Loading...
HomeMy WebLinkAboutReso 22-23 Approving Vesting Tentative Parcel Map No. 9306 for the Branaugh Property (APN# 905-0001-004-04) PLPA-2021-00014 Reso. No. 22-23, Item 6.1, Adopted 03/07/2023 Page 1 of 13 RESOLUTION NO. 22-23 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF DUBLIN APPROVING VESTING TENTATIVE PARCEL MAP NO. 9306 FOR THE BRANAUGH PROPERTY (APN# 905-0001-004-04) PLPA-2021-00014 WHEREAS, the property owner, BEX Development, is requesting approval to subdivide the 40.16-acre site into four parcels to accommodate proposed residential and industrial development. The project would allow up to 97 units within 9.87 acres designated Medium -Density Residential and approximately 527,773 square feet of industrial use on 30.29 acres designated Industrial Park. Requested approvals include amendments to Planned Development Stage 1 Development Plan (Ordinance No. 32-05 for Fallon Village), a Planned Development Zoning Stage 2 Development Plan, Vesting Tentative Parcel Map No. 9306 and a Development Agreement. These planning and implementing actions are collectively known as the “Branaugh Property Project” or the “Project;” and WHEREAS, the 40.16 acre Project site (APN 905-0001-004-04) is located in eastern Dublin adjacent to the city boundary and along the future Dublin Boulevard extension ; and WHEREAS, the proposed Vesting Tentative Parcel Map will allow for the orderly division of the Branaugh property into four parcels consistent with the City of Dublin General Plan and Eastern Dublin Specific Plan for the division of land; and WHEREAS, Government Code Sections 66428 of the Subdivision Map Act provide that a Tentative Parcel Map may be used when the purpo se of the map is to create four or fewer parcels; and WHEREAS, the California Environmental Quality Act (CEQA), together with the CEQA Guidelines and City of Dublin CEQA Guidelines and Procedures require that certain projects be reviewed for environmental impacts and that environmental documents be prepared; and WHEREAS, prior CEQA analysis for the Project area includes: 1) the Eastern Dublin General Plan Amendment and Specific Plan EIR (1993); 2) the East Dublin Properties Stage 1 Development Plan and Annexation Supplemental EIR (2002); and 3) the Fallon Village Supplemental EIR (2005). Collectively, these three environmental review documents are referred to as the “EDSP EIRs;” and WHEREAS, in compliance with CEQA, the City prepared a CEQA Addendum for the Project (the “Addendum”), incorporated by reference; and WHEREAS, the Addendum reflects the City’s independent judgment and analysis of the potential environmental impacts of the Project, and concludes that the Project would not result in any new significant impacts or substantially increase the severity of any significant impacts identified in the EDSP EIRs and no other CEQA standards for supplemental review are met; and Reso. No. 22-23, Item 6.1, Adopted 03/07/2023 Page 2 of 13 WHEREAS, following a public hearing on February 14, 2023, the Planning Commission adopted Resolution No. 23-01, recommending approval of the Branaugh Property Project, which resolution is incorporated herein by reference and available for review at City Hall during normal business hours; and WHEREAS, a Staff Report dated March 7, 2023, and incorporated herein by reference, described and analyzed the Project for the City Council; and WHEREAS, on March 7, 2023, the City Council held a duly noticed public hearing on the Project at which time all interested parties had the opportun ity to be heard; and WHEREAS, the City Council did hear and use independent judgment and considered all said reports, recommendations, and testimony hereinabove set forth; and WHEREAS, the City Council considered the Addendum and all above -referenced reports, recommendations, and testimony to evaluate the Project. NOW, THEREFORE, BE IT RESOLVED that the foregoing recitals are true and correct and made a part of this R esolution. BE IT FURTHER RESOLVED that the City Council of the City of Dublin does hereby make the following findings and determinations regarding the proposed Vesting Tentative Parcel Map No. 9306 for the Project: A. The proposed subdivision map together with the provisions for its design and improvement is consistent with the general plan and any applicable specific plan in that: 1) the proposed Vesting Tentative Parcel Map No. 9306 together with the provisions for the design and improvements comply with the development standards of the Eastern Dublin Specific Plan; 2) it is consistent with the land use and acreages of the Dublin General Plan and the Eastern Dublin Specific Plan; 3) it provides for the extension of Dublin Boulevard; and 4) respects the Airport Protection Area Line as the limit of residential development. B. The subdivision site is physically suitable for the type and proposed density of development in that: 1) the design and improvements of Vesting Tentative Parcel Map No. 9306 are consistent with the General Plan and Eastern Dublin Specific Plan objectives, polices, general land uses, and programs as they relate to the subject property in that it is a subdivision for the implementation of Medium-Density Residential and Industrial Park uses and is designated for these types of developments; 2) the Project site is physically suitable for the type and proposed density of development and is consistent with the land use designations of the Eastern Dublin Specific Plan , and consistent with the Stage 1 and Stage 2 Developme nt Plan as amended and adopted with this Project; 3) the subject property is a hillside development and generally slopes from the north east corner to I-580; 4) the project proposes to mass grade the site and flatten it where necessary to allow for intended future users and create the Dublin Blvd extension road subgrade; 5) The grading proposed for the project will take into