Loading...
HomeMy WebLinkAbout7.1 Approval of Plans and Specifications, Award of Contract to Strawn Construction, Inc., and Approval of a Budget Change for the Cultural Arts Center Project, CIP No. GI0120CELEBRATING 41111) 1982 - 2022 DUBLIN STAFF REPORT CITY COUNCIL Agenda Item 7.1 DATE: September 20, 2022 TO: Honorable Mayor and City Councilmembers FROM: Linda Smith, City Manager SU B.FCT : Approval of Plans and Specifications, Award of Contract to Strawn Construction, Inc., and Approval of a Budget Change for the Cultural Arts Center Project, CIP No. GI0120 Prepared by: Michael Boitnott, Capital Improvement Program Manager EXECUTIVE SUMMARY: The City Council will consider approving the plans and specifications and awarding a construction contract to Strawn Construction, Inc. for the Cultural Arts Center Project. The project will provide for a 13,000-square-foot Cultural Arts Center on the first floor of the Civic Center and will renovate the second -floor office space for the Parks and Community Services Department. The City Council will also consider approving a budget change to increase the project funding. STAFF RECOMMENDATION: Adopt the Resolution Approving the Plans and Specifications and Awarding a Contract to Strawn Construction, Inc. for the Cultural Arts Center Project, CIP No. GI0120, and approve the budget change. FINANCIAL IMPACT: As approved in the 2022-2027 Capital Improvement Program, the total budget for the project is $12,721,035 with $11,797,035 in funding from CIP No. GI0120 and $924,000 from CIP No. GI0122, as summarized below. The base bid submitted by Strawn Construction, Inc. is $10,010,226, with three add -alternate items totaling $260,000. Staff recommends the inclusion of all three add - alternate items and a 10% construction contingency in the amount of $1,027,024 to facilitate change orders for unforeseen construction issues, bringing the total potential construction contract amount to $11,297,250. In addition to the construction contract, the project budget includes expenditures for furniture, fixtures, equipment, and soft costs, which include staff, consultants, permits, fees, and other miscellaneous costs. With these, Staff estimates a total project cost of $15,321,035, requiring a budget increase of $2,600,000. Staff recommends reassigning this amount from the Fallon Sports Park - Phase 3 General Fund Committed Reserve (current balance of $3,110,500) to this project. Page 1 of 4 125 Funding Sources Cultural Arts Center (GI0120) Civic Center Renovation (GI0122) $11,797,035 $924,000 Total Project Funding $12,721,035 Project Costs Base Bid Add Alternates No.1, 2, & 3 Construction Contingency Furniture, Fixtures, and Equipment (FF&E) Soft Costs $10, 010, 226 $260,000 $1, 027, 024 $975,000 $3,048,785 Total Estimated Expenditures Funding Shortfall Additional Potential Funding Source General Fund Committed Reserve - Fallon Sports Park —Phase 3 DESCRIPTION: $15,321,035 ($2,600,000) $2,600,000 The 2022-2027 Capital Improvement Program (CIP) includes the Cultural Arts Center Project (CIP No. GI0120) which will convert the former Dublin Police Services wing of the Civic Center to a roughly 13,000-square-foot Cultural Arts Center on the first floor and renovate the second -floor office space for the Parks and Community Services Department. The CIP also includes the Civic Center Rehabilitation Project (CIP No. GI0120), which provides a portion of the funding of the Cultural Arts Center Project. Budget summaries of both projects are included in this report as Attachment 2. On May 19, 2020, the City Council approved the schematic design for the facility. The first floor's space plan includes a 2,100-square-foot black box performance/event space; 1,330 square feet for gallery, art classrooms, dance, and music studios; and a 1,290-square-foot indoor/outdoor ceramics yard workspace along with a catering kitchen, restrooms, and the City's main telephone/data center. The renovation includes major reconstruction of the first floor where all interior construction, finishes, and most systems will be replaced with a new layout to accommodate the Cultural Arts Center. The second -floor plan consists of offices for the