Loading...
HomeMy WebLinkAbout05-022 The Well Christian Chrch AGENDA STATEMENT PLANNING COMMISSION MEETING DATE: June 28, 2005 SUBJECT: ATTACHMENTS: 1. 2. 3. 4. 5. 6. 7. 8. RECOMMENDATION: 1. 2. PROJECT DESCRIPTION: PUBLIC HEARING: Quasi Judicial- PA 05-022 The Well Christian Community Church Conditional Use Permit to expand the existing Place of Worship within the Light Industrial (M-I) zoning district and a parking reduction for shared parking. j ~ Report prepared by: Jeff Baker, Associate Planner ,\V·· Resolution approving a Conditional Use Permit Vicinity Map Written Statement Site Plan Project Plans Parking Study Off-Site Parking Agreement Planning Commission Staff Report Dated September 9,2003 3. 4. Open the Public Hearing; Receive Staff Presentation and Take Testimony from the Applicant and the Public; Close the Public Hearing and Deliberate; and Adopt a Resolution (Attachment 1) Approving a Conditional Use Permit for The Well Christian Community Church Expansion. The project site is located at 6533 Sierra Lane within the Sierra Business Center. The Sierra Business Center consists of three buildings, which total approximately 70,000 square feet of industrial/warehousing space. The property is zoned Light Industrial (M-I) and has a General Plan Land Use Designation of Business Park/Industrial. The City of Dublin Zoning Ordinance classifies a church as a Community Facility (Chapter 8.08.020). Approval of a Conditional Use Permit by the Planning Commission is required in order to operate a Community Facility within the Light Industrial zoning district (Chapter 8.12.050 - Civic Use Types). On September 9, 2003, the Planning Commission approved a request for a Conditional Use Permit to allow The Well Christian Community to establish a new 10,800 square foot church at 6533 Sierra Lane (PA 03-047, Attachment 8). That Conditional Use Permit allowed the church to operate within an existing building in the Light Industrial zoning district. The Applicant currently requests approval of a Conditional Use Permit to expand the existing church. The expanded facility would have a total of 21,998 square feet. The expanded facility would include a 7,325 square foot sanctuary, three classrooms, and related improvements. COPIES TO: Applicant In-House Distribution ITEM NO. g./ G:\P A#\2005\05-022 The Well Expansion \pcsr 6-28-05.doc ANALYSIS: A Conditional Use Permit is required in order to operate a Community Facility within the M-I Zoning District. The Conditional Use Permit process allows the City to place conditions of approval on the project to ensure that the operation of the proposed use is compatible with the surrounding uses. The proposed project has been reviewed for issues related to operating characteristics, parking, and project design. Conditions of approval have been proposed where appropriate to ensure compatibility. Operating Characteristics: The Well Christian Community is a non-denominational non-sectarian church. The church will conduct two Sunday morning services and mid-week activities as described in the Written Statement (Attachment 3) and Table 1 below. The church staff includes 5-7 full and part time employees with offices at this location. The church offices are open Monday through Friday from 8am to 4pm. Worship/service attendance is estimated to rise from the current level of approximately 400 adults and children to approximately 700 over the next two to three years. Maximum occupancy for the building will be limited to 600 persons. Therefore, the church will offer two services on Sunday mornings to accommodate their growing service/worship attendance levels. The existing uses within the Sierra Business Center typically operate Monday through Friday from 8am to 5pm. Weekday church activities are limited to running the office and holding two women's bible study groups that meet on Thursday. Approximately 10 people attend each of these bible study sessions. The limited attendance at these weekday activities reduces the potential conflict with the other uses within the center. The proposed church activities on weekday evenings and weekends will not conflict with the other uses within the center because they occur when the other businesses are closed. Parking Analysis: The City of Dublin Zoning Ordinance contains off-street parking requirements by use type. A Place of Worship is required to provide one parking space per 50 square feet for non-fixed seating in the assembly area, plus 1 per classroom (Chapter 8.76.080.C). As previously stated, the proposed sanctuary is approximately 7,325 s.f. and there will be three classrooms. Therefore, the Zoning Ordinance parking requirement for the expanded facility is 150 parking spaces. As previously mentioned, The Well is located within the Sierra Business Center. The center contains a mix of existing use types. A multi-use project, such as this center is required to provide the cumulative total number of parking spaces required for each use type within the center (Chapter 8.76.040.G). A total of 324 on-site parking spaces are required for this center based on the existing and proposed uses. However, only 222 on-site parking spaces are provided within the center - a shortage of 102 parking spaces. The Zoning Ordinance (Chapter 8.76.050.F) allows a parking reduction for shared parking by way of a Conditional Use Permit. A reduction for shared parking may be granted if a report by a registered traffic engineer shows that, 1) the Conditional Use Permit findings can be made; 2) a sufficient number of spaces 2 is provided to meet the greatest parking demands of the participating use types and to ensure that there will not be a parking deficiency; 3) satisfactory evidence is provided that the use types, by their natures and operating times, will not conflict with each other; and 4) overflow parking will not adversely effect any adjacent use. A Parking Study was prepared for the City by Omni Means Engineers to identify the existing parking demand and average vehicle occupancy for the Sierra Business Center (Attachment 6). The peak operating hours for the church occur during weekday service on Tuesday and Wednesday evenings and weekend services on Sunday mornings. Therefore, the parking study was conducted on a Wednesday evening from 6:30pm-9pm and a Sunday morning from 9:30am-12:45pm. The following table shows the peak parking demand for the center as noted in the parking study. The City's Traffic Engineer used the average vehicle occupancy identified in the parking study to estimate the peak parking demand generated by the expanded facility to ensure that adequate parking is provided for this use. The peak parking is anticipated to occur on Sunday mornings and generate the need for 309 parking spaces (600 peoplell.96 people per vehicle + 3 spaces for company vehicles = 309). The anticipated parking demand exceeds the Zoning Ordinance parking requirement of 150 spaces. Therefore, Condition 5 has been included which requires the Applicant to provide a minimum of 309 parking spaces on Sunday mornings. However, only 222 on-site parking spaces are provided within the center - a shortage of 87 parking spaces. The Applicant has obtained an Off-Site Parking Agreement (Attachment 7) that grants the use of 150 parking spaces on Sunday mornings. These parking spaces are located at 6591 Sierra Lane and at the Sierra Trinity Business Park located at 6723 and 6761 Sierra Court. The tenants at these locations do not operate on Sundays and have consented to allowing use of this parking by the church. These off-site parking spaces are located within 350 feet of The Well. Condition 24 has been included which requires the off-site spaces to be ADA accessible to the project site and includes providing a pedestrian pathway that joins the off-site parking with the project site. Access to the church will be through the doors located on the east and west elevations of the building. The combination of on and off-site parking spaces will make a total of 372 parking spaces available for use by The Well Church on Sunday mornings. The available parking exceeds the anticipated parking demand by 63 spaces (372-309=63). The peak operating hours for the church (i.e. Tuesday and Wednesday evenings and Sunday mornings) occur when the other businesses within the center are closed. Therefore, the availability of on and off-site parking spaces and the operating hours of the church should limit the potential for overflow parking and impacts to surrounding uses. On March 9, 2004, the Planning Commission approved a Conditional Use Permit for the Cross Winds Church (P A 03-054). Approval of this Conditional Use Permit allowed a place of worship to operate in the M-l zoning district with a parking reduction. The parking reduction included an Off-Site Parking Agreement to utilize 150 spaces located on the parcel to the north of the project site. Staff has not received any complaints regarding the parking at The Cross Winds Church since this Conditional Use Permit was approved. The proposed Off-Site Parking Agreement proposed for The Well is similar in nature to the agreement for the Cross Winds Church. 