Loading...
HomeMy WebLinkAbout4.7 Acceptance of Work – Project No. PK0215, Dublin Heritage Park CemeteryCELEBRATING STAFF REPORT CITY COUNCIL DUBLIN CALIFORNIA Agenda Item 4.7 DATE: November 15, 2022 TO: Honorable Mayor and City Councilmembers FROM: Linda Smith, City Manager SU B,ECT : Acceptance of Work - Project No. PK0215, Dublin Heritage Park Cemetery Improvements Project Prepared by: Rosemary Alex, Parks and Facilities Development Coordinator EXECUTIVE SUMMARY: The City Council will consider the acceptance of the Dublin Heritage Park Cemetery Improvements. The project improved the courtyard, pathways, landscape, irrigation, parking lot, street frontage, lighting, memorial program elements, site furniture, and upgraded IT infrastructure. STAFF RECOMMENDATION: Adopt the Resolution Accepting the Dublin Heritage Park Cemetery Improvements Project, CIP No. PK0215. FINANCIAL IMPACT: The Dublin Heritage Park Cemetery Improvements Project is complete, though there may be some minor close-out expenditures. Project funding and estimated costs are as follows: Funding Sources General Fund (Developer Contribution) General Fund Committed Reserve for Non -Streets CIP IT Infrastructure Improvement (CIP No. GI0117) Bay Area Air Quality Management District Grant (EV Chargers) $1,500,000.00 $180,600.00 $16,400.00 $8,000.00 Total Funding $1,705,000.00 Estimated Expenditures Construction Contract with Change Orders $1,236,992.70 Page 1 of 2 106 Contract Services, Design, Salary, and Testing Total Expenditures Estimated Project Balance DESCRIPTION: $464,007.30 $1,701,000.00 $4,000.00 On April 20, 2021, the City Council awarded a contract for the Dublin Heritage Park Cemetery Improvements Project (CIP No. PK0215) to Saboo, Inc. for $1,031,000 plus a contingency amount of $100,000. The project consisted of restoration of the tree allee along Hawthorne Lane, landscape improvements throughout the site, the addition of a shade structure and improvements to the courtyard adjacent to Old St. Raymond's Church, renovation of the existing pathways within the cemetery, lighting improvements, the addition of site furnishings, creation of spaces for memorial program elements (pavers, monuments, benches and boulders), the resurfacing of and accessibility upgrades to the parking lot, installation of two electric vehicle charging stations, frontage improvements, and the expansion of parking along Donlon Way. On November 6, 2021, the City Council approved additional improvements and a budget change in the amount of $210,000 to support information technology infrastructure upgrades, including new data conduits within the park and to the street right-of-way, and utility service connection points. Also included was the installation of fiber optic network cabling between the park buildings, creating a connected campus. Staff has determined that the project is complete and recommends that the City Council accept the project and begin the warranty period. STRATEGIC PLAN INITIATIVE: None. NOTICING REQUIREMENTS/PUBLIC OUTREACH: The City Council Agenda was posted, and a courtesy copy of this report was sent to Saboo, Inc. ATTACHMENTS: 1) Resolution Accepting the Dublin Heritage Park Cemetery Improvements Project, CIP No. PK0215 Page 2 of 2 107 Attachment I RESOLUTION NO. XX - 22 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF DUBLIN ACCEPTING THE DUBLIN HERITAGE PARK CEMETERY IMPROVEMENTS PROJECT, CIP No. PK0215 WHEREAS, on April 20, 2021, the City of Dublin entered into a contract with Saboo, Inc. for the Dublin Heritage Park Cemetery Improvements Project that included improvements to the courtyard, pathways, landscape, irrigation, parking lot, street frontage, lighting, memorial program elements, and site furniture; and WHEREAS, on November 6, 2021, the City Council approved additional improvements and a budget change to support IT infrastructure updates that included new data conduits, utility service connection points, and installation of fiber optic network cabling; and WHEREAS, said improvements have been completed in accordance with plans and specifications, and any approved modifications thereof, to the satisfaction of the City Engineer of the City of Dublin; and WHEREAS, as a condition of the contract, Saboo, Inc., is required to warranty the improvements for a period of one year following acceptance of the work by the City of Dublin and maintain a maintenance bond in the amount of 10% of the final contract value. NOW, THEREFORE, BE IT RESOLVED that the City Council of the City of Dublin does hereby accept the Dublin Heritage Park Cemetery Improvements, Project No. PK0215, and authorize Staff to file a Notice of Completion with Alameda County. BE IT FURTHER RESOLVED that the City Council of the City of Dublin does hereby authorize the City Manager or designee to release the retention, if after 35 days of filing the Notice of Completion there are no subcontractor claims. BE IT FURTHER RESOLVED that the City Council of the City of Dublin does hereby authorize the City Manager or designee to release the maintenance bond at the end of the one- year warranty period. {Signatures on the Following Page} Reso. No. XX-22, Item X.X, Adopted XX/XX/2022 Page 1 of 2 108 Attachment I PASSED, APPROVED AND ADOPTED this 15th day of November 2022, by the following vote: AYES: NOES: ABSENT: ABSTAIN: Mayor ATTEST: City Clerk Reso. No. XX-22, Item X.X, Adopted XX/XX/2022 Page 2 of 2 109