HomeMy WebLinkAbout4.3 Approval of Plans and Specifications and Award of Contract to St. Francis Electric for the Citywide Signal Communications Upgrade – Conduit Installation for Future Fiber Interconnect on Dublin BLVD Proj ST0713CELEBRATING
41111)
1982 - 2022
DUBLIN
STAFF REPORT
CITY COUNCIL
Agenda Item 4.3
DATE: January 10, 2023
TO: Honorable Mayor and City Councilmembers
FROM: Linda Smith, City Manager
SU B.ECT : Approval of Plans and Specifications and Award of Contract to St. Francis
Electric for the Citywide Signal Communications Upgrade - Conduit
Installation for Future Fiber Interconnect on Dublin Boulevard Project, CIP
No. ST0713
Prepared by: Sai Midididdi, Associate Civil (Traffic) Engineer
EXECUTIVE SUMMARY:
The City Council will consider approving the plans and specifications and awarding a construction
contract to St. Francis Electric for the Citywide Signal Communications Upgrade - Conduit
Installation for Future Fiber Interconnect on Dublin Boulevard Project, CIP No. ST0713. The
project will install a three-inch conduit on Dublin Boulevard between the Civic Center and San
Ramon Road. This project is exempt under Section 15302 (Replacement and Reconstruction) of
the CEQA Guidelines.
STAFF RECOMMENDATION:
Adopt the Resolution Approving the Plans and Specifications and Awarding a Contract to St.
Francis Electric for the Citywide Signal Communications Upgrade - Conduit Installation for Future
Fiber Interconnect on Dublin Boulevard Project, CIP No. ST0713.
FINANCIAL IMPACT:
The bid submitted by St. Francis Electric is $806,000. Since the project involves directional drilling
and installation of a conduit under the sidewalk with the potential for utility conflicts, Staff
recommends a construction contingency of $160,000 (about 20%) to facilitate change orders for
unforeseen construction issues, bringing the total potential construction cost to $966,000.
Sufficient funds are available in the approved budget for CIP No. ST0713.
Page 1 of 3
61
DESCRIPTION:
The 2022-2027 Capital Improvement Program (CIP) includes the Citywide Signal Communications
Upgrade, CIP No. ST0713 (Attachment 2), which provides for a variety of upgrades to the City's
signal communications infrastructure. The subject project, Conduit Installation for Future Fiber
Interconnect on Dublin Boulevard, is part of the scope of CIP No. ST0713 and will install a three-
inch conduit on Dublin Boulevard between the Civic Center and San Ramon Road. In a future
phase, a fiber optic interconnect will be installed in the conduit, and all the intersections along
Dublin Boulevard between the Civic Center and San Ramon Road will be upgraded to a faster,
more reliable, and higher bandwidth network connection.
Bid Process and Results
The City of Dublin issued the bid package for the project on November 14, 2022. The bid package
was made up of 10 base bid items. Three sealed bids with the base bid amounts of $806,000,
$975,910, and $1,100,300 were received by the deadline of December 13, 2022. The lowest base
bid of $806,000 was submitted by St. Francis Electric. A summary of the bids is provided as
Attachment 3.
Compliance with Community Workforce Agreement
On January 11, 2022, the City Council approved a Community Workforce Agreement (CWA) with
the Building and Construction Trades Council of Alameda County and its Affiliated Local Unions.
The CWA is applicable to public works projects valued at over $1,000,000, ensures that there are
no labor issues related to said projects, and bolsters local efforts to connect residents with careers
in the building and construction trades. The CWA includes a Local Hire Goal where 20% of all
hours on a project be worked by Local Residents, which are defined as individuals that reside
within Alameda County or within a 15-mile radius of City limits. The CWA also requires
contractors to hire one new apprentice for the first $1,000,000 of construction costs, and an
additional new apprentice for every $5,000,000 of construction costs, based on the engineer's
estimate. Apprentices must work a minimum of 10% of the total craft's work hours, but the CWA
allows that apprentices may be deployed to another project to ensure the minimum number of
hours are met.
Although the lowest bid is less than $1,000,000, the engineer's estimate for the project was
between $900,000 and $1,000,000, so Staff worked with a consultant, Workforce Integrity and
Training Solutions, to prepare bid documents that comply with the provisions of the CWA. The
provisions include that responsive bidders and their subcontractors must provide an executed
agreement to be bound to and by the CWA within 14 days after notice of award.
Recommendation
Staff reviewed the bid results, checked references and necessary licenses, and recommends that
the City Council award the construction contract to St. Francis Electric as the lowest responsive
and responsible bidder. St. Francis Electric did include an executed agreement to be bound to the
CWA with their bid.
To facilitate the approval of change orders and avoid construction delays, Staff recommends that
the City Manager or designee be authorized to approve change orders up to the contingency
Page 2 of 3
62
amount of $160,000. With the award of the contract as Staff proposes, the total project
construction cost could be $966,000, including a contingency amount of $160,000, funded by CIP
No. ST0713.