consideration the hilly terrain and will be designed to avoid excessive cuts and fills ; and 6) a slope is proposed between the residential and industrial which provides a buffer between the uses. Reso. No. 22-23, Item 6.1, Adopted 03/07/2023 Page 3 of 13 C. The tentative tract map is consistent with the intent of applicable subdivision design or improvements of the tentative tract map are consistent with the city’s general plan and any applicable specific plan in that: Vesting Tentative Parcel Map No. 9306 is consistent with the General Provisions and Development Standards for the Planned Development Zoning District for the Fallon Village area of which the site is a part, and the proposed Stage 2 Development Plan adopted with this Project. D. The subdivision design and proposed improvements will not cause substantial environmental damage or substantially and avoidably injure fish or wildlife or their habitat in that: 1) Vesting Tentative Parcel Map No. 9306 will not cause environmental damage or substantially injure fish or wildlife of their habitat; 2) the project site is located adjacent to major roads, including I-580 and the future extension of Dublin Boulevard, on approximately 40.16 acres of land; and 3) the topography of the property consists of rolling hills; however with an approved grading plan this site is physically suitable for the type and intensity of Medium-Density Residential and Industrial Park, uses. E. The design of the subdivision or type of improvements will not cause serious public health concerns in that: 1) the project is consistent with the Eastern Dublin Specific Plan policies and the City’s zoning ordinances enacted for the public health, safety, and welfare; 2) the project will not adversely affect the health or safety of persons residing or working in the vicinity nor will it be detrimental to public health, safety, or welfare ; 3) additionally, no noxious odors, hazardous materials, or excessive noises will be produced; 4) in order to ensure adequate emergency vehicle access to all portions of the site access is currently provided via Collier Canyon Road and will be provided from Croak Road via the Central Parkway Extension approved as part of the East Ranch Project and the future Dublin Boulevard Extension and 5) pursuant to CEQA Guidelines the City prepared a CEQA Addendum for the Project and, therefore, the proposed subdivision will not result in environmental damage or substantially injure fish or wildlife or their habitat or cause public health concerns. F. The design of the subdivision or the type of improvements will not conflict with easements, acquired by the public at large, for access through or use of property within the proposed subdivision; or alternate easements are provided pursuant to Government Code in that: 1) the design of the subdivision will not conflict with easements, acquired by the public at large, or access through or use of property within the proposed subdivision; and 2) the City Engineer has reviewed the map and title report and has not found any conflicting easements of this nature. G. The design or improvements of the tentative map are consistent with the city’s general plan and any applicable specific plan in that: 1) the proposed Vesting Tentative Parcel Map will subdivide the property, which is consistent with the Stage 1 Development Plan approved for the Fallon Village area, the proposed Stage 2 Development Plan as adopted for this Project, and the City of Dublin Zoning Ordinance, General Plan and Eastern Dublin Specific Plan; and 2) the Vesting Tentative Parcel Map will not alter the use of the site, which is allowed residential and industrial uses. H. The subdivision is designed to provide for future passive or natural heating or cooling opportunities in that: 1) any future development will be required to comply with the Reso. No. 22-23, Item 6.1, Adopted 03/07/2023 Page 4 of 13 California Green Building Code; and 2) landscaping will be provided throughout the surface parking lot providing natural shading. I. The tentative tract map, including design and improvement, shall comply with all the applicable provisions and requirements of the zoning ordinance, the latest municipal stormwater permit issued to the city by the Regional Water Quality Control Board, this title, any other ordinance of the city, and the Subdivision Map Act in that: 1) the proposed Vesting Tentative Parcel Map creates four parcels which is consistent with the Stage 1 Development Plan approved for the Fallon Village area, the Stage 2 Development adopted for this Project, and the City of Dublin Zoning Ordinance, General Plan, and Eastern Dublin Specific Plan; and 2) the Project is compliant with the California Regional Water Quality Control Board San Francisco Bay Region Municipal Regional Stormwater NPDES Permit; 3) the Project would include bioretention areas and stormwater treatment vaults to ensure consistency with regional C.3 stormwater treatment; and 4) the Project would include full trash capture devices to ensure consistency with regional C.10 stormwater treatment requirements. NOW, THEREFORE, BE IT FURTHER RESOLVED that the City Council of the City of Dublin hereby conditionally approves Vesting Tentative Parcel Map No. 9306, attached Exhibit A, for the Branaugh Property, subject to the following Conditions of Approval: CONDITIONS OF APPROVAL: Unless stated otherwise, all Conditions of Approval shall be complied with prior to the issuance of building permits or establishment of use, and shall be subject to Planning Department review and approval. The following codes represent those departments/agencies responsible for monitoring compliance of the conditions of approval. [PL.] Planning, [B] Building, [PO] Police, [PW] Public Works [P&CS] Parks & Community Services, [ADM] Administration/City Attorney, [FIN] Finance, [F] Alameda County Fire Department, [DSR] Dublin