Loading...
HomeMy WebLinkAbout4.5 Acceptance of Work – Project No. GI0119, Civic Center HVAC and Roof Replacement ProjectDUBLIN STAFF REPORT CITY COUNCIL Agenda Item 4.5 DATE: January 10, 2023 TO: Honorable Mayor and City Councilmembers FROM: Linda Smith, City Manager SU B.ECT : Acceptance of Work - Project No. GI0119, Civic Center HVAC and Roof Replacement Project Prepared by: Michael Boitnott, Capital Improvement Program Manager EXECUTIVE SUMMARY: The City Council will consider the acceptance of the Civic Center HVAC and Roof Replacement Project, CIP No. GI0119. The project included the replacement of the flat roof assembly, roof - mounted HVAC equipment, modifications to the existing HVAC duct system, HVAC controls, minor structural upgrades, fire alarm panel and ancillary devices, T-bar ceilings and recessed lighting, interior painting, and new ethernet data cable drops. STAFF RECOMMENDATION: Adopt the Resolution Accepting the Civic Center HVAC and Roof Replacement Project, CIP No. GI0119. FINANCIAL IMPACT: The Civic Center HVAC and Roof Replacement Project, CIP No. GI0119, is complete and the project funding and cost were as follows: Project Funding Source General Fund $2,387,634 IT Fund $200,000 Internal Service Fund - Facilities $2,587,366 Total Funding $5,175,000 Estimated Expenditures Design -Build Contract with Change Orders $4,377,973 Contract Services, Design, Salary, and Testing $732,027 Total Expenditures $5,110,000 Page 1 of 2 334 Estimated Project Balance $65,000 Upon the City Council's acceptance of the project, the capital improvement project will be closed at the end of this fiscal year and all unspent funds will be returned to their funding sources. DESCRIPTION: On July 21, 2020, the City of Dublin awarded a Design/Builder Agreement to ADC Construction Management, Inc., for the Civic Center HVAC and Roof Replacement project (CIP No. GI0119) for $3,836,831. The project consisted of the replacement of the City Hall side of Civic Center's flat roof assembly, roof -mounted HVAC equipment, modifications to the existing HVAC duct system, HVAC controls, minor structural upgrades, fire alarm panel and ancillary devices, T-bar ceilings and recessed lighting, interior painting, and new ethernet data cable drops. On May 4, 2021, the City Council approved an additional $165,000 of work to furnish and install additional heating hot water piping, heating boiler, and modifications to the Civic Center building to accommodate the future Cultural Arts Center improvements. The project also included the temporary relocation of City staff and offices to the Cultural Arts Center side of Civic Center to allow for the improvements to be constructed. Staff has determined that the project is complete and ADC Construction Management, Inc. has completed the warranty period requirements of the agreement and recommends that the City Council accept the project and release the maintenance bond. The capital improvement project will be closed at the end of this fiscal year and all unspent funds will be returned to their funding sources. The balance of the Civic Center HVAC and roof replacement improvements for the Cultural Arts Center side of the building are included within the Cultural Arts Center project, which is currently under construction. STRATEGIC PLAN INITIATIVE: None. NOTICING REQUIREMENTS/PUBLIC OUTREACH: The City Council Agenda was posted. A copy of this report was sent to ADC Construction Management, Inc. ATTACHMENTS: 1) Resolution Accepting the Civic Center HVAC and Roof Replacement Project, CIP No. GI0119 2) CIP No. GI0119 Page 2 of 2 335 Attachment I RESOLUTION NO. XX - 23 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF DUBLIN ACCEPTING THE CIVIC CENTER HVAC AND ROOF REPLACEMENT PROJECT, CIP No. GI0119 WHEREAS, on July 21, 2020, the City of Dublin entered into a Design/Builder Agreement with ADC Construction Management, Inc., to perform the work to replace HVAC and roof on the City Hall side of Civic Center, Project No. GI0119; and WHEREAS, on May 4, 2021, the City Council approved additional improvements to furnish and install additional heating hot water piping, heating boiler, and modification to the Civic Center building to accommodate the future Cultural Arts Center; and WHEREAS, said improvements have been completed in accordance with plans and specifications, and any approved modifications thereof, to the satisfaction of the City Engineer of the City of Dublin; and WHEREAS, said improvements have been in place for more than one year, thus completing the obligation of the one-year warranty period allowing the maintenance bond to be released after the Notice of Completion is filed. NOW, THEREFORE, BE IT RESOLVED that the City Council of the City of Dublin does hereby accept the Civic Center HVAC and Roof Replacement improvements, Project No. GI0119 and authorize Staff to file a Notice of Completion with Alameda County. BE IT FURTHER RESOLVED that the City Council of the City of Dublin does hereby authorize the City Manager or designee to release the retention, if after 35 days of filing the Notice of Completion there are no subcontractor claims. {Signatures on the following page} Reso. No. XX-23, Item X.X, Adopted 01/10/23 Page 1 of 2 336 Attachment I PASSED, APPROVED AND ADOPTED this 10th day of January 2023, by the following vote: AYES: NOES: ABSENT: ABSTAIN: Mayor ATTEST: City Clerk Reso. No. XX-23, Item X.X, Adopted 01/10/23 Page 2 of 2 337 Number GI0119 CIVIC CENTER HVAC AND ROOF REPLACEMENT Program GENERAL S PROJECT DESCRIPTION This project provides for the design and replacement of the heating, ventilation, and air conditioning (HVAC) system and controls, roof replacement, associated building modifications, and code compliance upgrades for the City Hall portion of the Civic Center complex. The existing HVAC and roof systems are at the end of their useful life and are due for replacement. A new HVAC system and controls will be more energy efficient and have a greater ability to be adjusted. Additionally, the project will provide the heating hot water boilers for the entire Civic Center complex. With the roof replacement, the project will also upgrade communications infrastructure for new data connections to offices, workstations, and conference rooms. The project will be completed in several phases to minimize disruption to the public and to Staff working within the buildings. The HVAC and roof improvements for the future Cultural Arts Center portion of the Civic Center complex will be completed with the renovation of the Cultural Arts Center Project, CIP No. GI0120. This project is funded by $2 million in a General Fund Reserve set aside for this purpose in addition to the Internal Service Fund for Facilities Replacement. ANNUAL OPERATING IMPACT: None MANAGING DEPARTMENT: Public Works 2022-2027 CAPITAL IMPROVEMENT PROGRAM STIMATED COSTS PRIOR YEARS 2021-2022 BUDGET 2022-2023 2023-2024 2024-2025 2025-2026 2026-2027 FUTURE YEARS TOTALS 9100 Salaries & Benefits 9200 Contract Services 9400 Improvements 9500 Miscellaneous $81,422 $556,875 $3,613,331 $771 $7,678 $49,025 $161,769 $4,129 $89,100 $605,900 $3,775,100 9600 E ui ment TOT $700,000 $4,952,398 $222,602 $4,900 $700,000 $5,175,000 FUNDING SOURCE PRIOR YEARS 2021-2022 BUDGET 2022-2023 2023-2024 2024-2025 2025-2026 2026-2027 FUTURE YEARS TOTALS 1001 General Fund IT Fund Internal Service Fund - Facilities $2,587,366 , 52,3 8 $222,602 $2,365,032 $22,602 $200,000 $2,387,634 $200,000 $2,587,366 5,175,000 ANNUAL OPERATING IMPACT CO