
Alameda CTC Agreement No. A22-0010
Project No. 1554000
Page 2 of 16
2021 PFA Version
C. The voters of Alameda County, pursuant to Section 65089.20 of the Government Code,
approved Measure F, the Vehicle Registration Fee (“VRF”), authorizing Alameda County Congestion
Management Agency (“ACCMA”) to administer the proceeds from a $10 per year vehicle registration fee on
each annual motor-vehicle registration in Alameda County, starting with registrations effective July 2011 with
collection beginning in May 2011, six months following approval of Measure F. Vehicles subject to the VRF
include all motorized vehicles, including passenger cars, light-duty trucks, medium-duty trucks, heavy-duty
trucks, buses of all sizes, motorcycles, and motorized camper homes, unless vehicles are expressly exempted
from the payment of the VRF.
D. By resolutions adopted by the ACTA and ACTIA Boards on June 24, 2010, all of ACTA’s
functions and responsibilities were assigned to, and accepted by, ACTIA. On that same date, the ACTIA and
ACCMA Boards took the final actions to create ALAMEDA CTC, a joint powers authority with all
responsibilities of ACTIA and ACCMA. Pursuant to resolutions adopted by the ACTIA and ACCMA
Boards and the Commission of ALAMEDA CTC, ACCMA and ACTIA were terminated as of the close of
business on February 29, 2012, with ALAMEDA CTC designated as the successor entity. All of its
predecessors’ functions and responsibilities have been assigned to, and accepted by, ALAMEDA CTC.
E. The voters of Alameda County, pursuant to the provisions of the Local Transportation
Authority and Improvement Act, California Public Utilities Code Section 180000 et seq., approved Measure
BB at the General Election held on November 4, 2014, authorizing the extension of an existing one-half of
one percent transaction and use tax scheduled to terminate on March 31, 2022, and the augmentation of the
tax by one-half of one percent, and giving ALAMEDA CTC responsibility for the administration of the
proceeds of the 2014 Measure BB tax. The duration of the 2014 Measure BB tax will be 30 years from the
initial year of collection, which began April 1, 2015, with said tax to terminate/expire on March 31, 2045. The
proceeds from the 2014 Measure BB will be used to pay for investments as outlined in the 2014 Alameda
County Transportation Expenditure Plan (“2014 TEP”), as it may be amended.
F. As the Transportation Fund for Clean Air (“TFCA”) Program Manager in Alameda County,
ALAMEDA CTC annually programs 40 percent of the TFCA funds collected in Alameda County. ALAMEDA
CTC receives these funds from the Bay Area Air Quality Management District (“BAAQMD”), and then
distributes these funds on a reimbursement basis to eligible project sponsors.
G. ALAMEDA CTC is continuing the implementation of the CMA Exchange Program, originally
established by the ACCMA, for the purpose of providing local or otherwise unrestricted funds to ALAMEDA
CTC for use in projects and programs adopted into the CMA Transportation Improvement Program (“CMA
TIP”) by ALAMEDA CTC.
H. The funding programs administered by ALAMEDA CTC and available for projects and
programs that benefit the Alameda County transportation system, consisting of 1986 Measure B, 2000
Measure B, 2014 Measure BB, VRF, TFCA, and CMA TIP, are collectively defined as and shall be referenced
herein as the “ALAMEDA CTC ADMINISTERED FUNDS”. Requirements related to 2000 Measure B, VRF and
2014 Measure BB Direct Local Distribution (“DLD”) funding distributed pursuant to 2000 Measure B, VRF
and 2014 Measure BB Transportation Expenditure Plans are covered by separate agreements between
ALAMEDA CTC and DLD recipients.
51
Attachment 2
Alameda CTC Agreement No. A22-0010
Project No. 1554000
Page 3 of 16
2021 PFA Version
I. Measure B, Measure BB, VRF, and TFCA funds obligated by this AGREEMENT shall be
programmed, allocated, and expended for the purpose defined and in accordance with the provisions set
forth in the applicable transportation expenditure plans, or the BAAQMD-approved TFCA County Program
Manager Policies.
J. ALAMEDA CTC programs and allocates ALAMEDA CTC ADMINISTERED FUNDS through
the ALAMEDA CTC Comprehensive Investment Plan (“CIP”) that is updated periodically to summarize the
programming and allocations of ALAMEDA CTC ADMINISTERED FUNDS, and the policies, procedures and
requirements related to the expenditure of ALAMEDA CTC ADMINISTERED FUNDS.
K. The PROJECT SPONSOR is implementing a project or program (“PROJECT”) that is eligible
for ALAMEDA CTC ADMINISTERED FUNDS. The PROJECT and the strategy to implement the PROJECT are
described in greater detail in Appendix A: Project Control Information.
L. This AGREEMENT obligates funds from one or more of ALAMEDA CTC administered
funding programs as specified in Appendix B: Alameda CTC Administered Funds Obligated by this
Agreement, for the PROJECT and the phase(s) described in Appendix A: Project Control Information.
ALAMEDA CTC ADMINISTERED FUNDS obligated by this AGREEMENT are available to reimburse eligible
costs incurred by PROJECT SPONSOR for the PROJECT and the phase(s) described in Appendix A: Project
Control Information.
M. The issuance of bonds or another financing mechanism are possible funding options as part
of ALAMEDA CTC administered funding programs to meet cash flow requirements of each individual
program based on current schedule and project delivery information.
NOW, THEREFORE, it is agreed by and between the parties as follows:
SECTION I
PROJECT SPONSOR AGREES:
1. PROJECT SPONSOR shall implement the PROJECT in accordance with all requirements in this
AGREEMENT and the following appendices attached hereto and incorporated herein by reference.
a. Appendix A: Project Control Information
b. Appendix B: Alameda CTC Administered Funds Obligated by this Agreement
c. Appendix C: Alameda CTC Request for Reimbursement and Reporting Requirements
d. Appendix D: Local Business Contract Equity Program
e. Appendix E: Deliverables and Due Dates
f. Appendix F: Project Performance Measures
g. Appendix G: Transportation Fund for Clean Air Policies and Requirements
52
Attachment 2
Alameda CTC Agreement No. A22-0010
Project No. 1554000
Page 4 of 16
2021 PFA Version
2. PROJECT SPONSOR shall perform the necessary work associated with the PROJECT required
to implement PROJECT as described in Appendix A: Project Control Information.
3. PROJECT SPONSOR shall inform ALAMEDA CTC in writing of any changes to the
information contained in Appendix A: Project Control Information as soon as PROJECT SPONSOR becomes
aware of such changes. Per Section III.2, any change that requires an amendment to this AGREEMENT must
be approved by ALAMEDA CTC prior to PROJECT SPONSOR implementing the change.
4. PROJECT SPONSOR shall commit to the timing of ALAMEDA CTC ADMINISTERED FUNDS
as described in Appendix B: Alameda CTC Administered Funds Obligated by this Agreement.
5. PROJECT SPONSOR shall expend ALAMEDA CTC ADMINISTERED FUNDS received under
this AGREEMENT in accordance with all applicable provisions of law and shall return to ALAMEDA CTC all
funds that are not expended in accordance with all applicable provisions of law.
6. PROJECT SPONSOR shall be responsible for costs in excess of the total funding obligations
shown in Appendix A: Project Control Information. Costs in excess of the total funding obligations will not
be reimbursed with ALAMEDA CTC ADMINISTERED FUNDS unless this AGREEMENT is amended in writing
or the parties execute a separate agreement for a subsequent phase of the PROJECT.
7. PROJECT SPONSOR shall return to ALAMEDA CTC, on a pro-rated basis, funds realized from
the sale of any vehicle(s) purchased with ALAMEDA CTC ADMINISTERED FUNDS, if the sale of the vehicle(s)
is completed prior to the last day of the last year listed as the PROJECT’S “Years of Effectiveness” as
identified in either Appendix A: Project Control Information or Appendix G: Transportation Fund for Clean
Air Policies and Requirements, as applicable. The amount of sale proceeds required to be returned to
ALAMEDA CTC shall be proportional to the percentage of ALAMEDA CTC ADMINISTERED FUNDS originally
used to purchase the vehicle(s).
8. PROJECT SPONSOR staff costs for any local agency which receives DLD funding shall not be
eligible for reimbursement from ALAMEDA CTC ADMINISTERED FUNDS allocated to the PROJECT unless
staff costs are specifically identified as eligible in Appendix A: Project Control Information. Staff costs
included in Appendix A are limited to project implementation costs. Staff costs related to the administration
of this AGREEMENT including preparation of requests for reimbursement or progress reports are ineligible
for reimbursement. PROJECT SPONSOR staff costs funded by other sources can be included in the total cost
for the purpose of meeting the cost and risk sharing provisions of this AGREEMENT.
9. PROJECT SPONSOR staff costs eligible for reimbursement may include the individual’s actual
hourly wage plus a fringe benefit rate, as approved by a cognizant agency or an independent auditor, of up to
a maximum of 70% of the hourly wage. Staff costs also may include direct costs including contracted services,
such as legal counsel, that are considered an extension of the PROJECT SPONSOR’S staff.
10. PROJECT SPONSOR overhead, or "indirect," costs are not eligible for reimbursement from
ALAMEDA CTC ADMINISTERED FUNDS obligated by this AGREEMENT, and shall not be included in the total
53
Attachment 2
Alameda CTC Agreement No. A22-0010
Project No. 1554000
Page 5 of 16
2021 PFA Version
eligible PROJECT cost calculations used to determine the ALAMEDA CTC ADMINISTERED FUNDS share of
such total eligible PROJECT costs.
11. The cost of maintenance, security, or protection performed by PROJECT SPONSOR or third-
party contractors during any temporary suspension of activities associated with the PROJECT will not be
considered an eligible cost for reimbursement by ALAMEDA CTC.
12. PROJECT SPONSOR shall advertise, award and administer all professional services contracts for
PROJECT work not performed by PROJECT SPONSOR.
13. PROJECT SPONSOR shall invite ALAMEDA CTC staff to participate as a voting member of
PROJECT SPONSOR’s selection panel for the selection of all professional consultants, and furnish drafts of all
professional services contracts, upon ALAMEDA CTC’s request.
14. All locally funded contracts approved by PROJECT SPONSOR, funded wholly or in part with
Measure B, Measure BB, and/or Vehicle Registration Fee funds administered by ALAMEDA CTC, except for
contracts that also include state and/or federal funds or contracts funding non-capital projects (e.g., transit
operations), are required to comply with ALAMEDA CTC’s Local Business Contract Equity (LBCE) Program
as listed and described in Appendix D: Local Business Contract Equity Program Requirements. PROJECT
SPONSOR shall comply with the reporting requirements set forth in the LBCE Program and provide the
required information to ALAMEDA CTC in accordance with Appendix D for all contracts partially or wholly
funded by ALAMEDA CTC, whether or not the specific contract is subject to the LBCE Program.
15. PROJECT SPONSOR shall require insurance coverage that names ALAMEDA CTC, its
governing body, officers, employees and consultants as additional insureds of the PROJECT SPONSOR,
professional services consultants and subconsultants, construction services contractors and subcontractors,
volunteer service individuals, and any other contractors or subcontractors involved with the PROJECT on all
insurance required by PROJECT SPONSOR for PROJECT. PROJECT SPONSOR shall keep and maintain
insurance certificates and policy endorsements evidencing the policies on file, and furnish the same to
ALAMEDA CTC upon request. ALAMEDA CTC will not be responsible for any premiums or assessments on
any policy. If this AGREEMENT includes any TFCA funds, PROJECT SPONSOR shall also comply with the
insurance requirements specified in Appendix G: Transportation Fund for Clean Air Policies and
Requirements.
16. PROJECT SPONSOR shall provide ALAMEDA CTC with periodic (i.e., monthly, quarterly or
semi-annually) progress reports describing the current status of the PROJECT. The required progress reporting
frequency schedule and forms are provided in Appendix C: Alameda CTC Request for Reimbursement and
Reporting Requirements. Progress reports are due by the last day of each calendar month following the
established reporting period in which the work was performed. These reports shall include PROJECT status
information such as the scope of work completed to date, total costs incurred, future actions, project
performance, issues identification, changes to scope or schedule, and any additional relevant information
requested by ALAMEDA CTC.
54
Attachment 2
Alameda CTC Agreement No. A22-0010
Project No. 1554000
Page 6 of 16
2021 PFA Version
17. PROJECT SPONSOR shall submit to ALAMEDA CTC a Request for Reimbursement in
accordance with the minimum required invoicing frequency established for the PROJECT, but not more than
one such request per month, for reimbursement of eligible PROJECT costs and expenses incurred by PROJECT
SPONSOR. The required minimum invoicing frequency and invoice forms are provided in Appendix C:
Alameda CTC Request for Reimbursement and Reporting Requirements. If PROJECT SPONSOR does not
incur any reimbursable expenses during the minimum invoicing period, in lieu of submitting an invoice,
PROJECT SPONSOR shall submit a letter or a statement as part of the required progress report for the same
period confirming that no reimbursable costs were incurred during the given period. If PROJECT SPONSOR
requests reimbursement for costs incurred as a result of a contract or agreement with a third party that
contains a contract value of $50,000 or greater, e.g. a consultant, contractor or other entity, PROJECT
SPONSOR shall submit an electronic copy of the fully executed contract or agreement to ALAMEDA CTC prior
to ALAMEDA CTC authorizing reimbursement of such costs. Supporting documentation for the Request for
Reimbursement packages includes copies of invoices from vendors, consultants, or contractors and
summaries of eligible PROJECT SPONSOR staff time charges. PROJECT SPONSOR may suggest an alternative
method, subject to approval in advance by ALAMEDA CTC, to document staff costs charged to the PROJECT.
18. PROJECT SPONSOR shall provide a Parcel and Utility Agreement Tracking Log upon
ALAMEDA CTC’s request, if the PROJECT includes the acquisition of right-of-way and/or the relocation or
protection of utility facilities.
19. PROJECT SPONSOR shall keep all necessary PROJECT records to demonstrate compliance
with this AGREEMENT, including documentation of activities, performance, progress reports, final report,
expenses and charges to support invoices submitted to ALAMEDA CTC and other PROJECT reporting
requirements as described in Appendix C: Alameda CTC Request for Reimbursement and Reporting
Requirements in one central location for a period of not less than five (5) years after the later of (i) ALAMEDA
CTC’s payment of the final invoice, (ii) the PROJECT SPONSOR’S submittal of the Final Report for ALAMEDA
CTC ADMINISTERED FUNDS under this AGREEMENT, and (iii) the end of the PROJECT’S established “Years
of Effectiveness” period (as identified in Appendix G: Transportation Fund for Clean Air Policies and
Requirements) if any TFCA funds are provided under this AGREEMENT.
a. PROJECT SPONSOR and PROJECT SPONSOR’s contractors and subcontractors shall each
maintain and make available for inspection and audit all books, documents, papers,
accounting records, and other evidence pertaining to the performance of such contracts,
including, but not limited to, the costs of administering those various contracts.
b. PROJECT SPONSOR shall allow ALAMEDA CTC or its authorized representatives to inspect,
audit, or make copies of any PROJECT records for a period of five (5) years after ALAMEDA
CTC’s payment of the final invoice and the PROJECT SPONSOR’S submittal of the Final
Report. The same access also shall be granted to BAAQMD or its authorized
representatives for TFCA funds obligated by this AGREEMENT.
20. PROJECT SPONSOR shall comply with all of the following publicity requirements to inform
the public on the use of ALAMEDA CTC ADMINISTERED FUNDS on the PROJECT.
55
Attachment 2
Alameda CTC Agreement No. A22-0010
Project No. 1554000
Page 7 of 16
2021 PFA Version
a. PROJECT SPONSOR shall credit ALAMEDA CTC as a funding source and display the
approved ALAMEDA CTC logo, where practical, on construction informational signs,
vehicles or equipment operated or obtained as part of the PROJECT, and on any publicly
distributed information (e.g., fact sheets, flyers, brochures, maps, schedules, websites, press
releases), created for or associated with the PROJECT. For TFCA funding obligated through
this AGREEMENT, SPONSOR shall also credit the BAAQMD as a funding source and display
the BAAQMD-approved TFCA logo.
b. PROJECT SPONSOR shall provide updated and accurate PROJECT information on the
PROJECT SPONSOR’s website, or create such a website if none exists, and provide a link to
ALAMEDA CTC website.
c. PROJECT SPONSOR shall publish an article in a printed or electronically distributed
publication such as a newsletter, local newspaper, e-publications, or website highlighting the
PROJECT and the use of ALAMEDA CTC ADMINISTERED FUNDS at least once per fiscal year.
For TFCA funding obligated through this AGREEMENT, SPONSOR shall also credit the
BAAQMD as a funding source.
d. PROJECT SPONSOR shall document compliance with the publicity requirements and furnish
such documentation upon request, and regularly through the progress and final reporting
required by this AGREEMENT, through evidence such as photos of construction and vehicle
signage, copies of print, electronic and other media published to satisfy this requirement.
For TFCA funding obligated through this AGREEMENT, SPONSOR shall also document that
the BAAQMD was credited as a funding source and the BAAQMD-approved TFCA logos
were displayed.
e. PROJECT SPONSOR shall notify ALAMEDA CTC and request an exemption as soon as it is
reasonably known that the PROJECT SPONSOR is unable to fulfill the requirements under this
Section I.20 due to extraordinary circumstances.
21. PROJECT SPONSOR shall, to the extent not otherwise prohibited by law, and to the extent
required by the California Public Records Act (California Government Code section 6250 et seq.), place in
the public domain any software, written document, or other product developed with ALAMEDA CTC
ADMINISTERED FUNDS received through this AGREEMENT.
22. PROJECT SPONSOR shall participate, upon the request of ALAMEDA CTC, in a Public
Awareness Program in partnership with ALAMEDA CTC and/or its community advisory committees as a
means of informing the public of the benefits derived from the use of ALAMEDA CTC ADMINISTERED
FUNDS.
23. PROJECT SPONSOR shall obtain all state, local and federal permits and approvals for work,
including environmental approvals in accordance with the National Environment Policy Act (NEPA) and the
California Environmental Quality Act (CEQA), as applicable. PROJECT SPONSOR will comply with all
applicable state and federal laws and regulations.
56
Attachment 2
Alameda CTC Agreement No. A22-0010
Project No. 1554000
Page 8 of 16
2021 PFA Version
24. PROJECT SPONSOR shall render a report or answer any and all inquiries, upon ALAMEDA
CTC’s request, in regards to its receipt of ALAMEDA CTC ADMINISTERED FUNDS, compliance audit findings,
and usage of ALAMEDA CTC ADMINISTERED FUNDS before the ALAMEDA CTC Commission, Independent
Watchdog Committee, and/or community advisory committees, as applicable.
25. For TFCA funds obligated by this AGREEMENT, a PROJECT SPONSOR who has failed a
BAAQMD financial or performance audit for the PROJECT will be excluded from receiving an award of any
TFCA funds for five (5) years from the date of BAAQMD’s final audit determination. Existing TFCA funds
already awarded to the SPONSOR will not be released until all audit recommendations and remedies have been
satisfactorily implemented. A failed BAAQMD financial audit means a final audit report that includes an
uncorrected audit finding that confirms an ineligible expenditure of TFCA funds. A failed BAAQMD
performance audit means that the PROJECT was not implemented in accordance with the AGREEMENT.
SPONSOR shall be afforded a reasonable amount of time to address/cure adverse audit findings.
26. For TFCA funds obligated by this AGREEMENT, PROJECT SPONSOR shall return to
ALAMEDA CTC, on a pro-rated basis, TFCA funds received under this Agreement if PROJECT is not
maintained and/or operated throughout, and at least until the conclusion of, its “Years of Effectiveness” as
identified in Appendix G: Transportation Fund for Clean Air Policies and Requirements.
27. For TFCA funds obligated by this AGREEMENT, PROJECT SPONSOR shall submit a TFCA
Final Report to the ALAMEDA CTC. The required content for the TFCA Final Report is identified in the
TFCA Final Report Form referenced in Appendix G.
SECTION II
ALAMEDA CTC AGREES:
1. ALAMEDA CTC shall make a good faith effort to provide all ALAMEDA CTC
ADMINISTERED FUNDS obligated by this AGREEMENT.
2. ALAMEDA CTC shall assist PROJECT SPONSOR when able, upon request and as necessary, in
resolving issues related to the PROJECT.
3. ALAMEDA CTC shall provide a copy of its approved logo for PROJECT SPONSOR to use as
required by this AGREEMENT.
4. ALAMEDA CTC shall provide notice to the PROJECT SPONSOR of any and all expenditures
made by PROJECT SPONSOR, which are not in compliance with the AGREEMENT or the applicable ALAMEDA
CTC ADMINISTERED FUNDS promptly after ALAMEDA CTC becomes aware of any such expenditures.
57
Attachment 2
Alameda CTC Agreement No. A22-0010
Project No. 1554000
Page 9 of 16
2021 PFA Version
5. ALAMEDA CTC shall provide timely notice to PROJECT SPONSOR prior to conducting an
audit of expenditures made by PROJECT SPONSOR to determine whether such expenditures are compliant
with this AGREEMENT or the applicable ALAMEDA CTC ADMINISTERED FUNDS.
SECTION III
IT IS MUTUALLY AGREED AS FOLLOWS:
1. That ALAMEDA CTC ADMINISTERED FUNDS obligated by this AGREEMENT may be
shifted between the phases of the PROJECT or between activities in the same phase of the PROJECT, so long
as each of the following occurs: 1) PROJECT SPONSOR submits a written amendment request that provides
revised and updated Appendix A: Project Control Information forms documenting the requested funding
obligation shift and demonstrating to ALAMEDA CTC’s satisfaction that the phase or activity from which the
funds were shifted remains fully funded, and 2) the parties execute an amendment to this AGREEMENT
incorporating the revised and updated Appendix A forms as described above, which amendment shall be
approved by ALAMEDA CTC pursuant to applicable ALAMEDA CTC policies.
2. ALAMEDA CTC and the PROJECT SPONSOR may jointly authorize an “Administrative
Amendment” for any minor schedule revisions, deliverables, or budget revisions that do not increase the total
ALAMEDA CTC ADMINISTERED FUNDS obligated by this AGREEMENT. Any change in the PROJECT scope
of work must be approved by ALAMEDA CTC prior to implementation of the change by the PROJECT
SPONSOR. Administrative amendment requests sent to ALAMEDA CTC must include a revised Appendix A:
Project Control Information which reflects the requested changes by the PROJECT SPONSOR.