Staff expects the construction phase of the project to begin in early 2023 and complete in spring
2023.
California Environmental Quality Act (CEQA)
This project is exempt under Section 15302 (Replacement and Reconstruction) of the CEQA
Guidelines.
STRATEGIC PLAN INITIATIVE:
None.
NOTICING REQUIREMENTS/PUBLIC OUTREACH:
A copy of this Staff Report was sent to St. Francis Electric and Alameda County Transportation
Commission's Independent Watchdog Committee. The City Council Agenda was posted.
ATTACHMENTS:
1) Resolution Approving the Plans and Specifications and Awarding a Contract to St. Francis
Electric for Citywide Signal Communications Upgrade - Conduit Installation for Future Fiber
Interconnect on Dublin Boulevard Project, CIP No. ST0713
2) CIP No. ST0713
3) Bid Results
Page 3 of 3
63
Attachment I
RESOLUTION NO. XX - 23
A RESOLUTION OF THE CITY COUNCIL
OF THE CITY OF DUBLIN
APPROVING THE PLANS AND SPECIFICATIONS AND AWARDING A CONTRACT TO ST.
FRANCIS ELECTRIC FOR THE CITYWIDE SIGNAL COMMUNICATIONS UPGRADE —
CONDUIT INSTALLATION FOR FUTURE FIBER INTERCONNECT ON DUBLIN
BOULEVARD, CIP NO. ST0713
WHEREAS, the design team has completed the plans and specifications for the Citywide
Signal Communications Upgrade — Conduit Installation for Future Fiber Interconnect on Dublin
Boulevard Project, CIP No. ST0713, (Project), which includes the installation of a three-inch
conduit and upgrading of pull boxes along Dublin Boulevard between City Hall and San Ramon
Road; and
WHEREAS, the City of Dublin did, on December 13, 2022, publicly open, examine, and
declare all sealed bids for doing the work described in the approved plans and specifications for
the Project, which plans and specifications are hereby expressly referred to for a description of
said work and for all particulars relative to the proceedings under the request for bids; and
WHEREAS, said bids were submitted to City Staff and St. Francis Electric was determined
to be the lowest responsive and responsible bidder for doing said work.
NOW, THEREFORE, BE IT RESOLVED that the City Council of the City of Dublin hereby
approves the Plans and Specifications for the Project.
BE IT FURTHER RESOLVED that the City Council of the City of Dublin does hereby award
the Contract for the Project to the lowest responsive bidder, St. Francis Electric at a base bid
amount of $806,000, the particulars of which bids are on file in the Office of the Public Works
Director.
BE IT FURTHER RESOLVED that the City Council of the City of Dublin does hereby
authorize the City Manager or designee to approve the Project contract change orders based on
the appropriated funds designated for the Project up to the contingency amount of $160,000.
BE IT FURTHER RESOLVED that the City Manager or designee is authorized to execute
the Construction Agreement with St. Francis Electric.
{Signatures on the following page}
Reso. No. XX-23, Item X.X, Adopted 01/10/23 Page 1 of 2
64
PASSED, APPROVED AND ADOPTED this 10th day of January 2023, by the following
vote:
AYES:
NOES:
ABSENT:
ABSTAIN:
Mayor
ATTEST:
City Clerk
Reso. No. XX-23, Item X.X, Adopted 01/10/2023 Page 2 of 2
65
Attachment 2
Number — ST0713
CITYWIDE SIGNAL COMMUNICATIONS UPGRADE mim Program — STREETS
1
PROJECT DESCRIPTION
This project provides for the continued upgrades of the traffic signal communications system and includes the replacement of signal controllers, conflict
monitors, and battery backup units, as well as managing ongoing signal operations of coordinated corridors. In Fiscal Years 2019-20 and 2020-21, the project
further expanded the traffic communication network, connecting traffic signals on Fallon Road and Tassajara Road. The project will also provide for installing a
new conduit, removing the existing copper communication cables and installing new fiber optic cables on Dublin Boulevard, which is anticipated to begin in fall
2022. The project will also expand the adaptive traffic signal system along key corridors and will connect existing and new public safety infrastructure, such as
situational awareness cameras and automated license plate recognition cameras, to the high-speed fiber optic communications system.
The project updated the City of Dublin Travel Demand Forecasting Model to provide traffic flow projections on the arterial and collector roadways as well as
analyzed future land use development proposals and transportation network changes in the City. In April 2021, the project resulted in City Council adopting a
resolution establishing the California Environmental Quality Act (CEQA) transportation thresholds of significance for Vehicle Miles Traveled (VMT).
This project is partially funded with General Fund reserve designation for One Time Initiative - Capital. Potential other funding for this project may include
Federal and State grants.