San Ramon Services District, [CO] Alameda County Department of Environmental Health, [Z7] Zone 7. # CONDITION TEXT RESPON. AGENCY WHEN REQ’D Prior to: GENERAL CONDITIONS 1. Approval. This approval is for Vesting Tentative Parcel Map (PLPA-2021-00014). This approval shall be as generally depicted and indicated on the Vesting Tentative Parcel Map No. 9306 prepared MacKay & Somps, dated December 2022, attached as Exhibit A and other plans, text, and diagrams relating to this project, and as specified as the following Conditions of Approval. PL Ongoing 2. Effectiveness: This Vesting Tentative Parcel Map approval shall become effective only if the Ordinance approving the companion Planned Development Zoning Stage 2 Development Plan becomes effective. Should such Ordinance not become effective within 12 months of this approval of this resolution, this approval shall be null and void. PL Ongoing Reso. No. 22-23, Item 6.1, Adopted 03/07/2023 Page 5 of 13 3. Compliance. Applicant/Developer shall comply with the Subdivision Map Act, the City of Dublin Subdivision and Zoning Ordinances, City of Dublin Title 7 Public Works Ordinance, which includes the Grading Ordinance, the City of Dublin Public Works Standards and Policies, the most current requirements of the State Code Title 24 and the Americans with Disabilities Act with regard to accessibility, and all building and fire codes and ordinances in effect at the time of building permit. Public improvements constructed by Applicant/Developer to be paid in whole or in part out of public funds and to be dedicated to the City are hereby identified as “public works” under Labor Code section 1771. Accordingly, Applicant/Developer, in constructing such improvements, shall comply with the Prevailing Wage Law (Labor Code. Sects. 1720 and following). Various Final Map Approval or Grading Permit 4. Hold Harmless/Indemnification. Applicant/Developer shall defend, indemnify, and hold harmless the City of Dublin and its agents, officers, and employees from any claim, action, or proceeding against the City of Dublin or its agents, officers, or employees to attack, set aside, void, or annul an approval of the City of Dublin or its advisory agency, appeal board, Planning Commission, City Council, Community Development Director, Zoning Administrator, or any other department, committee, or agency of the City to the extent such actions a re brought within the time period required by Government Code Section 66499.37 or other applicable law: provided, however, that the Applicant/Developer’s duty to so defend, indemnify, and hold harmless shall be subject to the City’s promptly notifying the Applicant/Developer of any said claim, action or proceeding and the City’s full cooperation in the defense of such actions or proceedings. ADM On-going 5. Clarifications and Changes to the Conditions. In the event that there needs to be clarification to these Conditions of Approval, the City Engineer and Community Development Director have the authority to clarify the intent without going to a public hearing. The City Engineer and Community Development Director also have the authority to make minor modifications to these conditions without going to a public hearing in order for the Applicant/Developer to fulfill needed improvements or mitigations resulting from impacts of this project. PL, PW On-going PLANNING – PROJECT SPECFIC CONDITIONS 6. Mitigation Monitoring Program. Applicant/ Developer shall comply with CEQA Addendum for Branaugh Property dated December 15, 2022, including all PL, PW Approval of Improvement Plans and On- Reso. No. 22-23, Item 6.1, Adopted 03/07/2023 Page 6 of 13 8. Conditions of Approval. Applicant/Developer shall comply with the City of Dublin Public Works Standard Conditions of Approval contained below (“Standard Condition”) unless specifically modified by Project Specific Conditions of Approval below. PW On-going 9. Fees. At the time of grading permit issuance, the Applicant/Developer shall pay only those fees normally due at the time of the grading permit issuance. All other fees, including, but not limited to, Planning fees; Building fees; Dublin San Ramon Services District fees; Public Facilities fees; Transportation Impact Fees; City of Dublin Fire fees; Noise Mitigation fees; Inclusionary House In-Lieu fees; Alameda County Flood Control and Water Various Depts Grading Permit mitigation measures, action programs, and implementation measures contained in the Eastern Dublin General Plan Amendments and Specific Plan EIR, East Dublin Properties SEIR and Fallon Village SEIR. Applicant/Developer shall provide to the Planning Division and Public Works Department a copy of the mitigation measures maintenance manua l and schedule for reference, including maintenance procedures and protocols to follow after mitigation reporting is complete. going 7. Inclusionary Housing. The proposed project shall comply with the City of Dublin Inclusionary Zoning Regulations as follows: The inclusionary housing requirement is 12.5 percent of the total number of units within the development and shall be satisfied as follows unless an alternate method of compliance is approved by City Council consistent with the Inclusionary Zoning Regulations: • In-Lieu Fee: 40 percent of the total number of inclusionary units within the development shall be satisfied via payment of an “In-Lieu Fee” as provided by the City’s Impact Fee Schedule. • On-site Affordable Units: 60 percent of the total number of inclusionary units within the development shall be developed on site. • On-site Affordable Units shall be dispersed throughout the neighborhood and constructed concurrently with the market rate units. • Execution of an agreement imposing appropriate resale controls and/or rental restrictions on the affordable units shall be required in accordan ce with DMC Chapter 8.68. PL On-going PUBLIC