3. For the purposes of this AGREEMENT, (i) a “Contract” shall mean and refer to a third party
agreement with the PROJECT SPONSOR for services related to PROJECT, including agreements with another
public agency, consultant firm, contractor or entity; (ii) “PROJECT SPONSOR Staff” costs include costs for
staff dedicated directly to project implementation, management, oversight, and/or project development and
may include direct costs including contracted services, such as legal counsel, that are considered an extension
of PROJECT SPONSOR Staff; (iii) “Capital” with respect to any Right-of-Way Capital phase shall mean and
refer to the cost to acquire real property, access rights and other property interests; and (iv) “Agreement
Expiration Date” shall mean and refer to the expiration date of this AGREEMENT.
4. Reimbursable costs will be limited to the costs shown in Appendix A: Project Control
Information. Funds expended for work directly related to the phases of the PROJECT covered by this
AGREEMENT prior to the applicable allowable start date identified in Appendix B: ALAMEDA CTC
ADMINISTERED FUNDS Obligated by this AGREEMENT are ineligible for reimbursement pursuant to this
AGREEMENT. ALAMEDA CTC ADMINISTERED FUNDS obligated by this AGREEMENT are subject to fund
availability and any new requirements and policies imposed by ALAMEDA CTC. The AGREEMENT shall be
amended, as necessary, to reflect the applicable requirements.
5. If additional local, state or federal funding is obtained to partially offset ALAMEDA CTC
ADMINISTERED FUNDS planned for the PROJECT, ALAMEDA CTC ADMINISTERED FUNDS will not be
58
Attachment 2
Alameda CTC Agreement No. A22-0010
Project No. 1554000
Page 10 of 16
2021 PFA Version
transferred from the PROJECT until after it is ensured that all phases of the PROJECT can be fully delivered.
ALAMEDA CTC ADMINISTERED FUNDS offset by additional local, state or federal funding shall be available
for PROJECT only after all other funding planned for PROJECT, as described in Appendix A: Project Control
Information, has been committed and/or encumbered to the PROJECT.
6. Should any portion of PROJECT be financed with federal or state funds, all applicable laws,
rules and policies relating to the use of such funds shall apply, notwithstanding other provisions of this
AGREEMENT.
7. For TFCA funds obligated by this AGREEMENT, this AGREEMENT is subject to the current
BAAQMD-approved TFCA County Program Manager Fund Policies included in Appendix G:
Transportation Fund for Clean Air Policies and Requirements and any new requirements imposed by the
BAAQMD upon ALAMEDA CTC with respect to the TFCA funds distributed hereunder. ALAMEDA CTC
will only distribute TFCA funds under this AGREEMENT to the extent the documented project costs are
eligible under the applicable BAAQMD TFCA Policies.
8. The laws of the State of California shall govern this AGREEMENT.
9. All correspondence and communications will contain ALAMEDA CTC project number and
name for PROJECT in a clearly identifiable location. For projects with TFCA funds obligated by this
AGREEMENT, all correspondence and communications will also contain the TFCA project number as
identified in Appendix G: Transportation Fund for Clean Air Policies and Requirements.
10. ALAMEDA CTC reserves the right to conduct technical and financial audits of PROJECT
work and records when determined to be necessary or appropriate and PROJECT SPONSOR agrees, and shall
require its contractors and subcontractors to agree, to cooperate with ALAMEDA CTC by making all
appropriate and relevant PROJECT records promptly available for audit and copying.
11. PROJECT costs incurred by PROJECT SPONSOR are only eligible for reimbursement on a pro-
rated basis unless specifically provided for in Appendix A: Project Control Information, and PROJECT
SPONSOR is expected to concurrently seek reimbursement from the other sources shown in Project A: Project
Control Information. Pro-rated basis, as used herein, equals the amount of ALAMEDA CTC ADMINISTERED
FUNDS obligated by this AGREEMENT to a phase, divided by the total funding for the phase, as shown in
Appendix A: Project Control Information. For any Request for Reimbursement which includes such
expenditures, PROJECT SPONSOR shall (i) report the total expenditures during the reimbursement period, (ii)
indicate the percentage of the total expenditures for the phase expected to be funded by ALAMEDA CTC
ADMINISTERED FUNDS obligated by this AGREEMENT, and (iii) request reimbursement for the dollar amount
which equals the product of such total expenditures and such percentage.
12. ALAMEDA CTC approval of PROJECT SPONSOR submitted Requests for Reimbursement will
be contingent on the submittal of progress reports and deliverables by PROJECT SPONSOR as required by this
AGREEMENT. In the event that progress reports and deliverables are not complete and current, approval of
Requests for Reimbursement shall be withheld until an acceptable remedy has been implemented and
approved by ALAMEDA CTC. If PROJECT SPONSOR fails to submit the required deliverables or otherwise fails
59
Attachment 2
Alameda CTC Agreement No. A22-0010
Project No. 1554000
Page 11 of 16
2021 PFA Version
to meet the reporting and invoicing requirements of this AGREEMENT, ALAMEDA CTC may deobligate funds
from the PROJECT and this AGREEMENT. Not less than thirty (30) days prior to the effective date of any
such action, ALAMEDA CTC will endeavor to notify PROJECT SPONSOR in writing that the required
deliverables, invoicing and reporting is overdue.
13. Request for Reimbursements submitted after the Agreement Expiration Date identified in
Appendix B: Alameda CTC Administered Funds Obligated by this AGREEMENT will be ineligible for
reimbursement by ALAMEDA CTC unless an exception is requested by the PROJECT SPONSOR no less than
sixty (60) days before the Agreement Expiration Date, and the exception is approved by ALAMEDA CTC.
ALAMEDA CTC will deobligate any remaining ALAMEDA CTC ADMINISTERED FUNDS from PROJECT and
this AGREEMENT.
14. Each Right-of-Way transaction which is funded either wholly or in part with ALAMEDA CTC
ADMINISTERED FUNDS shall be subject to repayment or reimbursement to ALAMEDA CTC under ALAMEDA
CTC Policies in effect as of the effective date of this AGREEMENT, irrespective of the party holding title to
the real estate which is the subject of the Right-of-Way transaction in question. The parties agree that Section
III.15(a) through Section III.15(f), the provisions of which are intended to provide further detail regarding
the application of such Policies, shall govern the extent to which such repayment is required and the
conditions applicable to any such repayment. If such Policies are amended after the effective date of this
AGREEMENT by ALAMEDA CTC, the PROJECT SPONSOR and ALAMEDA CTC shall execute an amendment
to this AGREEMENT which references the revised Policies.
15. For the purposes of the following provisions, “ALAMEDA CTC Share” shall mean the
percentage share of the original property purchase price funded by ALAMEDA CTC ADMINISTERED FUNDS
(i.e., if the purchase was fully funded by ALAMEDA CTC ADMINISTERED FUNDS, ALAMEDA CTC Share shall
equal 100%); any appraisal required under Section III.15(a) and Section III.15(f) only, shall be conducted at
no cost to ALAMEDA CTC; “Fair Market Value” of a given property shall mean the net proceeds from the
sale of such property if such sale occurs in an open market transaction or by auction, or the value of the
property determined by an independent third-party appraisal of the property if some or all of the property is
retained by PROJECT SPONSOR or otherwise transferred to any other party without an auction or open market
transaction; and “CPI” means the Consumer Price Index, All Items for All Urban Consumers, San Francisco-
Oakland, San Jose, CA.
a. If any property is acquired for the PROJECT using ALAMEDA CTC ADMINISTERED FUNDS
to finance some or all of the acquisition, and the PROJECT is cancelled or otherwise does
not begin construction within five (5) years after the effective date of AGREEMENT (as
such deadline may be extended by agreement between the parties hereto), then PROJECT
SPONSOR shall, within one (1) year after such cancellation decision or the expiration of
such five (5) year period, reimburse ALAMEDA CTC for the greater of the following:
ALAMEDA CTC Share of the property’s Fair Market Value or the full amount of ALAMEDA
CTC ADMINISTERED FUNDS used to acquire the property, as escalated by the increase in
the CPI during the most recent period for which CPI data is available which is equal in
length to the period between the date ALAMEDA CTC ADMINISTERED FUNDS were paid
to PROJECT SPONSOR and the date reimbursement is made to ALAMEDA CTC.
60
Attachment 2
Alameda CTC Agreement No. A22-0010
Project No. 1554000
Page 12 of 16
2021 PFA Version
b. If any property is acquired for the PROJECT using ALAMEDA CTC ADMINISTERED FUNDS
to finance some or all of the acquisition and only a portion of the acquired property is
required for the PROJECT, and if the PROJECT begins construction within five (5) years
after the effective date of this AGREEMENT (as such deadline may be extended by
agreement between the parties hereto), then PROJECT SPONSOR shall, within one (1) year
after PROJECT completion, reimburse ALAMEDA CTC for ALAMEDA CTC Share of the
Fair Market Value of any property determined to be “excess property”.
c. If the PROJECT begins construction within five (5) years after the effective date of this
AGREEMENT (as such deadline may be extended by agreement between the parties hereto),
then except as provided in subparagraph (d) below, no reimbursement is due with respect
to any property interest acquired for the project using ALAMEDA CTC ADMINISTERED
FUNDS if the entirety of the acquired property is required for the PROJECT.
d. If PROJECT SPONSOR anticipates receiving net revenues (i.e., rental or other income
generated by the property, less reasonable costs for insurance, maintenance and related
items) from any property acquired using ALAMEDA CTC ADMINISTERED FUNDS,
PROJECT SPONSOR shall notify ALAMEDA CTC on how PROJECT SPONSOR will use such
revenue to offset other project costs, and document such revenue separately in project
reimbursement requests.
e. If PROJECT is suspended, PROJECT SPONSOR shall pay all property management costs.
f. Property that is required for the PROJECT and acquired wholly or in part with ALAMEDA
CTC ADMINISTERED FUNDS shall be available for PROJECT construction within ten (10)
years of ALAMEDA CTC reimbursement to the PROJECT SPONSOR. If, after ten (10) years,
PROJECT has not been completed, PROJECT SPONSOR shall reimburse ALAMEDA CTC
Share of the fair market value of the property, based on the net proceeds from the sale of
the property or an appraisal of the property conducted at no cost to ALAMEDA CTC,
within one (1) year after the expiration of this ten (10) year period.
16. If condemnation procedures are required to obtain possession to Right-of-Way, ALAMEDA
CTC will consider the required deposit as an eligible cost and reimburse the PROJECT SPONSOR upon request.
PROJECT SPONSOR shall submit documentation of the final order of condemnation settlement within ninety
(90) days after the date of the court recording of the final order of condemnation. If the amount of
ALAMEDA CTC reimbursement to the PROJECT SPONSOR is higher than ALAMEDA CTC Share of the
amount of settlement in the final order of condemnation, the PROJECT SPONSOR shall pay ALAMEDA CTC
the difference between the amount reimbursed and ALAMEDA CTC Share of the amount settled plus
ALAMEDA CTC Share of the interest accrued to the deposit account within one (1) year of the final order of
condemnation.
17. PROJECT SPONSOR shall not initiate condemnation of any property until full funding for the
construction of the PROJECT has been secured.
61
Attachment 2
Alameda CTC Agreement No. A22-0010
Project No. 1554000
Page 13 of 16
2021 PFA Version
18. Reimbursement to PROJECT SPONSOR by ALAMEDA CTC for PROJECT Right-of-Way is
limited to the following (and net of any relocation payments provided by other sources):
a. The cost to purchase all real property required for the PROJECT free and clear of liens
and/or conflicting easements, including the costs for preparation of documents,
negotiations and legal services.
b. The cost of damages to owners of the remainder of real property not actually taken but
injuriously affected by PROJECT.
c. The cost of relocation payments and services provided to owners and occupants pursuant
to the appropriate State laws and regulations when the PROJECT displaces an individual,
family, business, farm operation or nonprofit organization.
d. The cost of demolition and/or the sale of all improvements on the right-of-way. Proceeds
from the sale of any such improvements shall be credited to the PROJECT and used to
offset PROJECT costs.
e. The cost of all unavoidable utility relocation, protection or removal necessary for the
completion of the PROJECT.
f. The cost of all necessary hazardous material and hazardous waste treatment, encapsulation
or removal and protective storage for which PROJECT SPONSOR accepts responsibility and
where the actual generator cannot be identified and recovery made.
19. If PROJECT SPONSOR materially breaches this AGREEMENT, including but not limited to
failing to deliver the PROJECT within the schedule defined by this AGREEMENT without compelling reason,
failing to file required progress reports in the time specified by this AGREEMENT, or failing to comply with
applicable regulations, ALAMEDA CTC may either terminate this AGREEMENT or suspend payments to
PROJECT SPONSOR until such time as PROJECT SPONSOR makes reasonable efforts to comply with this
AGREEMENT.
20. Neither ALAMEDA CTC, nor its governing body or any officer, consultant, or employee
thereof shall be responsible for any damage or liability occurring by reason of anything done or omitted to be
done by PROJECT SPONSOR in connection with the PROJECT. It is also understood and agreed, pursuant to
Government Code Section 895.4, PROJECT SPONSOR shall fully defend, protect, indemnify and hold harmless
ALAMEDA CTC, its governing body, and all its officers, employees, agents, representatives, and successors-in-
interest, against any and all liability, loss, expense, including reasonable attorneys’ fees, or claims for injury (as
defined in Government Code Section 810.8) or damages occurring by reason of anything done or omitted to
be done by PROJECT SPONSOR in connection with PROJECT, including the performance of the PROJECT or
operation or use of the equipment that is subject to this AGREEMENT. If TFCA funds are obligated by this
AGREEMENT, PROJECT SPONSOR shall also fully defend, protect, indemnify and hold harmless BAAQMD,
its governing body, and all its officers, employees, agents, representatives, and successors-in-interest, from
62
Attachment 2
Alameda CTC Agreement No. A22-0010
Project No. 1554000
Page 14 of 16
2021 PFA Version
any liability imposed on BAAQMD for injury (as defined in Government Code Section 810.8) occurring by
reason of anything done or omitted to be done by PROJECT SPONSOR in connection with PROJECT.
21. Neither PROJECT SPONSOR, nor its governing body or any officer, consultant, or employee
thereof shall be responsible for any damage or liability occurring by reason of anything done or omitted to be
done by ALAMEDA CTC under or in connection with any work, authority or jurisdiction delegated to
ALAMEDA CTC under this AGREEMENT. It is also understood and agreed, pursuant to Government Code
Section 895.4, ALAMEDA CTC shall fully defend, protect, indemnify and hold harmless PROJECT SPONSOR,
its governing body, and all its officers, employees, agents, representatives, and successors-in-interest, against
any and all liability, loss, expense, including reasonable attorneys’ fees, or claims for injury (as defined in
Government Code Section 810.8) or damages occurring by reason of anything done or omitted to be done by
ALAMEDA CTC in connection with PROJECT, including the performance of the PROJECT or operation or use
of the equipment that is subject to this AGREEMENT.
22. Nothing in the provisions of this AGREEMENT is intended to create duties or obligations to
or rights in third parties not party to this AGREEMENT. This AGREEMENT gives no rights or benefits to anyone
other than ALAMEDA CTC and PROJECT SPONSOR and has no third-party beneficiaries.
23. All legal actions by either party against the other arising from this AGREEMENT, or for the
failure to perform in accordance with the applicable standard of care, or for any other cause of action, will be
subject to the statutes of limitations of the State of California.
24. Should it become necessary to enforce the terms of this AGREEMENT, the prevailing party
shall be entitled to recover reasonable expenses and attorney’s fees from the other party.
25. This AGREEMENT shall terminate upon the Agreement Expiration Date identified in
Appendix B: Funds Obligated by this AGREEMENT unless this AGREEMENT is extended by mutual
agreement of the parties. Notwithstanding the foregoing, Sections I.7, I.19, III.21 and III.22 shall survive the
termination or expiration of this AGREEMENT.
26. This AGREEMENT, including its Recitals and Appendices, constitutes the entire
AGREEMENT. This AGREEMENT may be changed only as allowed in Sections III.1 and Section III.2 of this
AGREEMENT or by a written amendment executed by both parties.
[Signatures on the next page]
63
Attachment 2
Alameda CTC Agreement No. A22-0010
Project No. 1554000
Page 15 of 16
2021 PFA Version
CITY OF DUBLIN
(PROJECT SPONSOR)
ALAMEDA COUNTY
TRANSPORTATION COMMISSION
(ALAMEDA CTC)
By: By:
Linda Smith Date
City Manager
Tess Lengyel Date
Executive Director
Recommended
By:
Gary Huisingh Date
Deputy Executive Director of
Capital Projects
Reviewed as to Budget/Financial Controls:
By:
Patricia Reavey Date
Deputy Executive Director of
Finance and Administration
Approved as to Legal form:
Approved as to Legal Form:
By:
By:
John Bakker Date
Legal Counsel to the CITY OF DUBLIN
Wendel Rosen LLP Date
Legal Counsel to ALAMEDA CTC
64
Attachment 2
Alameda CTC Agreement No. A22-0010
Project No. 1554000
Page 16 of 16
2021 PFA Version
LIST OF APPENDICES
APPENDIX A: PROJECT CONTROL INFORMATION
Appendix A-1 Project Description
Appendix A-2 Project Scope Detail by Phase
Appendix A-3 Project Milestone Schedule
Appendix A-4 Project Cost Estimate Summary by Phase and Fund Source
Appendix A-5 Project Funding Summary by Phase and Reimbursement Ratio
Appendix A-6 Project Phase Cost Detail
APPENDIX B: ALAMEDA CTC ADMINISTERED FUNDS OBLIGATED BY THIS AGREEMENT
APPENDIX C: ALAMEDA CTC REQUEST FOR REIMBURSEMENT AND REPORTING REQUIREMENTS
APPENDIX D: LOCAL BUSINESS CONTRACT EQUITY PROGRAM REQUIREMENTS
APPENDIX E: DELIVERABLES AND DUE DATES
APPENDIX F: PROJECT PERFORMANCE MEASURES
APPENDIX G: TRANSPORTATION FUND FOR CLEAN AIR POLICIES AND REQUIREMENTS
Appendix G-1 TFCA Project Number and “Years of Effectiveness”
Appendix G-2 BAAQMD-approved TFCA County Program Manager Fund Policies
Appendix G-3 Minimum required insurance for TFCA-funded projects
Appendix G-4 Reporting Forms to BAAQMD for TFCA-funded projects
Note: Appendix G is only included and attached to this AGREEMENT if TFCA funds are obligated and applicable to
AGREEMENT.
65
Attachment 2
Alameda CTC Agreement No. A22-0010
Project No. 1554000
Appendix A – Page 1
APPENDIX A
PROJECT CONTROL INFORMATION
Appendix Index
Appendix A-1 Project Description
Appendix A-2 Project Scope Detail by Phase
Appendix A-3 Project Milestone Schedule
Appendix A-4 Project Cost Estimate Summary by Phase and Fund Source
Appendix A-5 Project Funding Summary by Phase and Reimbursement Ratio
Appendix A-6 Project Phase Cost Detail
66
Attachment 2
Alameda CTC Agreement No. A22-0010
Project No. 1554000
Appendix A – Page 2
APPENDIX A-1
PROJECT DESCRIPTION
Project Description
The City of Dublin will implement improvements identified in the School Site Assessments (SSA) for
Amador Valley Boulevard at Burton Street, Central Parkway at Aspen Street and Grafton Street at Antone
Way.
The project scope includes designing and developing plans, specifications and estimates for installation of
Rectangular Rapid Flashing Beacons (RRFB), ADA curb ramp upgrades and bulbouts at three uncontrolled
crosswalk locations including Amador Valley Boulevard at Burton Street, Central Parkway at Aspen Street
and Grafton Street at Antone Way.
Project Limits
· Amador Valley Boulevard at Burton Street
· Central Parkway at Aspen Street
· Antone Way at Grafton Street
67
Attachment 2
Alameda CTC Agreement No. A22-0010
Project No. 1554000
Appendix A – Page 3
APPENDIX A-2
PROJECT SCOPE DETAIL BY PHASE
The ALAMEDA CTC ADMINISTERED FUNDS obligated by this AGREEMENT are to support the project
phase(s) identified and described below:
FINAL DESIGN (PS&E)
· Development of final plans and specifications related to the PROJECT
The design will include the following:
Amador Valley Boulevard at Burton Street
· Install pedestrian crossing improvements and Rectangular Rapid Flashing Beacons (RRFB).
· Install yield markings in advance of crosswalks
· Install additional in-pavement yield sign
Central Parkway at Aspen Street
· Upgrade existing crosswalk to high visibility crosswalk
· Extend median to provide pedestrian refuge island
· Install pedestrian crossing improvements and Rectangular Rapid Flashing Beacons (RRFB).
Antone Way at Grafton Street
· Striping improvements and installation of Rectangular Rapid Flashing Beacons (RRFB)
68
Attachment 2
Alameda CTC Agreement No. A22-0010
Project No. 1554000
Appendix A – Page 4
APPENDIX A-3
PROJECT MILESTONE SCHEDULE
Phase/Milestone
Begin
End
Final Design (PS&E) 06/2022 06/2023
69
Attachment 2
Alameda CTC Agreement No. A22-0010
Project No. 1554000
Appendix A – Page 5
APPENDIX A-4
PROJECT COST SUMMARY BY PHASE AND FUND SOURCE
This Project Cost Summary provides a project funding plan for all Project phases, regardless if funded
through ALAMEDA CTC ADMINISTERED FUNDS obligated by this AGREEMENT.
PHASE
Alameda CTC
Administered Funds
Sponsor
Funds Total
Funding
2000 Measure B
Disc-BP
Local
Funds
Final Design (PS&E) $94,000 $21,000 $115,000
Construction $ - $ 100,000 $ 100,000
Total
Project Cost $94,000 $121,000 $215,000
70
Attachment 2
Alameda CTC Agreement No. A22-0010
Project No. 1554000
Appendix A – Page 6
APPENDIX A-5
PROJECT FUNDING SUMMARY BY PHASE AND REIMBURSEMENT RATIO
(Only Phases Funded with Alameda CTC Administered Funds)
The ALAMEDA CTC ADMINISTERED FUNDS obligated by this AGREEMENT are to support the project
phase(s) identified and described below:
PROJECT FUNDING SUMMARY BY PHASE AND REIMBURSEMENT RATIO
PHASE
Alameda CTC
Administered
Funds
Matching
Funds
Total
Funding
Reimbursement
Ratio
Percentage 2000 Measure B
Disc-BP
Final Design (PS&E) $94,000 $21,000 $115,000 81.74%
Total Funding $94,000 $121,000 $215,000
Notes:
· PROJECT SPONSOR shall be reimbursed eligible costs in the percentage of Total ALAMEDA CTC ADMINISTERED FUNDS to
Total Funding per the Reimbursement Ratio Percentage for each phase. Each Alameda CTC Administered Fund amount
identified is a not-to-exceed amount. The Reimbursement Ratio is defined as ALAMEDA CTC ADMINISTERED FUNDS
divided by the Total Funding.