Parks and Community Services Department, two new restrooms, two new showers, a new janitor's closet, kitchenette space, a conference room, a lactation room, and a fitness room for City staff. Bid Process and Results Page 2 of 4 126 The City of Dublin issued the bid package for the Cultural Arts Center Project on June 15, 2022. The bid package was made up of nine base bid items and three add -alternate items. Six sealed bids were received by August 30, 2022, with the base bids ranging from $10,010,226 to $13,732,000. A summary of the bids is provided as Attachment 3. The lowest base bid of $10,010,226 was submitted by Strawn Construction, Inc. The three add -alternate items included in the bid package were: 1) tubular skylights above the art classroom and arts yard; 2) felt acoustic ceiling panels in the black box theater, arts yard, gallery, arts classroom, and dance studio; and 3) acoustic wall panels in the black box theater, arts yard, gallery, arts classroom, and dance studio. Staff recommends award of all three add -alternate bid items for a total of $260,000. Cost Considerations The construction industry is experiencing unprecedented impacts to supply chains, lack of skilled workers entering the building trades, high fuel prices, and rising interest rates. All of these create uncertainty for contractors when submitting a fixed price bid to construct a project. That is, the contractor is accepting all risks to complete the project within the allotted time and submitted fixed price, which is commonly referred to as "Builders Risk." The City received six bids for the project all within 37% of the low bidder, which would not be considered competitive pricing. However, the four lowest bids submitted all were within 8.6% of the low bidder, which by industry standards is considered very competitive pricing and indicates this is the current price given the Builders Risks for the project. Building cost escalation over the past 12 months has been 9-15% depending on the construction trade compared to 2-5% per year on average historically, something that was not planned for in the Cultural Arts Center budget. Another factor that resulted in higher -than -planned pricing is an increase in duration of the construction phase that was originally anticipated to be about one year. Due to supply chain impacts and longer lead-times, the construction duration was extended to 14 months to provide the bidders sufficient time to construct the project, which resulted in higher prices. Community Workforce Agreement On January 11, 2022, the City Council approved a Community Workforce Agreement (CWA) with the Building and Construction Trades Council of Alameda County and its Affiliated Local Unions. The CWA is applicable to public works projects valued at over $1,000,000, ensures that there are no labor issues related to said projects, and bolsters local efforts to connect residents with careers in the building and construction trades. The CWA includes a Local Hire Goal where 20% of all hours on a project be worked by Local Residents, which are defined as individuals that reside within Alameda County or within a 15-mile radius of City limits. The CWA also requires contractors to hire one new apprentice for the first $1,000,000 of construction costs, and an additional new apprentice for every $5,000,000 construction costs, based on the engineer's estimate. Apprentices must work a minimum of 10% of the total craft's work hours, but the CWA allows that apprentices may be deployed to another project to ensure the minimum number of hours are met. Staff worked with a consultant, Workforce Integrity and Training Solutions, to prepare bid Page 3 of 4 127 documents and solicit bids for the Cultural Arts Center that comply with the provisions of the CWA. The provisions include the requirement that responsive bidders include an executed Agreement to be Bound to and by the CWA, and that all subcontractors of the successful bidder also execute the Agreement to be Bound within 14 days after Notice of Award. Recommendation Staff reviewed the bid results, checked references and necessary licenses, and recommends that the City Council award the project construction