3 Project Design and Development: The Applicant proposed to make tenant improvements to the interior of the building. These improvements will include new exterior doors to meet exiting requirements. No further improvements to the exterior of the building are proposed. The Applicant is required to obtain a building permit for the proposed improvements. Review by City Departments: The proposed project has been reviewed by the Building Division, Public Works Department, Police Services Department, the Alameda County Fire Department, and the Dublin San Ramon Services District. Conditions of Approval have been included where applicable. The Applicant has reviewed the draft Conditions of Approval and agreed to comply with the City's requirements. Conditional Use Permit Required Findings: To approve a Conditional Use Permit, the following findings must be made: the proposed use is compatible with other land uses, transportation and service facilities in the vicinity; will not adversely affect the health or safety of persons residing or working in the vicinity, or be detrimental to the public health, safety and welfare; will not be injurious to property or improvements in the neighborhood; will have adequate provisions for public access, water, sanitation, and public utilities and services to ensure that it would not be detrimental to the public health, safety and welfare; and the site is physically suitable for the type, density and intensity of the use and related structures being proposed. Staff has prepared the draft findings included in the proposed resolution (Attachment 1). NOTICING: In accordance with State law, a public notice regarding this hearing was mailed to all property owners and occupants within 300 feet of the proposed project. A public notice was also published in the Valley Times and posted at several locations throughout the City. To date, the City has not received comments or objections from surrounding property owners or tenants regarding the current proposal. ENVIRONMENTAL REVIEW: This project is categorically exempt from the environmental review requirements of the California Environmental Quality Act (CEQA) pursuant to CEQA Guidelines Section 15301 (Existing Facilities). RECOMMENDATION: Staff recommends that the Planning Commission open the public hearing; receive Staff presentation and take testimony from the Applicant and the Public; close the Public Hearing and Deliberate; and adopt a Resolution (Attachment 1) approving a Conditional Use Permit for The Well Christian Community Church Expansion. 4 GENERAL INFORMATION: Applicant: Evan Simmons The Well Christian Community 6533 Sierra Lane Dublin, CA 94568 Property Owner: Pat Rouse Sleepy Hollow Investment Co. II 18 Crow Canyon Court, Suite 100 San Ramon, CA 94583 Location: 6533 Sierra Lane Existing Zoning: M-I (Light Industrial) Environmental Review: This project is categorically exempt rrom the environmental review requirements of the California Environmental Quality Act (CEQA) pursuant to CEQA Guidelines Section 15301 (Existing Facilities). 5 RESOLUTION NO. 05- A RESOLUTION OF THE PLANNING COMMISSION OF THE CITY OF DUBLIN APPROVING A REQUEST FOR A CONDITIONAL USE PERMIT TO EXPAND THE EXISTING PLACE OF WORSHIP WITHIN THE LIGHT INDUSTRIAL (M-l) ZONING DISTRICT AND A PARKING REDUCTION FOR SHARED PARKING AT THE PROPERTY LOCATED AT 6533 SIERRA LANE (APN 941-0205-020) P A 05-022 WHEREAS, Evan Simmons, the Applicant, has requested approval of a Conditional Use Permit to allow a 11,198 square foot expansion of the existing Well Christian Community Church, and a parking reduction for shared parking for property in the Light Industrial (M-l) zoning district at 6533 Sierra Lane; and WHEREAS, a complete application for the above noted entitlement request is available and on file in the Community Development Department; and WHEREAS, the Applicant has submitted project plans dated received April 20 and June 15, 2005; and WHEREAS, a Parking Study was prepared by Omni Means Engineers to evaluate the request for a Parking Reduction for Shared Parking; and WHEREAS, the California Environmental Quality Act (CEQA), together with the State guidelines and City environmental regulations require that certain projects be reviewed for environmental impact and that environmental documents be prepared; and WHEREAS, This project is categorically exempt from the environmental review requirements of the California Environmental Quality Act (CEQA) pursuant to CEQA Guidelines Section 15301 (Existing Facilities); and WHEREAS, a Staff Report was submitted outlining the issues surrounding the request; and WHEREAS the Planning Commission held a properly noticed public hearing on said application on June 28,2005; and WHEREAS, the Planning Commission did hear and consider all said reports, recommendations and testimony herein above set forth and used their independent judgment to make a decision; and WHEREAS, the Planning Commission has found that the proposed project is appropriate for the subject site. NOW, THEREFORE, BE IT RESOLVED THAT the Dublin City Council does hereby make the following findings and determinations. A. The proposed use and related structures are compatible with other land uses, transportation and service facilities in the vicinity because it is located within an existing building and the existing on and off-site parking is adequate to serve the existing, proposed and future uses. G:\PA#\2005\05-022 The Well Expansion\pc reso 6-28-05.doc ATTACHMENT \ B. The proposed use, as conditioned, will not adversely affect the health or safety of persons residing or working in the vicinity, or be detrimental to the public health, safety and welfare and will not be injurious to property or improvements in the neighborhood because the proposed use will operate during no peak hours for surrounding uses and will be adequately conditioned to ensure that the operation has had no recognizable negative impacts. C. The proposed use, under all circumstances and conditions ofthis permit, will not be injurious to property or improvements in the neighborhood because the proposed use will be operated completely within an existing and enclosed building. D. There are adequate provisions for public access, water, sanitation, and public utilities and services to ensure that the proposed use and related structures would not be detrimental to the public health, safety, and welfare because the proposed use will be operated completely within an existing building that is serviced by all appropriate utilities and infrastructure. E. The subject site is physically suitable for the type, density and intensity of the use and related structures being proposed because the existing roadway network leading to the site and the existing on-site parking is adequate to serve the proposed use. F. The proposed use will not be contrary to the specific intent clauses, development regulations, and performance standards established for the Light Industrial (M-l) zoning district. G. The approval of this Conditional Use Permit is consistent with the Dublin General Plan and will provide a service to the community that is consistent with the intent of the Industrial/Business Park General Plan Land Use designation. BE IT FURTHERED RESOLVED THAT the Dublin Planning Commission does hereby find the following requirements for a parking reduction for shared parking can be met: A. The Conditional Use Permit findings can be made. B. A sufficient number of on and off-site spaces are provided to meet the greatest parking