Loading...
HomeMy WebLinkAboutReso 112-05 ZumwaltEngineering RESOLUTION NO. 112 - 05 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF DUBLIN . ft * * * . * . * APPROVING AMENDMENT TO AGREEMENT WITH ZUMWALT ENGINEERING GROUP WHEREAS, the City of Dublin, State of California, entered into a two-year agreement with Zumwalt Engineering Group on July 20, 2004, to perfonn general engineering services; and WHEREAS, Consultant is requesting an adjustment of rates for Fiscal Year 2005-2006 as allowed by Section 2 of the Agreement; NOW, THEREFORE, BE IT RESOLVED that the City Council of the City of Dublin does hereby approve the amendment to the agreement with Zumwalt Engineering Group, which is attached hereto as "Exhibit A. " BE IT FURTHER RESOLVED that the Mayor is authorized to execute the amendment to the Agreement. PASSED, APPROVED AND ADOPTED this 21st day of June, 2005. AYES: Councilmembers Hildenbrand, McCormick, Oravetz, Zika and Mayor Lockhart NOES: None ABSENT: None ATTEST: ABSTAIN: None c/L K'/G/6-2 I -05/reso 11H)5 Zumwalt (Itern 4.10) g\CONSULTANTSlzumwa1tlreso amend 05~Q6 EXHIBIT "A" OF RESOLUTION 111--05 AMENDMENT TO AGREEMENT BETWEEN CITY OF DUBLIN AND ZUMWALT ENGINEERING GROUP FOR ENGINEERING SERVICES WHEREAS, the City of Dublin (hereinafter referred to as "CITY") and Zumwalt Engineering Group (hereinafter referred to as "CONSULTANT"), entered into an agreement on July 20, 2004, to provide engineering services to CITY; and WHEREAS, per said agreement Consultant is allowed to request a rate adjustment after the first year of the tenn; and ' WHEREAS, Consultant has requested an adjustment of rates for Fiscal Year 2005-2006; NOW, THEREFORE, the parties hereto agree as follows: Ad¡ustment of Rates The rate schedule attached hereto as Exhibit 1 shall be in effect for Fiscal Year 2005-2006. CITY OF DUBLIN ZUMW AL T ENGINEERING GROUP Janet Lockhart, Mayor ATTEST: Date: City Clerk g;cngr -çontract\zuJJ1Wa1t\amOTJdrnc:nt 04-05 _doc ZUMWALT ENGINEERING GROUP 2005-2006 CHARGE RATE FEE SCHEDULE The compensation of Zumwalt Engineering Group for work done will be on the basis of an hourly charge rate, plus incurred expenses and will be the sum of aU the items set forth below: A. PERSONNEL SERVICES PRINCIPAL SUPERVISING ENGINEER SENIOR ENGINEER ASSOCIATE ENGINEER ASSISTANT ENGINEER FIELD REPRESENTATIVE PROJECT MANAGEMENT ANALYST TECHNICIAN/CAD OPERA TOR . PROJECT MANAGEMENT ASSISTANT CLERlCAL I OFFICE SUPPORT TWO-MAN SURVEY CREW $ 152' HR 146 HR 133 HR 118 HR ]00 HR 93 HR 93 HR 88 HR 71 HR 55 HR 201 HR Rates for individuals may vary depending On the service performed. EFFECTIVE THROUGH JUNE 30, 2006 AND SUBJECT TO REVISION ANNUALLY B. TRANSPORTATION EXPENSES 1. Thirty-six and Y, cents (0.365) per miiefor use ofvehkles. A minimum of six dollars ($6.00) per hour will be charged for use of vehicles used for field inspection and supervision. C. OUTSIDE SERVICES I. Invoice cost of services and expenses charged to Zumwalt Engineering Group by outside consultants, professionai, or technical finns engaged in connection with the order, plus 15% handling charge. D. MISCELLANEOUS EXPENSES 1. The invoice cost of materials, suppJies, reproduction work, and other services procured by Zumwalt Engineering Group from outside sources, plus a handling charge of 15%. All out-of-pocket expenses not included in Items A, Band C will be inciuded in this category. ZUMWALT ENGINEERING GROUP MUNICIPAL STAFF AUGMENTATION 2005-2006 CHARGE RATE FEE SCHEDULE The compensation of Zumwalt Engineering Group for work done will be on the basis of an hourly charge rate, plus incurred expenses and wiU be the sum of all the items set forth below: A. MUNICIPAL STAFF AUGMENTATION SERVICES . . PRINCIPAL $ 116 HR SUPERVISING ENGINEER 116 HR SENIOR ENGINEER 1 I I HR PROJECT ENGINEER/SURVEYOR 105 HR ASSOCIATE ENGINEER 98 HR SENIOR DESIGNER 98 HR PROJECT MANAGEMENT ANALYST 85 HR STAFF ENGINEER 85 HR FIELD REPRESENTATIVE 85 HR CAD DESIGNER 85 fIR PROJECT MANAGEMENT ASSISTANT 72 HR TECHNICIAN/CAD OPERATOR 62 HR CLERlCAL / OffICE SUPPORT 50 HR EFFECTIVE THROUGH JUNE 30, 2006 AND SUBJECT TO REVISION ANNUALLY B. TRANSPORTATION EXPENSES I. Thirty-six and y, cents (0.365) per mile for use of vehicles. A minimum of six dollars ($6.00) per hour will be charged for use of vehicles used for field inspection and supervision. C. OUTSIDE SERVICES I. Invoice cost of services and expenses charged to Zumwalt Engineering Group by outside consultants, professional, or technical firms engaged in connection with the order, plus 15% handling charge. D. MISCELLANEOUS EXPENSES 1. The invoice cost of materia1s, supplies, reproduction work, and other services procured by Zumwalt Engineering Group from outside sources, plus a handling charge of ¡ 5%. All out-of-pocket expenses not included in Items A, B and C will be jneluded in this category.