71
Attachment 2
Alameda CTC Agreement No. A22-0010
Project No. 1554000
Appendix A – Page 7
APPENDIX A-6
PROJECT PHASE COST DETAIL
This Project Phase Cost Detail summarizes the total cost for each phase with ALAMEDA CTC ADMINISTERED
FUNDS obligated in this AGREEMENT.
PHASE COST DETAIL
FINAL DESIGN (PS&E) 2000 Measure B
Disc-BP
Matching
Funds Total Cost
Staff/Labor Cost $- $ - $ -
Contract(s)/Other Direct Cost $94,000 $21,000 $115,000
Total Phase Cost
(Staff + Contract Costs) $94,000 $21,000 $115,000
Notes:
· Contracts funded with any combination of Measure B, Measure BB, Vehicle Registration Fee and local funds that do not
contain State or federal funds are subject to Alameda CTC’s Local Business Contract Equity Program (refer to
Appendix D).
72
Attachment 2
Alameda CTC Agreement No. A22-0010
Project No. 1554000
Appendix B - Page 1
APPENDIX B
ALAMEDA CTC ADMINISTERED FUNDS OBLIGATED BY THIS AGREEMENT
The following Table B-1 identifies the ALAMEDA CTC ADMINISTERED FUNDS obligated by this
AGREEMENT and establishes a unique allowable start date for each obligated fund source.
TABLE B-1
FUNDS OBLIGATED BY THIS AGREEMENT
AND ALLOWABLE START AND EXPENDITURE DEADLINE DATES
Fund
Source
Fund
Subset Phase
Commission
Approval
Date
Allowable
Start Date
Expenditure
Deadline
Date
Obligated
Amount
2000 MB Disc-BP Final Design 7/22/2021 7/1/2021
The Agreement
Expiration Date
serves as the
expenditure deadline
date.
$94,000
Total Alameda CTC Administered Funds Obligated by AGREEMENT: $94,000
Agreement Expiration Date: 12/31/2023
Notes:
1. ALAMEDA CTC reimbursement amounts by fund source for PROJECT shall not exceed the total amount obligated by this
AGREEMENT, by fund source.
2. The Commission Approval Date is the date of the meeting at which the Commission approved the allocation.
3. The Allowable Start Date identified for each fund source is the earliest date at which costs eligible for reimbursement by the
fund source indicated may be incurred. Any costs incurred on the PROJECT before this date will not be eligible for
reimbursement under this AGREEMENT.
4. The Expenditure Deadline Date is the last date by which eligible reimbursable costs may be incurred. Any costs incurred
on the PROJECT after this date will not be eligible for reimbursement under this AGREEMENT.
5. The Agreement Expiration Date shall mean and refer to the expiration date of this AGREEMENT.
6. For TFCA funds obligated by this agreement, the Expenditure Deadline Date in the above table is two (2) years from the
date when ALAMEDA CTC first received funds from BAAQMD, unless an extended deadline is approved at the time of
programming or an extension has been approved by the ALAMEDA CTC. An estimated deadline date is noted in the above
table if at the time of this agreement the Alameda CTC has yet to receive funds from BAAQMD. Extended deadlines will
be reflected in an amended Table B-1, once approved.
7. For TFCA funds obligated by this agreement, the Commission may approve up to two one-year extensions to the
Expenditure Deadline Date. Any additional extensions require approval from both ALAMEDA CTC and BAAQMD.
73
Attachment 2
Alameda CTC Agreement No. A22-0010
Project No. 1554000
Appendix B - Page 2
APPENDIX B (CONT.)
Reimbursement of ALAMEDA CTC ADMINISTERED FUNDS obligated by this AGREEMENT shall be in
accordance with the Drawdown Limitation Schedule below.
TABLE B-2
ALAMEDA CTC ADMINISTERED FUNDS
REIMBURSEMENT - DRAWDOWN LIMITATION SCHEDULE
No. Fiscal Year Quarter Fund Source Drawdown
Limitation Amount
Cumulative
Drawdown
Limitation Amount
1 FY 22/23 Any 2000 MB $94,000 $94,000
Notes:
1. Fiscal Year (FY) begins July 1 and ends June 30.
2. Quarter 1 begins July 1 and ends September 30; Quarter 2 begins October 1 and ends December 31; Quarter 3 begins
January 1 and ends March 31; and Quarter 4 begins April 1 and ends June 30.
3. ALAMEDA CTC shall endeavor to transmit payments to PROJECT SPONSOR following the receipt and approval of a
complete Request for Reimbursement(s) submitted by the PROJECT SPONSOR.
4. Actual reimbursements from ALAMEDA CTC to the PROJECT SPONSOR shall not exceed the Cumulative Drawdown
Limitation Amount without Alameda CTC’s written approval. Any portion of a reimbursement request, which exceeds
the applicable Cumulative Drawdown Limitation without such prior approval by ALAMEDA CTC shall be deferred until
the following quarter or until sufficient capacity in the cumulative drawdown limitation amount is achieved.
74
Attachment 2
Alameda CTC Agreement No. A22-0010
Project No. 1554000
Appendix C – Page 1
APPENDIX C
REQUEST FOR REIMBURSEMENT AND REPORTING REQUIREMENTS
The below table establishes the required minimum frequency for Requests for Reimbursement and Progress Reports.
Requests for Reimbursements and Progress Reports are required either monthly, quarterly, or semi-annually, as indicated
below with an “X”.
REQUEST FOR REIMBURSEMENT AND PROGRESS REPORTING
FREQUENCY AND DUE DATES
Frequency
Required
(as checked)
Minimum Frequency Period Covered Due Dates
☐ Monthly
(once every month)
One month By 30 days following the end
of billed activity
☐
Quarterly
(once every 3 months)
Quarter 1: 7/1– 9/30
Quarter 2: 10/1 – 12/31
Quarter 3: 1/1– 3/31
Quarter 4: 4/1– 6/30
By October 31st
By January 31st
By April 30th
By July 31st
☒
Semi-annually
(once every 6 months)
Quarters 1 & 2: 7/1 – 12/31
Quarters 3 & 4: 1/1 – 6/30
By January 31st
By July 31st
☐
Annually
(TFCA Annual Report)
Fiscal Year: 7/1 – 6/30
By July 31st
☒
Final Request for
Reimbursement
Any work period eligible
under Appendix B.
Must be submitted prior to the
Agreement Expiration Date
Notes:
1. For all projects, the maximum frequency for Requests for Reimbursement is one (1) per month.
2. If no costs were incurred during the reporting period, a progress report for the corresponding period is still required.
3. TFCA funding requires annual reporting to BAAQMD in addition to the minimum required frequency for Alameda CTC
progress reports and invoices.
4. Requests for Reimbursement must be submitted prior to the Agreement Expiration Date in order to be eligible for
reimbursement.
REQUEST FOR REIMBURSEMENT AND REPORTING FORMS
Any PROJECT SPONSOR awarded ALAMEDA CTC Administered Funds shall use the following forms included
in the link below for progress reporting, final reporting, request for reimbursements, and requests for
amendments to this funding agreement. Note that the format and required content of these forms is subject
to change.
List of Downloadable Forms: https://www.alamedactc.org/funding/reporting-and-grant-forms/
1. Request for Reimbursement (RFR) Form
2. Alameda CTC Progress Report Form
3. Alameda CTC Final Report Form
4. Transportation Fund for Clean Air Program Reporting Forms (Interim and Final Report)
5. Amendment Request Form
75
Attachment 2
Alameda CTC Agreement No. A22-0010
Project No. 1554000
Appendix D – Page 1
APPENDIX D
LOCAL BUSINESS CONTRACT EQUITY PROGRAM REQUIREMENTS
As noted in Section I.14, PROJECT SPONSOR is obligated to comply with all applicable provisions of the
Alameda CTC Local Business Contract Equity (LBCE) Program, incorporated herein by reference as if
attached hereto.
LBCE Program Substitution: The LBCE Program allows substitution of Alameda CTC’s program if a
sponsor agency’s local preference program has been approved in writing by the Alameda CTC’s LBCE
Liaison Officer. This approval letter from Alameda CTC shall be attached as part of Appendix D.
The following resources are available to guide Project Sponsors through the LBCE Program requirements for
procurement and contracting processes:
· Sample template language for professional and construction services is available from ALAMEDA
CTC’s website: https://www.alamedactc.org/get-involved/contract-equity
· Prime and Subconsultant/Subcontractor Local Business Enterprise, Small Local Business Enterprise
and Very Small Local Business Enterprise Utilization Form: https://www.alamedactc.org/get-
involved/contracting-forms/
· The LBCE Program Guidelines, available at the above link, includes a Project Sponsor Responsibility
Checklist. Appendix B of the LBCE Program Guidelines identifies the Responsibilities of Sponsor
Agencies.
· Direct inquiries about the LBCE Program to ALAMEDA CTC’s LBCE Liaison Officer:
Seung Cho
Director of Procurement and Information Technology
Alameda County Transportation Commission
Email: scho@alamedactc.org
Phone: (510) 208-7472
76
Attachment 2
Alameda CTC Agreement No. A22-0010
Project No. 1554000
Appendix E - Page 1
APPENDIX E
DELIVERABLES AND DUE DATES
Project Deliverables and Due Dates: The Deliverables and Due Dates table below shows deliverables and
due dates, if any, for the phases listed in Appendix A-2 Project Phase Descriptions that contain ALAMEDA
CTC ADMINISTERED FUNDS.
Deliverables and Due Dates
No. Description Due Date to
Alameda CTC
1 Copy of Request for Proposal for design professional services. July 31, 2022
2 Progress Report #1: January to June, 2022 July 31, 2022
3 Progress Report #2: July to December, 2022 January 31, 2023
4 Progress Report #3: January to June, 2023 July 31, 2023
5 Copy of design concepts or similar document confirm completion
of design phase.
By the Agreement
Expiration Date
6 Final Invoice By the Agreement
Expiration Date
7 Final Report By the Agreement
Expiration Date
Note:
· Per Section III.19 of AGREEMENT, Alameda CTC may withhold payment of reimbursement requests until past due
deliverables are received and approved.
77
Attachment 2
Alameda CTC Agreement No. A22-0010
Project No. 1554000
Appendix F – Page 1
APPENDIX F
PROJECT PERFORMANCE MEASURES
Project Performance Measures: The Project Performance Measures and Targets describes what outcome-
based performance measure(s) the PROJECT SPONSOR plans to evaluate to ensure that the project/program is
meeting its objectives.
Appendix F is Not Applicable.
78
Attachment 3
Alameda CTC Agreement No. A22-0026
Project No. 1570000
Page 1 of 16
2021 PFA Version
PROJECT FUNDING AGREEMENT
between
ALAMEDA COUNTY TRANSPORTATION COMMISSION
and the
CITY OF DUBLIN
for the
SAFE ROUTES TO SCHOOL IMPROVEMENTS DUBLIN
This Project Funding Agreement (“AGREEMENT”), dated for reference purposes only as April 28,
2022, is by and between ALAMEDA COUNTY TRANSPORTATION COMMISSION, a joint powers agency
(“ALAMEDA CTC”), and the CITY OF DUBLIN, a public agency (“PROJECT SPONSOR”).
This AGREEMENT obligates funds from one or more ALAMEDA CTC administered funding programs as
indicated below, and as further specified in Appendix A: Project Control Information and Appendix B:
Alameda CTC Administered Funds Obligated by this AGREEMENT, for the PROJECT, as such term is defined
in Recital K below.
☐ 2000 Measure B
☐ 2014 Measure BB
☒ Vehicle Registration Fee
☐ Transportation Fund for Clean Air
☐ CMA TIP
RECITALS
A. The voters of Alameda County, pursuant to the provisions of the Bay Area County Traffic
and Transportation Funding Act, Public Utilities Code Section 131000, et seq., approved Measure B at the
General Election held in November 1986, authorizing the collection of a one-half cent transaction and use
tax over a fifteen (15)-year period to address major transportation needs and congestion in Alameda County
and giving Alameda County Transportation Authority (“ACTA”) the responsibility for the administration of
the proceeds of the tax. The proceeds from the 1986 Measure B tax have been and continue to be used to
pay for investments as outlined in the 1986 Alameda County Transportation Expenditure Plan (“1986 TEP”),
as it may be amended. Although collection of the 1986 Measure B tax ceased in 2002, capital projects funded
wholly or in part by 1986 Measure B funds are still being delivered using these funds.
B. The voters of Alameda County, pursuant to the provisions of the Local Transportation
Authority and Improvement Act, Public Utilities Code Section 180000, et seq., approved the reauthorization
of Measure B at the General Election held on November 7, 2000, authorizing the collection of a one-half
cent transaction and use tax to be collected for twenty (20) years beginning April 1, 2002 and giving Alameda
County Transportation Improvement Authority (“ACTIA”) responsibility for the administration of the
proceeds of the tax.. The proceeds from the 2000 Measure B tax have been and continue to be used to pay
for investments as outlined in the 2000 Alameda County Transportation Expenditure Plan (“2000 TEP”), as
it may be amended.
79
Attachment 3
Alameda CTC Agreement No. A22-0026
Project No. 1570000
Page 2 of 16
2021 PFA Version
C. The voters of Alameda County, pursuant to Section 65089.20 of the Government Code,
approved Measure F, the Vehicle Registration Fee (“VRF”), authorizing Alameda County Congestion
Management Agency (“ACCMA”) to administer the proceeds from a $10 per year vehicle registration fee on
each annual motor-vehicle registration in Alameda County, starting with registrations effective July 2011 with
collection beginning in May 2011, six months following approval of Measure F. Vehicles subject to the VRF
include all motorized vehicles, including passenger cars, light-duty trucks, medium-duty trucks, heavy-duty
trucks, buses of all sizes, motorcycles, and motorized camper homes, unless vehicles are expressly exempted
from the payment of the VRF.
D. By resolutions adopted by the ACTA and ACTIA Boards on June 24, 2010, all of ACTA’s
functions and responsibilities were assigned to, and accepted by, ACTIA. On that same date, the ACTIA and
ACCMA Boards took the final actions to create ALAMEDA CTC, a joint powers authority with all
responsibilities of ACTIA and ACCMA. Pursuant to resolutions adopted by the ACTIA and ACCMA
Boards and the Commission of ALAMEDA CTC, ACCMA and ACTIA were terminated as of the close of
business on February 29, 2012, with ALAMEDA CTC designated as the successor entity. All of its
predecessors’ functions and responsibilities have been assigned to, and accepted by, ALAMEDA CTC.
E. The voters of Alameda County, pursuant to the provisions of the Local Transportation
Authority and Improvement Act, California Public Utilities Code Section 180000 et seq., approved Measure
BB at the General Election held on November 4, 2014, authorizing the extension of an existing one-half of
one percent transaction and use tax scheduled to terminate on March 31, 2022, and the augmentation of the
tax by one-half of one percent, and giving ALAMEDA CTC responsibility for the administration of the
proceeds of the 2014 Measure BB tax. The duration of the 2014 Measure BB tax will be 30 years from the
initial year of collection, which began April 1, 2015, with said tax to terminate/expire on March 31, 2045. The
proceeds from the 2014 Measure BB will be used to pay for investments as outlined in the 2014 Alameda
County Transportation Expenditure Plan (“2014 TEP”), as it may be amended.
F. As the Transportation Fund for Clean Air (“TFCA”) Program Manager in Alameda County,
ALAMEDA CTC annually programs 40 percent of the TFCA funds collected in Alameda County. ALAMEDA
CTC receives these funds from the Bay Area Air Quality Management District (“BAAQMD”), and then
distributes these funds on a reimbursement basis to eligible project sponsors.
G. ALAMEDA CTC is continuing the implementation of the CMA Exchange Program, originally
established by the ACCMA, for the purpose of providing local or otherwise unrestricted funds to ALAMEDA
CTC for use in projects and programs adopted into the CMA Transportation Improvement Program (“CMA
TIP”) by ALAMEDA CTC.
H. The funding programs administered by ALAMEDA CTC and available for projects and
programs that benefit the Alameda County transportation system, consisting of 1986 Measure B, 2000
Measure B, 2014 Measure BB, VRF, TFCA, and CMA TIP, are collectively defined as and shall be referenced
herein as the “ALAMEDA CTC ADMINISTERED FUNDS”. Requirements related to 2000 Measure B, VRF and
2014 Measure BB Direct Local Distribution (“DLD”) funding distributed pursuant to 2000 Measure B, VRF
and 2014 Measure BB Transportation Expenditure Plans are covered by separate agreements between
ALAMEDA CTC and DLD recipients.
80
Attachment 3
Alameda CTC Agreement No. A22-0026
Project No. 1570000
Page 3 of 16
2021 PFA Version
I. Measure B, Measure BB, VRF, and TFCA funds obligated by this AGREEMENT shall be
programmed, allocated, and expended for the purpose defined and in accordance with the provisions set
forth in the applicable transportation expenditure plans, or the BAAQMD-approved TFCA County Program
Manager Policies.
J. ALAMEDA CTC programs and allocates ALAMEDA CTC ADMINISTERED FUNDS through
the ALAMEDA CTC Comprehensive Investment Plan (“CIP”) that is updated periodically to summarize the
programming and allocations of ALAMEDA CTC ADMINISTERED FUNDS, and the policies, procedures and
requirements related to the expenditure of ALAMEDA CTC ADMINISTERED FUNDS.
K. The PROJECT SPONSOR is implementing a project or program (“PROJECT”) that is eligible
for ALAMEDA CTC ADMINISTERED FUNDS. The PROJECT and the strategy to implement the PROJECT are
described in greater detail in Appendix A: Project Control Information.
L. This AGREEMENT obligates funds from one or more of ALAMEDA CTC administered
funding programs as specified in Appendix B: Alameda CTC Administered Funds Obligated by this
Agreement, for the PROJECT and the phase(s) described in Appendix A: Project Control Information.
ALAMEDA CTC ADMINISTERED FUNDS obligated by this AGREEMENT are available to reimburse eligible
costs incurred by PROJECT SPONSOR for the PROJECT and the phase(s) described in Appendix A: Project
Control Information.
M. The issuance of bonds or another financing mechanism are possible funding options as part
of ALAMEDA CTC administered funding programs to meet cash flow requirements of each individual
program based on current schedule and project delivery information.
NOW, THEREFORE, it is agreed by and between the parties as follows:
SECTION I
PROJECT SPONSOR AGREES:
1. PROJECT SPONSOR shall implement the PROJECT in accordance with all requirements in this
AGREEMENT and the following appendices attached hereto and incorporated herein by reference.
a. Appendix A: Project Control Information
b. Appendix B: Alameda CTC Administered Funds Obligated by this Agreement
c. Appendix C: Alameda CTC Request for Reimbursement and Reporting Requirements
d. Appendix D: Local Business Contract Equity Program
e. Appendix E: Deliverables and Due Dates
f. Appendix F: Project Performance Measures
g. Appendix G: Transportation Fund for Clean Air Policies and Requirements
81
Attachment 3
Alameda CTC Agreement No. A22-0026
Project No. 1570000
Page 4 of 16
2021 PFA Version
2. PROJECT SPONSOR shall perform the necessary work associated with the PROJECT required
to implement PROJECT as described in Appendix A: Project Control Information.
3. PROJECT SPONSOR shall inform ALAMEDA CTC in writing of any changes to the
information contained in Appendix A: Project Control Information as soon as PROJECT SPONSOR becomes
aware of such changes. Per Section III.2, any change that requires an amendment to this AGREEMENT must
be approved by ALAMEDA CTC prior to PROJECT SPONSOR implementing the change.
4. PROJECT SPONSOR shall commit to the timing of ALAMEDA CTC ADMINISTERED FUNDS
as described in Appendix B: Alameda CTC Administered Funds Obligated by this Agreement.
5. PROJECT SPONSOR shall expend ALAMEDA CTC ADMINISTERED FUNDS received under
this AGREEMENT in accordance with all applicable provisions of law and shall return to ALAMEDA CTC all
funds that are not expended in accordance with all applicable provisions of law.
6. PROJECT SPONSOR shall be responsible for costs in excess of the total funding obligations
shown in Appendix A: Project Control Information. Costs in excess of the total funding obligations will not
be reimbursed with ALAMEDA CTC ADMINISTERED FUNDS unless this AGREEMENT is amended in writing
or the parties execute a separate agreement for a subsequent phase of the PROJECT.
7. PROJECT SPONSOR shall return to ALAMEDA CTC, on a pro-rated basis, funds realized from
the sale of any vehicle(s) purchased with ALAMEDA CTC ADMINISTERED FUNDS, if the sale of the vehicle(s)
is completed prior to the last day of the last year listed as the PROJECT’S “Years of Effectiveness” as
identified in either Appendix A: Project Control Information or Appendix G: Transportation Fund for Clean
Air Policies and Requirements, as applicable. The amount of sale proceeds required to be returned to
ALAMEDA CTC shall be proportional to the percentage of ALAMEDA CTC ADMINISTERED FUNDS originally
used to purchase the vehicle(s).
8. PROJECT SPONSOR staff costs for any local agency which receives DLD funding shall not be
eligible for reimbursement from ALAMEDA CTC ADMINISTERED FUNDS allocated to the PROJECT unless
staff costs are specifically identified as eligible in Appendix A: Project Control Information. Staff costs
included in Appendix A are limited to project implementation costs. Staff costs related to the administration
of this AGREEMENT including preparation of requests for reimbursement or progress reports are ineligible
for reimbursement. PROJECT SPONSOR staff costs funded by other sources can be included in the total cost
for the purpose of meeting the cost and risk sharing provisions of this AGREEMENT.
9. PROJECT SPONSOR staff costs eligible for reimbursement may include the individual’s actual
hourly wage plus a fringe benefit rate, as approved by a cognizant agency or an independent auditor, of up to
a maximum of 70% of the hourly wage. Staff costs also may include direct costs including contracted services,
such as legal counsel, that are considered an extension of the PROJECT SPONSOR’S staff.