demands of the participating use types and to ensure that there will not be a parking deficiency. Satisfactory evidence is provided that the use types, by their natures and operating times, will not conflict with each other. Overflow parking will not adversely affect any adjacent use. A Parking Study was prepared by Ornni Means Engineers to identify the existing parking demand for the overall center and for sub-areas within the center. The overall peak parking demand for the church will occur on Tuesday and Wednesday evenings and Sunday mornings. BE IT FURTHER RESOLVED THAT the Dublin Planning Commission does hereby approve a Parking Reduction for Shared Parking for the Sierra Business Center. BE IT FURTHER RESOLVED THAT the Dublin Planning Commission does hereby approve PA 05-022 The Well Christian Community Church Conditional Use Permit to expand the existing facility to occupy a total of21,998 square feet of tenant space located at 6533 Sierra Lane, APN 941-0205-020. The project approval shall be subject to compliance with the following conditions which supersede the previous Conditions of Approval for a Conditional Use Permit contained in Resolution 03-46 (PA 03-047): CONDITIONS OF APPROVAL: Unless stated otherwise, all Conditions of Approval shall be complied with prior to the issuance of building permits or establishment of use. and shall be subiect to Planning Department review and approval. The following codes represent those departments/agencies responsible for monitoring compliance of the conditions of approval: rPLl Planning, rBl Building. rpO] Police, rpW] Public Works rADM] 2 Administration/City Attorney, rFIN] Finance, rFJ Alameda County Fire Department, [DSRSD] Dublin San Ramon Services District, [COl Alameda County Department of Environmental Health. GENERAL CONDITIONS 1. Permit Validity. Approval of this Conditional Use Permit shall be valid for one year from the effective date. This approval shall be null and void in the event the approved use fails to be established within one year, or ceases to operate for a continuous one-year period. 2. Revocation. The Conditional Use Permit will be revocable for cause in accordance with Section 8.96.020.1 of the Dublin Zoning Ordinance. Any violation of the terms or conditions of this approval shall be subject to citation and possible revocation. 3. Compliance. The Applicant/Property Owner shall develop this project and operate all uses in compliance with the Conditions of Approval of this Conditional Use Permit and the regulations established in the Zoning Ordinance. Any violation of the terms or conditions specified may be subject to enforcement action. 4. Hours of Operation. Activities of the church shall be limited to the activities listed on the Applicant's Written Statement dated received on April 20, 2005 and the following. Any other events and activities proposed by the Church shall first be subject to review by the Community Development Director. Sunday: Two Sunday morning services (between 8 :OOam & 12pm) and Prayer/Worship (6pm) Monday-Friday: Office hours (8am-4pm) Tuesday: Mid-week services (6pm) Wednesday: Mid-week services (6pm) Thursday: Women's Bible Study (9:30am & 12pm) Friday: Periodic evening activities (7pm) Saturda : Pra er 6:30am 5. Outdoor Events. Any outside events shall be subject to the Temporary Use Permit requirements contained in the City of Dublin Zonin Ordinance. 6. Parking. Applicant to provide a total of 309 on and off site parking spaces for Sunday services. Off site parking spaces to be provided at 6591 Sierra Lane and 6723 and 6761 Sierra Court. In the event that the adjacent property at 6591 Sierra Lane and 6723 and 6761 Sierra Court are sold while this Conditional Use Permit remains valid, the church will be required to replace any off-site parking that is lost in kind, or reduce the occu anc accordin I . 7. Noise/Nuisance. The Applicant shall control all activities on the site so as not to create a nuisance to the surrounding businesses and residents. No loudspeakers or amplified music shall be permitted to project or be placed outside the buildin . 3 PL PL PL PL PL PL PL On-going Standard On-going Standard On-going Standard On-going CUP On-going Standard On-going CUP On-going CUP 8. Signs. Any signage on site shall be subject to the sign requirements contained III the City of Dublin Zoning Ordinance. 9. Food Preparation. No cooking or other food preparation that would reqUIre the approval of Alameda County Environmental Health Services is hereby approved. In the event that food preparation is desired, the Applicant shall submit a written request, subject to review and approval by the Community Development Director. The Applicant will also be required to receive proper approval by Alameda County Environmental Health Services prior to commencing food re aration. 10. Minor amendments. Modifications or changes to this Conditional Use Permit approval may be considered and approved by the Community Development Director, if the modifications or changes proposed comply with Section 8.100.080, ofthe Zonin Ordinance. 11. Fees. The Applicant shall pay all applicable fees in effect at the time of building permit issuance, including, but not limited to, Planning Fees, Building Fees, Dublin San Ramon Service District fees, Public Facilities fees, Tri Valley Transportation fees, Downtown Traffic Impact Fee, Dublin Unified School District impact fees, Alameda County Fire Services fees, Noise Mitigation fees; Inclusionary Housing in lieu fees, Alameda County Flood and Water Conservation District (Zone 7) Drainage and Water connection fees. When and if applicable and customary, credits shall be applied for existin im rovements. 12. Property Maintenance. The property shall be maintained in accordance with Section 5.64, Property Maintenance of the Dublin Munici al Code. 13. Building Codes and Ordinances. All project construction shall conform to all building codes and ordinances in effect at the time of building permit. 14. Building Permits. To apply for building permits, the Applicant shall submit eight (8) sets of construction plans to the Building Division for plan check. Each set of plans shall have attached an annotated copy of these Conditions of Approval. The notations shall clearly indicate how all Conditions of Approval will or have been complied with. Construction plans will not be accepted without the annotated resolutions attached to each set of lans. 15. Construction Drawings. Construction plans shall be fully dimensioned (including building elevations) accurately drawn (de ictin existin and ro osed conditions on site). 16. Engineer Observation. The Engineer of record shall be retained to provide observation services for all components of the lateral and vertical design of the building, including nailing, hold downs, straps, shear, roof diaphragm and structural frame of building. A written report shall be submitted to the City Inspector prior to scheduling the final frame ins ection. 4 PL PL PL B B B B B B On-going Standard On-going CUP On-Going CUP Issuance of Standard Building Permits On-going Standard Through UBC Completion Issuance of Standard Building Permits Issuance of Standard Building Permits Issuance of Standard Building Permi ts 17. The restrooms have been reviewed and will be allowed without revision at this time. Due to the limited time usage of the buildin . 18. The maximum occupancy of the sanctuary is restricted to 600 eo Ie. 19. The storage area in the assembly area shall be separated from the assembly area by a one hour occupancy separation. CBC Cha ter 3. 20. Exit signs and emergency lighting shall be provided as required by the CBC Chapter 10. 21. Ifkey locking hardware is used on the main door, provide a sign above the door stating, "THIS DOOR TO REMAIN UNLOCKED DURING BUSINESS HOURS". Otherwise the exit doors shall be openable from the inside without special knowledge or effort and have lever or panic hardware anic hardware from the assembl area. CBC 1003.3.1.8. 