WORKS – GENERAL CONDITIONS Reso. No. 22-23, Item 6.1, Adopted 03/07/2023 Page 7 of 13 Conservation District fees shall be paid at the time of filing the Final Map, or upon issuance of building permits as may be applicable to such fees. PUBLIC WORKS – PERMITS AND BONDS 10. Encroachment Permit. Applicant/Developer shall obtain an Encroachment Permit from the Public Works Department for all construction activity within the public right-of-way. At the discretion of the City Engineer an encroachment permit for work specifically included in an Improvement Agreement may not be required. PW Permit Issuance 11. Grading Permit. Applicant/Developer shall obtain a Grading Permit from the Public Works Department for all grading. PW Permit Issuance 12. Security. Applicant/Developer shall provide faithful performance security to guarantee the improvements, as well as payment security, as determined by the City Engineer (Note: The performance security shall remain in effect until one year after final inspection). PW Permit Issuance 13. Permits from Other Agencies. Applicant/Developer shall obtain all permits and/or approvals required by other agencies including, but not limited to:  Army Corps of Engineers  US Fish and Wildlife  Regional Water Quality Control Board  Federal Emergency Management Agency  California Department of Fish and Wildlife  California Dept. of Transportation (Caltrans)  Bay Area Rapid Transit (BART)  Livermore-Amador Valley Transit Authority (LAVTA)  Tri-Valley-San Joaquin Valley Regional Rail Authority  Dublin San Ramon Services District (DSRSD)  Alameda County Flood Control and Water Conservation District Zone 7 (Zone 7) PW Permit Issuance PUBLIC WORKS – PARCEL MAP, EASEMENTS AND ACCESS RIGHTS 13. Dedications. All rights-of-way and easement dedications required by these conditions or determined necessary by the City Engineer shall be shown on the Parcel Map. At City Engineer’s discretion, Applicant/Developer may alternatively reserve said easements and rights-of-way on the Parcel Map and dedicate by separate deed instrument, in form satisfactory to the City Engineer. PW Approval of Parcel Map 14. Public Service Easements. A Public Service Easement (PSE) shall be dedicated along the PW Approval of Parcel Map Reso. No. 22-23, Item 6.1, Adopted 03/07/2023 Page 8 of 13 project’s frontage to allow for the proper placement of public utility vaults, boxes, appurtenances or similar items behind the back-of-sidewalk. Private improvements such as fences, gates or trellises shall not be located within the PSE. 15. Abandonment of Easements. Applicant/Developer shall obtain abandonment from all applicable public agencies of existing easements and rights-of-way within the project site that will no longer be used. Prior to completion of abandonment, the improvement plans may be approved if the Applicant/Developer can demonstrate to the satisfaction of the City Engineer that the abandonment process has been initiated. PW Approval of Parcel Map 16. Acquisition of Easements. Applicant/Developer shall be responsible for obtaining all on-site and off- site easements, and/or obtain rights-of-entry from the adjacent property owners for any improvements not located on their property. The Applicant/Developer shall prepare all required documentation for dedication of all easements on-site and off-site. The easements and/or rights-of-entry shall be in writing and copies furnished to the Public Works Department. PW Approval of Parcel Map and/or Grading Permit Issuance 17. Approval by Others. The Applicant/Developer will be responsible for submittals and reviews to obtain the approvals of all applicable non-City agencies. PW Approval of Parcel Map PUBLIC WORKS - GRADING 18. Grading Plan. The Grading Plan shall be in conformance with the recommendation of the Geotechnical Report, the approved Tentative Map, and the City design standards & ordinances. In case of conflict between the soil engineer’s recommendation and the City ordinances, the City Engineer shall determine which shall apply. PW Grading Permit Issuance 19. Geotechnical Engineer Review and Approval. The Project Geotechnical Engineer shall be retained to review all final grading plans and specifications. The Project Geotechnical Engineer shall approve all grading plans prior to City approval. PW Grading Permit Issuance 20. Grading Off-Haul. The disposal site and haul truck route for any off-haul dirt materials shall be subject to the review and approval by the City Engineer prior to the issuance of a Grading Permit. If the Applicant/Developer does not own the parcel on which the proposed disposal site is located, the Applicant/Developer shall provide the City with a Letter of Consent signed by the current owner, approving the placement of off -haul material on their PW Grading Permit Issuance Reso. No. 22-23, Item 6.1, Adopted 03/07/2023 Page 9 of 13 parcel. A Grading Plan may be required for the placement of the off-haul material. A Transportation Permit or Encroachment Permit may be required for the haul route, as determined by the City Engineer, which shall include a pre- and post- hauling survey of the pavement condition. Applicant/Developer shall be responsible for repairing damaged pavement due to hauling operations, as determined by the City Engineer. 