10. PROJECT SPONSOR overhead, or "indirect," costs are not eligible for reimbursement from
ALAMEDA CTC ADMINISTERED FUNDS obligated by this AGREEMENT, and shall not be included in the total
82
Attachment 3
Alameda CTC Agreement No. A22-0026
Project No. 1570000
Page 5 of 16
2021 PFA Version
eligible PROJECT cost calculations used to determine the ALAMEDA CTC ADMINISTERED FUNDS share of
such total eligible PROJECT costs.
11. The cost of maintenance, security, or protection performed by PROJECT SPONSOR or third-
party contractors during any temporary suspension of activities associated with the PROJECT will not be
considered an eligible cost for reimbursement by ALAMEDA CTC.
12. PROJECT SPONSOR shall advertise, award and administer all professional services contracts for
PROJECT work not performed by PROJECT SPONSOR.
13. PROJECT SPONSOR shall invite ALAMEDA CTC staff to participate as a voting member of
PROJECT SPONSOR’s selection panel for the selection of all professional consultants, and furnish drafts of all
professional services contracts, upon ALAMEDA CTC’s request.
14. All locally funded contracts approved by PROJECT SPONSOR, funded wholly or in part with
Measure B, Measure BB, and/or Vehicle Registration Fee funds administered by ALAMEDA CTC, except for
contracts that also include state and/or federal funds or contracts funding non-capital projects (e.g., transit
operations), are required to comply with ALAMEDA CTC’s Local Business Contract Equity (LBCE) Program
as listed and described in Appendix D: Local Business Contract Equity Program Requirements. PROJECT
SPONSOR shall comply with the reporting requirements set forth in the LBCE Program and provide the
required information to ALAMEDA CTC in accordance with Appendix D for all contracts partially or wholly
funded by ALAMEDA CTC, whether or not the specific contract is subject to the LBCE Program.
15. PROJECT SPONSOR shall require insurance coverage that names ALAMEDA CTC, its
governing body, officers, employees and consultants as additional insureds of the PROJECT SPONSOR,
professional services consultants and subconsultants, construction services contractors and subcontractors,
volunteer service individuals, and any other contractors or subcontractors involved with the PROJECT on all
insurance required by PROJECT SPONSOR for PROJECT. PROJECT SPONSOR shall keep and maintain
insurance certificates and policy endorsements evidencing the policies on file, and furnish the same to
ALAMEDA CTC upon request. ALAMEDA CTC will not be responsible for any premiums or assessments on
any policy. If this AGREEMENT includes any TFCA funds, PROJECT SPONSOR shall also comply with the
insurance requirements specified in Appendix G: Transportation Fund for Clean Air Policies and
Requirements.
16. PROJECT SPONSOR shall provide ALAMEDA CTC with periodic (i.e., monthly, quarterly or
semi-annually) progress reports describing the current status of the PROJECT. The required progress reporting
frequency schedule and forms are provided in Appendix C: Alameda CTC Request for Reimbursement and
Reporting Requirements. Progress reports are due by the last day of each calendar month following the
established reporting period in which the work was performed. These reports shall include PROJECT status
information such as the scope of work completed to date, total costs incurred, future actions, project
performance, issues identification, changes to scope or schedule, and any additional relevant information
requested by ALAMEDA CTC.
83
Attachment 3
Alameda CTC Agreement No. A22-0026
Project No. 1570000
Page 6 of 16
2021 PFA Version
17. PROJECT SPONSOR shall submit to ALAMEDA CTC a Request for Reimbursement in
accordance with the minimum required invoicing frequency established for the PROJECT, but not more than
one such request per month, for reimbursement of eligible PROJECT costs and expenses incurred by PROJECT
SPONSOR. The required minimum invoicing frequency and invoice forms are provided in Appendix C:
Alameda CTC Request for Reimbursement and Reporting Requirements. If PROJECT SPONSOR does not
incur any reimbursable expenses during the minimum invoicing period, in lieu of submitting an invoice,
PROJECT SPONSOR shall submit a letter or a statement as part of the required progress report for the same
period confirming that no reimbursable costs were incurred during the given period. If PROJECT SPONSOR
requests reimbursement for costs incurred as a result of a contract or agreement with a third party that
contains a contract value of $50,000 or greater, e.g. a consultant, contractor or other entity, PROJECT
SPONSOR shall submit an electronic copy of the fully executed contract or agreement to ALAMEDA CTC prior
to ALAMEDA CTC authorizing reimbursement of such costs. Supporting documentation for the Request for
Reimbursement packages includes copies of invoices from vendors, consultants, or contractors and
summaries of eligible PROJECT SPONSOR staff time charges. PROJECT SPONSOR may suggest an alternative
method, subject to approval in advance by ALAMEDA CTC, to document staff costs charged to the PROJECT.
18. PROJECT SPONSOR shall provide a Parcel and Utility Agreement Tracking Log upon
ALAMEDA CTC’s request, if the PROJECT includes the acquisition of right-of-way and/or the relocation or
protection of utility facilities.
19. PROJECT SPONSOR shall keep all necessary PROJECT records to demonstrate compliance
with this AGREEMENT, including documentation of activities, performance, progress reports, final report,
expenses and charges to support invoices submitted to ALAMEDA CTC and other PROJECT reporting
requirements as described in Appendix C: Alameda CTC Request for Reimbursement and Reporting
Requirements in one central location for a period of not less than five (5) years after the later of (i) ALAMEDA
CTC’s payment of the final invoice, (ii) the PROJECT SPONSOR’S submittal of the Final Report for ALAMEDA
CTC ADMINISTERED FUNDS under this AGREEMENT, and (iii) the end of the PROJECT’S established “Years
of Effectiveness” period (as identified in Appendix G: Transportation Fund for Clean Air Policies and
Requirements) if any TFCA funds are provided under this AGREEMENT.
a. PROJECT SPONSOR and PROJECT SPONSOR’s contractors and subcontractors shall each
maintain and make available for inspection and audit all books, documents, papers,
accounting records, and other evidence pertaining to the performance of such contracts,
including, but not limited to, the costs of administering those various contracts.
b. PROJECT SPONSOR shall allow ALAMEDA CTC or its authorized representatives to inspect,
audit, or make copies of any PROJECT records for a period of five (5) years after ALAMEDA
CTC’s payment of the final invoice and the PROJECT SPONSOR’S submittal of the Final
Report. The same access also shall be granted to BAAQMD or its authorized
representatives for TFCA funds obligated by this AGREEMENT.
20. PROJECT SPONSOR shall comply with all of the following publicity requirements to inform
the public on the use of ALAMEDA CTC ADMINISTERED FUNDS on the PROJECT.
84
Attachment 3
Alameda CTC Agreement No. A22-0026
Project No. 1570000
Page 7 of 16
2021 PFA Version
a. PROJECT SPONSOR shall credit ALAMEDA CTC as a funding source and display the
approved ALAMEDA CTC logo, where practical, on construction informational signs,
vehicles or equipment operated or obtained as part of the PROJECT, and on any publicly
distributed information (e.g., fact sheets, flyers, brochures, maps, schedules, websites, press
releases), created for or associated with the PROJECT. For TFCA funding obligated through
this AGREEMENT, SPONSOR shall also credit the BAAQMD as a funding source and display
the BAAQMD-approved TFCA logo.
b. PROJECT SPONSOR shall provide updated and accurate PROJECT information on the
PROJECT SPONSOR’s website, or create such a website if none exists, and provide a link to
ALAMEDA CTC website.
c. PROJECT SPONSOR shall publish an article in a printed or electronically distributed
publication such as a newsletter, local newspaper, e-publications, or website highlighting the
PROJECT and the use of ALAMEDA CTC ADMINISTERED FUNDS at least once per fiscal year.
For TFCA funding obligated through this AGREEMENT, SPONSOR shall also credit the
BAAQMD as a funding source.
d. PROJECT SPONSOR shall document compliance with the publicity requirements and furnish
such documentation upon request, and regularly through the progress and final reporting
required by this AGREEMENT, through evidence such as photos of construction and vehicle
signage, copies of print, electronic and other media published to satisfy this requirement.
For TFCA funding obligated through this AGREEMENT, SPONSOR shall also document that
the BAAQMD was credited as a funding source and the BAAQMD-approved TFCA logos
were displayed.
e. PROJECT SPONSOR shall notify ALAMEDA CTC and request an exemption as soon as it is
reasonably known that the PROJECT SPONSOR is unable to fulfill the requirements under this
Section I.20 due to extraordinary circumstances.
21. PROJECT SPONSOR shall, to the extent not otherwise prohibited by law, and to the extent
required by the California Public Records Act (California Government Code section 6250 et seq.), place in
the public domain any software, written document, or other product developed with ALAMEDA CTC
ADMINISTERED FUNDS received through this AGREEMENT.
22. PROJECT SPONSOR shall participate, upon the request of ALAMEDA CTC, in a Public
Awareness Program in partnership with ALAMEDA CTC and/or its community advisory committees as a
means of informing the public of the benefits derived from the use of ALAMEDA CTC ADMINISTERED
FUNDS.
23. PROJECT SPONSOR shall obtain all state, local and federal permits and approvals for work,
including environmental approvals in accordance with the National Environment Policy Act (NEPA) and the
California Environmental Quality Act (CEQA), as applicable. PROJECT SPONSOR will comply with all
applicable state and federal laws and regulations.
85
Attachment 3
Alameda CTC Agreement No. A22-0026
Project No. 1570000
Page 8 of 16
2021 PFA Version
24. PROJECT SPONSOR shall render a report or answer any and all inquiries, upon ALAMEDA
CTC’s request, in regards to its receipt of ALAMEDA CTC ADMINISTERED FUNDS, compliance audit findings,
and usage of ALAMEDA CTC ADMINISTERED FUNDS before the ALAMEDA CTC Commission, Independent
Watchdog Committee, and/or community advisory committees, as applicable.
25. For TFCA funds obligated by this AGREEMENT, a PROJECT SPONSOR who has failed a
BAAQMD financial or performance audit for the PROJECT will be excluded from receiving an award of any
TFCA funds for five (5) years from the date of BAAQMD’s final audit determination. Existing TFCA funds
already awarded to the SPONSOR will not be released until all audit recommendations and remedies have been
satisfactorily implemented. A failed BAAQMD financial audit means a final audit report that includes an
uncorrected audit finding that confirms an ineligible expenditure of TFCA funds. A failed BAAQMD
performance audit means that the PROJECT was not implemented in accordance with the AGREEMENT.
SPONSOR shall be afforded a reasonable amount of time to address/cure adverse audit findings.
26. For TFCA funds obligated by this AGREEMENT, PROJECT SPONSOR shall return to
ALAMEDA CTC, on a pro-rated basis, TFCA funds received under this Agreement if PROJECT is not
maintained and/or operated throughout, and at least until the conclusion of, its “Years of Effectiveness” as
identified in Appendix G: Transportation Fund for Clean Air Policies and Requirements.
27. For TFCA funds obligated by this AGREEMENT, PROJECT SPONSOR shall submit a TFCA
Final Report to the ALAMEDA CTC. The required content for the TFCA Final Report is identified in the
TFCA Final Report Form referenced in Appendix G.
SECTION II
ALAMEDA CTC AGREES:
1. ALAMEDA CTC shall make a good faith effort to provide all ALAMEDA CTC
ADMINISTERED FUNDS obligated by this AGREEMENT.
2. ALAMEDA CTC shall assist PROJECT SPONSOR when able, upon request and as necessary, in
resolving issues related to the PROJECT.
3. ALAMEDA CTC shall provide a copy of its approved logo for PROJECT SPONSOR to use as
required by this AGREEMENT.
4. ALAMEDA CTC shall provide notice to the PROJECT SPONSOR of any and all expenditures
made by PROJECT SPONSOR, which are not in compliance with the AGREEMENT or the applicable ALAMEDA
CTC ADMINISTERED FUNDS promptly after ALAMEDA CTC becomes aware of any such expenditures.
86
Attachment 3
Alameda CTC Agreement No. A22-0026
Project No. 1570000
Page 9 of 16
2021 PFA Version
5. ALAMEDA CTC shall provide timely notice to PROJECT SPONSOR prior to conducting an
audit of expenditures made by PROJECT SPONSOR to determine whether such expenditures are compliant
with this AGREEMENT or the applicable ALAMEDA CTC ADMINISTERED FUNDS.
SECTION III
IT IS MUTUALLY AGREED AS FOLLOWS:
1. That ALAMEDA CTC ADMINISTERED FUNDS obligated by this AGREEMENT may be
shifted between the phases of the PROJECT or between activities in the same phase of the PROJECT, so long
as each of the following occurs: 1) PROJECT SPONSOR submits a written amendment request that provides
revised and updated Appendix A: Project Control Information forms documenting the requested funding
obligation shift and demonstrating to ALAMEDA CTC’s satisfaction that the phase or activity from which the
funds were shifted remains fully funded, and 2) the parties execute an amendment to this AGREEMENT
incorporating the revised and updated Appendix A forms as described above, which amendment shall be
approved by ALAMEDA CTC pursuant to applicable ALAMEDA CTC policies.
2. ALAMEDA CTC and the PROJECT SPONSOR may jointly authorize an “Administrative
Amendment” for any minor schedule revisions, deliverables, or budget revisions that do not increase the total
ALAMEDA CTC ADMINISTERED FUNDS obligated by this AGREEMENT. Any change in the PROJECT scope
of work must be approved by ALAMEDA CTC prior to implementation of the change by the PROJECT
SPONSOR. Administrative amendment requests sent to ALAMEDA CTC must include a revised Appendix A:
Project Control Information which reflects the requested changes by the PROJECT SPONSOR.
3. For the purposes of this AGREEMENT, (i) a “Contract” shall mean and refer to a third party
agreement with the PROJECT SPONSOR for services related to PROJECT, including agreements with another
public agency, consultant firm, contractor or entity; (ii) “PROJECT SPONSOR Staff” costs include costs for
staff dedicated directly to project implementation, management, oversight, and/or project development and
may include direct costs including contracted services, such as legal counsel, that are considered an extension
of PROJECT SPONSOR Staff; (iii) “Capital” with respect to any Right-of-Way Capital phase shall mean and
refer to the cost to acquire real property, access rights and other property interests; and (iv) “Agreement
Expiration Date” shall mean and refer to the expiration date of this AGREEMENT.
4. Reimbursable costs will be limited to the costs shown in Appendix A: Project Control
Information. Funds expended for work directly related to the phases of the PROJECT covered by this
AGREEMENT prior to the applicable allowable start date identified in Appendix B: ALAMEDA CTC
ADMINISTERED FUNDS Obligated by this AGREEMENT are ineligible for reimbursement pursuant to this
AGREEMENT. ALAMEDA CTC ADMINISTERED FUNDS obligated by this AGREEMENT are subject to fund
availability and any new requirements and policies imposed by ALAMEDA CTC. The AGREEMENT shall be
amended, as necessary, to reflect the applicable requirements.
5. If additional local, state or federal funding is obtained to partially offset ALAMEDA CTC
ADMINISTERED FUNDS planned for the PROJECT, ALAMEDA CTC ADMINISTERED FUNDS will not be
87
Attachment 3
Alameda CTC Agreement No. A22-0026
Project No. 1570000
Page 10 of 16
2021 PFA Version
transferred from the PROJECT until after it is ensured that all phases of the PROJECT can be fully delivered.
ALAMEDA CTC ADMINISTERED FUNDS offset by additional local, state or federal funding shall be available
for PROJECT only after all other funding planned for PROJECT, as described in Appendix A: Project Control
Information, has been committed and/or encumbered to the PROJECT.
6. Should any portion of PROJECT be financed with federal or state funds, all applicable laws,
rules and policies relating to the use of such funds shall apply, notwithstanding other provisions of this
AGREEMENT.
7. For TFCA funds obligated by this AGREEMENT, this AGREEMENT is subject to the current
BAAQMD-approved TFCA County Program Manager Fund Policies included in Appendix G:
Transportation Fund for Clean Air Policies and Requirements and any new requirements imposed by the
BAAQMD upon ALAMEDA CTC with respect to the TFCA funds distributed hereunder. ALAMEDA CTC
will only distribute TFCA funds under this AGREEMENT to the extent the documented project costs are
eligible under the applicable BAAQMD TFCA Policies.
8. The laws of the State of California shall govern this AGREEMENT.
9. All correspondence and communications will contain ALAMEDA CTC project number and
name for PROJECT in a clearly identifiable location. For projects with TFCA funds obligated by this
AGREEMENT, all correspondence and communications will also contain the TFCA project number as
identified in Appendix G: Transportation Fund for Clean Air Policies and Requirements.
10. ALAMEDA CTC reserves the right to conduct technical and financial audits of PROJECT
work and records when determined to be necessary or appropriate and PROJECT SPONSOR agrees, and shall
require its contractors and subcontractors to agree, to cooperate with ALAMEDA CTC by making all
appropriate and relevant PROJECT records promptly available for audit and copying.
11. PROJECT costs incurred by PROJECT SPONSOR are only eligible for reimbursement on a pro-
rated basis unless specifically provided for in Appendix A: Project Control Information, and PROJECT
SPONSOR is expected to concurrently seek reimbursement from the other sources shown in Project A: Project
Control Information. Pro-rated basis, as used herein, equals the amount of ALAMEDA CTC ADMINISTERED
FUNDS obligated by this AGREEMENT to a phase, divided by the total funding for the phase, as shown in
Appendix A: Project Control Information. For any Request for Reimbursement which includes such
expenditures, PROJECT SPONSOR shall (i) report the total expenditures during the reimbursement period, (ii)
indicate the percentage of the total expenditures for the phase expected to be funded by ALAMEDA CTC
ADMINISTERED FUNDS obligated by this AGREEMENT, and (iii) request reimbursement for the dollar amount
which equals the product of such total expenditures and such percentage.
12. ALAMEDA CTC approval of PROJECT SPONSOR submitted Requests for Reimbursement will
be contingent on the submittal of progress reports and deliverables by PROJECT SPONSOR as required by this
AGREEMENT. In the event that progress reports and deliverables are not complete and current, approval of
Requests for Reimbursement shall be withheld until an acceptable remedy has been implemented and
approved by ALAMEDA CTC. If PROJECT SPONSOR fails to submit the required deliverables or otherwise fails
88
Attachment 3
Alameda CTC Agreement No. A22-0026
Project No. 1570000
Page 11 of 16
2021 PFA Version
to meet the reporting and invoicing requirements of this AGREEMENT, ALAMEDA CTC may deobligate funds
from the PROJECT and this AGREEMENT. Not less than thirty (30) days prior to the effective date of any
such action, ALAMEDA CTC will endeavor to notify PROJECT SPONSOR in writing that the required
deliverables, invoicing and reporting is overdue.
13. Request for Reimbursements submitted after the Agreement Expiration Date identified in
Appendix B: Alameda CTC Administered Funds Obligated by this AGREEMENT will be ineligible for
reimbursement by ALAMEDA CTC unless an exception is requested by the PROJECT SPONSOR no less than
sixty (60) days before the Agreement Expiration Date, and the exception is approved by ALAMEDA CTC.
ALAMEDA CTC will deobligate any remaining ALAMEDA CTC ADMINISTERED FUNDS from PROJECT and
this AGREEMENT.
14. Each Right-of-Way transaction which is funded either wholly or in part with ALAMEDA CTC
ADMINISTERED FUNDS shall be subject to repayment or reimbursement to ALAMEDA CTC under ALAMEDA
CTC Policies in effect as of the effective date of this AGREEMENT, irrespective of the party holding title to
the real estate which is the subject of the Right-of-Way transaction in question. The parties agree that Section
III.15(a) through Section III.15(f), the provisions of which are intended to provide further detail regarding
the application of such Policies, shall govern the extent to which such repayment is required and the
conditions applicable to any such repayment. If such Policies are amended after the effective date of this
AGREEMENT by ALAMEDA CTC, the PROJECT SPONSOR and ALAMEDA CTC shall execute an amendment
to this AGREEMENT which references the revised Policies.
15. For the purposes of the following provisions, “ALAMEDA CTC Share” shall mean the
percentage share of the original property purchase price funded by ALAMEDA CTC ADMINISTERED FUNDS
(i.e., if the purchase was fully funded by ALAMEDA CTC ADMINISTERED FUNDS, ALAMEDA CTC Share shall
equal 100%); any appraisal required under Section III.15(a) and Section III.15(f) only, shall be conducted at
no cost to ALAMEDA CTC; “Fair Market Value” of a given property shall mean the net proceeds from the
sale of such property if such sale occurs in an open market transaction or by auction, or the value of the
property determined by an independent third-party appraisal of the property if some or all of the property is
retained by PROJECT SPONSOR or otherwise transferred to any other party without an auction or open market
transaction; and “CPI” means the Consumer Price Index, All Items for All Urban Consumers, San Francisco-
Oakland, San Jose, CA.
a. If any property is acquired for the PROJECT using ALAMEDA CTC ADMINISTERED FUNDS
to finance some or all of the acquisition, and the PROJECT is cancelled or otherwise does
not begin construction within five (5) years after the effective date of AGREEMENT (as
such deadline may be extended by agreement between the parties hereto), then PROJECT
SPONSOR shall, within one (1) year after such cancellation decision or the expiration of
such five (5) year period, reimburse ALAMEDA CTC for the greater of the following:
ALAMEDA CTC Share of the property’s Fair Market Value or the full amount of ALAMEDA
CTC ADMINISTERED FUNDS used to acquire the property, as escalated by the increase in
the CPI during the most recent period for which CPI data is available which is equal in
length to the period between the date ALAMEDA CTC ADMINISTERED FUNDS were paid
to PROJECT SPONSOR and the date reimbursement is made to ALAMEDA CTC.
89
Attachment 3
Alameda CTC Agreement No. A22-0026
Project No. 1570000
Page 12 of 16
2021 PFA Version
b. If any property is acquired for the PROJECT using ALAMEDA CTC ADMINISTERED FUNDS
to finance some or all of the acquisition and only a portion of the acquired property is
required for the PROJECT, and if the PROJECT begins construction within five (5) years
after the effective date of this AGREEMENT (as such deadline may be extended by
agreement between the parties hereto), then PROJECT SPONSOR shall, within one (1) year
after PROJECT completion, reimburse ALAMEDA CTC for ALAMEDA CTC Share of the
Fair Market Value of any property determined to be “excess property”.
c. If the PROJECT begins construction within five (5) years after the effective date of this
AGREEMENT (as such deadline may be extended by agreement between the parties hereto),
then except as provided in subparagraph (d) below, no reimbursement is due with respect
to any property interest acquired for the project using ALAMEDA CTC ADMINISTERED
FUNDS if the entirety of the acquired property is required for the PROJECT.
d. If PROJECT SPONSOR anticipates receiving net revenues (i.e., rental or other income
generated by the property, less reasonable costs for insurance, maintenance and related
items) from any property acquired using ALAMEDA CTC ADMINISTERED FUNDS,
PROJECT SPONSOR shall notify ALAMEDA CTC on how PROJECT SPONSOR will use such
revenue to offset other project costs, and document such revenue separately in project
reimbursement requests.
e. If PROJECT is suspended, PROJECT SPONSOR shall pay all property management costs.
f. Property that is required for the PROJECT and acquired wholly or in part with ALAMEDA
CTC ADMINISTERED FUNDS shall be available for PROJECT construction within ten (10)
years of ALAMEDA CTC reimbursement to the PROJECT SPONSOR. If, after ten (10) years,
PROJECT has not been completed, PROJECT SPONSOR shall reimburse ALAMEDA CTC
Share of the fair market value of the property, based on the net proceeds from the sale of
the property or an appraisal of the property conducted at no cost to ALAMEDA CTC,
within one (1) year after the expiration of this ten (10) year period.