contract to Strawn Construction, Inc. as the lowest responsive and responsible bidder. Strawn Construction, Inc. also included an executed Agreement to be Bound to the CWA with their bid. With award of the contract as Staff proposes, the total project cost would be $15,321,035, including all three add -alternates and a contingency amount of $1,027,024, which requires a budget increase of $2,600,000. Staff recommends transferring this amount from available funding in the Fallon Sports Park - Phase 3 General Fund Committed Reserve (Attachment 4). Staff expects the project to begin in fall 2022 and anticipates completion of the project by the end of the first quarter of calendar year 2024. California Environmental Quality Act (CEQA) This project is exempt under Section 15301 (Existing Facilities) of the CEQA Guidelines. STRATEGIC PLAN INITIATIVE: None. NOTICING REQUIREMENTS/PUBLIC OUTREACH: A copy of this Staff Report was sent to Strawn Construction, Inc. and the City Council Agenda was posted. ATTACHMENTS: 1) Resolution Approving the Plans and Specifications and Awarding a Contract to Strawn Construction, Inc. for the Cultural Arts Center Project, CIP No. GI0120 2) CIP Nos. GI0120 and GI0122 3) Bid Results 4) Budget Change Form Page 4 of 4 128 Attachment I RESOLUTION NO. XX - 22 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF DUBLIN APPROVING THE PLANS AND SPECIFICATION AND AWARDING A CONTRACT TO STRAWN CONSTRUCTION, INC. FOR THE CULTURAL ARTS CENTER PROJECT, CIP NO. GI0120 WHEREAS, on May 19, 2020, the City Council approved the schematic design to convert the former Dublin Police Services wing of Civic Center to a roughly 13,000-square-foot Cultural Arts Center on the first floor and renovate the second -floor office space for Parks and Community Services staff (Project); and WHEREAS, the design team has completed the plans and specifications for the Project, which includes the major reconstruction of the first floor where all interior construction, finishes, and most systems will be replaced with a new layout to accommodate the Cultural Arts Center, with minor renovations to the second floor of the building; and WHEREAS, the City of Dublin did, on August 30, 2022, publicly open, examine, and declare all sealed bids for doing the work described in the approved plans and specifications for the Project, which plans and specifications are hereby expressly referred to for a description of said work and for all particulars relative to the proceedings under the request for bids; and WHEREAS, said bids were submitted to City Staff and Strawn Construction, Inc. was determined to be the lowest responsive and responsible bidder for doing said work. NOW, THEREFORE, BE IT RESOLVED that the City Council of the City of Dublin hereby approves the Plans and Specifications for the Project. BE IT FURTHER RESOLVED that the City Council of the City of Dublin does hereby award the Contract for the Project to the lowest responsive bidder, Strawn Construction, Inc. at a base bid of $10,010,226, with the inclusion of all three add alternate items up to $260,000, for a total contract amount up to $10,270,226, the particulars of which bids are on file in the Office of the Public Works Director. BE IT FURTHER RESOLVED that the City Council of the City of Dublin does hereby authorize the City Manager or designee to approve the Project Contract Change Orders based on the appropriated funds designated for the Project up to the contingency amount of $1,027,024. BE IT FURTHER RESOLVED that the City Manager or designee is authorized to execute the Construction Agreement with Strawn Construction, Inc. Reso. No. XX-22, Item X.X, Adopted 09/20/22 Page 1 of 2 129 PASSED, APPROVED AND ADOPTED this 20th day of September 2022, by the following vote: AYES: NOES: ABSENT: ABSTAIN: Mayor ATTEST: City Clerk Reso. No. XX-22, Item X.X, Adopted 09/20/22 Page 2 of 2 130 Attachment 2 Number GI0120 CULTURAL ARTS CENTER Progra GENERAL PROJECT DESCRIPTION This project provides for the design and improvement of an approximately 13,000-square-foot Cultural Arts Center on the first floor of the Civic Center, which was formerly occupied by Dublin Police Services. The Parks & Recreation