21. Erosion Control Plan. A detailed Erosion and Sediment Control Plan shall be included with the Grading Plan submittal. The plan shall include detailed design, location, and maintenance criteria of all erosion and sedimentation control measures. The plan shall also address site housekeeping best management practices. PW Grading Permit Issuance 22. Demolition Plan. The Applicant/Developer’s Civil Engineer shall prepare a demolition plan for the project, which shall be submitted concurrent with the improvement plan package. The demolition plan shall address the following:  Pavement demolition, including streetlights and landscaped median islands  Landscaping and irrigation  Fencing to be removed and fencing to remain  Any items to be saved in place and or protected, such as trees, water meters, sewer cleanouts, drainage inlets or backflow prevention devices PW Grading Permit Issuance PUBLIC WORKS – CONSTRUCTION 23. Erosion Control Implementation. The Erosion and Sediment Control Plan shall be implemented between October 1st and April 30th unless otherwise allowed in writing by the City Engineer. The Applicant/Developer will be responsible for maintaining erosion and sediment control measures for one year following the City’s acceptance of the improvements. PW Start of Construction and On-going 24. Archaeological Finds. If archaeological materials are encountered during construction, construction within 100 ft of these materials shall be halted until a professional Archaeologist certified by the Society of California Archaeology (SCA) or the Society of Professional Archaeology (SOPA) has had an opportunity to evaluate the significance of the find and suggest appropriate mitigation measures. PW Start of Construction and On-going Reso. No. 22-23, Item 6.1, Adopted 03/07/2023 Page 10 of 13 25. Construction Activities. Construction activities, including the idling, maintenance, and warming up of equipment, shall be limited to Monday through Friday, and non-City holidays, between the hours of 7:30 a.m. and 6:00 p.m. except as otherwise approved by the City Engineer. Extended hours or Saturday work will be considered by the City Engineer on a case-by-case basis. Note that the construction hours of operation within the public right-of-way are more restrictive. PW Start of Construction and On-going 26. Temporary Fencing. Temporary construction fencing shall be installed along the construction work perimeter to separate the construction area from the public. All construction activities shall be confined within the fenced area. Construction materials and/or equipment shall not be operated/stored outside of the fenced area or within the public right-of-way unless approved in advance by the City Engineer. PW Start of Construction and On-going 27. Construction Noise Management Plan. Applicant/Developer shall prepare a construction noise management plan that identifies measures to minimize construction noise on surrounding developed properties. The plan shall include hours of construction operation, use of mufflers on construction equipment, speed limit for construction traffic, haul routes, and identify a noise monitor. Specific noise management measures shall be provided prior to project construction. PW Start of Construction Implementation , and On-going as needed 28. Traffic Control Plan. Traffic Control Plan shall be submitted for review and approval prior to any work within the public right-of-way which requires lane closure. Closing of any existing pedestrian pathway and/or sidewalk during construction shall be implemented through the City-approved Traffic Control Plan and shall be done with the goal of minimizing the impact on pedestrian circulation. Traffic Control Plan shall be prepared in accordance with the latest edition of the CA Manual on Uniform Traffic Control Devices (MUTCD). PW Start of Construction and On-going as needed 29. Construction Traffic Interface Plan. Applicant/Developer shall prepare a plan for construction traffic interface with public traffic on any existing public street. Construction traffic and parking may be subject to specific requirements by the City Engineer. PW Start of Construction; Implementation , and On-going as needed 30. Pest Control. Applicant/Developer shall be responsible for controlling any rodent, mosquito, or other pest problem due to construction activities. PW On-going Reso. No. 22-23, Item 6.1, Adopted 03/07/2023 Page 11 of 13 31. Dust Control Measures. Applicant/Developer shall be responsible for watering or other dust-palliative measures to control dust as conditions warrant or as directed by the City Engineer. PW Start of Construction; Implementation On-going as needed 32. Dust Control/Street Sweeping. The Applicant/Developer shall provide adequate dust control measures at all times during the grading and hauling operations. All trucks hauling export and import materials shall be provided with tarp cover at all times. Spillage of haul materials and mud -tracking on the haul routes shall be prevented at all times. The Applicant/Developer shall be responsible for sweeping of streets within, surrounding and adjacent to the project, as well as along the haul route, if it is determined that the tracking or accumulation of material on the streets is due to its construction activities. PW During Grading 33. Construction Traffic and Parking. All construction- related parking shall be off-street in an area provided by the Applicant/Developer. Construction traffic and parking shall be provided in a manner approved by the City Engineer. PW Start of Construction and On-going PUBLIC WORKS – EROSION CONTROL & STORMWATER QUALITY 34. Stormwater Source Control. All applicable structural and operational stormwater source controls shall be implemented. PW/ESD Grading Permit Issuance 35. NOI and SWPPP. Prior to any clearing or grading, Applicant/Developer shall provide the City evidence that a Notice of Intent (NOI) has been sent to the California State Water Resources Control Board per the requirements of the NPDES. A copy of the Storm Water Pollution Prevention Plan (SWPPP) shall be provided to the Public Works Department and be kept at the construction site. PW Start of Any Construction Activities 36. SWPPP. The Storm Water Pollution Prevention Plan (SWPPP) shall identify the Best Management Practices (BMPs) appropriate to the project construction activities. The SWPPP shall include the erosion and sediment control measures in accordance with the regulations outlined in