16. If condemnation procedures are required to obtain possession to Right-of-Way, ALAMEDA
CTC will consider the required deposit as an eligible cost and reimburse the PROJECT SPONSOR upon request.
PROJECT SPONSOR shall submit documentation of the final order of condemnation settlement within ninety
(90) days after the date of the court recording of the final order of condemnation. If the amount of
ALAMEDA CTC reimbursement to the PROJECT SPONSOR is higher than ALAMEDA CTC Share of the
amount of settlement in the final order of condemnation, the PROJECT SPONSOR shall pay ALAMEDA CTC
the difference between the amount reimbursed and ALAMEDA CTC Share of the amount settled plus
ALAMEDA CTC Share of the interest accrued to the deposit account within one (1) year of the final order of
condemnation.
17. PROJECT SPONSOR shall not initiate condemnation of any property until full funding for the
construction of the PROJECT has been secured.
90
Attachment 3
Alameda CTC Agreement No. A22-0026
Project No. 1570000
Page 13 of 16
2021 PFA Version
18. Reimbursement to PROJECT SPONSOR by ALAMEDA CTC for PROJECT Right-of-Way is
limited to the following (and net of any relocation payments provided by other sources):
a. The cost to purchase all real property required for the PROJECT free and clear of liens
and/or conflicting easements, including the costs for preparation of documents,
negotiations and legal services.
b. The cost of damages to owners of the remainder of real property not actually taken but
injuriously affected by PROJECT.
c. The cost of relocation payments and services provided to owners and occupants pursuant
to the appropriate State laws and regulations when the PROJECT displaces an individual,
family, business, farm operation or nonprofit organization.
d. The cost of demolition and/or the sale of all improvements on the right-of-way. Proceeds
from the sale of any such improvements shall be credited to the PROJECT and used to
offset PROJECT costs.
e. The cost of all unavoidable utility relocation, protection or removal necessary for the
completion of the PROJECT.
f. The cost of all necessary hazardous material and hazardous waste treatment, encapsulation
or removal and protective storage for which PROJECT SPONSOR accepts responsibility and
where the actual generator cannot be identified and recovery made.
19. If PROJECT SPONSOR materially breaches this AGREEMENT, including but not limited to
failing to deliver the PROJECT within the schedule defined by this AGREEMENT without compelling reason,
failing to file required progress reports in the time specified by this AGREEMENT, or failing to comply with
applicable regulations, ALAMEDA CTC may either terminate this AGREEMENT or suspend payments to
PROJECT SPONSOR until such time as PROJECT SPONSOR makes reasonable efforts to comply with this
AGREEMENT.
20. Neither ALAMEDA CTC, nor its governing body or any officer, consultant, or employee
thereof shall be responsible for any damage or liability occurring by reason of anything done or omitted to be
done by PROJECT SPONSOR in connection with the PROJECT. It is also understood and agreed, pursuant to
Government Code Section 895.4, PROJECT SPONSOR shall fully defend, protect, indemnify and hold harmless
ALAMEDA CTC, its governing body, and all its officers, employees, agents, representatives, and successors-in-
interest, against any and all liability, loss, expense, including reasonable attorneys’ fees, or claims for injury (as
defined in Government Code Section 810.8) or damages occurring by reason of anything done or omitted to
be done by PROJECT SPONSOR in connection with PROJECT, including the performance of the PROJECT or
operation or use of the equipment that is subject to this AGREEMENT. If TFCA funds are obligated by this
AGREEMENT, PROJECT SPONSOR shall also fully defend, protect, indemnify and hold harmless BAAQMD,
its governing body, and all its officers, employees, agents, representatives, and successors-in-interest, from
91
Attachment 3
Alameda CTC Agreement No. A22-0026
Project No. 1570000
Page 14 of 16
2021 PFA Version
any liability imposed on BAAQMD for injury (as defined in Government Code Section 810.8) occurring by
reason of anything done or omitted to be done by PROJECT SPONSOR in connection with PROJECT.
21. Neither PROJECT SPONSOR, nor its governing body or any officer, consultant, or employee
thereof shall be responsible for any damage or liability occurring by reason of anything done or omitted to be
done by ALAMEDA CTC under or in connection with any work, authority or jurisdiction delegated to
ALAMEDA CTC under this AGREEMENT. It is also understood and agreed, pursuant to Government Code
Section 895.4, ALAMEDA CTC shall fully defend, protect, indemnify and hold harmless PROJECT SPONSOR,
its governing body, and all its officers, employees, agents, representatives, and successors-in-interest, against
any and all liability, loss, expense, including reasonable attorneys’ fees, or claims for injury (as defined in
Government Code Section 810.8) or damages occurring by reason of anything done or omitted to be done by
ALAMEDA CTC in connection with PROJECT, including the performance of the PROJECT or operation or use
of the equipment that is subject to this AGREEMENT.
22. Nothing in the provisions of this AGREEMENT is intended to create duties or obligations to
or rights in third parties not party to this AGREEMENT. This AGREEMENT gives no rights or benefits to anyone
other than ALAMEDA CTC and PROJECT SPONSOR and has no third-party beneficiaries.
23. All legal actions by either party against the other arising from this AGREEMENT, or for the
failure to perform in accordance with the applicable standard of care, or for any other cause of action, will be
subject to the statutes of limitations of the State of California.
24. Should it become necessary to enforce the terms of this AGREEMENT, the prevailing party
shall be entitled to recover reasonable expenses and attorney’s fees from the other party.
25. This AGREEMENT shall terminate upon the Agreement Expiration Date identified in
Appendix B: Funds Obligated by this AGREEMENT unless this AGREEMENT is extended by mutual
agreement of the parties. Notwithstanding the foregoing, Sections I.7, I.19, III.21 and III.22 shall survive the
termination or expiration of this AGREEMENT.
26. This AGREEMENT, including its Recitals and Appendices, constitutes the entire
AGREEMENT. This AGREEMENT may be changed only as allowed in Sections III.1 and Section III.2 of this
AGREEMENT or by a written amendment executed by both parties.
[Signatures on the next page]
92
Attachment 3
Alameda CTC Agreement No. A22-0026
Project No. 1570000
Page 15 of 16
2021 PFA Version
CITY OF DUBLIN
(PROJECT SPONSOR)
ALAMEDA COUNTY
TRANSPORTATION COMMISSION
(ALAMEDA CTC)
By: By:
Linda Smith Date
City Manager
Tess Lengyel Date
Executive Director
Recommended
By:
Gary Huisingh Date
Deputy Executive Director of
Capital Projects
Reviewed as to Budget/Financial Controls:
By:
Patricia Reavey Date
Deputy Executive Director of
Finance and Administration
Approved as to Legal Form:
Approved as to Legal Form:
By:
By:
John Bakker Date
Legal Counsel to CITY OF DUBLIN
Wendel Rosen LLP Date
Legal Counsel to ALAMEDA CTC
93
Attachment 3
Alameda CTC Agreement No. A22-0026
Project No. 1570000
Page 16 of 16
2021 PFA Version
LIST OF APPENDICES
APPENDIX A: PROJECT CONTROL INFORMATION
Appendix A-1 Project Description
Appendix A-2 Project Scope Detail by Phase
Appendix A-3 Project Milestone Schedule
Appendix A-4 Project Cost Estimate Summary by Phase and Fund Source
Appendix A-5 Project Funding Summary by Phase and Reimbursement Ratio
Appendix A-6 Project Phase Cost Detail
APPENDIX B: ALAMEDA CTC ADMINISTERED FUNDS OBLIGATED BY THIS AGREEMENT
APPENDIX C: ALAMEDA CTC REQUEST FOR REIMBURSEMENT AND REPORTING REQUIREMENTS
APPENDIX D: LOCAL BUSINESS CONTRACT EQUITY PROGRAM REQUIREMENTS
APPENDIX E: DELIVERABLES AND DUE DATES
APPENDIX F: PROJECT PERFORMANCE MEASURES
APPENDIX G: TRANSPORTATION FUND FOR CLEAN AIR POLICIES AND REQUIREMENTS
Appendix G-1 TFCA Project Number and “Years of Effectiveness”
Appendix G-2 BAAQMD-approved TFCA County Program Manager Fund Policies
Appendix G-3 Minimum required insurance for TFCA-funded projects
Appendix G-4 Reporting Forms to BAAQMD for TFCA-funded projects
Note: Appendix G is only included and attached to this AGREEMENT if TFCA funds are obligated and applicable to
AGREEMENT.
94
Attachment 3
Alameda CTC Agreement No. A22-0026
Project No. 1570000
Appendix A – Page 1
APPENDIX A
PROJECT CONTROL INFORMATION
Appendix Index
Appendix A-1 Project Description
Appendix A-2 Project Scope Detail by Phase
Appendix A-3 Project Milestone Schedule
Appendix A-4 Project Cost Estimate Summary by Phase and Fund Source
Appendix A-5 Project Funding Summary by Phase and Reimbursement Ratio
Appendix A-6 Project Phase Cost Detail
95
Attachment 3
Alameda CTC Agreement No. A22-0026
Project No. 1570000
Appendix A – Page 2
APPENDIX A-1
PROJECT DESCRIPTION
Project Description:
The Safe Routes to Schools Project implements improvements near twelve schools in the City of Dublin. The
proposed improvements were selected based upon recommendations of walk audits.
The funding obligated by this AGREEMENT is for developing design specifications leading up to major
engineering and construction improvements including, but not limited to:
1. Installation of Rectangular Rapid Flashing Beacons (RRFBs) and other intersection
improvements at 3 locations: Central Parkway and Aspen Street, Amador Valley Boulevard and
Burton Street and at Grafton Street and Antone Way intersections.
2. Sidewalk Repair – Replacement of damaged sidewalk (approximately 18,920 square feet of
sidewalk) on Village Parkway between Brighton Road and Tamarack Drive in the vicinity of
Dublin High School and Fredrikson Elementary School.
3. Traffic Signal Modification - Addition of protected left turn phases northbound and southbound
on Hibernia Drive to eliminate conflicts between pedestrians and left turning vehicles at the
intersection of Central Parkway and Hibernia Drive.
4. Other Safety Improvements - General improvements at various locations include restriping
crosswalks to high visibility type and upgrade of curb ramps to be compliant with existing ADA
standards.
96
Attachment 3
Alameda CTC Agreement No. A22-0026
Project No. 1570000
Appendix A – Page 3
APPENDIX A-2
PROJECT SCOPE DETAIL BY PHASE
The ALAMEDA CTC ADMINISTERED FUNDS obligated by this AGREEMENT are to support the project
phase(s) identified and described below:
FINAL DESIGN
· Development of Final Design Plans and Specifications leading to the construction of safe routes to
school improvements in Dublin.
CONSTRUCTION
· Consist of construction activities for the following:
o Installation of Rectangular Rapid Flashing Beacons (RRFBs) and other intersection
improvements at 3 locations: Central Parkway and Aspen Street, Amador Valley Boulevard
and Burton Street and at Grafton Street and Antone Way intersections.
o Traffic Signal Modification - Addition of protected left turn phases northbound and
southbound on Hibernia Drive to eliminate conflicts between pedestrians and left turning
vehicles at the intersection of Central Parkway and Hibernia Drive.
o Other Safety Improvements - General improvements at various locations include restriping
crosswalks to high visibility type and upgrade of curb ramps to be compliant with existing
ADA standards.
97
Attachment 3
Alameda CTC Agreement No. A22-0026
Project No. 1570000
Appendix A – Page 4
APPENDIX A-3
PROJECT MILESTONE SCHEDULE
Phase/Milestone
Begin
(Mo/Yr)
End
(Mo/Yr)
Final Design (Plans, Specifications and Estimate (PS&E)) 06/2022 12/2023
Construction
Release Request for Proposal/Advertisement 01/2024 03/2024
Contract Award 03/2024 04/2024
Construction Activities 05/2024 11/2024
Project Closeout 10/2024 12/2024
98
Attachment 3
Alameda CTC Agreement No. A22-0026
Project No. 1570000
Appendix A – Page 5
APPENDIX A-4
PROJECT COST SUMMARY BY PHASE AND FUND SOURCE
This Project Cost Summary provides a project funding plan for all Project phases, regardless if funded
through ALAMEDA CTC ADMINISTERED FUNDS obligated by this AGREEMENT.
PHASE
Alameda CTC
Administered
Funds
Sponsor
Funds Total
Funding
2010 Vehicle
Registration Fee
Disc-BP
Local Funds
Final Design (PS&E) $110,000 $40,000 $150,000
Construction $390,000 $10,000 $400,000
Total Project Cost $500,000 $50,000 $550,000
99
Attachment 3
Alameda CTC Agreement No. A22-0026
Project No. 1570000
Appendix A – Page 6
APPENDIX A-5
PROJECT FUNDING SUMMARY BY PHASE AND REIMBURSEMENT RATIO
(Only Phases Funded with Alameda CTC Administered Funds)
The ALAMEDA CTC ADMINISTERED FUNDS obligated by this AGREEMENT are to support the project
phase(s) identified and described below:
PROJECT FUNDING SUMMARY BY PHASE AND REIMBURSEMENT RATIO
PHASE
Alameda CTC
Administered
Funds Matching
Funds
Total
Funding
Reimbursement
Ratio
Percentage 2010 Vehicle
Registration Fee
Disc-BP
Final Design (PS&E) $110,000 $40,000 $150,000 73.33%
Construction $390,000 $10,000 $400,000 97.50%
Total Funding $500,000 $50,000 $550,000
Notes:
· PROJECT SPONSOR shall be reimbursed eligible costs in the percentage of Total ALAMEDA CTC
ADMINISTERED FUNDS to Total Funding per the Reimbursement Ratio Percentage for each phase. Each
Alameda CTC Administered Fund amount identified is a not-to-exceed amount. The Reimbursement Ratio is
defined as ALAMEDA CTC ADMINISTERED FUNDS divided by the Total Funding.
100
Attachment 3
Alameda CTC Agreement No. A22-0026
Project No. 1570000
Appendix A – Page 7
APPENDIX A-6
PROJECT PHASE COST DETAIL
This Project Phase Cost Detail summarizes the total cost for each phase with ALAMEDA CTC ADMINISTERED
FUNDS obligated in this AGREEMENT.
PHASE COST DETAIL
FINAL DESIGN
2010 Vehicle
Registration Fee
Disc-BP
Matching
Funds
Total Cost
Sponsor Staff/Labor Cost $ - $ - $ -
Contract(s)/Other Direct Cost $110,000 $40,000 $150,000
Total Phase Cost
(Staff + Contract Costs) $110,000 $40,000 $150,000
PHASE COST DETAIL
CONSTRUCTION
2010 Vehicle
Registration Fee
Disc-BP
Matching
Funds
Total Cost
Sponsor Staff/Labor Cost $ - $ - $ -
Contract(s)/Other Direct Cost $390,000 $10,000 $400,000
Total Phase Cost
(Staff + Contract Costs) $390,000 $10,000 $400,000
Notes:
· Contracts funded with any combination of Measure B, Measure BB, Vehicle Registration Fee and local funds
that do not contain State or federal funds are subject to Alameda CTC’s Local Business Contract Equity
Program (refer to Appendix D).
101
Attachment 3
Alameda CTC Agreement No. A22-0026
Project No. 1570000
Appendix B - Page 1
APPENDIX B
ALAMEDA CTC ADMINISTERED FUNDS OBLIGATED BY THIS AGREEMENT
The following Table B-1 identifies the ALAMEDA CTC ADMINISTERED FUNDS obligated by this
AGREEMENT and establishes a unique allowable start date for each obligated fund source.
TABLE B-1
FUNDS OBLIGATED BY THIS AGREEMENT
AND ALLOWABLE START AND EXPENDITURE DEADLINE DATES
Fund
Source
Fund
Subset Phase
Commission
Approval
Date
Allowable
Start Date
Expenditure
Deadline
Date
Obligated
Amount
2010 VRF Disc-BP Final Design 4/28/22 6/1/22 The Agreement
Expiration Date
serves as the
expenditure deadline
date.
$110,000
2010 VRF Disc-BP Construction 4/28/22 7/1/23 $390,000
Total Alameda CTC Administered Funds Obligated by AGREEMENT: $500,000
Agreement Expiration Date: December 31, 2024
Notes:
1. ALAMEDA CTC reimbursement amounts by fund source for PROJECT shall not exceed the total amount
obligated by this AGREEMENT, by fund source.
2. The Commission Approval Date is the date of the meeting at which the Commission approved the allocation.
3. The Allowable Start Date identified for each fund source is the earliest date at which costs eligible for
reimbursement by the fund source indicated may be incurred. Any costs incurred on the PROJECT before this
date will not be eligible for reimbursement under this AGREEMENT.
4. The Expenditure Deadline Date is the last date by which eligible reimbursable costs may be incurred. Any
costs incurred on the PROJECT after this date will not be eligible for reimbursement under this AGREEMENT.
5. The Agreement Expiration Date shall mean and refer to the expiration date of this AGREEMENT.
6. For TFCA funds obligated by this agreement, the Expenditure Deadline Date in the above table is two (2)
years from the date when ALAMEDA CTC first received funds from BAAQMD, unless an extended deadline is
approved at the time of programming or an extension has been approved by the ALAMEDA CTC. An estimated
deadline date is noted in the above table if at the time of this agreement the Alameda CTC has yet to receive
funds from BAAQMD. Extended deadlines will be reflected in an amended Table B-1, once approved.
7. For TFCA funds obligated by this agreement, the Commission may approve up to two one-year extensions to
the Expenditure Deadline Date. Any additional extensions require approval from both ALAMEDA CTC and
BAAQMD.
102
Attachment 3
Alameda CTC Agreement No. A22-0026
Project No. 1570000
Appendix B - Page 2
APPENDIX B (CONT.)
Reimbursement of ALAMEDA CTC ADMINISTERED FUNDS obligated by this AGREEMENT shall be in
accordance with the Drawdown Limitation Schedule below.
TABLE B-2
ALAMEDA CTC ADMINISTERED FUNDS
REIMBURSEMENT - DRAWDOWN LIMITATION SCHEDULE
No. Fiscal Year Quarter Fund Source Drawdown
Limitation Amount
Cumulative
Drawdown
Limitation Amount
1 FY 22/23 Any 2010 VRF $250,000 $250,000
2 FY 23/24 Any 2010 VRF $250,000 $500,000
Notes:
1. Fiscal Year (FY) begins July 1 and ends June 30.
2. Quarter 1 begins July 1 and ends September 30; Quarter 2 begins October 1 and ends December 31;
Quarter 3 begins January 1 and ends March 31; and Quarter 4 begins April 1 and ends June 30.
3. ALAMEDA CTC shall endeavor to transmit payments to PROJECT SPONSOR following the receipt and
approval of a complete Request for Reimbursement(s) submitted by the PROJECT SPONSOR.
4. Actual reimbursements from ALAMEDA CTC to the PROJECT SPONSOR shall not exceed the Cumulative
Drawdown Limitation Amount without Alameda CTC’s written approval. Any portion of a reimbursement
request, which exceeds the applicable Cumulative Drawdown Limitation without such prior approval by
ALAMEDA CTC shall be deferred until the following quarter or until sufficient capacity in the cumulative
drawdown limitation amount is achieved.
103
Attachment 3
Alameda CTC Agreement No. A22-0026
Project No. 1570000
Appendix C – Page 1
APPENDIX C
REQUEST FOR REIMBURSEMENT AND REPORTING REQUIREMENTS
The below table establishes the required minimum frequency for Requests for Reimbursement and Progress Reports.
Requests for Reimbursements and Progress Reports are required either monthly, quarterly, or semi-annually, as indicated
below with an “X”.
REQUEST FOR REIMBURSEMENT AND PROGRESS REPORTING
FREQUENCY AND DUE DATES
Frequency
Required
(as checked)
Minimum Frequency Period Covered Due Dates
☐ Monthly
(once every month)
One month By 30 days following the end
of billed activity
☐
Quarterly
(once every 3 months)
Quarter 1: 7/1– 9/30
Quarter 2: 10/1 – 12/31
Quarter 3: 1/1– 3/31
Quarter 4: 4/1– 6/30
By October 31st
By January 31st
By April 30th
By July 31st
☒
Semi-annually
(once every 6 months)
Quarters 1 & 2: 7/1 – 12/31
Quarters 3 & 4: 1/1 – 6/30
By January 31st
By July 31st
☐
Annually
(TFCA Annual Report)
Fiscal Year: 7/1 – 6/30
By July 31st
☒
Final Request for
Reimbursement
Any work period eligible
under Appendix B.
Must be submitted prior to the
Agreement Expiration Date
Notes:
1. For all projects, the maximum frequency for Requests for Reimbursement is one (1) per month.
2. If no costs were incurred during the reporting period, a progress report for the corresponding period is still
required.
3. TFCA funding requires annual reporting to BAAQMD in addition to the minimum required frequency for
Alameda CTC progress reports and invoices.
4. Requests for Reimbursement must be submitted prior to the Agreement Expiration Date in order to be eligible
for reimbursement.
REQUEST FOR REIMBURSEMENT AND REPORTING FORMS
Any PROJECT SPONSOR awarded ALAMEDA CTC Administered Funds shall use the following forms included
in the link below for progress reporting, final reporting, request for reimbursements, and requests for
amendments to this funding agreement. Note that the format and required content of these forms is subject
to change.