Master Plan identifies a Cultural Arts Center that would serve as a multi -use facility that affords cultural, educational, and social opportunities for the community. The Cultural Arts Center could include: an Art gallery, Black Box theater space; multi -purpose art and music classrooms; a dance studio; and restrooms. The project also provides for the replacement of the heating, ventilation, and air conditioning (HVAC) systems, HVAC controls, roof replacement, major upgrades to the main telecommunication room, and the relocation of the Parks and Community Services Department offices to the second floor of the Cultural Arts Center. ANNUAL OPERATING IMPACT: TBD MANAGING DEPARTMENT: Public Works 2022-2027 CAPITAL IMPROVEMENT PROGRAM STIMATED COSTS PRIOR YEARS 2021-2022 BUDGET 2022-2023 FUTURE 2023-2024 2024-2025 2025-2026 2026-2027 YEARS TOTALS 9100 Salaries & Benefits 9200 Contract Services $32,259 $886,211 $167,686 $1,828,789 9400 9500 Improvements Miscellaneous $13 $8,063,987 $18,090 9600 E ui ment $800,000 $918,482 $10,878, FUNDING SOURCE 1001 I General Fund PRIOR YEARS 4100 Public Facility Fees Internal Service Fund - Facilities 2021-2022 BUDGET 2022-2023 2023-2024 2024-2025 2025-2026 2026-2027 YEARS $4,364,197 $918,482 $4,970,718 $1,543,638 $918,482 $10,878,553 FUTURE $199,945 $2,715,000 $8,064,000 $18,090 $800,000 $11,797,035 TOTALS $4,364,197 $5,889,200 $1,543,638 $11,797,035 ANNUAL OPERATING IMPACT Number GI0122 CIVIC CENTER REHABILITATION Program GENERAL PROJECT DESCRIPTION This project provides for the planning, design, and construction of various rehabilitation and renovation projects at the Civic Center. Projects may include: renovation of all restrooms, showers, kitchenettes, and the employee break room; modifications to conference rooms; lighting and ceiling replacement; site improvements to the parking lot area and surrounding walkways of the Civic Center; building security evaluation and upgrades; repainting; and Americans with Disabilities Act (ADA) and Code upgrades. Interior repainting in select areas were completed during construction of the Civic Center HVAC and Roof Replacement project, and minor parking lot and walkway improvements are anticipated to be designed and constructed in conjunction with the Cultural Arts Center project. Planning for other projects is anticipated to begin in 2022. This project is funded by General Fund Reserves. Other potential funding sources for the building security upgrades may include Federal and State public safety grants. ANNUAL OPERATING IMPACT: None MANAGING DEPARTMENT: Public Works 2022-2027 IMPROVEMENT PROG I STIMATED COSTS PRIOR YEARS 2021-2022 BUDGET 2022-2023 2023-2024 2024-2025 2025-2026 2026-2027 FUTURE YEARS TOTALS 9100 Salaries & Benefits 9200 Contract Services 9400 9500 Improvements Miscellaneous FUNDING SOURCE 1 1001 1 General Fund TOTAL $32,300 $22,880 $210,750 $192,960 $24,960 $107,880 $100,000 PRIOR YEARS $875,000 $5,000 $1,123,050 2021-2022 BUDGET $550,000 $100,000 $5,000 $5,000 $5,000 $220,840 87,840 $205,000 2022-2023 $1,123,0501 1111 $1,123,050 2023-2024 $220,8401 $687,8401 $220,840 IPPI $687,840 $205,000 $205,000 $80,140 $611,590 FUTURE 2025-2026 2026-2027 YEARS TOTALS $1,525,000 $20,000 ilmt 2,236,7,1 $2,236,730 1 $2,236,730 ANNUAL OPERATING IMPACT Project Name: Project No. : Bid Date: CITY OF DUBLIN PUBLIC WORKS DEPARTMENT ENGINEERING DIVISION BID SUMMARY Cultural Arts Center GI0120 & GI0122 August 30, 2022 Attachment 3 BASE BID Strawn Construction, Inc. CWS Construction Group, Inc. Arntz Builders, Inc. Thompson Builders Corporation Zovich & Sons Inc. Patriot Contracting, Inc. ITEM DESCRIPTION Unit Cost Unit Cost Unit Cost Unit Cost Unit Cost Unit Cost A Base Bid Item A- Base Contract Work (Project No. GI0120) $9,690,226.00 $9,765,000.00 $10,143,972.00 $10,103,000.00 $11,998,000.00 $13,117,000.00 B Base Bid Item B- Stair and Guardrail Modifications (Project No. GI0120) $80,000.00 $117,000.00 $35,000.00 $114,000.00 $66,000.00 $100,000.00 C Base Bid Item C- Second Floor Restrooms, Showers, and janitor's Closet (Project No. GI0122) $59,000.00 $120,000.00 $65,000.00 $128,000.00 $55,000.00 $85,000.00 D Base Bid Item D- Sidewalk and Landscaping at the