the most current version of the Association of Bay Area Governments (ABAG) Erosion and Sediment Control Handbook or State Construction Best Management Practices Handbook. The Applicant/Developer is responsible for ensuring that all contractors implement all storm water pollution prevention measures in the SWPPP. PW SWPPP to be Prepared Prior to Grading Permit Issuance; Implementation Prior to Start of Construction and On-going as needed Reso. No. 22-23, Item 6.1, Adopted 03/07/2023 Page 12 of 13 PUBLIC WORKS - SPECIAL CONDITIONS 37. Dublin Boulevard Dedication. Property Owner shall dedicate right-of-way in fee for public roadway purposes for the future Dublin Boulevard extension in general conformance with the adopted Precise Plan, the most current design plans on file with the office of the City Engineer, and the Vesting Tentative Parcel Map. Applicant/Developer will receive Eastern Dublin Transportation Impact Fee (“EDTIF”) credits for dedication of this right-of-way in the amount specified in the EDTIF program for right-of-way dedication. PW Approval of Parcel Map 38. Central Parkway Dedication. Property Owner shall dedicate right-of-way in fee for public roadway purposes for widening of the future Central Parkway extension in general conformance with the Vesting Tentative Parcel Map. PW Approval of Parcel Map 39. Slope Easement. Property Owner shall dedicate a Slope Easement (“SE”) via separate instrument adjacent to the future Dublin Boulevard frontage if mass grading has not commenced per the preliminary grading plan as shown on the Vesting Tentative Parcel Map. Property Owner shall cooperate with the City Engineer on the extent of the SE dedication to accommodate the future Dublin Boulevard extension. PW Approval of Parcel Map 40. Collier Canyon Road Dedication. Property Owner shall dedicate right-of-way in fee or provide an irrevocable offer of dedication in fee for public roadway purposes for the widening of Collier Canyon Road necessary to meet the Eastern Dublin Specific Plan “Industrial Road” street geometric standards. PW Approval of Parcel Map 41. Collier Canyon Road Dedication. Property Owner shall dedicate right-of-way in fee or provide an irrevocable offer of dedication in fee for public roadway purposes for the future relocation of Collier Canyon Road as may be necessary for the future Valley Link project in general conformance with the Vesting Tentative Parcel Map, the most current design plans on file with the office of the City Engineer. Alternatively, subject to City Engineer approval, Property Owner can provide an easement for public roadway purposes which prohibits construction of any permanent improvements and structures, as determined by the City Engineer, within the future right-of-way. PW Approval of Parcel Map 42. Private Access Easements. Property Owner shall reserve on the parcel map and grant via separate instrument Private Access Easement(s) (“PAE”) for PW Approval of Parcel Map Reso. No. 22-23, Item 6.1, Adopted 03/07/2023 Page 13 of 13 the purpose of providing legal access to all newly created parcels to a public roadway. PAE shall be minimum 26’ wide and shall be recorded concurrently with the parcel map. PASSED, APPROVED, AND ADOPTED this 7th day of March 2023 by the following vote: AYES: Councilmembers Hu, Josey, McCorriston, Qaadri and Mayor Hernandez NOES: ABSENT: ABSTAIN: ______________________________ Mayor ATTEST: ______________________________ City Clerk PARCEL 3 PARCEL 4 103 PARCEL 1 PARCEL 2 PARCEL 5 PARCEL P 404 405 406 403 402 399 PARCEL OO 468 PARCEL NN 434 427 PARCEL FF 425 PARCEL AA 408 464 467 PARCEL LL 458 PARCEL MM 407 433 422 420 459 465 455 429 PARCEL BB 430 428 PARCEL CC 421432 426 423 424 462 431 460 461 456 400 398 401 463 457466 PARCEL QQ PARCEL RR PARCEL Q 542 491 480 479 478 477 476 475481 546 496 495 494 493 492497 483 484 485 486 487 488 489482 490 474 545544 543 419 GRADING EASEMENT TO BE OBTAINED FROM ADJACENT PROPETY OWNER GRADING EASEMENT TO BE OBTAINED FROM ADJACENT PROPETY OWNER 10' PSE 10' PSE PARCEL 3 PARCEL 1 PARCEL 4 103 PARCEL 2 N88°41'57"W 760.37' 11 4 . 9 ' 315' 53' 206' 54'126' 13' PRIVATE ACCESS EASEMENT TO BE PROVIDED BY TOWN & COUNTRY, LLC FOR SHARED PRIVATE ACCESS/ROADWAY ACCESSING BOTH PROPERTIES FROM THE PLANNED FULLY SIGNALIZED INTERSECTION WITH DUBLIN BLVD FUTURE CENTRAL PARKWAY DEDICATION SLOPE EASEMENT ALONG DUBLIN BOULEVARD TO BE COORDINATED WITH DUBLIN BOULEVARD EXTENSION PROJECT AND MADE VIA SEPARATE INSTRUMENT 17.87±AC PARCEL 3 9.87±AC PARCEL 1 2.04±AC PARCEL 2 8.51±AC PARCEL 4 DEDICATION OF COLLIER CANYON ROAD ROW SHALL BE PER PROJECT CONDITIONS AND THE PROJECT DEVELOPMENT AGREEMENT. N89°03'50"W 760.31' BNDY N0 ° 2 5 ' 4 5 " E 1 7 9 3 . 9 5 ' B N D Y N0 ° 2 5 ' 4 5 " E 2 8 0 5 . 6 7 ' B N D Y N89°03'15"W 378.50' BNDY N0 ° 2 5 ' 4 5 " E 1 0 0 8 . 2 6 ' B N D Y N88°33'15"W 381.86' BNDY 96 6 . 6 ' 41.7' 97 6 . 0 ' 82.2' 10 4 9 . 7 ' 10 1 6 . 8 ' 99.0' 13 0 . 0 ' 56 7 . 9 ' 56 3 . 0 ' MAP NOTES: 1.OWNER/APPLICANT RANDY BRANAUGH BEX DEVELOPMENT 19077 MADISON AVE. CASTRO VALLEY, CA 94546 2.ENGINEER: MACKAY & SOMPS 5142 FRANKLIN DR. SUITE B PLEASANTON, CA 94588-3355 CONTACT: MARK McCLELLAN/ COLETTE L'HEUREUX (925) 225-0690 3.AREA SUBJECT TO INUNDATION: NONE (PANEL 0607050002B) 4.SUBDIVIDED AREA: 40.16± ACRES 5.ASSESSOR'S PARCEL NUMBER: 905-0001-004-04 6.WATER/SEWER SYSTEM: TO BE INSTALLED IN CONFORMANCE WITH DUBLIN SAN RAMON SERVICES DISTRICT (DSRSD) STANDARDS. 7.DRAINAGE: TO BE INSTALLED IN CONFORMANCE WITH CITY OF DUBLIN STANDARDS. 8.GAS & ELECTRICITY: TO BE INSTALLED IN CONFORMANCE WITH STANDARDS OF PACIFIC GAS AND ELECTRIC CO. 9.TELEPHONE: TO BE INSTALLED IN CONFORMANCE WITH STANDARDS OF SBC. 10.STREET IMPROVEMENTS: PER CITY OF DUBLIN STANDARDS 11.EXISTING ZONING: PD-INDUSTRIAL PARK, PD-MEDIUM DENSITY RESIDENTIAL 12.EXISTING LAND USE: CATTLE GRAZING, DRY LAND FARMING 13.PROPOSED LAND USE: PD-INDUSTRIAL PARK, PD-MEDIUM DENSITY RESIDENTIAL 14.UNLESS OTHERWISE SPECIFICALLY STATED IN THE CONDITIONS OF APPROVAL, LOCAL AGENCY APPROVAL OF THIS MAP SHALL CONSTITUTE AN EXPRESS FINDING THAT THE PROPOSED DIVISION AND DEVELOPMENT OF THE SUBJECT PROPERTY WILL NOT UNREASONABLY INTERFERE WITH THE FREE AND COMPLETE EXERCISE OF RIGHTS DESCRIBED IN GOVERNMENT CODE SECTION 66436(A)(3)(A)(I). 