22. The sprinkler system shall be modified as necessary to provide protection for the tenant improvement. Submit detailed shop drawings to the Fire Department for approval and permit prior to installation. A separate permit fee is re uired. NFP A 13 23. Provide a fire alarm system in the space as required by CBC 303.9. The system shall be tied into the existing sprinkler monitoring/fire alarm system for the building. Submit detailed shop drawings to the Fire Department for approval and permit prior to installation. A separate permit fee is re uired. NFP A 72 24. A Knox box shall be provided at the main entry door. The Knox box shall contain a key that provides access to the tenant space. Order forms for the lock box are available at the Fire Prevention office at the address above. The key can be laced in the box durin the Fire D artment ins ection. 25. Approved numbers or addresses shall be placed on the tenant space in such a position as to be plainly visible and legible from the street or road fronting the property. Said numbers shall be laced on a contrastin back ound. CFC 902.4 26. The project shall comply with Uniform Building and Fire Codes as ado ted b the Cit of Dublin. 27. Provide an accessible concrete walkway from the public sidewalk on Sierra Lane to the building entrance per California Building Code requirements. Said walkway shall be 4' minimum width with compliant curb ramps at transitions between the walkway and the drive aisle crossings. Note that minor adjustments to the existing landscaping and irrigation systems will be necessary to install the walkwa . 5 B B F F F F F F F F PW On-going CUP On-going CUP Issuance of CUP Building Permits Issuance of CUP Building Permits On-going Standard Issuance of CUP Building Permits Issuance of CUP Building Permits On-going Standard On-going Standard Final Standard Final Standard 28. Provide an accessible concrete walkway from the parking PWIPL area at 6591 Sierra Lane and 6723 and 6761 Sierra Court to the building entrance per California Building Code requirements. Said walkway shall be 4' minimum width with compliant ramps at transition between the walkway and the drive aisle crossin s. 29. Provide photometric calculations for the existing parking lot PW and around the building that demonstrates a minimum foot- candle lighting level of not less than 1.0 at the ground surface for the adjacent parking area; ifthis cannot be verified rovide additionalli htin where necess 30. Applicant should repair any distressed areas of pavement PW within the existing parking field, then seal and re-stripe the arkin field. 31. The Applicant shall comply with all applicable City of PO Dublin Non Residential Securit Ordinance re uirements 32. The Developer and/or Property Owner shall keep the site PO clear of graffiti vandalism on a regular and continuous basis at all times. 33. Lighting used after daylight hours shall be adequate to PO provide for security needs (1.5 foot candles). Exterior lighting shall be provided around the entire perimeter of the buildin and in the arkin area. 34. Prior to issuance of any building permit, complete DSRSD improvement plans shall be submitted to DSRSD that conform to the requirements of the Dublin San Ramon Services District Code, the DSRSD "Standard Procedures, Specifications and Drawings for Design and Installation of Water and Wastewater Facilities", all applicable DSRSD Master Plans and all DSRSD olicies 35. Prior to issuance by the City of any Building Permit or DSRSD Construction Permit by the Dublin San Ramon Services District, whichever comes first, all utility connection fees including DSRSD and Zone 7, plan checking fees, inspection fees, connection fees, and fees associated with a wastewater discharge permit shall be paid to DSRSD in accordance with the rates and schedules established in the DSRSD Code. 6 Final Issuance of Building Permits Final On-going On-going On-going Issuance of Building Permits Issuance of Building Permits CUP Standard Standard CUP CUP CUP Standard Standard 36. Prior to issuance by the City of any Building Permit or DSRSD Construction Permit by the Dublin San Ramon Services District, whichever comes first, all improvement plans for DSRSD facilities shall be signed by the District Engineer. Each drawing of improvement plans shall contain a signature block for the District Engineer indicating approval of the sanitary sewer or water facilities shown. Prior to approval by the District Engineer, the Applicant shall pay all required DSRSD fees, and provide an engineer's estimate of construction costs for the sewer and water systems, a performance bond, a one-year maintenance bond, and a comprehensive general liability insurance policy in the amounts and forms that are acceptable to DSRSD. The Applicant shall allow at least 15 working days for final improvement drawing review by DSRSD before signature by the District En ineer. 37. No sewer line or waterline construction shall be permitted DSRSD unless the proper utility construction permit has been issued by DSRSD. A construction permit will only be issued after all of the items in Condition No.9 have been satisfied. 38. The Applicant shall hold DSRSD, its Board of Directors, DSRSD commissions, employees, and agents of DSRSD harmless and indemnify and defend the same from any litigation, claims, or fines resulting from the construction and com letion of the ro'ect. PASSED, APPROVED AND ADOPTED this 28th day of June 2005. AYES: NOES: ABSENT: ABSTAIN: Issuance of Building Permits Standard Issuance of Building Permits Standard On-going Standard ATTEST: Planning Commission Chairperson Planning Manager 7 V/~/N ITV mAP ~ \f) I . 3 i - V) - , ~ ~ ~ t Q :z ~t ::..9. ~ i f.TTACHMEt:. d- r;~ CITY OF DUBLIN APPLlCA nON SUBMITTAL REQUIREMENTS FOR CONDITIONAL USE PERMIT (CUP) GENERAL INFORMATION Project Street Address/Location: 6527 Sierra Lane. Dublin. CA. 94568 Note: This CUP is to cover the expansion of our current facility located at 6533 Sierra Lane, Dublin, CA. 94568. 6527 Sierra Lane is adjacent to, and will provide the needed expansion for the existing Church location at 6533 Sierra Lane. Project Name: The Well. A Christian Community Project Description: Church. Worship Center and Staff Offices Zoning District: APN: General Plan Designation: Specific Plan Designation: Applicant Name: Evan L. Simmons Phone: 925-479-1410 · Completed Application Form: Attached · Completed Environmental Information Form: TBD · Application Fe and Processinl! Deposit: Included · Environmental Filinl! FeeslDeposits: TBD · Written Statement: a. The Well Christian Community is a non-denominational non-sectarian church, conducting Sunday morning services, and mid-week meetings/activities during non-business, evening hours. The church staff will also have their offices at this location, and will be conducting office business during normal office hours. b. The church staff will be comprised of 5-7 full/part time employees who will conduct business during normal Monday through Friday business hours. Corporate worship/service attendance is estimated to rise from the current level of approximately 400 (adults and children attending two services, 8:00am and 10:00am on Sundays), to approximately 700 (adults and children attending a single Sunday morning service). We estimate that this increase will be noted gradually over the next two - three years. -·...EIVED -J 2 0 200S ¡)Æ~-ó¿ ~AT.JM}ffMENT 3 surrounding this facility number approximately 230. Using the City of Dublin Zoning Ordinance document, amended November 1, 2002, Chapter 8.76, Section C under "Place of Worship", the number of parking spaces required, in a non-fixed seating area is: 182 (The assembly area of the facility is approximately 8858 ft. sq., 1 space per 50 sq. ft. is 177 required spaces, plus 1 space per classroom (five classroom spaces are anticipated), equaling 182 spaces). Thus, available parking spaces are more than sufficient to handle the expected maximum occupancy load during the Sunday morning service. i. The subject facility is not located on a hazardous waste and substance site (pursuant to Government Code Section 65962.5). · Preliminary Title ReportlPropertv Profile: Attached · Public Notice Materials: a. Reproduced copy of Alameda County Assessor's Parcel Map: Attached b. Two sets of mailing labels: Attached c. Plain envelopes with postage stamps: Attached · Vicinity Map: Attached · Site Map (10 copies): Attached · Buildine: Elevations (photos acceptable): Attached · Floor Plans (10 copies. fully dimensioned. folded 9" bv 11" maximum): Attached · Reduced Copies (10 copies. 