List of Downloadable Forms: https://www.alamedactc.org/funding/reporting-and-grant-forms/
1. Request for Reimbursement (RFR) Form
2. Alameda CTC Progress Report Form
3. Alameda CTC Final Report Form
4. Transportation Fund for Clean Air Program Reporting Forms (Interim and Final Report)
5. Amendment Request Form
104
Attachment 3
Alameda CTC Agreement No. A22-0026
Project No. 1570000
Appendix C – Page 2
105
Attachment 3
Alameda CTC Agreement No. A22-0026
Project No. 1570000
Appendix D – Page 1
APPENDIX D
LOCAL BUSINESS CONTRACT EQUITY PROGRAM REQUIREMENTS
As noted in Section I.14, PROJECT SPONSOR is obligated to comply with all applicable provisions of the
Alameda CTC Local Business Contract Equity (LBCE) Program, incorporated herein by reference as if
attached hereto.
LBCE Program Substitution: The LBCE Program allows substitution of Alameda CTC’s program if a
sponsor agency’s local preference program has been approved in writing by the Alameda CTC’s LBCE
Liaison Officer. This approval letter from Alameda CTC shall be attached as part of Appendix D.
The following resources are available to guide Project Sponsors through the LBCE Program requirements for
procurement and contracting processes:
· Sample template language for professional and construction services is available from ALAMEDA
CTC’s website: https://www.alamedactc.org/get-involved/contract-equity
· Prime and Subconsultant/Subcontractor Local Business Enterprise, Small Local Business Enterprise
and Very Small Local Business Enterprise Utilization Form: https://www.alamedactc.org/get-
involved/contracting-forms/
· The LBCE Program Guidelines, available at the above link, includes a Project Sponsor Responsibility
Checklist. Appendix B of the LBCE Program Guidelines identifies the Responsibilities of Sponsor
Agencies.
· Direct inquiries about the LBCE Program to ALAMEDA CTC’s LBCE Liaison Officer:
Seung Cho
Director of Procurement and Information Technology
Alameda County Transportation Commission
Email: scho@alamedactc.org
Phone: (510) 208-7472
106
Attachment 3
Alameda CTC Agreement No. A22-0026
Project No. 1570000
Appendix E - Page 1
APPENDIX E
DELIVERABLES AND DUE DATES
Project Deliverables and Due Dates: The Deliverables and Due Dates table below shows deliverables and
due dates, if any, for the phases listed in Appendix A-2 Project Phase Descriptions that contain ALAMEDA
CTC ADMINISTERED FUNDS.
Deliverables and Due Dates
No. Description Due Date to
Alameda CTC
1 Progress Report #1: July to December, 2022 January 31, 2023
2 Copy of Request for Proposal for professional services January 31, 2023
3 Progress Report #2: January to June, 2023 July 31, 2023
4 Progress Report #3 July to December, 2023 January 31, 2024
5 Copy of Final Plans and Specifications January 31, 2024
6 Copy of Request for Proposal for Construction January 31, 2024
7 Progress Report #4: January to June, 2024 July 31, 2024
8 Copy of Photos or resolution to confirm construction completion By the Agreement
Expiration Date
9 Final Invoice By the Agreement
Expiration Date
10 Final Report By the Agreement
Expiration Date
Note:
· Per Section III.19 of AGREEMENT, Alameda CTC may withhold payment of reimbursement requests until past
due deliverables are received and approved.
107
Attachment 3
Alameda CTC Agreement No. A22-0026
Project No. 1570000
Appendix F – Page 1
APPENDIX F
PROJECT PERFORMANCE MEASURES
Project Performance Measures: The Project Performance Measures and Targets describes what outcome-
based performance measure(s) the PROJECT SPONSOR plans to evaluate to ensure that the project/program is
meeting its objectives.
Appendix F is Not Applicable.
108
Attachment 3
Alameda CTC Agreement No. A22-0026
Project No. 1570000
Appendix G – Page 1
APPENDIX G
TRANSPORTATION FUND FOR CLEAN AIR POLICIES AND REQUIREMENTS
The contents of Appendix G are only included and attached to this AGREEMENT if TFCA funds are obligated and applicable
to AGREEMENT.
Appendix Index
Appendix G-1 TFCA Project Number and “Years of Effectiveness”
Appendix G-2 BAAQMD-approved TFCA County Program Manager Fund Policies
Appendix G-3 Minimum required insurance for TFCA-funded projects
Appendix G-4 Reporting Forms to BAAQMD for TFCA-funded projects
109
Attachment 4
Alameda CTC Agreement No. A22-0027
Project No. 1571000
Page 1 of 16
2021 PFA Version
PROJECT FUNDING AGREEMENT
between
ALAMEDA COUNTY TRANSPORTATION COMMISSION
and the
CITY OF DUBLIN
for the
DUBLIN DOWNTOWN STREETSCAPE PLAN IMPLEMENTATION
This Project Funding Agreement (“AGREEMENT”), dated for reference purposes only as of July 22,
2021, is by and between ALAMEDA COUNTY TRANSPORTATION COMMISSION, a joint powers agency
(“ALAMEDA CTC”), and the CITY OF DUBLIN, a public agency (“PROJECT SPONSOR”).
This AGREEMENT obligates funds from one or more ALAMEDA CTC administered funding programs as
indicated below, and as further specified in Appendix A: Project Control Information and Appendix B:
Alameda CTC Administered Funds Obligated by this AGREEMENT, for the PROJECT, as such term is defined
in Recital K below.
☒ 2000 Measure B
☐ 2014 Measure BB
☒ Vehicle Registration Fee
☐ Transportation Fund for Clean Air
☐ CMA TIP
RECITALS
A. The voters of Alameda County, pursuant to the provisions of the Bay Area County Traffic
and Transportation Funding Act, Public Utilities Code Section 131000, et seq., approved Measure B at the
General Election held in November 1986, authorizing the collection of a one-half cent transaction and use
tax over a fifteen (15)-year period to address major transportation needs and congestion in Alameda County
and giving Alameda County Transportation Authority (“ACTA”) the responsibility for the administration of
the proceeds of the tax. The proceeds from the 1986 Measure B tax have been and continue to be used to
pay for investments as outlined in the 1986 Alameda County Transportation Expenditure Plan (“1986 TEP”),
as it may be amended. Although collection of the 1986 Measure B tax ceased in 2002, capital projects funded
wholly or in part by 1986 Measure B funds are still being delivered using these funds.
B. The voters of Alameda County, pursuant to the provisions of the Local Transportation
Authority and Improvement Act, Public Utilities Code Section 180000, et seq., approved the reauthorization
of Measure B at the General Election held on November 7, 2000, authorizing the collection of a one-half
cent transaction and use tax to be collected for twenty (20) years beginning April 1, 2002 and giving Alameda
County Transportation Improvement Authority (“ACTIA”) responsibility for the administration of the
proceeds of the tax.. The proceeds from the 2000 Measure B tax have been and continue to be used to pay
for investments as outlined in the 2000 Alameda County Transportation Expenditure Plan (“2000 TEP”), as
it may be amended.
110
Attachment 4
Alameda CTC Agreement No. A22-0027
Project No. 1571000
Page 2 of 16
2021 PFA Version
C. The voters of Alameda County, pursuant to Section 65089.20 of the Government Code,
approved Measure F, the Vehicle Registration Fee (“VRF”), authorizing Alameda County Congestion
Management Agency (“ACCMA”) to administer the proceeds from a $10 per year vehicle registration fee on
each annual motor-vehicle registration in Alameda County, starting with registrations effective July 2011 with
collection beginning in May 2011, six months following approval of Measure F. Vehicles subject to the VRF
include all motorized vehicles, including passenger cars, light-duty trucks, medium-duty trucks, heavy-duty
trucks, buses of all sizes, motorcycles, and motorized camper homes, unless vehicles are expressly exempted
from the payment of the VRF.
D. By resolutions adopted by the ACTA and ACTIA Boards on June 24, 2010, all of ACTA’s
functions and responsibilities were assigned to, and accepted by, ACTIA. On that same date, the ACTIA and
ACCMA Boards took the final actions to create ALAMEDA CTC, a joint powers authority with all
responsibilities of ACTIA and ACCMA. Pursuant to resolutions adopted by the ACTIA and ACCMA
Boards and the Commission of ALAMEDA CTC, ACCMA and ACTIA were terminated as of the close of
business on February 29, 2012, with ALAMEDA CTC designated as the successor entity. All of its
predecessors’ functions and responsibilities have been assigned to, and accepted by, ALAMEDA CTC.
E. The voters of Alameda County, pursuant to the provisions of the Local Transportation
Authority and Improvement Act, California Public Utilities Code Section 180000 et seq., approved Measure
BB at the General Election held on November 4, 2014, authorizing the extension of an existing one-half of
one percent transaction and use tax scheduled to terminate on March 31, 2022, and the augmentation of the
tax by one-half of one percent, and giving ALAMEDA CTC responsibility for the administration of the
proceeds of the 2014 Measure BB tax. The duration of the 2014 Measure BB tax will be 30 years from the
initial year of collection, which began April 1, 2015, with said tax to terminate/expire on March 31, 2045. The
proceeds from the 2014 Measure BB will be used to pay for investments as outlined in the 2014 Alameda
County Transportation Expenditure Plan (“2014 TEP”), as it may be amended.
F. As the Transportation Fund for Clean Air (“TFCA”) Program Manager in Alameda County,
ALAMEDA CTC annually programs 40 percent of the TFCA funds collected in Alameda County. ALAMEDA
CTC receives these funds from the Bay Area Air Quality Management District (“BAAQMD”), and then
distributes these funds on a reimbursement basis to eligible project sponsors.
G. ALAMEDA CTC is continuing the implementation of the CMA Exchange Program, originally
established by the ACCMA, for the purpose of providing local or otherwise unrestricted funds to ALAMEDA
CTC for use in projects and programs adopted into the CMA Transportation Improvement Program (“CMA
TIP”) by ALAMEDA CTC.
H. The funding programs administered by ALAMEDA CTC and available for projects and
programs that benefit the Alameda County transportation system, consisting of 1986 Measure B, 2000
Measure B, 2014 Measure BB, VRF, TFCA, and CMA TIP, are collectively defined as and shall be referenced
herein as the “ALAMEDA CTC ADMINISTERED FUNDS”. Requirements related to 2000 Measure B, VRF and
2014 Measure BB Direct Local Distribution (“DLD”) funding distributed pursuant to 2000 Measure B, VRF
and 2014 Measure BB Transportation Expenditure Plans are covered by separate agreements between
ALAMEDA CTC and DLD recipients.
111
Attachment 4
Alameda CTC Agreement No. A22-0027
Project No. 1571000
Page 3 of 16
2021 PFA Version
I. Measure B, Measure BB, VRF, and TFCA funds obligated by this AGREEMENT shall be
programmed, allocated, and expended for the purpose defined and in accordance with the provisions set
forth in the applicable transportation expenditure plans, or the BAAQMD-approved TFCA County Program
Manager Policies.
J. ALAMEDA CTC programs and allocates ALAMEDA CTC ADMINISTERED FUNDS through
the ALAMEDA CTC Comprehensive Investment Plan (“CIP”) that is updated periodically to summarize the
programming and allocations of ALAMEDA CTC ADMINISTERED FUNDS, and the policies, procedures and
requirements related to the expenditure of ALAMEDA CTC ADMINISTERED FUNDS.
K. The PROJECT SPONSOR is implementing a project or program (“PROJECT”) that is eligible
for ALAMEDA CTC ADMINISTERED FUNDS. The PROJECT and the strategy to implement the PROJECT are
described in greater detail in Appendix A: Project Control Information.
L. This AGREEMENT obligates funds from one or more of ALAMEDA CTC administered
funding programs as specified in Appendix B: Alameda CTC Administered Funds Obligated by this
Agreement, for the PROJECT and the phase(s) described in Appendix A: Project Control Information.
ALAMEDA CTC ADMINISTERED FUNDS obligated by this AGREEMENT are available to reimburse eligible
costs incurred by PROJECT SPONSOR for the PROJECT and the phase(s) described in Appendix A: Project
Control Information.
M. The issuance of bonds or another financing mechanism are possible funding options as part
of ALAMEDA CTC administered funding programs to meet cash flow requirements of each individual
program based on current schedule and project delivery information.
NOW, THEREFORE, it is agreed by and between the parties as follows:
SECTION I
PROJECT SPONSOR AGREES:
1. PROJECT SPONSOR shall implement the PROJECT in accordance with all requirements in this
AGREEMENT and the following appendices attached hereto and incorporated herein by reference.
a. Appendix A: Project Control Information
b. Appendix B: Alameda CTC Administered Funds Obligated by this Agreement
c. Appendix C: Alameda CTC Request for Reimbursement and Reporting Requirements
d. Appendix D: Local Business Contract Equity Program
e. Appendix E: Deliverables and Due Dates
f. Appendix F: Project Performance Measures
g. Appendix G: Transportation Fund for Clean Air Policies and Requirements
112
Attachment 4
Alameda CTC Agreement No. A22-0027
Project No. 1571000
Page 4 of 16
2021 PFA Version
2. PROJECT SPONSOR shall perform the necessary work associated with the PROJECT required
to implement PROJECT as described in Appendix A: Project Control Information.
3. PROJECT SPONSOR shall inform ALAMEDA CTC in writing of any changes to the
information contained in Appendix A: Project Control Information as soon as PROJECT SPONSOR becomes
aware of such changes. Per Section III.2, any change that requires an amendment to this AGREEMENT must
be approved by ALAMEDA CTC prior to PROJECT SPONSOR implementing the change.
4. PROJECT SPONSOR shall commit to the timing of ALAMEDA CTC ADMINISTERED FUNDS
as described in Appendix B: Alameda CTC Administered Funds Obligated by this Agreement.
5. PROJECT SPONSOR shall expend ALAMEDA CTC ADMINISTERED FUNDS received under
this AGREEMENT in accordance with all applicable provisions of law and shall return to ALAMEDA CTC all
funds that are not expended in accordance with all applicable provisions of law.
6. PROJECT SPONSOR shall be responsible for costs in excess of the total funding obligations
shown in Appendix A: Project Control Information. Costs in excess of the total funding obligations will not
be reimbursed with ALAMEDA CTC ADMINISTERED FUNDS unless this AGREEMENT is amended in writing
or the parties execute a separate agreement for a subsequent phase of the PROJECT.
7. PROJECT SPONSOR shall return to ALAMEDA CTC, on a pro-rated basis, funds realized from
the sale of any vehicle(s) purchased with ALAMEDA CTC ADMINISTERED FUNDS, if the sale of the vehicle(s)
is completed prior to the last day of the last year listed as the PROJECT’S “Years of Effectiveness” as
identified in either Appendix A: Project Control Information or Appendix G: Transportation Fund for Clean
Air Policies and Requirements, as applicable. The amount of sale proceeds required to be returned to
ALAMEDA CTC shall be proportional to the percentage of ALAMEDA CTC ADMINISTERED FUNDS originally
used to purchase the vehicle(s).
8. PROJECT SPONSOR staff costs for any local agency which receives DLD funding shall not be
eligible for reimbursement from ALAMEDA CTC ADMINISTERED FUNDS allocated to the PROJECT unless
staff costs are specifically identified as eligible in Appendix A: Project Control Information. Staff costs
included in Appendix A are limited to project implementation costs. Staff costs related to the administration
of this AGREEMENT including preparation of requests for reimbursement or progress reports are ineligible
for reimbursement. PROJECT SPONSOR staff costs funded by other sources can be included in the total cost
for the purpose of meeting the cost and risk sharing provisions of this AGREEMENT.
9. PROJECT SPONSOR staff costs eligible for reimbursement may include the individual’s actual
hourly wage plus a fringe benefit rate, as approved by a cognizant agency or an independent auditor, of up to
a maximum of 70% of the hourly wage. Staff costs also may include direct costs including contracted services,
such as legal counsel, that are considered an extension of the PROJECT SPONSOR’S staff.
10. PROJECT SPONSOR overhead, or "indirect," costs are not eligible for reimbursement from
ALAMEDA CTC ADMINISTERED FUNDS obligated by this AGREEMENT, and shall not be included in the total
113
Attachment 4
Alameda CTC Agreement No. A22-0027
Project No. 1571000
Page 5 of 16
2021 PFA Version
eligible PROJECT cost calculations used to determine the ALAMEDA CTC ADMINISTERED FUNDS share of
such total eligible PROJECT costs.
11. The cost of maintenance, security, or protection performed by PROJECT SPONSOR or third-
party contractors during any temporary suspension of activities associated with the PROJECT will not be
considered an eligible cost for reimbursement by ALAMEDA CTC.
12. PROJECT SPONSOR shall advertise, award and administer all professional services contracts for
PROJECT work not performed by PROJECT SPONSOR.
13. PROJECT SPONSOR shall invite ALAMEDA CTC staff to participate as a voting member of
PROJECT SPONSOR’s selection panel for the selection of all professional consultants, and furnish drafts of all
professional services contracts, upon ALAMEDA CTC’s request.
14. All locally funded contracts approved by PROJECT SPONSOR, funded wholly or in part with
Measure B, Measure BB, and/or Vehicle Registration Fee funds administered by ALAMEDA CTC, except for
contracts that also include state and/or federal funds or contracts funding non-capital projects (e.g., transit
operations), are required to comply with ALAMEDA CTC’s Local Business Contract Equity (LBCE) Program
as listed and described in Appendix D: Local Business Contract Equity Program Requirements. PROJECT
SPONSOR shall comply with the reporting requirements set forth in the LBCE Program and provide the
required information to ALAMEDA CTC in accordance with Appendix D for all contracts partially or wholly
funded by ALAMEDA CTC, whether or not the specific contract is subject to the LBCE Program.
15. PROJECT SPONSOR shall require insurance coverage that names ALAMEDA CTC, its
governing body, officers, employees and consultants as additional insureds of the PROJECT SPONSOR,
professional services consultants and subconsultants, construction services contractors and subcontractors,
volunteer service individuals, and any other contractors or subcontractors involved with the PROJECT on all
insurance required by PROJECT SPONSOR for PROJECT. PROJECT SPONSOR shall keep and maintain
insurance certificates and policy endorsements evidencing the policies on file, and furnish the same to
ALAMEDA CTC upon request. ALAMEDA CTC will not be responsible for any premiums or assessments on
any policy. If this AGREEMENT includes any TFCA funds, PROJECT SPONSOR shall also comply with the
insurance requirements specified in Appendix G: Transportation Fund for Clean Air Policies and
Requirements.
16. PROJECT SPONSOR shall provide ALAMEDA CTC with periodic (i.e., monthly, quarterly or
semi-annually) progress reports describing the current status of the PROJECT. The required progress reporting
frequency schedule and forms are provided in Appendix C: Alameda CTC Request for Reimbursement and
Reporting Requirements. Progress reports are due by the last day of each calendar month following the
established reporting period in which the work was performed. These reports shall include PROJECT status
information such as the scope of work completed to date, total costs incurred, future actions, project
performance, issues identification, changes to scope or schedule, and any additional relevant information
requested by ALAMEDA CTC.
114
Attachment 4
Alameda CTC Agreement No. A22-0027
Project No. 1571000
Page 6 of 16
2021 PFA Version
17. PROJECT SPONSOR shall submit to ALAMEDA CTC a Request for Reimbursement in
accordance with the minimum required invoicing frequency established for the PROJECT, but not more than
one such request per month, for reimbursement of eligible PROJECT costs and expenses incurred by PROJECT
SPONSOR. The required minimum invoicing frequency and invoice forms are provided in Appendix C:
Alameda CTC Request for Reimbursement and Reporting Requirements. If PROJECT SPONSOR does not
incur any reimbursable expenses during the minimum invoicing period, in lieu of submitting an invoice,
PROJECT SPONSOR shall submit a letter or a statement as part of the required progress report for the same
period confirming that no reimbursable costs were incurred during the given period. If PROJECT SPONSOR
requests reimbursement for costs incurred as a result of a contract or agreement with a third party that
contains a contract value of $50,000 or greater, e.g. a consultant, contractor or other entity, PROJECT
SPONSOR shall submit an electronic copy of the fully executed contract or agreement to ALAMEDA CTC prior
to ALAMEDA CTC authorizing reimbursement of such costs. Supporting documentation for the Request for
Reimbursement packages includes copies of invoices from vendors, consultants, or contractors and
summaries of eligible PROJECT SPONSOR staff time charges. PROJECT SPONSOR may suggest an alternative
method, subject to approval in advance by ALAMEDA CTC, to document staff costs charged to the PROJECT.
18. PROJECT SPONSOR shall provide a Parcel and Utility Agreement Tracking Log upon
ALAMEDA CTC’s request, if the PROJECT includes the acquisition of right-of-way and/or the relocation or
protection of utility facilities.
19. PROJECT SPONSOR shall keep all necessary PROJECT records to demonstrate compliance
with this AGREEMENT, including documentation of activities, performance, progress reports, final report,
expenses and charges to support invoices submitted to ALAMEDA CTC and other PROJECT reporting
requirements as described in Appendix C: Alameda CTC Request for Reimbursement and Reporting
Requirements in one central location for a period of not less than five (5) years after the later of (i) ALAMEDA
CTC’s payment of the final invoice, (ii) the PROJECT SPONSOR’S submittal of the Final Report for ALAMEDA
CTC ADMINISTERED FUNDS under this AGREEMENT, and (iii) the end of the PROJECT’S established “Years
of Effectiveness” period (as identified in Appendix G: Transportation Fund for Clean Air Policies and
Requirements) if any TFCA funds are provided under this AGREEMENT.
a. PROJECT SPONSOR and PROJECT SPONSOR’s contractors and subcontractors shall each
maintain and make available for inspection and audit all books, documents, papers,
accounting records, and other evidence pertaining to the performance of such contracts,
including, but not limited to, the costs of administering those various contracts.
b. PROJECT SPONSOR shall allow ALAMEDA CTC or its authorized representatives to inspect,
audit, or make copies of any PROJECT records for a period of five (5) years after ALAMEDA
CTC’s payment of the final invoice and the PROJECT SPONSOR’S submittal of the Final
Report. The same access also shall be granted to BAAQMD or its authorized
representatives for TFCA funds obligated by this AGREEMENT.
20. PROJECT SPONSOR shall comply with all of the following publicity requirements to inform
the public on the use of ALAMEDA CTC ADMINISTERED FUNDS on the PROJECT.