15.PARCEL DIMENSIONS ARE PRELIMINARY AND SUBJECT TO FINAL ENGINEERING DESIGN. 16.THE APPLICANT RESERVES THE OPTION TO PHASE THE MAPPING AND CONSTRUCTION OF THIS PROJECT IN VARIOUS COMBINATIONS OF FINAL MAPS/TRACT DEVELOPMENT AGREEMENTS AND/OR IMPROVEMENT PLANS/IMPROVEMENT AGREEMENTS, ALL AS APPROVED BY THE DIRECTOR OF PUBLIC WORKS. 17.THE APPLICANT INTENDS TO FILE A FUTURE VESTING TENTATIVE TRACT MAP ON PARCEL 1. 18.THE APPLICANT RESERVES THE OPTION TO FILE FUTURE TENTATIVE PARCEL MAPS ON PARCELS 3 AND 4, OR FILE COMMERCIAL AIRSPACE CONDOMINIUM PLANS ON SAID PARCELS AFTER THE PARCEL MAP 9306 RECORDATION. 19.IF COLLIER CANYON ROAD RIGHT OF WAY IS NO LONGER NEEDED AFTER THE EXTENSION OF DUBLIN BLVD IS COMPLETED, PROPERTY OWNER WOULD LIKE TO OBTAIN RIGHT-OF-WAY REMAINING AFTER VALLEY LINK TAKE TO USE FOR A UTILITY CORRIDOR AND STORM WATER QUALITY BASIN. 20.IMPROVEMENTS ALONG COLLIER CANYON ROAD WILL BE DEFERRED UNTIL AN APPLICATION FOR THE SOUTHERN INDUSTRIAL PARCEL IS PROVIDED TO THE CITY. 21.IMPROVEMENTS ALONG CENTRAL PARKWAY WILL BE DEFERRED UNTIL AN APPLICATION FOR THE RESIDENTIAL PARCEL IS PROVIDED TO THE CITY. 22.IMPROVEMENTS ALONG DUBLIN BLVD. WILL BE DEFFERED UNTIL AN APPLICATION FOR PARCEL 3 OR 4 IS PROVIDED TO THE CITY. LEGEND: BOUNDARY LINE PARCEL LINE EASEMENT LINE/IOD EXISTING RIGHT OF WAY PAE PRIVATE ACCESS EASEMENT AIRPORT PROTECTION ZONE LINE EXISTING PARCEL LINE BNDY BOUNDARY IOD IRREVOCABLE OFFER OF DEDICATION AC.ACRES PUE PUBLIC UTILITY EASEMENT ROW RIGHT OF WAY RIGHT OF WAY BASIS OF BEARINGS: THE BASIS OF BEARINGS SHOWN HEREON, IS THE LINE BETWEEN USC&GS TRIANGULATION STATIONS "FALLON" AND "MOUNT DIABLO TOWER". THE GRID BEARING CALCULATED FROM PUBLISHED CCS 27 ZONE 3 GRID COORDINATES FOR THIS LINE IS TAKEN AS NORTH 15°44'21" WEST. PARCEL PROPOSED OWNER MAINTAINED BY PROPOSED USE PARCEL 1 BEX DEVELOPMENT BEX DEVELOPMENT MEDIUM DENSITY RESIDENTIAL PARCEL 2 BEX DEVELOPMENT BEX DEVELOPMENT WATER QUALITY FACILITY FOR MEDIUM DENSITY RESIDENTIAL PARCEL 3 BEX DEVELOPMENT BEX DEVELOPMENT INDUSTRIAL PARK PARCEL 4 BEX DEVELOPMENT BEX DEVELOPMENT INDUSTRIAL PARK DSRSD DUBLIN SAN RAMON SERVICES DISTRICT LEGEND: GHAD GEOLOGIC HAZARD ABATEMENT DISTRICT SDE PUBLIC STORM DRAIN EASEMENT ESMT EASEMENT SDO STORM DRAIN OPEN SPACE Exhibit A PARCEL 3 PARCEL 1 PARCEL 4 103 PARCEL 2 8"W 8" W 8"W 8" W 8" W 8"W 8" W 8"W 8"W 8" W 8"W8"W 8" W 8"W 8" W 8" W 8"W 8" W 427 425 428 426 PARCEL QQ 546 545 544 STORM DRAIN SYSTEM IN PARKING LOT CONVEYS UNTREATED DRAINAGE TO BIORETENTION BASIN FOR TREATMENT. DRAINAGE OUTLETS AT FINISH GRADE OF BASIN OVERFLOW RISER CONVEYS TREATED FLOWS TO STORM DRAIN SYSTEM IN COLLIER CANYON ROAD RIGHT-OF WAY INSTALL STORM DRAIN IN COLLIER CANYON ROAD RIGHT-OF-WAY STORM DRAIN LINE CONVEYS TREATED DRAINAGE TO CROAK ROAD, TO BENEFIT ALL PROPERTIES SOUTH OF DUBLIN BLVD. EASEMENTS BETWEEN ALL OWNERS WILL BE COORDINATED STORM DRAIN SYSTEM IN PARKING LOT CONVEYS UNTREATED DRAINAGE TO BIORETENTION BASIN FOR TREATMENT. DRAINAGE OUTLETS AT FINISH GRADE OF BASIN OVER FLOW RISER IN BASIN CONVERYS STORM DRAINAGE TO SDO LINE IN STORM DRAIN EASEMENT FUTURE WATER CONNECTION FOR RESIDENTIAL FUTURE SEWER CONNECTION FOR RESIDENTIAL. (SEWER TO BE ROUTED THROUGH PUBLIC STREETS IN RIGHETTI PROPERTY. PROPERTY OWNERS WILL COORDINATE DEVELOPMENT) FUTURE SECONDARY WATER CONNECTION FOR RESIDENTIAL. (WATER TO BE ROUTED THROUGH PUBLIC STREETS IN RIGHETTI PROPERTY. PROPERTY OWNERS WILL COORDINATE DEVELOPMENT) NOTES: 1.SITE PLAN AND UTILITY LAYOUT IN INDUSTRIAL PARK LAND USE AREAS ARE CONCEPTUAL AND SUBJECT TO CHANGE WITH SITE DEVELOPMENT REVIEW PROCESS. APPLICATION SHOWS SITE PLAN FOR REFERENCE ONLY. NO IMPERVIOUS AREA IS PROPOSED WITH THIS APPLICATION. 2.UTILITIES WITHIN DUBLIN BLVD TO BE DESIGNED AND INSTALLED WITH DUBLN BLVD EXTENSION. 3. STORM DRAIN OPEN SPACE (SDO) INDICATES A STORM DRAIN LINE THAT CONVEYS STORMWATER FROM UNDEVELOPED AREAS NOT REQUIRING C3 TREATMENT, OR TREATED DRAINAGE FROM STORMWATER QUALITY AREAS. NOTES: FUTURE VESTING TENTATIVE TRACT MAP TO SUBDIVIDE PARCEL 1 WILL DETAIL UTILITY LAYOUT IN RESIDENTIAL LAND USE AREA 46' SDE AND DSRSD EASEMENT FOR SHARED USE BETWEEN USERS INLET CONVEYS DRAINAGE FROM DITCH IN BENCH TO SDO LINE STORM DRAIN WITHIN PUBLIC STREETS TO COLLECT DRAINAGE AND CONVEY TO OUTLET AT BIORETENTION BASINS FOR TREATMENT. OUTLETS DESIGNED TO BUBBLE UP 1' 8"SS 6"SS6"SS 8"SS 8" S S 8"SS 6" S S 6"SS 6"SS 8" S S 15"SD15"SD 48 " S D 15"SD 15" S D 1 5 " S D 15"SD 15"SD15"SD15"SD 1 5 " S D 15"SD 15"SD15"SD15"SD15"SD 15 " S D 30"SDO 15 " S D 15"SD 15"SD15"SD 15" S D 15"SD 15"SD 15 " S D 15 " S D 15" S D 15 " S D 15 " S D 15"SD 15 " S D 15"SD 15 " S D 15 " S D 24 " S D 15 " S D O 15 " S D O 15"SDO 15"SD EX. SPRINT FIBER OPTIC LINE (TO BE RELOCATED TO PRIMARY JOINT TRENCH LINE ALONG DUBLIN BLVD STORM DRAIN SYSTEM CONNECTS TO ULTIMATE STORM DRAIN IN DUBLIN BLVD DIVERSION STRUCTURE DIVERTS HIGH FLOWS TO STORM DRAIN SYSTEM BYPASSING BASIN 48 " S D 48 " S D 48 " S D 15"SD 48"SD OVERSIZED PIPE IN PARKING LOT METERS FLOWS TO BASIN FOR HYDROMODIFICATION. MAINTAINED BY COMMERCIAL OWNER/OWNER'S ASSOCIATION. OVERSIZED PIPE IN PARKING LOT METERS FLOWS TO BASIN FOR HYDROMODIFICATION. MAINTAINED BY COMMERCIAL OWNER/OWNER'S ASSOCIATION. DIVERSION STRUCTURE DIVERTS HIGH FLOWS TO STORM DRAIN SYSTEM BYPASSING BASIN DIVERSION STRUCTURE DIVERTS HIGH FLOWS TO STORM DRAIN SYSTEM BYPASSING BASIN OVERSIZED PIPE IN FUTURE PUBLIC STREET METERS FLOWS TO BASIN FOR HYDROMODIFICATION FOR RESIDENTIAL. MAINTAINED BY HOME OWNER'S ASSOCIATION. 