11" by 17"): Attached · Traffic Data: To Be Determined Ð5!25/20~3 14:54 9258370150 SLEEPY HJLLm,¡ I ~N CO PAGE 02 SITE PLAN r--- r/r¿.Q5' ~,~ ~ 4(2..gt) e!.I~-riUY .~'.)f2-c..I+ p..~"V :::yPk'): :::u C,f·I. ¡. ®N ATTBrr"~ r FNT I J I" . - f :lECEIVED ~\PR 2 0 Z005 'tt. UN .PLANNIN.G Y Pí~'6 -022 <:;" "'Ä /-. --~, / D j~-~ i-' v./J /I' / '-" /\ r,l'--rl):;.;. "-~-.- .-----" x-- I/{;.. -)ç::- ::::~.: p ~-. ~ jf~- Ju ~. )_r I -- ¡ I' I ,"" _. -... \ I I I I I I r~-----~------+------~---~~~~~----+------~~----~l ~-----~ ~ ~ I I I I I I I I I I I I I ¡ L---l-;:;~-------------------------------------~ l_________________ _____ ____~_____________________________, ..... n II II II II II ... II II II I I I I I . ... -.- RF(""" ',- '".. APR 2 0 2005 lA' DUBUN PLANNING ATTACHMENTJ P(jo:r:Cl22 /I>ÆA NÐ ~NCY CALcu..AT1ONS BUILDING T'1PE: V-I HA ~ 1- 11 BUILDING ÞÆA CAlCULATION ON ACCORDANCE IIIlH 2001 C8C.): MA)QIIIJI ALLOWABLE BIJtlOINÇ ÞÆA FOR A-2.1 occ.: IMOO SF (TAIIlE iHI FOR T'II'E V-I HR.) BUILDING ÞMA ALLOWAIILE INCREASE P£II SECTION !5OS.1.1: SÐ>ARAl1ON ON 2 SIDES: WEST =~ 47'-0" 2ct -0" ...... REa'D. ~::g: (DISTANCE O\Q 20') EAST tIIJ'-O" 20' -0" M~. REa'D. TOTAL DISTANCE O\Q MINlllUII REO'o.- 27'-0' AU.OWEÐ 1.:mI' ~CREASE FOR E\oÐIY rOOT O'ÆR IIINIMUII REQ'O. 27' x 1.:ze . 33.79 INCREASE 10,!iOO X 1.3375 . 14,044 s.r. ~ILDlNG _k Itm ~f. A1l£A INtw:'AV DFR S£Cl1ON M!L3 (AI.J~ATIC F1R£ ~KI FA SI"I'S'IBt)· NOT -.JCAIILE - USED AS FIIE-RESlSlIVE SUIS1I1UTE mlANT OCCUPANCY CLASSlf1CAl1ON (NEW ÞÆA): QtURQ! ASSÐI8I. Y: A-2.1 LESS lHAN 1000 OCCUPANT LOAD 1111HOUT STAGE. ACCESSORY AREAS: B ACCESSORY SPACES INa..uDING VESTIBULE. TOII.ET ROOIIS, ETC. OCCUPANCY SEPERAl10N REQUIRED BE1WEEN A-2.1 .. B OCOJPANaES P£II TAIILE 3-B i.-.,,~I''''''' , 114;;......}::.1ì!El' dUN 1 S 200~ Cì1r3L' ,..~ .1' PL/\NNi~k~ 534.71 N 20" 411' 00' W - - + EXlSllNG NEW 2-HOUR OCCUPANCY 2-HOUR AREA SEPARAllON WAlL SEPARAllON WAlL a-OCC) a ace. 8533 8EFRA LAtE EXISTING 2-HR AREA SEPARATION WAlL OCCUPANCY GROUP A (E) I-HR OCCUPANCY SEP ARA l10N WAlLS .. IL ð !§ t ¡ ~ __ ~~.,,<i ---;;:;.\'S 0': ~ EXISTtIQ SITE PLAN SCALE: ,. - JI1-0· fþ~0J I::iQIE; lHIS ORAIIING HAS BEEN PREPARED IIITH<JUT 1HE BENEFIT (1F A SITE SURVEY FOR 1HE CONVENIENCE (1F 1HE OIINER. ~FOAIIA lION OEPICTED ON 1HIS SITE PlAN IS BASfJ) ON ORAIIINOS PREPARED BY MICHAEL WOI.DERIIAR AND ASSOCIATES, INe. I PAUl SOlTON - ænRAL ENQNŒRING ASSOCIATES DATED AUGUST 1879. IIHILE 1NF0000Al1ON IS BEIJEVEO TO BE ACCURATE. IT CANNOT BE GUARAN1œ. RENOVE EXISTING 2-HOUR AREA SEPARATION WAlL ~ XlS11NG 2-HR OCCUPANCY SEPARATION WAlL ------FOR CURRENT PARKING AREA SlRIPlNG, REFER TO PARTIAL SIlt PLAN, SHT. R-1 EXISTtIQ BUI...DINQ (E) 2-HOUR AREA SEPARA l10N WAlL EXISTING 2-HR OCCUPANCY SEPARAllON WAlL '-S-3 OCCUPANCY \ :"ECI:'1Vr-:,·· J~ .....,1':. dUN 1 ,) 2On5 :'" J"3lVN PL\I\I[\\'" - EP 6515 ( --------------------~ :- --l LE6END, U ,402 B aee1L~NeLAREAJ EXISTIN6 I"ULI.. HElðHT ytÞ,U" ~- ........ EXISTIN6 I HOIJIIt AATEI:II'IAU- -91/0 = 0 aee _ _ _ _ EXISTIN6 2 HOIJIIt AATEI:II'IAI..L - 79/0 = 0 aee ., , , ,. L.O¡'¡ ytÞ,U" ¡'¡¡TH PAINT 6RADe JI'IOOO c,AP. -805/0 = 0 aee .. NÐ'I c.eILIN6 HT. PAATITIOH (No IN5ULATION) -427/0 = 0 aee - NOTES, 1,402 = 0 aee f21 I'œ~IT EXISTIN6 II'IALL TO SHEAR I'IAI..L.. REFER TO l..=J S~'T\RAL. EN6INæI'œD DRAY't1N6S. f'Sl INFILL. 2 HR AATEI:IISHEAA II'IALL.. P'INISH TO MATc.H EXI5TIN6 L.::.J 60TH SiDes. STeEL. S'T\JD-RI!5IL 5/&' 5lE!TROCoK MAND 6~ PANeLS. FII'tec.OPI! GORe- , 5/&' S'1'1J05 24' O,c,. - PANEL5 5Co1lœ¡'¡ ATT-.JOIHT5 F'IH-PeRIMET!!R C.þ, JL ŒO U41"1 OR U465. aee I I I (lV I ~Óv (lV ñ nO~ (lç)'~ OV G" I ~ ~v (lV (\ ~ . I ~ <\0 <\OV é1V Çr : f) ~"'h """'ARV <\Ov V d:}V M 0 : I "- ''h ~Q 11001 "Q"~ ~ ov NV A;;) : I ~'f) ~Qr, Qnn "" "" <\V~ " é1V <tV 0 : f) 'Qf) ~Q n "<i"<i~O ooarnrna"""" ocr~crvV OV ¿JV.-(.) ¡ I ~ 'QQ~0QQ ~Q~o Q;;¡:Jaa aa~ oQO~ç.OO "çP~O~ ¡ I ~ ~Q ~QQQQO """"" aoo~ o~V ..,ç. ~VV({.} ¡ I ~'f) ~"nn kdkdkdkdkd """0 "V V é1V <1V : ~ ~Q~ "<i"<iQQo """oao"oo"""""" ,,<\QO""'..,ç. g~ NV ¡ I f) ~Qf) ~v kdkdOd ""V ,,0"'" <1V é1 " ~f) ~~ Qf;]QQQnn ""aOoo goO~ø ov é100~ ¡ I ~~ ~"Qnn:::"# acaaaa "";.'''''000 ,,00"'" ,,00 é10V é10V ¡ ...I. ~ ,""-..,. ~~ ~ [)IJ~ "<i~Q o--,""""a a""",,"" ~"n "" <¥'.f.J"'" clOV é1Q>V é1 : , ., ~'f1 ~Vnnn ~kdOdOdOd "",,\,d""~ gv é1V cl V A'\V : QQQIJ "<i 0QQ::::'~Q Q::aaaaa a"";::;::"oog "O~çP~O'J'" 0 ¡ I QQf) ~QQIJIJ "<i~Q Oo;;¡aaaaa 00""",,"" ""gO"'" O~OVclO~ ¡ I ~DIJ:::~Q nn "" gg""'''''"gOO OVV<\OV r:",r ¡ I "<i"<iQ"n ~"<iQCCQO """"0"000",,"" "og"" "nO nOV~nOV A'\ ¡ I ~"<i n = OdOdkdOd~ "" "" """'~ ~ é1\,)~ r:",r " " "<iQQOQO" """"" :;x:;:0"""" "gg"" "nO OV clOV ¡ I ="# OdOdOdOdOd "" "" """",~,, ó\v : """"" aao"""" re",,""' ,,""'" ¡ I OdOdkdOdOd ~ ""'~ " ~ - - - - - ~- - - - - -1- - - - - ~ - - - ~r:~r~~ ~ - - - - ~ - - - - - ~ - - - - - %; . GAS B FE L_________J _O:gt6~ 11011 aee o = PLATFORM 11081 768 = 52 aee FCP 80UND CONTROL AREA 11071 530 = o aee C,ONSTRUC,TION TYPE: V-I HR FULLY SPRINKLERED Oc,C,UP ANC, Y TYPE: A-2.1 / B NUMBER OF STORIES: I YE8TBULE 11041 805 OS/2ß/2005 11:55 9259352247 OMNIMEANSNICKELSON PAGE 01 ~~ml)!:,~~~';'.~ May 20, 2005 Mr. Jeff Baker Associate Planner City of Dtlblin 100 Civic Plaza Dublin, CA 94568 Subject: Parking Survey Data for 6fThe Well" Church at #6527 Sierra Lane in the Sierra Business Center Development Dear Mr. Baker: This letter report slUIlIDarizes our parking survey data for The Well chmch at 6527 Sierra Lane in Dublin. The parking surveys were conducted on Sunday May 15 from 9:30 AM to 12:45 PM and Wednesday evening May 18 from 6:30 PM to 9:00 PM. These survey hours reflect the Sunday morning church worship services and the Wednesday evening church activity. The attached data includes detailed parking sUIVey results (recorded every 15 minutes), a sketch of the parking survey area and vehicle occupancy survey results. We counted a total of 222 marked parking spaces within the Sierra Business Center development. It is noted that 17 of the marked spaces were observed to be unavailable due to materials storage and a shipping container. It is also noted that 6 church related vehicles were observed parallel parking along the west side of the west parking aisle leading to/from Sierra Lane, but there are no marked spaces along this aisle near SjeITa Lane. This road is only 26-28 feet wide, and the paraJlel parking substantially reduces the width available for two-way traffic flow. At several other locations in the development, a total of 5 additional church related vehicles were observed parking along unmarked curbs. As noted in the parking surveys, the Sunda.y morning church demand peaks between 11 :00 AM and 12:00 noon at 150-151 vehicles. There is very limited background parking (9 vehicles) that appears to reflect permanent vehicles related to the Sierra Business Center tenants. This total demand includes the 11 church related vehicles paxked along ruunarked curbs in the development. Based on our surveys, the average occupancy was 1.96 persons per vehicle. During the Wednesday evening sUIVeys, the church related demand peaked between 7; 15 and 8:00 PM at 84-87 vehicles. Again, background parking is very light at only 7 vehicles. No vehicles were observed parking along the west parking aisle or other .____.~_____._ ,. I,'· "..~. 1901 Olympic Boulevard. Suite 120 · Walnut Creek, CA 9459ó . (925) 935-2230 fox: (925) 935-22£17 ROSEVILLE REDDING VISALlA WALNUT CREEK ATTACHft~""'·'T / H..d.....h. LV OS/20/2005 11:55 9259352247 OMNIMEANSNICKELSON PAGE 02 May 20, 2005 Mr. Jeff Baker Page 2 of2 unmarked curbs during the Wednesday evening sW'Vey. The average occupancy during the Wednesday eve:nìng surveys was 1.90 persons per vehicle. Although not recorded on the attached survey sheets, we also observed parking demand in the business developments west and north of the Sierra Business Center development. During both the SWlday morning and Wednesday evening periods, parking demand in those developments was very light. I trust that this analysis responds to your data needs. Please call me with any further questions or comments. George W. Nickelson, P.E. Branch Manager OS/20/2005 11:55 9259352247 OMNIMEANSNICKELSON .5: ]i :::I a I/) I _ C ~<;Q¡e CJ) ~ CJ) (6 CÐ ~ 0 ~ 0 ... ;1; ~ ~ 0 """ It) ID (C ~ I- .c::. aJ ... ...... ... ...... .... ~ .... ...... .... .... ~ 'j £ ~I ~ r-- ~ 0 ... ..- .... .... N It) ~ 5(\)t-- ~ t-- I") 10 \t) It) U') \C) ~ r- ~.c::."i61D C1 .... .... .... .... .... ...... .... .... .... 