Northwest Side of Building (Project No. GI0122) $30,000.00 $112,000.00 $100,000.00 $292,000.00 $30,000.00 $75,000.00 E Base Bid Item E- Paving and Landscaping at the West Side of Building in Secured Parking Lot (Project No. GI0120) $33,000.00 $70,000.00 $10,000.00 $102,000.00 $35,000.00 $65,000.00 F Base Bid Item F- Replace Detectable Waming Panels at Parking Lot Aisle (Project No. GI0122) $5,000.00 $25,000.00 $2,500.00 $19,000.00 $25,000.00 $15,000.00 G Base Bid Item G- Path of Travel Compliance (Project No. GI0122) $6,000.00 $90,000.00 $20,000.00 $56,000.00 $80,000.00 $35,000.00 H Base Bid Item H- Replace Second Floor Acoustical Tile Ceilings (Project No. GI0122) $56,000.00 $21,000.00 $15,000.00 $10,000.00 $85,000.00 $125,000.00 Base Bid Item I- Replace Second Floor Lighting and Controls (Project No. GI0122) $51,000.00 $50,000.00 $35,000.00 $50,000.00 $75,000.00 $115,000.00 TOTAL $10,010,226.00 $10,370,000.00 $10,426,472.00 $10,874,000.00 $12,449,000.00 $13,732,000.00 APPARENT LOW BIDDER ADD ALTERNATES ITEM DESCRIPTION Unit Cost Unit Cost Unit Cost Unit Cost Unit Cost Unit Cost Al Alternate No.1- Tubular Skylights, Accessories and Framing (Project No.G10120) $95,000.00 $100,000.00 $27,000.00 $28,000.00 None provided $35,000.00 A2 Alternate No.2- Acoustical Ceiling Clouds in the Gallery, Arts Rooms, Arts & Crafts, Arts Yard and Dance Studio (Project No.G10120) $60,000.00 $145,000.00 $148,800.00 $137,000.00 None provided $145,000.00 A3 Alternate No.3-Acoustic Wall Panels (AWP-1) in Black Box Theater, Arts + Crafts Yard, Gallery, Arts Room & Dance Studio $105,000.00 $185,000.00 $194,400.00 $160,000.00 None provided $175,000.00 Attachment 4 CITY OF DUBLIN FISCAL YEAR 2022-23 BUDGET CHANGE FORM Budget Change Reference #: City Council's Approval Required From Un-Appropriated Reserves From Designated Reserves DECREASE BUDGET AMOUNT Account Budget Transfer Between Funds Amount Other INCREASE BUDGET AMOUNT Account Amount EXP: Cultural Arts Center (GI0120) G10120.9200.9202 (Design) G10120.9400.9401 (Improvements) 3500.9510.49999 (Transfers In) G10120.1101 (1101.9510.89101) - General Fund Designated Reserve Transfers Out $120,000 $2,480,000 $2,600,000 $2,600,000 REASON FOR BUDGET CHANGE Appropriation of funds from designated reserve for Cultural Arts Center, based on bids received and additional alternate items. As Presented at the City Council Meeting 9/20/2022 **********Finance Use Only********** Posted By: Date: C:\Users\michaelb\AppData\Local\Microsoft\Windows\INetCache\Content.Outlook\MD4KDIQW\Cultural Arts Center G10120 Budget Change_0921 134 I/ DUBLIN CALIFORNIA Item 7. Cultural Arts Center Project, CIP No.G10120 City Council September 20, 2022 II DUBLIN CULTRAL ARTS CENTEL GA. Cultural Arts Center • 13,000 sq.ft. Cultural Arts Center (ist Floor) • Parks & Community Services Office Space (2nd Floor) • 2,100 sq.ft. Black Box Performance/Event Space • Catering Kitchen • Gallery Space • Art Classrooms • Dance & Music Studios • Indoor/Outdoor Ceramics Workspace • New Restrooms (1st and 2nd Floor) • Relocate the Staff Fitness Room and Showers to 2nd Floor • Limited Site Improvements and Landscaping Cultural Arts Center F. L• Tel Server Telecom & Storage Elec Room • r ▪ Trafhi Darius Studio Operation Storage Center Music Studio Dance Studio Arts Storog Ceramics Yard gl Elev. Fire / Roam Gallery Ocher 1, ontro �� Room Arts + Crafts Gallery :S Farag Arts Storage mi.SSSlllbiilti iiiii meli*ii�ii Mmfiiii■ Black Box First Floor Plan Pre- ` Function Lounge Dressing Room.& torage ° Ei DUBLIN Cultural Arts Center Storage ervisor Second Floor Plan DUBLIN Cultural Arts Center Bid Base Bid Ranged $1O.O1OM to $13.732M Bid Included Three Add Alternate Items: 1. Tubular Skylights at Art Classroom & Arts Yard 2. Added Felt Acoustic Ceiling Panels 3. Added Acoustic Wall Panels Community Workforce Agreement Local Hire Goal (20% of All Hours Worked) New Apprentice for 1st S1M + 1/S5M After DUBLIN Staff Recommendations: 1. Adopt the Resolution Approving the Plans and Specifications and Awarding a Contract to Strawn Construction, Inc. for the Cultural Arts Center Project, CIP No. GI0120. 2. Approve the Budget Change. El 4 DUBLIN DUBLIN CALIFORNIA ThankYou 19