115
Attachment 4
Alameda CTC Agreement No. A22-0027
Project No. 1571000
Page 7 of 16
2021 PFA Version
a. PROJECT SPONSOR shall credit ALAMEDA CTC as a funding source and display the
approved ALAMEDA CTC logo, where practical, on construction informational signs,
vehicles or equipment operated or obtained as part of the PROJECT, and on any publicly
distributed information (e.g., fact sheets, flyers, brochures, maps, schedules, websites, press
releases), created for or associated with the PROJECT. For TFCA funding obligated through
this AGREEMENT, SPONSOR shall also credit the BAAQMD as a funding source and display
the BAAQMD-approved TFCA logo.
b. PROJECT SPONSOR shall provide updated and accurate PROJECT information on the
PROJECT SPONSOR’s website, or create such a website if none exists, and provide a link to
ALAMEDA CTC website.
c. PROJECT SPONSOR shall publish an article in a printed or electronically distributed
publication such as a newsletter, local newspaper, e-publications, or website highlighting the
PROJECT and the use of ALAMEDA CTC ADMINISTERED FUNDS at least once per fiscal year.
For TFCA funding obligated through this AGREEMENT, SPONSOR shall also credit the
BAAQMD as a funding source.
d. PROJECT SPONSOR shall document compliance with the publicity requirements and furnish
such documentation upon request, and regularly through the progress and final reporting
required by this AGREEMENT, through evidence such as photos of construction and vehicle
signage, copies of print, electronic and other media published to satisfy this requirement.
For TFCA funding obligated through this AGREEMENT, SPONSOR shall also document that
the BAAQMD was credited as a funding source and the BAAQMD-approved TFCA logos
were displayed.
e. PROJECT SPONSOR shall notify ALAMEDA CTC and request an exemption as soon as it is
reasonably known that the PROJECT SPONSOR is unable to fulfill the requirements under this
Section I.20 due to extraordinary circumstances.
21. PROJECT SPONSOR shall, to the extent not otherwise prohibited by law, and to the extent
required by the California Public Records Act (California Government Code section 6250 et seq.), place in
the public domain any software, written document, or other product developed with ALAMEDA CTC
ADMINISTERED FUNDS received through this AGREEMENT.
22. PROJECT SPONSOR shall participate, upon the request of ALAMEDA CTC, in a Public
Awareness Program in partnership with ALAMEDA CTC and/or its community advisory committees as a
means of informing the public of the benefits derived from the use of ALAMEDA CTC ADMINISTERED
FUNDS.
23. PROJECT SPONSOR shall obtain all state, local and federal permits and approvals for work,
including environmental approvals in accordance with the National Environment Policy Act (NEPA) and the
California Environmental Quality Act (CEQA), as applicable. PROJECT SPONSOR will comply with all
applicable state and federal laws and regulations.
116
Attachment 4
Alameda CTC Agreement No. A22-0027
Project No. 1571000
Page 8 of 16
2021 PFA Version
24. PROJECT SPONSOR shall render a report or answer any and all inquiries, upon ALAMEDA
CTC’s request, in regards to its receipt of ALAMEDA CTC ADMINISTERED FUNDS, compliance audit findings,
and usage of ALAMEDA CTC ADMINISTERED FUNDS before the ALAMEDA CTC Commission, Independent
Watchdog Committee, and/or community advisory committees, as applicable.
25. For TFCA funds obligated by this AGREEMENT, a PROJECT SPONSOR who has failed a
BAAQMD financial or performance audit for the PROJECT will be excluded from receiving an award of any
TFCA funds for five (5) years from the date of BAAQMD’s final audit determination. Existing TFCA funds
already awarded to the SPONSOR will not be released until all audit recommendations and remedies have been
satisfactorily implemented. A failed BAAQMD financial audit means a final audit report that includes an
uncorrected audit finding that confirms an ineligible expenditure of TFCA funds. A failed BAAQMD
performance audit means that the PROJECT was not implemented in accordance with the AGREEMENT.
SPONSOR shall be afforded a reasonable amount of time to address/cure adverse audit findings.
26. For TFCA funds obligated by this AGREEMENT, PROJECT SPONSOR shall return to
ALAMEDA CTC, on a pro-rated basis, TFCA funds received under this Agreement if PROJECT is not
maintained and/or operated throughout, and at least until the conclusion of, its “Years of Effectiveness” as
identified in Appendix G: Transportation Fund for Clean Air Policies and Requirements.
27. For TFCA funds obligated by this AGREEMENT, PROJECT SPONSOR shall submit a TFCA
Final Report to the ALAMEDA CTC. The required content for the TFCA Final Report is identified in the
TFCA Final Report Form referenced in Appendix G.
SECTION II
ALAMEDA CTC AGREES:
1. ALAMEDA CTC shall make a good faith effort to provide all ALAMEDA CTC
ADMINISTERED FUNDS obligated by this AGREEMENT.
2. ALAMEDA CTC shall assist PROJECT SPONSOR when able, upon request and as necessary, in
resolving issues related to the PROJECT.
3. ALAMEDA CTC shall provide a copy of its approved logo for PROJECT SPONSOR to use as
required by this AGREEMENT.
4. ALAMEDA CTC shall provide notice to the PROJECT SPONSOR of any and all expenditures
made by PROJECT SPONSOR, which are not in compliance with the AGREEMENT or the applicable ALAMEDA
CTC ADMINISTERED FUNDS promptly after ALAMEDA CTC becomes aware of any such expenditures.
117
Attachment 4
Alameda CTC Agreement No. A22-0027
Project No. 1571000
Page 9 of 16
2021 PFA Version
5. ALAMEDA CTC shall provide timely notice to PROJECT SPONSOR prior to conducting an
audit of expenditures made by PROJECT SPONSOR to determine whether such expenditures are compliant
with this AGREEMENT or the applicable ALAMEDA CTC ADMINISTERED FUNDS.
SECTION III
IT IS MUTUALLY AGREED AS FOLLOWS:
1. That ALAMEDA CTC ADMINISTERED FUNDS obligated by this AGREEMENT may be
shifted between the phases of the PROJECT or between activities in the same phase of the PROJECT, so long
as each of the following occurs: 1) PROJECT SPONSOR submits a written amendment request that provides
revised and updated Appendix A: Project Control Information forms documenting the requested funding
obligation shift and demonstrating to ALAMEDA CTC’s satisfaction that the phase or activity from which the
funds were shifted remains fully funded, and 2) the parties execute an amendment to this AGREEMENT
incorporating the revised and updated Appendix A forms as described above, which amendment shall be
approved by ALAMEDA CTC pursuant to applicable ALAMEDA CTC policies.
2. ALAMEDA CTC and the PROJECT SPONSOR may jointly authorize an “Administrative
Amendment” for any minor schedule revisions, deliverables, or budget revisions that do not increase the total
ALAMEDA CTC ADMINISTERED FUNDS obligated by this AGREEMENT. Any change in the PROJECT scope
of work must be approved by ALAMEDA CTC prior to implementation of the change by the PROJECT
SPONSOR. Administrative amendment requests sent to ALAMEDA CTC must include a revised Appendix A:
Project Control Information which reflects the requested changes by the PROJECT SPONSOR.
3. For the purposes of this AGREEMENT, (i) a “Contract” shall mean and refer to a third party
agreement with the PROJECT SPONSOR for services related to PROJECT, including agreements with another
public agency, consultant firm, contractor or entity; (ii) “PROJECT SPONSOR Staff” costs include costs for
staff dedicated directly to project implementation, management, oversight, and/or project development and
may include direct costs including contracted services, such as legal counsel, that are considered an extension
of PROJECT SPONSOR Staff; (iii) “Capital” with respect to any Right-of-Way Capital phase shall mean and
refer to the cost to acquire real property, access rights and other property interests; and (iv) “Agreement
Expiration Date” shall mean and refer to the expiration date of this AGREEMENT.
4. Reimbursable costs will be limited to the costs shown in Appendix A: Project Control
Information. Funds expended for work directly related to the phases of the PROJECT covered by this
AGREEMENT prior to the applicable allowable start date identified in Appendix B: ALAMEDA CTC
ADMINISTERED FUNDS Obligated by this AGREEMENT are ineligible for reimbursement pursuant to this
AGREEMENT. ALAMEDA CTC ADMINISTERED FUNDS obligated by this AGREEMENT are subject to fund
availability and any new requirements and policies imposed by ALAMEDA CTC. The AGREEMENT shall be
amended, as necessary, to reflect the applicable requirements.
5. If additional local, state or federal funding is obtained to partially offset ALAMEDA CTC
ADMINISTERED FUNDS planned for the PROJECT, ALAMEDA CTC ADMINISTERED FUNDS will not be
118
Attachment 4
Alameda CTC Agreement No. A22-0027
Project No. 1571000
Page 10 of 16
2021 PFA Version
transferred from the PROJECT until after it is ensured that all phases of the PROJECT can be fully delivered.
ALAMEDA CTC ADMINISTERED FUNDS offset by additional local, state or federal funding shall be available
for PROJECT only after all other funding planned for PROJECT, as described in Appendix A: Project Control
Information, has been committed and/or encumbered to the PROJECT.
6. Should any portion of PROJECT be financed with federal or state funds, all applicable laws,
rules and policies relating to the use of such funds shall apply, notwithstanding other provisions of this
AGREEMENT.
7. For TFCA funds obligated by this AGREEMENT, this AGREEMENT is subject to the current
BAAQMD-approved TFCA County Program Manager Fund Policies included in Appendix G:
Transportation Fund for Clean Air Policies and Requirements and any new requirements imposed by the
BAAQMD upon ALAMEDA CTC with respect to the TFCA funds distributed hereunder. ALAMEDA CTC
will only distribute TFCA funds under this AGREEMENT to the extent the documented project costs are
eligible under the applicable BAAQMD TFCA Policies.
8. The laws of the State of California shall govern this AGREEMENT.
9. All correspondence and communications will contain ALAMEDA CTC project number and
name for PROJECT in a clearly identifiable location. For projects with TFCA funds obligated by this
AGREEMENT, all correspondence and communications will also contain the TFCA project number as
identified in Appendix G: Transportation Fund for Clean Air Policies and Requirements.
10. ALAMEDA CTC reserves the right to conduct technical and financial audits of PROJECT
work and records when determined to be necessary or appropriate and PROJECT SPONSOR agrees, and shall
require its contractors and subcontractors to agree, to cooperate with ALAMEDA CTC by making all
appropriate and relevant PROJECT records promptly available for audit and copying.
11. PROJECT costs incurred by PROJECT SPONSOR are only eligible for reimbursement on a pro-
rated basis unless specifically provided for in Appendix A: Project Control Information, and PROJECT
SPONSOR is expected to concurrently seek reimbursement from the other sources shown in Project A: Project
Control Information. Pro-rated basis, as used herein, equals the amount of ALAMEDA CTC ADMINISTERED
FUNDS obligated by this AGREEMENT to a phase, divided by the total funding for the phase, as shown in
Appendix A: Project Control Information. For any Request for Reimbursement which includes such
expenditures, PROJECT SPONSOR shall (i) report the total expenditures during the reimbursement period, (ii)
indicate the percentage of the total expenditures for the phase expected to be funded by ALAMEDA CTC
ADMINISTERED FUNDS obligated by this AGREEMENT, and (iii) request reimbursement for the dollar amount
which equals the product of such total expenditures and such percentage.
12. ALAMEDA CTC approval of PROJECT SPONSOR submitted Requests for Reimbursement will
be contingent on the submittal of progress reports and deliverables by PROJECT SPONSOR as required by this
AGREEMENT. In the event that progress reports and deliverables are not complete and current, approval of
Requests for Reimbursement shall be withheld until an acceptable remedy has been implemented and
approved by ALAMEDA CTC. If PROJECT SPONSOR fails to submit the required deliverables or otherwise fails
119
Attachment 4
Alameda CTC Agreement No. A22-0027
Project No. 1571000
Page 11 of 16
2021 PFA Version
to meet the reporting and invoicing requirements of this AGREEMENT, ALAMEDA CTC may deobligate funds
from the PROJECT and this AGREEMENT. Not less than thirty (30) days prior to the effective date of any
such action, ALAMEDA CTC will endeavor to notify PROJECT SPONSOR in writing that the required
deliverables, invoicing and reporting is overdue.
13. Request for Reimbursements submitted after the Agreement Expiration Date identified in
Appendix B: Alameda CTC Administered Funds Obligated by this AGREEMENT will be ineligible for
reimbursement by ALAMEDA CTC unless an exception is requested by the PROJECT SPONSOR no less than
sixty (60) days before the Agreement Expiration Date, and the exception is approved by ALAMEDA CTC.
ALAMEDA CTC will deobligate any remaining ALAMEDA CTC ADMINISTERED FUNDS from PROJECT and
this AGREEMENT.
14. Each Right-of-Way transaction which is funded either wholly or in part with ALAMEDA CTC
ADMINISTERED FUNDS shall be subject to repayment or reimbursement to ALAMEDA CTC under ALAMEDA
CTC Policies in effect as of the effective date of this AGREEMENT, irrespective of the party holding title to
the real estate which is the subject of the Right-of-Way transaction in question. The parties agree that Section
III.15(a) through Section III.15(f), the provisions of which are intended to provide further detail regarding
the application of such Policies, shall govern the extent to which such repayment is required and the
conditions applicable to any such repayment. If such Policies are amended after the effective date of this
AGREEMENT by ALAMEDA CTC, the PROJECT SPONSOR and ALAMEDA CTC shall execute an amendment
to this AGREEMENT which references the revised Policies.
15. For the purposes of the following provisions, “ALAMEDA CTC Share” shall mean the
percentage share of the original property purchase price funded by ALAMEDA CTC ADMINISTERED FUNDS
(i.e., if the purchase was fully funded by ALAMEDA CTC ADMINISTERED FUNDS, ALAMEDA CTC Share shall
equal 100%); any appraisal required under Section III.15(a) and Section III.15(f) only, shall be conducted at
no cost to ALAMEDA CTC; “Fair Market Value” of a given property shall mean the net proceeds from the
sale of such property if such sale occurs in an open market transaction or by auction, or the value of the
property determined by an independent third-party appraisal of the property if some or all of the property is
retained by PROJECT SPONSOR or otherwise transferred to any other party without an auction or open market
transaction; and “CPI” means the Consumer Price Index, All Items for All Urban Consumers, San Francisco-
Oakland, San Jose, CA.
a. If any property is acquired for the PROJECT using ALAMEDA CTC ADMINISTERED FUNDS
to finance some or all of the acquisition, and the PROJECT is cancelled or otherwise does
not begin construction within five (5) years after the effective date of AGREEMENT (as
such deadline may be extended by agreement between the parties hereto), then PROJECT
SPONSOR shall, within one (1) year after such cancellation decision or the expiration of
such five (5) year period, reimburse ALAMEDA CTC for the greater of the following:
ALAMEDA CTC Share of the property’s Fair Market Value or the full amount of ALAMEDA
CTC ADMINISTERED FUNDS used to acquire the property, as escalated by the increase in
the CPI during the most recent period for which CPI data is available which is equal in
length to the period between the date ALAMEDA CTC ADMINISTERED FUNDS were paid
to PROJECT SPONSOR and the date reimbursement is made to ALAMEDA CTC.
120
Attachment 4
Alameda CTC Agreement No. A22-0027
Project No. 1571000
Page 12 of 16
2021 PFA Version
b. If any property is acquired for the PROJECT using ALAMEDA CTC ADMINISTERED FUNDS
to finance some or all of the acquisition and only a portion of the acquired property is
required for the PROJECT, and if the PROJECT begins construction within five (5) years
after the effective date of this AGREEMENT (as such deadline may be extended by
agreement between the parties hereto), then PROJECT SPONSOR shall, within one (1) year
after PROJECT completion, reimburse ALAMEDA CTC for ALAMEDA CTC Share of the
Fair Market Value of any property determined to be “excess property”.
c. If the PROJECT begins construction within five (5) years after the effective date of this
AGREEMENT (as such deadline may be extended by agreement between the parties hereto),
then except as provided in subparagraph (d) below, no reimbursement is due with respect
to any property interest acquired for the project using ALAMEDA CTC ADMINISTERED
FUNDS if the entirety of the acquired property is required for the PROJECT.
d. If PROJECT SPONSOR anticipates receiving net revenues (i.e., rental or other income
generated by the property, less reasonable costs for insurance, maintenance and related
items) from any property acquired using ALAMEDA CTC ADMINISTERED FUNDS,
PROJECT SPONSOR shall notify ALAMEDA CTC on how PROJECT SPONSOR will use such
revenue to offset other project costs, and document such revenue separately in project
reimbursement requests.
e. If PROJECT is suspended, PROJECT SPONSOR shall pay all property management costs.
f. Property that is required for the PROJECT and acquired wholly or in part with ALAMEDA
CTC ADMINISTERED FUNDS shall be available for PROJECT construction within ten (10)
years of ALAMEDA CTC reimbursement to the PROJECT SPONSOR. If, after ten (10) years,
PROJECT has not been completed, PROJECT SPONSOR shall reimburse ALAMEDA CTC
Share of the fair market value of the property, based on the net proceeds from the sale of
the property or an appraisal of the property conducted at no cost to ALAMEDA CTC,
within one (1) year after the expiration of this ten (10) year period.
16. If condemnation procedures are required to obtain possession to Right-of-Way, ALAMEDA
CTC will consider the required deposit as an eligible cost and reimburse the PROJECT SPONSOR upon request.
PROJECT SPONSOR shall submit documentation of the final order of condemnation settlement within ninety
(90) days after the date of the court recording of the final order of condemnation. If the amount of
ALAMEDA CTC reimbursement to the PROJECT SPONSOR is higher than ALAMEDA CTC Share of the
amount of settlement in the final order of condemnation, the PROJECT SPONSOR shall pay ALAMEDA CTC
the difference between the amount reimbursed and ALAMEDA CTC Share of the amount settled plus
ALAMEDA CTC Share of the interest accrued to the deposit account within one (1) year of the final order of
condemnation.
17. PROJECT SPONSOR shall not initiate condemnation of any property until full funding for the
construction of the PROJECT has been secured.
121
Attachment 4
Alameda CTC Agreement No. A22-0027
Project No. 1571000
Page 13 of 16
2021 PFA Version
18. Reimbursement to PROJECT SPONSOR by ALAMEDA CTC for PROJECT Right-of-Way is
limited to the following (and net of any relocation payments provided by other sources):
a. The cost to purchase all real property required for the PROJECT free and clear of liens
and/or conflicting easements, including the costs for preparation of documents,
negotiations and legal services.
b. The cost of damages to owners of the remainder of real property not actually taken but
injuriously affected by PROJECT.
c. The cost of relocation payments and services provided to owners and occupants pursuant
to the appropriate State laws and regulations when the PROJECT displaces an individual,
family, business, farm operation or nonprofit organization.
d. The cost of demolition and/or the sale of all improvements on the right-of-way. Proceeds
from the sale of any such improvements shall be credited to the PROJECT and used to
offset PROJECT costs.
e. The cost of all unavoidable utility relocation, protection or removal necessary for the
completion of the PROJECT.
f. The cost of all necessary hazardous material and hazardous waste treatment, encapsulation
or removal and protective storage for which PROJECT SPONSOR accepts responsibility and
where the actual generator cannot be identified and recovery made.
19. If PROJECT SPONSOR materially breaches this AGREEMENT, including but not limited to
failing to deliver the PROJECT within the schedule defined by this AGREEMENT without compelling reason,
failing to file required progress reports in the time specified by this AGREEMENT, or failing to comply with
applicable regulations, ALAMEDA CTC may either terminate this AGREEMENT or suspend payments to
PROJECT SPONSOR until such time as PROJECT SPONSOR makes reasonable efforts to comply with this
AGREEMENT.
20. Neither ALAMEDA CTC, nor its governing body or any officer, consultant, or employee
thereof shall be responsible for any damage or liability occurring by reason of anything done or omitted to be
done by PROJECT SPONSOR in connection with the PROJECT. It is also understood and agreed, pursuant to
Government Code Section 895.4, PROJECT SPONSOR shall fully defend, protect, indemnify and hold harmless
ALAMEDA CTC, its governing body, and all its officers, employees, agents, representatives, and successors-in-
interest, against any and all liability, loss, expense, including reasonable attorneys’ fees, or claims for injury (as
defined in Government Code Section 810.8) or damages occurring by reason of anything done or omitted to
be done by PROJECT SPONSOR in connection with PROJECT, including the performance of the PROJECT or
operation or use of the equipment that is subject to this AGREEMENT. If TFCA funds are obligated by this
AGREEMENT, PROJECT SPONSOR shall also fully defend, protect, indemnify and hold harmless BAAQMD,
its governing body, and all its officers, employees, agents, representatives, and successors-in-interest, from
122
Attachment 4
Alameda CTC Agreement No. A22-0027
Project No. 1571000
Page 14 of 16
2021 PFA Version
any liability imposed on BAAQMD for injury (as defined in Government Code Section 810.8) occurring by
reason of anything done or omitted to be done by PROJECT SPONSOR in connection with PROJECT.
21. Neither PROJECT SPONSOR, nor its governing body or any officer, consultant, or employee
thereof shall be responsible for any damage or liability occurring by reason of anything done or omitted to be
done by ALAMEDA CTC under or in connection with any work, authority or jurisdiction delegated to
ALAMEDA CTC under this AGREEMENT. It is also understood and agreed, pursuant to Government Code
Section 895.4, ALAMEDA CTC shall fully defend, protect, indemnify and hold harmless PROJECT SPONSOR,
its governing body, and all its officers, employees, agents, representatives, and successors-in-interest, against
any and all liability, loss, expense, including reasonable attorneys’ fees, or claims for injury (as defined in
Government Code Section 810.8) or damages occurring by reason of anything done or omitted to be done by
ALAMEDA CTC in connection with PROJECT, including the performance of the PROJECT or operation or use
of the equipment that is subject to this AGREEMENT.
22. Nothing in the provisions of this AGREEMENT is intended to create duties or obligations to
or rights in third parties not party to this AGREEMENT. This AGREEMENT gives no rights or benefits to anyone
other than ALAMEDA CTC and PROJECT SPONSOR and has no third-party beneficiaries.
23. All legal actions by either party against the other arising from this AGREEMENT, or for the
failure to perform in accordance with the applicable standard of care, or for any other cause of action, will be
subject to the statutes of limitations of the State of California.
24. Should it become necessary to enforce the terms of this AGREEMENT, the prevailing party
shall be entitled to recover reasonable expenses and attorney’s fees from the other party.
25. This AGREEMENT shall terminate upon the Agreement Expiration Date identified in
Appendix B: Funds Obligated by this AGREEMENT unless this AGREEMENT is extended by mutual
agreement of the parties. Notwithstanding the foregoing, Sections I.7, I.19, III.21 and III.22 shall survive the
termination or expiration of this AGREEMENT.