0~ ~ rn "'<t . . ø'<t ..,. '<t "<t '<t "<t """ "'<t . "<t . :R ì:: ~ :::I « ..- Õ £1 e (,) 0 0 U-~o a .... ... ('oj 'Ct ..,. It) It) 10 \t) It) '0 ~ 0 0 0 Ïii 0 0 0 0 0 0 0 0 0 0 0 m C II) ;:¡ :t+ ~l It) II! (J N It) r-- ..... t-- f::¡ t-- r-- ~ r- ¡:Q'-O ~ . \0 e iN C"I N ('oj N N N N C"I N .... Il) t) ... ¡¡s » ~I~ ft ~ C 10 Ie) U') L() \0 I( 1.0 \0 \t) L() 10 \t) 10 ::::s f/J ~ « 111 "' ~ 0 \t) Q) en OJ CÐ 0'1 8 ::::s :::'ii:~t- N i! 0'1 LO ~ r.f) ,È'<t \t) en .... .... ... .... .... ..- ... IC) ...... ... ...... ...... .... ... ... ...... "CI 0 C c'II E ~ E E ~ E E e E E E È E E «Î td (\) m iii ai cti m c. ci.. ci. ci ~ cti C\ 8 10 0 \t) 0 10 ~ ID 0 U') g ~ ?J IC) ..... ~ ~ 9- ..... ":": 0 .... ·~1~ '<t ö ö è 0 .... .... .... ..... c'i N ¿,.¡ N éri .... ..... .... '"" ... .... .... .... ...... .... ....... "' (¡j ñí iií "tií 16 - 1ií ñí œ 16 iV - iií I- (\) I'I t1I ¡;:; --1 ~ .~ CIJ "'" &J (!) .c::. u ~ .c::. t) ~ ( ) ,,¡:; t- ~ ~ 0.. ~ "CI 'iii ~ .c I1Î r: !! 0 ca~ - I'I õ c. .:;: 0 ~¡ ~ I! m 0 ~£ en >.J:::: ì6-t::: o ~ g ~¿"O .....q¡c: tI:I"Om .i::'~"aS t;: .- IP 0'5:: me> g.:a-= CI).8,e ~a!! m ' 51 ~'2CD t'I:I ~ C ~~:g <.> 0 IV ..2:"00. \I.) '* .~ ;;0'0 ..... Q. ( ) 0_111 r: g ;:¡ ~.!t1~ o~:!2 c.---::::s ¡;)-æ8 ?! C) - 1:~~ "t: .~ .a 0111,2 ~-ec :¡ai:í "0 1& .~ C::C::'O t'I:I è¡) e> 'i'...."O "5'¡ ~ 0-5= -g g¡ ~fli tI:I 0 W"ffi B Q1 ~ ~~ 16 $ C\ 25 III a. ,- ~=~ C\ ~'O .~ g : .. EllS ~ a. ~ r co ÕCDC-E zF~rf PAGE 03 ... 3 .. c Q. CII ë. o Q) Q. ~ ... II g (! a. a 8 Q) :Q .c::. ~ q¡ CD ~ e> < 05/20/2005 11:55 9259352247 OMNIMEANSNICKELSON .E :£5 :::I ð f/ - Q,) 0 ..- .... (0 ('oj J9-o co - ..- ~ ..- t- o 0 0 ('oj .... o :ii .- "I:f ~ r--. Cb (Q lor> I- ..c ..- .... ..- ~ m~2 LO (i) 0 ..- ~ '<t ~ en "<t LO t- Õ~.!!! (i) "I:f t- (J) 0> (J) l"- V ..- ;-Ü~ ~ ~('t) ~ C"') C'<) C"') C"') M t") ("') (i) ('oj Q) ro .... ~§ 'ë..c: J:~O 0 0 0 0 0 0 0 0 0 0 .s:;. Ü "'C (!) m 0 0 õ3 ..-- .... ..-- .... ....- ..- ....- ..- ..- t'Ø .... c: Q ~ :::I 5 « + c: .::t: cÞ o..c: > m 0 a:I 5 0 0 0 0 0 0 0 0 0 0 0 >. ..r:: fa U Ie "'C &: ~ GJ ("') ("') ~ ~ v "'I:f ("') M C"') C'<) ("') r'> (i) ~ ro s::: Q) :::J '- + GJ « ~ .~ .c: :t ~ ~ 0 (i) "I:f '3; 0> '<t lor> ::;Ill"> M ..- r--. .s:;.r'> oq t- Ij) en (J) I"- ~ ,... c 0 n:I E Q) E E E E E E Ë e E E E ~ c.. ci. á. ci ci.. c.. ci. ri. ci.. ci. c:i. 0 Il) 0 LG 0 I.Ã) 0 1.0 0 I.Ã) 0 ËI~ oq 0 .... ("') ~ 0 ..- ('Q '<t 0 (ó ~ ,:....: ,:....: r--. 00 å::i å:> éO m I'll ¡:::ta 't6 7ð m .... 1û 16 't6 - .... 1û ro m ro II) e co 'If"' ¡o UJ "CI !:: -J ~ .!!:! en t- ('oj Il) (0 'ê ;:¡ ..c: (,) ~ Q) ..c:: t- "C <n 'tI a ~ 0.. ... ~ (J ... !. 4) ã. o Q Q. o Ø'! '"'" II ~ t: m a. ;:¡ o o o Æ o :E ~ IV 1f Q.) ~ PAGE 04 OS/20/2005 11:55 9259352247 ..... - --t · · · , · · · · · · , , · · , , , · · · · · V3~\f )\:)'18 IU :¡ « « l.U a:: « z ~ :2 <{ w c:: ~ « Q) ~ ~ è,,) c. ~ ..c:: W 't:: 0 ~ <{ UJ 0:: c( Z « ::E V3~'t )t~'v'8 en w ~ c.. (f. o (0 w ;: 9: II ¡; ~ i1í ~ ~ ~ :z ~ -g ~ ]5 >. :;:; c: Q) ~t:; L() ~ U:>ij N N II r-. II II ~ ;¡j Li5~ ...I a:; ~ a:;-ß « 0 o('ä; l- I- ~> Z ~~ ~ LL OMNIMEANSNICKELSON SS3~::>V N IVL^J :- .....- · · · · · , · SS3QQ'cf f.LS3M) Al;'cfON003S 9/s1V ...~ "'8- ~~ CI.. '~...P.._-..~-.._-.. --.....-............ -...-.....-.. Z -I ~ a:: UJ ê.i5 PAGE 05 .i~ ! :::J C) q:: L- Q) ...... C Q) Ü f/) tI) Q.) c: tn :::::I aJ ca- '-« .êi>ü cn¿ Q):'= .s::..c ......:::::1 cO L:. . ~.5 :::::lea L:... Ü(j) Q)Cf) ~~ Q)I.O ~~ L.. J2 nJ C1> L.. « C) t: ~ L- eu 0.. UJ -.I () CI) ~ I- o ;:: U) c I E o Dc:J fS ~~ Jun 17 05 11:518 RREEF M8n8~ement Comp8n~, S2SSSS18S8 p.2 June 16, 2005 City of Dublin 100 Civic Plaza Dublin. CA 94568 Attn: Planning Division We, the undersigned, do hereby agree that The Well Church has pCl111ission to use the approximately 150 parking spaces at the property located at the r)591 Sierra Lane and the back section of 6723 and 6761 Sierra Court located in the Sierra Trinity Business Park 111 Dublin on Sunday mornings for the duration of their Conditional Use Permit with tht; City ofD~.!bIl11. In the event that the property transtèrs ownership during that time I'cl'Ìod. The Wen Chure', wi111,eed to obtain a.pproval from th~ new property owner. It is also agreed that The \oVe11 Church shall hold hann1css RREEF Management Company and its employees and tenants for any liability matle:s arising as a result of¡)ersonal iI~ury or property damage while parking on RREEF Management Con-pany premises_ The Wel] Church understands th,at it will utilize the adjacent parking area on this pfC';Jerty at its own risk. n ~-_.- -------- \ ¡, /",- \ I"'~ R-R'E (Management Company \. ~ "-' ATTACHMENT 1 AGENDA STATEMENT PLANNING COMMISSION MEETING DATE: SEPTEMBER 9, 2003 SUBJECT: PUBLIC HEARING: PA 03-047 The Well Christian Community Church Conditional Use Permit for a new church to be located within an existing industrial building in a M-l (Light Industrial) zoning district located at 6533 Sierra Lane. Report prepared by: Andy Byde, Senior Planner ~ ATTACHMENTS: 1. 2. 3. Resolution approving a Conditional Use Permit; Project Plans; and Written Statement RECOMMENDATION: 1. 2. 3. 4. Open public hearing; Receive Staff presentation and public testimony; Close public hearing and deliberate; and Adopt a Resolution (Attachment 1) approving a Conditional Use Permit for The Well Christian Commwrity DESCRIPTION: The Applicant is requesting a Conditional Use Permit to establish a new church located at 6533 Sierra Lane. The proposed church would be located within an existing industrial building in a M-l (Light Industrial) zoning district. The proposed church would be 10,800 square feet in size and would be located entirely within the existing building. BACKGROUND: The Sierra Business Center consists of three buildings, which total approximately 70,000 square feet of industrial/warehousing space. The building the Well Church is proposed to be located within, totals 50,400 square feet and is located at the rear of the property. The center was constructed in the early 1980s as a light industrial building. Nearby businesses include Pacific Bell, Smart Auto Glass, and Onyx Optics. This area is characterized by its concentration of light industrial, warehousing, and back office type uses. COPIES TO: Applicant Project File Project Planner ITEMNO.~ ATTACHMENT î G:\PA#\2003\03·047 The WemPC Staff Report.doc ANALYSIS: Circulation and Parkin?: The property has 228 parking spaces to serve the approximately 70,000 square feet of the Sierra Business Center. The building that the proposed project is proposed to be located, totals 50,400 square feet. 11 . . l' f d lId ·th· th b 'ld' Fo OWmg IS a 1st 0 tenants an uses currently ocate WI III e U1 mg: Address Square Feet Tenant 6501 8,000 Vacant 6509 7,816 Hill and Watson (Industrial) 6515 4,584 SBC Services Inc (Office) 6529 11,200 Pacific Bell (Warehousing) 6533 12,000 Vacant-(Portion of Proposed Well Church) 6549 2,400 Smart Auto Glass (Auto Repairl) 6551 4,400 Onyx Optical (Industrial) 50,400 The current parking demand for the building is 50 parking spaces. The building has 152 parking spaces assigned and immediately adjacent to the building. The proposed church would be 10,800 square feet in size and, according to the City of Dublin Zoning Ordinance, would require 1 parking space per 50 square feet of non-fixed seating in the assembly area and 1 parking space per classroom. The assembly area is 4,800 square feet, which would require 96 parking spaces. The four proposed classrooms would require an additional four parking spaces for total required parking of 100 stalls. The total required parking, including the church, would be 150 parking stalls, based on the current and proposed tenant roster. The site would have adequate parking because there are 152 parking stalls to serve the building. Additionally the maj ority of the tenants within the building are industrial/warehouse type uses, which require 1 per 400 square feet and 1 per 1000 square feet, respectively. Therefore as the building tenants turn over and the vacant spaces are filled, the potential use types, which are permitted within the M-l zoning district, have a low parking demand (between 1 parking space per 400 and 1000 square feet of floor area). Moreover, the remaining square footage of the two buildings, total 19,600 square feet (70,000-50,400 =19,600) and 76 parking spaces remain to serve the two buildings. The remaining parking ratio of the two buildings is one parking space per 258 square feet, which is more than adequate to serve any allowed use, as well as allow for vacant tenant spaces to be filled and still have adequate parking. Imvrovements: The proposed church would occupy the existing building located at 6533 Sierra Lane and the applicant has not proposed any exterior modifications to the building. According to the Chief Building Official, any change in occupancies requires the building to meet the code requirements of the proposed occupancy. Use Permit Findiní!s: The church will not be located in close proximity to any residential uses. It is not anticipated that the church will have noise impacts on any adjacent uses. The church office will be open Monday through Friday, 8:00 am-4:00 pm and the church services will be held Sunday mornings at 8:00 a.m. to 1:00 p.m. with a potential evening service fTom 6:00 p.m. to 9:00 p.m. Additionally, mid-week service and or bible study occurs on Tuesday and/or Wednesday nights 6:00 to 9:30 p.m. The hours of operation of the proposed church, generating the most parking demand, are during the hours that other uses within the 2 Center are not functioning; therefore, Staff finds that the proposed use will not have any negative impacts to those uses within the Center or surrounding properties. Noticinf!: In accordance with State law, a public notice was mailed to all property owners and occupants within 300 feet of the proposed project, to advertise the project and the upcoming public hearing. A public notice was also published in the Tri-Valley Herald and posted at several locations throughout the City. To date, the City has received no contact or objections from surrounding property owners or tenants regarding the current proposal. Envjronmental Revjew: This project has been found to be Categorically Exempt from CEQA under Section 15301, Class I of the California Environmental Quality Act Guidelines. The project consists of minor modifications to an existing building and is consistent with all General Plan and Zoning regulations and is currently served by all required utilities and public services. CONCLUSION: Staff recommends that the Planning Commission adopt a Resolution (Attachment I) approving the Conditional Use Permit to establish a new church within the 10,800 square foot tenant space located at 6533 Sierra Lane. 3 GENERAL INFORMATION: Property Owner: Pat Rouse Sleepy Hollow Investment Co. II 18 Crow Canyon Court, Suite 1 00 San Ramon, CA 94583 Applicant: Evan Simmons The Well Christian Community 3130 Crow Canyon Road, Suite B San Ramon, CA 94583 Location: 6533 Sierra Lane Existing Zoning: M-l (Light Industrial) 4 RESOLUTION NO. 03-46 A RESOLUTION OF THE PLANNING COMMISSION OF THE CITY OF DUBLIN APPROVING PA 03-047 THE WELL CHRISTIAN COMMUNITY CHURCH CONDITIONAL USE PERMIT REQUEST TO ESTABLISH A NEW CHURCH WITHIN A 10,800 SQUARE FOOT TENANT SPACE LOCATED AT 6533 SIERRA LANE WHEREAS, the applican~ the Well Christian Community Church, has requested to establish a new church within an existing 10,800 square foot tenant space located at 6533 Sierra Lane, in a M-l Light Industrial Zoning District; and WHEREAS the Planning Commission held a properly noticed public hearing on said application on September 9, 2003; and WHEREAS, the California Environmental Quality Act (CEQA), together with the State guidelines and City environmental regulations require that certain projects be reviewed for environmental impact and that environmental documents be prepared; and WHEREAS, the project has been found to be Categorically Exempt from the California Environmental Quality Act (CEQA), according to Section 15301(a), Class 1; and WHEREAS, the Planning Commission did hear and consider all said reports, recommendations and testimony herein above set forth and used his independent judgment to make a decision; and WHEREAS, the Planning Commission has found that the proposed project is appropriate for the subject site. NOW, THEREFORE, BE IT RESOLVED THAT THE Dublin Planning Commission does find that: A. The proposed use is and related s1ructures are compatible wìth other land uses, transportation and service facilities in the vicinity because the existing on-site parking is adequate to serve the existing, proposed, and future uses. B. The use will not adversely affect the health or safety of persons residing or working in the vicinity, or be detrimental to the public health, safety, and welfare because the proposed church would operate during non-peak hours C. The use, under all circwnstances and conditions of this permit, will not be injurious to property or improvements in the neighborhood because the proposed use will be operated completely within an existing and enclosed building. D. There are adequate provisions for public access, water, sanitation, and public utilities and services to ensure that the proposed use and related structures would Dot be detrimental to the public health, safety and welfare proposed use will be operated completely withiD an existing building. E. The subject site is physically suitable for the type, density and intensity of the use and related structures being proposed because the existing roadway network leading to the site and the existing on-site parking is adequate to serve the proposed use. F. The approval of this Conditional Use Permit is consistent with the Dublin General Pian. BE IT FURTHER RESOLVED THAT THE Dublin Planning Commission does hereby approve PA 03-047 Conditional Use Permit to allow the Well Christian Community Church, to be located within an existing 10,800 square foot tenant space located at 6533 Sierra Lane as generally depicted on Exhibit A, stamped approved and on file. The project approval shall be subject to compliance with the following conditions: CONDITIONS OF APPROVAL: Unless stated otherwise. all Conditions of Aooroval shall be comolied with orior to the issuance ofbuildiml; permits or establishment of use. and shall be subject to Planning DeDRrtment review and approval. The following codes represent those deoartments/agencies responsible for monitoring compliance of the Conditions of Approval; (pL.l Planninr;t. rBl Buildin~. [PO) Police. (PW) Public Works rADMl Administration/City Attorney. rFINl Finance. rFl Alameda County Fire Deoartment.. fDSRl Dublin San Ramon Services District. rCO) Alameda County Deoartment of Environmental Health. 1. The activities associated with the church shall have the following operating hours: Church office, Monday to Friday 8:00 a.m. to 4:00 p.m. The activities associated with Sunday services shall have the following operating homs: 8:00 a.m. to 9;30 p.m. Evening Bible Study/Disciplesbip services shall be Monday to Friday from 6:00 p.m. to 9:30 p.m. Saturday morning worship rehearsal/prayer shall be from 6:30 a.m. to noon and Saturday evening services shall be from 6:00 p.m. to 9:30 p.m. [PL] 2. Any signage on site shall be subject to the Sign Requirements contained within the Dublin Zoning Code. [PL] 3. The Applicant shall comply with all applicable Planning, Building, Alameda COWlty Fire Authority, and Police Department regulations and ordinances. [PL. B, F, PO] 4. A disabled access stall must be provided along the front of building. 