ANNUAL OPERATING IMPACT: None
MANAGING DEPARTMENT: Public Works
PRIOR
YEARS
2021-2022
BUDGET
2022-2027
2022-2023
CAPITAL
2023-2024
IMPROVEMENT
2024-2025
PROGRAM
2025-2026
2026-2027
FUTURE
YEARS
TOTALS
ESTIMATED COSTS
9100 - Salaries & Benefits
$31,859
$91,448
$8,320
$8,320
$8,320
$148,267
9200 - Contract Services
$538,107
$404,974
$135,000
$135,000
$135,000
$1,348,081
9400 — Improvements
$675,083
$1,998,115
$291,720
$91,720
$131,720
$3,188,358
9500 — Miscellaneous
$4,900
$4,900
9600 - E.ui.ment
TOTAL
$1,249,949
$5,120
$2,499,657
$435,040
$235,040
$275,040
$5,120
$4,694,726
treets srs
City of Dublin Capital Improvement Program 2022-2027
age 57
FUNDING SOURCE
PRIOR
YEARS
$79,853
2021-2022
BUDGET
$1,420,147
2022-2023
2023-2024
2024-2025
2025-2026
2026-2027
FUTURE
YEARS
TOTALS
$1,500,000
1001 - General Fund
2201 - State Gas Tax
$104,000
$104,000
2204 - Measure B Sales Tax -
Local Streets Fund (ACTC)
$175,550
$73,090
$248,640
2207 - TFCA/Transportation
for Clean Air
$146,000
$146,000
2212 - Vehicle Registration Fee
(ACTC)
$691,070
$31,676
$35,040
$35,040
$35,040
$827,866
2214 - Measure BB Sales Tax -
Local Streets Fund (ACTC)
$200,000
$200,000
$200,000
$600,000
2220 - Road Maint. & Rehab.
Account (RMRA)
$36,844
$417,476
$200,000
$40,000
$694,320
4301 - Eastern Dublin
Transportation Impact Fee
$177,158
$22,842
$200,000
4304 - Western Dublin
Transportation Impact Fee
$199,000
$199,000
6305 - Internal Service Fund -
E.ui.ment
TOTAL
$89,474
$1,249,949
$85,426
$2,499,657
$435,040
$235,040
$275,040
$174,900
$4,694,726
ANNUAL OPERATING IMPACT
Streets City of Dublin Capital Improvement Program 2022-2027 Page 58
Attachment 3
LIF'ORi
Project Name:
Project No. :
Bid Date:
CITY OF DUBLIN
PUBLIC WORKS DEPARTMENT
ENGINEERING DIVISION
BID SUMMARY
Citywide Signal Communication Upgrade
Conduit Installation for Future Fiber Interconnect on Dublin Blvd
ST 0713
December 13, 2022
BASE BID
St. Francis Electric, LLC
W. Bradley Electric, Inc
Columbia Electric
ITEM
DESCRIPTION
Qty.
UNIT
Unit Cost
Extension
Unit Cost
Extension
Unit Cost
Extension
1
Mobilization (Max10% of the total base bid)
1
LS
$64,000.00
$64,000.00
$25,000.00
$25,000.00
$100,000.00
$100,000.00
2
Construction Area Traffic Control (Max 10% of the total base bid)
1
LS
$64,000.00
$64,000.00
$42,000.00
$42,000.00
$100,000.00
$100,000.00
3
Caltrans Permit
1
LS
$18,000.00
$18,000.00
$280.00
$280.00
$2,500.00
$2,500.00
4
Sheeting, Shoring, and Bracing
1
LS
$20,000.00
$20,000.00
$3,000.00
$3,000.00
$35,000.00
$35,000.00
5
Storm Water Pollution Prevention Plan
1
LS
$6,320.00
$6,320.00
$3,100.00
$3,100.00
$15,000.00
$15,000.00
6
3" Schedule 40 HDPE Conduit
5,990
LF
$97.00
$581,030.00
$131.00
$784,690.00
$125.00
$748,750.00
7
Install Cabinet Riser
3
EA
$2,100.00
$6,300.00
$2,100.00
$6,300.00
$5,500.00
$16,500.00
8
Inspect Existing Conduit
330
LF
$20.00
$6,600.00
$28.00
$9,240.00
$35.00
$11,550.00
9
No. N48 Pull Box
6
EA
$3,600.00
$21,600.00
$7,150.00
$42,900.00
$4,500.00
$27,000.00
10
No. 6E Pull Box
11
EA
$1,650.00
$18,150.00
$5,400.00
$59,400.00
$4,000.00
$44,000.00
TOTAL
$806,000.00
$975,910.00
$1,100,300.00
APPARENT LOW BIDDER
List of Sub -Contractors
Description
St. Francis Electric, LLC
W. Bradley Electric, Inc
Columbia Electric
Directional Drilling
Pioneer Underground
Construction
Excavate&Bore
Tight Access Excavation Inc
Traffic Control
Farwest Safety Inc
Civil
Golden Bay Construction Inc
Video Pipe Inspection
GPRS
C3
SoCal Stormwater Runoff Solution
Services, Inc
1