26. This AGREEMENT, including its Recitals and Appendices, constitutes the entire
AGREEMENT. This AGREEMENT may be changed only as allowed in Sections III.1 and Section III.2 of this
AGREEMENT or by a written amendment executed by both parties.
[Signatures on the next page]
123
Attachment 4
Alameda CTC Agreement No. A22-0027
Project No. 1571000
Page 15 of 16
2021 PFA Version
CITY OF DUBLIN
(PROJECT SPONSOR)
ALAMEDA COUNTY
TRANSPORTATION COMMISSION
(ALAMEDA CTC)
By: By:
Linda Smith Date
City Manager
Tess Lengyel Date
Executive Director
Recommended
By:
Gary Huisingh Date
Deputy Executive Director of
Capital Projects
Reviewed as to Budget/Financial Controls:
By:
Patricia Reavey Date
Deputy Executive Director of
Finance and Administration
Approved as to Legal Form:
Approved as to Legal Form:
By:
By:
John Bakker Date
Legal Counsel to CITY OF DUBLIN
Wendel Rosen LLP Date
Legal Counsel to ALAMEDA CTC
124
Attachment 4
Alameda CTC Agreement No. A22-0027
Project No. 1571000
Page 16 of 16
2021 PFA Version
LIST OF APPENDICES
APPENDIX A: PROJECT CONTROL INFORMATION
Appendix A-1 Project Description
Appendix A-2 Project Scope Detail by Phase
Appendix A-3 Project Milestone Schedule
Appendix A-4 Project Cost Estimate Summary by Phase and Fund Source
Appendix A-5 Project Funding Summary by Phase and Reimbursement Ratio
Appendix A-6 Project Phase Cost Detail
APPENDIX B: ALAMEDA CTC ADMINISTERED FUNDS OBLIGATED BY THIS AGREEMENT
APPENDIX C: ALAMEDA CTC REQUEST FOR REIMBURSEMENT AND REPORTING REQUIREMENTS
APPENDIX D: LOCAL BUSINESS CONTRACT EQUITY PROGRAM REQUIREMENTS
APPENDIX E: DELIVERABLES AND DUE DATES
APPENDIX F: PROJECT PERFORMANCE MEASURES
APPENDIX G: TRANSPORTATION FUND FOR CLEAN AIR POLICIES AND REQUIREMENTS
Appendix G-1 TFCA Project Number and “Years of Effectiveness”
Appendix G-2 BAAQMD-approved TFCA County Program Manager Fund Policies
Appendix G-3 Minimum required insurance for TFCA-funded projects
Appendix G-4 Reporting Forms to BAAQMD for TFCA-funded projects
Note: Appendix G is only included and attached to this AGREEMENT if TFCA funds are obligated and applicable to
AGREEMENT.
125
Attachment 4
Alameda CTC Agreement No. A22-0027
Project No. 1571000
Appendix A – Page 1
APPENDIX A
PROJECT CONTROL INFORMATION
Appendix Index
Appendix A-1 Project Description
Appendix A-2 Project Scope Detail by Phase
Appendix A-3 Project Milestone Schedule
Appendix A-4 Project Cost Estimate Summary by Phase and Fund Source
Appendix A-5 Project Funding Summary by Phase and Reimbursement Ratio
Appendix A-6 Project Phase Cost Detail
126
Attachment 4
Alameda CTC Agreement No. A22-0027
Project No. 1571000
Appendix A – Page 2
APPENDIX A-1
PROJECT DESCRIPTION
Project Description:
The Downtown Dublin Streetscape Plan proposed several pedestrian and bicycle improvements in the
downtown Dublin area.
The project will install a mid-block crosswalk on Regional Street between Dublin Boulevard and Amador
Valley Boulevard in Downtown Dublin. This includes installation of Rectangular Rapid Flashing Beacons
(RRFBs), a midblock crosswalk, bulbouts with opportunities for ornamental or stormwater planting and
associated signing and striping improvements.
The proposed mid-block crosswalk will provide pedestrians with a safe crossing without having to walk long
distances to commercial destinations on Regional Street. The crosswalk will also increase pedestrian visibility
and encourage vehicles and cyclists to proceed at a reduced speed.
127
Attachment 4
Alameda CTC Agreement No. A22-0027
Project No. 1571000
Appendix A – Page 3
APPENDIX A-2
PROJECT SCOPE DETAIL BY PHASE
The ALAMEDA CTC ADMINISTERED FUNDS obligated by this AGREEMENT are to support the project
phase(s) identified and described below:
FINAL DESIGN
· Development of Final Design Plans and Specifications leading to the construction of the PROJECT
CONSTRUCTION
· Includes improvements on Regional Street between Dublin Boulevard and Amador Valley Boulevard
in Downtown Dublin.
· Includes installation of Rectangular Rapid Flashing Beacons (RRFBs), a midblock crosswalk,
bulbouts with opportunities for ornamental or stormwater planting and associated signing and
striping improvements.
128
Attachment 4
Alameda CTC Agreement No. A22-0027
Project No. 1571000
Appendix A – Page 4
APPENDIX A-3
PROJECT MILESTONE SCHEDULE
Phase/Milestone
Begin
(Mo/Yr)
End
(Mo/Yr)
Final Design (Plans, Specifications and Estimate (PS&E)) 04/2022 12/2022
Construction
Release Request for Proposal / Advertisement 01/2023 02/2023
Contract Award 03/2023 04/2023
Construction Activities 06/2023 12/2023
Project Closeout 12/2023 06/2024
129
Attachment 4
Alameda CTC Agreement No. A22-0027
Project No. 1571000
Appendix A – Page 5
APPENDIX A-4
PROJECT COST SUMMARY BY PHASE AND FUND SOURCE
This Project Cost Summary provides a project funding plan for all Project phases, regardless if funded
through ALAMEDA CTC ADMINISTERED FUNDS obligated by this AGREEMENT.
PHASE
Alameda CTC
Administered Funds
Sponsor
Funds
Total
Funding
2000 Measure B
Disc-TCD
2010 Vehicle
Registration
Fee
Disc-BP
Local Funds
Final Design (PS&E) $41,000 $ - $14,000 $55,000
Construction $ - $226,000 $75,000 $301,000
Total Project Cost $41,000 $226,000 $89,000 $356,000
130
Attachment 4
Alameda CTC Agreement No. A22-0027
Project No. 1571000
Appendix A – Page 6
APPENDIX A-5
PROJECT FUNDING SUMMARY BY PHASE AND REIMBURSEMENT RATIO
(Only Phases Funded with Alameda CTC Administered Funds)
The ALAMEDA CTC ADMINISTERED FUNDS obligated by this AGREEMENT are to support the project
phase(s) identified and described below:
PROJECT FUNDING SUMMARY BY PHASE AND REIMBURSEMENT RATIO
PHASE
Alameda CTC
Administered Funds Matching
Funds
Total
Funding
Reimbursement
Ratio
Percentage 2000 Measure B
Disc-TCD
2010 Vehicle
Registration
Fee
Disc-BP
Final Design
(PS&E) $41,000 $ - $14,000 $55,000 74.55%
Construction $ - $226,000 $75,000 $301,000 75.08%
Total Funding $41,000 $226,000 $89,000 $356,000
Notes:
· PROJECT SPONSOR shall be reimbursed eligible costs in the percentage of Total ALAMEDA CTC
ADMINISTERED FUNDS to Total Funding per the Reimbursement Ratio Percentage for each phase. Each
Alameda CTC Administered Fund amount identified is a not-to-exceed amount. The Reimbursement Ratio is
defined as ALAMEDA CTC ADMINISTERED FUNDS divided by the Total Funding.
131
Attachment 4
Alameda CTC Agreement No. A22-0027
Project No. 1571000
Appendix A – Page 7
APPENDIX A-6
PROJECT PHASE COST DETAIL
This Project Phase Cost Detail summarizes the total cost for each phase with ALAMEDA CTC ADMINISTERED
FUNDS obligated in this AGREEMENT.
PHASE COST DETAIL
FINAL DESIGN 2000 Measure B
Disc-TCD
Matching
Funds
Total Cost
Sponsor Staff/Labor Cost $ - $ - $ -
Contract(s)/Other Direct Cost $41,000 $14,000 $55,000
Total Phase Cost
(Staff + Contract Costs) $41,000 $14,000 $55,000
PHASE COST DETAIL
CONSTRUCTION
2010 Vehicle
Registration Fee
Disc-BP
Matching
Funds
Total Cost
Sponsor Staff/Labor Cost $ - $ - $ -
Contract(s)/Other Direct Cost $226,000 $75,000 $301,000
Total Phase Cost
(Staff + Contract Costs) $226,000 $75,000 $301,000
Notes:
· Contracts funded with any combination of Measure B, Measure BB, Vehicle Registration Fee and local funds
that do not contain State or federal funds are subject to Alameda CTC’s Local Business Contract Equity
Program (refer to Appendix D).
132
Attachment 4
Alameda CTC Agreement No. A22-0027
Project No. 1571000
Appendix A – Page 8
133
Attachment 4
Alameda CTC Agreement No. A22-0027
Project No. 1571000
Appendix B - Page 1
APPENDIX B
ALAMEDA CTC ADMINISTERED FUNDS OBLIGATED BY THIS AGREEMENT
The following Table B-1 identifies the ALAMEDA CTC ADMINISTERED FUNDS obligated by this
AGREEMENT and establishes a unique allowable start date for each obligated fund source.
TABLE B-1
FUNDS OBLIGATED BY THIS AGREEMENT
AND ALLOWABLE START AND EXPENDITURE DEADLINE DATES
Fund
Source
Fund
Subset Phase
Commission
Approval
Date
Allowable
Start Date
Expenditure
Deadline
Date
Obligated
Amount
2000 MB Disc-TCD Final Design 7/22/21 7/1/21 The Agreement
Expiration Date
serves as the
expenditure deadline
date.
$41,000
2010 VRF Disc-BP Construction 7/22/21 7/1/22 $226,000
Total Alameda CTC Administered Funds Obligated by AGREEMENT: $267,000
Agreement Expiration Date: December 31, 2024
Notes:
1. ALAMEDA CTC reimbursement amounts by fund source for PROJECT shall not exceed the total amount
obligated by this AGREEMENT, by fund source.
2. The Commission Approval Date is the date of the meeting at which the Commission approved the allocation.
3. The Allowable Start Date identified for each fund source is the earliest date at which costs eligible for
reimbursement by the fund source indicated may be incurred. Any costs incurred on the PROJECT before this
date will not be eligible for reimbursement under this AGREEMENT.
4. The Expenditure Deadline Date is the last date by which eligible reimbursable costs may be incurred. Any
costs incurred on the PROJECT after this date will not be eligible for reimbursement under this AGREEMENT.
5. The Agreement Expiration Date shall mean and refer to the expiration date of this AGREEMENT.
6. For TFCA funds obligated by this agreement, the Expenditure Deadline Date in the above table is two (2)
years from the date when ALAMEDA CTC first received funds from BAAQMD, unless an extended deadline is
approved at the time of programming or an extension has been approved by the ALAMEDA CTC. An estimated
deadline date is noted in the above table if at the time of this agreement the Alameda CTC has yet to receive
funds from BAAQMD. Extended deadlines will be reflected in an amended Table B-1, once approved.
7. For TFCA funds obligated by this agreement, the Commission may approve up to two one-year extensions to
the Expenditure Deadline Date. Any additional extensions require approval from both ALAMEDA CTC and
BAAQMD.
134
Attachment 4
Alameda CTC Agreement No. A22-0027
Project No. 1571000
Appendix B - Page 2
APPENDIX B (CONT.)
Reimbursement of ALAMEDA CTC ADMINISTERED FUNDS obligated by this AGREEMENT shall be in
accordance with the Drawdown Limitation Schedule below.
TABLE B-2
ALAMEDA CTC ADMINISTERED FUNDS
REIMBURSEMENT - DRAWDOWN LIMITATION SCHEDULE
No. Fiscal Year Quarter Fund Source Drawdown
Limitation Amount
Cumulative
Drawdown
Limitation Amount
1 FY 21/22 Any 2000 MB $41,000 $41,000
Subtotal 2000 MB $41,000
2 FY 22/23 Any 2010 VRF $226,000 $226,000
Subtotal 2010 VRF $226,000
Notes:
1. Fiscal Year (FY) begins July 1 and ends June 30.
2. Quarter 1 begins July 1 and ends September 30; Quarter 2 begins October 1 and ends December 31;
Quarter 3 begins January 1 and ends March 31; and Quarter 4 begins April 1 and ends June 30.
3. ALAMEDA CTC shall endeavor to transmit payments to PROJECT SPONSOR following the receipt and
approval of a complete Request for Reimbursement(s) submitted by the PROJECT SPONSOR.
4. Actual reimbursements from ALAMEDA CTC to the PROJECT SPONSOR shall not exceed the Cumulative
Drawdown Limitation Amount without Alameda CTC’s written approval. Any portion of a reimbursement
request, which exceeds the applicable Cumulative Drawdown Limitation without such prior approval by
ALAMEDA CTC shall be deferred until the following quarter or until sufficient capacity in the cumulative
drawdown limitation amount is achieved.
135
Attachment 4
Alameda CTC Agreement No. A22-0027
Project No. 1571000
Appendix C – Page 1
APPENDIX C
REQUEST FOR REIMBURSEMENT AND REPORTING REQUIREMENTS
The below table establishes the required minimum frequency for Requests for Reimbursement and Progress Reports.
Requests for Reimbursements and Progress Reports are required either monthly, quarterly, or semi-annually, as indicated
below with an “X”.
REQUEST FOR REIMBURSEMENT AND PROGRESS REPORTING
FREQUENCY AND DUE DATES
Frequency
Required
(as checked)
Minimum Frequency Period Covered Due Dates
☐ Monthly
(once every month)
One month By 30 days following the end
of billed activity
☐
Quarterly
(once every 3 months)
Quarter 1: 7/1– 9/30
Quarter 2: 10/1 – 12/31
Quarter 3: 1/1– 3/31
Quarter 4: 4/1– 6/30
By October 31st
By January 31st
By April 30th
By July 31st
☒
Semi-annually
(once every 6 months)
Quarters 1 & 2: 7/1 – 12/31
Quarters 3 & 4: 1/1 – 6/30
By January 31st
By July 31st
☐
Annually
(TFCA Annual Report)
Fiscal Year: 7/1 – 6/30
By July 31st
☒
Final Request for
Reimbursement
Any work period eligible
under Appendix B.
Must be submitted prior to the
Agreement Expiration Date
Notes:
1. For all projects, the maximum frequency for Requests for Reimbursement is one (1) per month.
2. If no costs were incurred during the reporting period, a progress report for the corresponding period is still
required.
3. TFCA funding requires annual reporting to BAAQMD in addition to the minimum required frequency for
Alameda CTC progress reports and invoices.
4. Requests for Reimbursement must be submitted prior to the Agreement Expiration Date in order to be eligible
for reimbursement.
REQUEST FOR REIMBURSEMENT AND REPORTING FORMS
Any PROJECT SPONSOR awarded ALAMEDA CTC Administered Funds shall use the following forms included
in the link below for progress reporting, final reporting, request for reimbursements, and requests for
amendments to this funding agreement. Note that the format and required content of these forms is subject
to change.
List of Downloadable Forms: https://www.alamedactc.org/funding/reporting-and-grant-forms/
1. Request for Reimbursement (RFR) Form
2. Alameda CTC Progress Report Form
3. Alameda CTC Final Report Form
4. Transportation Fund for Clean Air Program Reporting Forms (Interim and Final Report)
5. Amendment Request Form
136
Attachment 4
Alameda CTC Agreement No. A22-0027
Project No. 1571000
Appendix C – Page 2
137
Attachment 4
Alameda CTC Agreement No. A22-0027
Project No. 1571000
Appendix D – Page 1
APPENDIX D
LOCAL BUSINESS CONTRACT EQUITY PROGRAM REQUIREMENTS
As noted in Section I.14, PROJECT SPONSOR is obligated to comply with all applicable provisions of the
Alameda CTC Local Business Contract Equity (LBCE) Program, incorporated herein by reference as if
attached hereto.
LBCE Program Substitution: The LBCE Program allows substitution of Alameda CTC’s program if a
sponsor agency’s local preference program has been approved in writing by the Alameda CTC’s LBCE
Liaison Officer. This approval letter from Alameda CTC shall be attached as part of Appendix D.
The following resources are available to guide Project Sponsors through the LBCE Program requirements for
procurement and contracting processes:
· Sample template language for professional and construction services is available from ALAMEDA
CTC’s website: https://www.alamedactc.org/get-involved/contract-equity
· Prime and Subconsultant/Subcontractor Local Business Enterprise, Small Local Business Enterprise
and Very Small Local Business Enterprise Utilization Form: https://www.alamedactc.org/get-
involved/contracting-forms/
· The LBCE Program Guidelines, available at the above link, includes a Project Sponsor Responsibility
Checklist. Appendix B of the LBCE Program Guidelines identifies the Responsibilities of Sponsor
Agencies.
· Direct inquiries about the LBCE Program to ALAMEDA CTC’s LBCE Liaison Officer:
Seung Cho
Director of Procurement and Information Technology
Alameda County Transportation Commission
Email: scho@alamedactc.org
Phone: (510) 208-7472
138
Attachment 4
Alameda CTC Agreement No. A22-0027
Project No. 1571000
Appendix E - Page 1
APPENDIX E
DELIVERABLES AND DUE DATES
Project Deliverables and Due Dates: The Deliverables and Due Dates table below shows deliverables and
due dates, if any, for the phases listed in Appendix A-2 Project Phase Descriptions that contain ALAMEDA
CTC ADMINISTERED FUNDS.
Deliverables and Due Dates
No. Description Due Date to
Alameda CTC
1 Progress Report #1: July to December, 2021 January 31, 2022
2 Copy of Request for Proposal for professional services January 31, 2022
3 Progress Report #2: January to June, 2022 July 31, 2022
4 Copy of Final Plans and Specifications January 31, 2023
5 Copy of Advertisement for construction contract(s) January 31, 2023
6 Progress Report #3: July to December, 2022 January 31, 2023
7 Progress Report #4: January to June, 2023 July 31, 2023
8 Progress Report #5: July to December, 2023 January 31, 2024
9 Progress Report #6: January to June, 2024 July 31, 2024
10 Copy of project completion photos By the Agreement
Expiration Date
11 Final Invoice By the Agreement
Expiration Date
12 Final Report By the Agreement
Expiration Date
Note:
· Per Section III.19 of AGREEMENT, Alameda CTC may withhold payment of reimbursement requests until past
due deliverables are received and approved.
139
Attachment 4
Alameda CTC Agreement No. A22-0027
Project No. 1571000
Appendix F – Page 1
APPENDIX F
PROJECT PERFORMANCE MEASURES
Project Performance Measures: The Project Performance Measures and Targets describes what outcome-
based performance measure(s) the PROJECT SPONSOR plans to evaluate to ensure that the project/program is
meeting its objectives.
Appendix F is Not Applicable.
140
Attachment 4
Alameda CTC Agreement No. A22-0027
Project No. 1571000
Appendix G – Page 1
APPENDIX G
TRANSPORTATION FUND FOR CLEAN AIR POLICIES AND REQUIREMENTS
The contents of Appendix G are only included and attached to this AGREEMENT if TFCA funds are obligated and applicable
to AGREEMENT.
Appendix Index
Appendix G-1 TFCA Project Number and “Years of Effectiveness”
Appendix G-2 BAAQMD-approved TFCA County Program Manager Fund Policies
Appendix G-3 Minimum required insurance for TFCA-funded projects
Appendix G-4 Reporting Forms to BAAQMD for TFCA-funded projects
141
Number ST0517ProgramSTREETSPRIOR YEARS 2021-2022 BUDGET 2022-2023 2023-2024 2024-2025 2025-2026 2026-2027 FUTURE YEARS TOTALS9100 $45,218 $55,802 $30,160 $30,160 $30,160 $191,5009200 $524,885 $226,115 $62,350 $222,350 $302,350 $1,338,0509400 $1,380,060 $395,608 $390,988 $390,988 $390,988$2,948,6329500$768 $19,460 $9,730 $9,730 $9,730$49,418$1,950,931 $696,985 $493,228 $653,228 $733,228$4,527,600PRIOR YEARS 2021-2022 BUDGET 2022-2023 2023-2024 2024-2025 2025-2026 2026-2027 FUTURE YEARS TOTALS1001$384,358 $263,642 $105,000 $105,000 $105,000$963,0002203$192,683 $17,317$210,0002204$509,900 $100$510,0002205$122,461 $20,439$142,9002214$574,569 $337,031 $280,000 $280,000 $280,000$1,751,600Transportation Development ActMiscellaneousTOTALGeneral FundMeasure B Sales Tax - Local Streets Fund (ACTC)FUNDING SOURCEMeasure B Sales Tax - Bike & Pedestrian Fund (ACTC)Measure BB Sales Tax - Local Streets Fund (ACTC)Contract ServicesImprovementsCITYWIDE BICYCLE AND PEDESTRIAN IMPROVEMENTSESTIMATED COSTSSalaries & Benefits2022-2027 CAPITAL IMPROVEMENT PROGRAMPROJECT DESCRIPTIONThis project includes planning, design, and construction of improvements to various pedestrian and bicycle facilities throughout the City, including pedestrian/bicycle bridges. This project replaces former projects that provided funding for Americans with Disabilities Act (ADA) Transition Plan improvements and Citywide Sidewalk Repair Improvements. In addition to the scope of those previous projects, this project includes design and construction of improvements recommended in the City of Dublin Bicycle and Pedestrian Master Plan, the ADA Transition Plan, and the Class 1 Facilities Maintenance Plan.The project includes an update to the ADA Transition Plan. The plan update will include a review of City buildings, parks, and rights-of-way. The ADA Transition Plan update will be funded by General Fund. It is anticipated that the ADA Transition Plan update will be completed in 2022.An update of the City of Dublin Bicycle and Pedestrian Master Plan began in Fiscal Year 2019-20 and is anticipated to be completed in summer 2022. ANNUAL OPERATING IMPACT:NoneMANAGING DEPARTMENT: Public WorksAttachment 5142
PRIOR YEARS 2021-2022 BUDGET 2022-2023 2023-2024 2024-2025 2025-2026 2026-2027 FUTURE YEARS TOTALSFUNDING SOURCE2215 $166,959 $58,457 $108,228 $268,228 $348,228 $950,100$1,950,931 $696,985 $493,228$653,228 $733,228 $4,527,600ANNUAL OPERATING IMPACTTOTALMeasure BB Sales Tax - Bike & Pedestrian Fund (ACTC)143