5. Signs must be posted at the driveway entrance that read, "Unauthorized not displaying distinguishing placards or license plates issued for physically handicapped persons will be towed away at owner's expense. Towed vehicles may be reclaimed at Dublin Police or by telephoning 833-6670". [PO] 6. The applicant shall comply with all applicable City of Dublin Non Residential Security Ordinance requirements. [PO] 7. Lighting used after daylight hours shall be adequate to provide for security needs (1.5 foot candles). Exterior lighting shall be provided around the entire perimeter of the building and in the parking areas. [PO] 8. The Developer and/or Property Owner shall keep the site clear of graffiti vandalism on a regular and continuous basis at all times. Graffiti resistant paints for the structures and film for windows or glass should be used. [PO] 9. An "Emergency Response Card" will be completed and submitted to police services prior to occupancy of the site. [PO] 2 10. No cooking or other food preparation that would require the approval of Alameda County EnvironmentaJ Health Services is hereby approved. In the event that food preparation is desired, the applicant shall submit a written request, subject to review and approval by the Community Development Director. The applicant will also be required to receive proper approval by Alameda COW1ty Environmental Health Services prior to commencing food preparation. [PL] 11. The Automatic fire sprinkler system shall be modified as required by any renovation, wall installation or change in floor or room configuration. A permit for the system shall be completed an all fees paid prior to installation, if applicable. [F] 12. Exiting from all areas of the building shall meet the minimum requirements of the California Building Code. [F] 13. The project shall meet the requirements of the California Fire Code. [F] 14. Approved numbers or addresses shall be placed on all existing buildings. The address shall be positioned as to be plainly visible and legible fTom the Street or Road ftonting the property. Said numbers shall contfaBt the their background. [F] 15. All Plans and Calculations shall be prepared by a California licensed Architect or Engineer. [B] 16. This permit shall be revocable for cause in accordance with Section 8.96.020.1 of the Dublin Zoning Ordinance. Any violation of the terms or conditions of this use permit shall be subject to citation. [PL] PASSED, APPROVED AND ADOPTED this 9th. day of September 2003. AYES: Cm. Fasulkey. Jennings, King and Machtmes NOES: ABSENT: ATTEST: PlanningMW 3 "- § o '" D '5 o 0> ê /' , '" " gjl .o-.oc (J! \ --1 l ~;9-,jo (11' [] [] .11-\11 (;¡) Z I 0" :::J =IJ W U => a w 0::: ~ :r "_ ¡i! T CJ ::::¡ cLJ ê:) :7J ---.... 'Y :J o ê:) ---.... _J --, « :;:: :J L -LI-- - -II ~.I '1 :¡¡ ¡¡:¡ ~ ,._.-~ ,... . . 5:1-- I n~ ..J :;::w IuD I l···j······· ". .' -'~ . ::I (j . . ~i [) 1 Z ~ .( [I J:. w ,~1: \-i'¡ ~ ',1 ~ --: ~...-, ~ ,t OJ ¡L¡ D Z ð ~tl ~ { - c¡ Œ. [I' Æ 6A ',.1} () ~¡ I , , 5'1'; r¡t, ,1\1 -1" II, ~6~., f ".Ò<) (, i<)~ Ú.~ði if r,l (:J 6.1 ~* ;:";¡..;"v';~::."~;;. N~' " ~I ·7i I,~-...·$I.-''''''" oN /' \ '" ~ .., , .. .C~1 ;.r.\'-'> 'I: F ~~~ ", -.') ::.....,.. " .. -f!fll"" Hi :r-I ¡¡I~;' T (' ~¡r· ~ _,' ~ 18 ~l~.~ ., cr. .""""""-~ _.~~ .-~.~.~~ :;;: - t'1~: ,: ":.¡ -___: 11311 " ~', I !nj <:(' ¡ 1r1H I,~l ~ , :rtm,1'1- .~ l' ~ ¡f\ . :1 V ~ q; m ~ . ~. , ! . I '~'F"" I. ..1 .... . iJ J ~ " 1'¡¡~¡:'2 J.:.i l '1. ¡l~¡' " .~ L~ I" , I'" ,>. .....' '-\J! F"'. IV <....... i ...."" ....' :;¡; .. ñ', , I J1.J . ,r,)~I~ , f;.)I' ' ¡i,j@ji li!Jr , .J ~~-j:~ fJ)~ iI\ ~~ 1 ~~ ì " i:h -:_ t J ~ \~t> -----,..---.- I, ~ ~ -~ ~Bæl ~ I_-,CI([ - '\ ~ \ .. ".:-' \ ~-: ~'l:0 ~ .&/? ->- ~ ~'[~_/ ¡ (J .,' d ,,) :1J [J -æ J ~ .~ ,\ , '\ .'1...., -':--: f. I 1/ 1/' 1/ " hi/'/ ~' ..: - / .'" : / /." CITY OF DUBLIN APPLICATION SUBMITTAL REQUIREMENTS FOR CONDITIONAL USE PERMIT (CUP) GENERAL INFORMATION Project Street AddresslLocation: 6533 Sierra Lane. Dublin. CA. 94568 Project Name: The Well. A Christian Community Project Description: Church. Worship Center and StatTOffices Zoning District: APN: General Plan Designation: Specific Plan Designation: Applicant Name: Evan L Simmons Phone: 925-277-3033 · Completed Application Form: Attached · Completed Environmental Information Form: TBD · Application Fe and Processine: Deposit: Included · Environmental Filin2 FeeslDeoosits: TBD · Written Statement: 8. The Well Christian Community is a non-denominational non-sectarian church, conducting Sunday morning services, and mid-week meetings/activities during non-business, evening hours. The church staff will also have their offices at this location, and will be conducting office business during normal office hours. b. The church staff will be comprised of 5-7 ful1Jpart time employees who will conduct business during normal Monday through Friday business hours. Corporate worShip/service attendance is estimated to rise from the current level of approximately 150 (adults and children), to approximately 300 (adults and children). We estimate that this increase will be noted gradually over the next two years. The maximum occupancy load will be experienced during the Sunday morning worship service (10:00 am through 12:00 noon). c. Church "office" hours will generally be conducted Monday through Friday from 8:00 am through 4:00 pm. Sunday morning service will be RECEIVED - ..1UL 2 8 2003 /I JUBLlN PLANNING -) 1"1 :'" -_, ¡. "\ , : ;.¡ i "'" '""" . .... conducted ftom 10:00 am to 12:00 noon. There will be two mid-week evening services on Tuesday and Wednesday from 7:00 pm through 9:00 pm. Additionally, there will periodically be Friday evening activities (7:00 pm), Saturday morning activities (6:30 am - 8:30 am), and Sunday evening activities (7:00 pm). These activities will in all probability be somewhat less attended than the maximum projected attendance of 300 for the Sunday morning worship service. d. This business is not designed to target a specific segment of the community, excepting the fact that being a Biblically based, Christian organization; the Church will inherently attract individuals and families with similar Christian backgrounds, or those seeking to learn more about the Church and the Gospel of Jesus Christ. e. The Well does and will continue to preach and minister the Gospel of Jesus Christ to individuals and families of many cultural backgrounds. We feel strongly that the message delivered by the Holy Scriptures is for all people regardless of ethnic origin and believe in the impact of these teachings for positively effecting family relationships, individual relationships within the neighborhood or community, and within the workplace. The Gospel of Jesus Christ, when delivered in truth and love carries with it the power to change people's lives. The benefits and results of this teaching for the commW1ity of Dublin and the surrounding area will be positive for all those involved. Acknowledging that all are children of the God we worship, The Well actively seeks to be an ethnically diverse, multi-cultural church. f. Owing to the relatively small number of staff employees who will be present during norma] Monday through Friday business hours, there win be no discernable impact on the current business (or residential) environment. Any "high volume" attendance activities will be conducted either on weekends or during the evening hours, as noted above. As such these activities will have no significant negative affect on other businesses in this area. Further, as this is a zoned industrial area, there are no "residential" disruption concerns for either weekday, or weekend times and activities. g. Excepting the nonna] "office and traffic" issues, there will be no additional negative effects or impacts on the health or safety of individuals either working or visiting this business or its immediate vicinity. b. There will be no unusual effects or negative impacts on the facility or surrounding property, transportation system, or any other neighborhood function as a result of The Well occupying this business location. Parking spaces surrounding this facility number approximately 230. Using the City ofDubJin Zoning Ordinance document, amended November 1,2002, Chapter 8.76, Section C under "Place of Worship", the number of parking spaces required, in a non-fixed seating area is: 1 00 (The assembly area of the facility is approximately 4800 ft. sq., 1 space per 50 sq. ft. is 96 required spaces, plus 1 space per classroom (four classroom spaces are anticipated), equaling 100 spaces). Thus, available parking spaces are more than sufficient to handle the expected maximum occupancy load during the Sunday morning service. i. The subject facility is not located on a hazardous waste and substance site (pursuant to Government Code Section 65962.5). · Preliminary Title ReDortlProøertv Profile: Attached · Public Notice Materials: a. Reproduced copy of Alameda County Assessor's Parcel Map: Attached b. Two sets of mailing labels: Attached c. Plain envelopes with postage stamps: Attached · Vicinitv Map: Attached · Site Map (10 cODies): Attached · BuildiD2 Elevations (photos acceptable): Attached · Floor Plans 00 copies. fully dimensioned. folded 9" bv 11" maximum): Attached · Reduced Copies (l0 copies. 11" bv 17"): Attached · Traffic Data: To Be Determined