30"SD 15 " S D 24"SD CONNECT TO 12" ZONE 2 WATER LINE IN DUBLIN BLVD CONNECT TO SEWER MAINLINE IN DUBLIN BLVD 12"SS INV. 386.5 +/- CLEAR SIGHT TRIANGLE PER HIGHWAY DESIGN MANUAL CLEAR SIGHT TRIANGLE PER HIGHWAY DESIGN MANUAL 15"SD 15"SD 15"SD 15" S D 15"SD 1 5 " S D 15"SD 15 " S D 8" S S 8"W 8"W 8"W 8" W 8"W 8" W 8"W 15"SD SW Q SW Q SW Q 15 ' S S E 15' SSE FOR SHARED SEWER MAIN ALONG COMMON PROPERTY LINE, TO BE PROVIDED BY TOWN AND COUNTY, LLC. 21 PARCEL A 22 24 25 20 26 23 19 16 14 15 18 17 PARCEL B 8 13 11 10 12 9 PARCEL G PARCEL I PARCEL H PARCEL TT PARCEL UU PARCEL P 416 395 PARCEL YPARCEL Z 394 393397 PARCEL GG 409 396 451 471 404405 406 403 402 399 PARCEL OO 468 392 PARCEL PPPARCEL NN 454 PARCEL KK PARCEL HH 434 415 441 PARCEL JJ 437 453 472 427 PARCEL FF 425 PARCEL AA 447 408 470 464 450 467 PARCEL LL 473 439 446 458 PARCEL MM 448 445 452 436 407 438 444 433 449 PARCEL II 440 422 420 459 PARCEL EE 412 465 455 429 PARCEL BB 469 411 430 428 PARCEL CC 418 413 421 PARCEL DD 432 443 442 426 435 423 417 424 462 431 460 461 456 414 400 398 401 463 457 466 410 PARCEL QQ PARCEL RR PARCEL Q PARCEL U 542 503 502 501 500 499 498 519 518 517 516 515 514 513 512PARCEL R 511 510 509 508 507 491 480 479 478 477 476 475 481 546 496 495 494 493 492 497 504 506 483 484 485 486 487 488 489 482 505490474 545 544 543 541 540 419 SANITARY SEWER SYSTEM (BY OTHERS) SANITARY SEWER SYSTEM (PROPOSED) EX STORM DRAIN SYSTEM STORM DRAIN SYSTEM (BY OTHERS) STORM DRAIN SYSTEM (PROPOSED) OPEN SPACE STORM DRAIN SYSTEM (BY OTHERS) OPEN SPACE STORM DRAIN SYSTEM (PROPOSED) POTABLE WATER SYSTEM (BY OTHERS) POTABLE WATER SYSTEM (PROPOSED) RECYCLED WATER SYSTEM (BY OTHERS) RECYCLED WATER SYSTEM (PROPOSED) LEGEND ULTIMATE 12" WATER (ZONE 2) BY OTHERS (W/ DUBLIN BLVD EXTENSION) SWQ SW Q SWQ 12" WATER (ZONE 2) BY EAST RANCH DEVELOPER STUBBED AT END OF THEIR FRONTAGE ZO N E 2 W A T E R ULTIMATE 18" SS BY OTHERS (W/ DUBLIN BLVD EXTENSION) ULTIMATE 48" SD BY OTHERS (W/ DUBLIN BLVD EXTENSION) PARCEL 3 PARCEL 1 PARCEL 4 103 PARCEL 2 PARCEL 3 PARCEL 4 103 PARCEL 1 PARCEL 2 PARCEL 5 APPROXIMATE TERMINATION OF ULTIMATE 12" WATER (ZONE 1) BY OTHERS (W/ DUBLIN BLVD EXTENSION) ULTIMATE 10" RECYCLED WATER BY OTHERS (W/ DUBLIN BLVD EXTENSION) SW Q SW Q SW Q STORM DRAIN IN COLLIER CANYON ROAD INSTALLED TO BENIFIT ALL PROPETY OWNERS TO CROAK ROAD STORM DRAIN IN UTILITY EASEMENT STORM DRAIN IN UTILITY EASEMENT DRAINAGE OF INDUSTRIAL SITE TO BE DISCHARGED TO BIORETENTION BASINS ALONG DUBLIN BLVD FOR TREATMENT PER PROVISION C.3. DRAINAGE OF INDUSTRIAL SITE TO BE DISCHARGED TO BIORETENTION BASIN ALONG COLLIER CANYON ROAD FOR TREATMENT PER PROVISION C.3. PROPERTY OWNER TO ACQUIRE UTILITY EASEMENTS ACROSS RIGHETTI AND GH PACVEST PARCELS FOR STORM DRAIN SYSTEM AND OVERLAND RELEASE. INDUSTRIAL SITE SEWER CONNECTS TO TRUNK LINE IN DUBLIN BLVD. INDUSTRIAL SITE SEWER CONNECTS TO TRUNK LINE IN DUBLIN BLVD.TREATED STORM DRAINAGE FROM INDUSTRIAL SITE FLOWS TO STORM DRAIN TO BE INSTALLED IN COLLIER CANYON ROAD RIGHT-OF-WAY STORM DRAIN CONNECTION TO BE EXTENDED WEST IN CROAK RD ROW TO ULTIMATE DISCHARGE POINT AT FALLON ROAD FUTURE 12" WATER (ZONE 2) BY OTHERS EXTENDED TO DUBLIN BLVD PERMANENT SEWER IN CROAK ROAD TO BE INSTALLED BY OTHERS CONNECT RIGHETTI AND BRANAUGH RESIDENTIAL SEWER TO CENTRAL PARKWAY TREATED STORM DRAINAGE FOR RESIDENTIAL SITE TO BE PIPED THROUGH SDE ON INDUSTRIAL SITE TO DUBLIN BLVD. TREATED STORM DRAINAGE FROM INDUSTRIAL AND RESIDENTIAL SITES FLOW TO STORM DRAIN SYSTEM IN DUBLIN BLVD CONNECT ZONE 2 WATER TO CENTRAL PARKWAY FOR LOOPED SERVICE TO RIGHETTI AND BRANAUGH PROPERTY DRAINAGE OF RESIDENTIAL SITE TO BE DISCHARGED TO BIORETENTION BASINS SOUTH OF FUTURE PUBLIC STREET FOR TREATMENT PER PROVISION C.3. SEWER IN RESIDENTIAL SITE TO FLOW THROUGH RIGHETTI RESIDENTIAL SITE TO CENTRAL PARKWAY IN FUTURE PUBLIC STREET RIGHT-OF-WAY CONNECT ZONE 2 WATER TO CENTRAL PARKWAY FOR LOOPED SERVICE TO RIGHETTI AND BRANAUGH PROPERTY NOTE: DESIGN OF UTILITIES, LOTTING AND DRAINAGE FOR RESIDENTIAL SITE WILL BE INCLUDED IN A SUBSEQUENT SMALL LOT VESTING TENTATIVE MAP EX I S T I N G 1 2 " Z O N E 2 W A T E R EX I S T I N G 1 0 " R E C Y C L E D W A T E R FU T U R E P U B L I C S T R E E T SOUTHERN INDUSTRIAL SITE CONNECTS TO 12" WATER (ZONE 2) IN DUBLIN BLVD. NORTHERN INDUSTRIAL SITE CONNECTS TO 12" WATER (ZONE 2) IN DUBLIN BLVD. STORM DRAIN PROPOSED BY EAST RANCH SW Q FOR REFERENCE ONLY CONNECT TO EX 96" SD (CONNECTION TO BOX CULVERT AND 96" SD INSTALLED AS PART OF DUBLIN BLVD IMPROVEMENTS) EX 6'x5' DOUBLE BOX CULVERTS UNDER EX. FALLON RD. 8'x9' BOX CULVERT CONNECTION BETWEEN G3 & EX. 6'x5' EX 84" CULVERT E X G 3 C U L V E R T 96" SD SEE CONTINUATION ABOVE RIGHT SEE CONTINUATION BELOW LEFT PARCEL P 405 406 PARCEL NN 427 PARCEL FF 425 408 464 458 PARCEL MM 407 459 465 429 PARCEL BB 430 428 PARCEL CC 426 423 424 462 460 461 463 PARCEL QQ 480 479 478 477 476 475 481 546 474 545 544 543 PARCEL 3 PARCEL 1 PARCEL 4 103 PARCEL 2 PARCEL 3PARCEL 4 103 PARCEL 1 PARCEL 2 PARCEL 5 SW Q SW Q SW Q SW Q SW Q SW Q SW Q SW Q SW Q 40 0 41 0 43 0 44 0 45 0 520 510 500 490 44 0 42 0 43 0 40 0 39 0 380 370 430 440 480 470 490500 570 560 550 580 540 530 53 052051 050 049 0480470 460450 390 400 410 38 0 37 0 38 0 39 0 41 0 40 8 41 0 42 0 41 8 42 0 41 8 440 45 0 46 0 47 0 48 0 45 0 46 0 47 0 48 0 47 0 46 8 47 2 46 0 47 0 48 0 49 0 50 0 ABBCC S R PO N M M L K G H J W X Y T V U F I D E Q W Y Z J-DITCH ALONG PL CAPTURES DRAINAGE LIMIT OF GRADING AT PROPERTY LINE J-DITCH ALONG PL CAPTURES DRAINAGE CONFORM GRADING AT EXISTING ACCESS EASEMENT CONFORM GRADING AT COLLIER CANYON ROAD CONFORM GRADING AT COLLIER CANYON ROAD DAYLIGHT GRADING ONTO ADJACENT PROPERTY. OWNER TO OBTAIN GRADING PERMISSION AND GRADING EASEMENT. GRADING PERMIT TO BE OBTAINED FROM COUNTY FUTURE ENTRANCE INTO INDUSTRIAL DEVELOPMENT FUTURE ENTRANCE INTO INDUSTRIAL DEVELOPMENT 6' BENCHES EVERY 30' VERTICALLY MATCH GRADES AT CENTRAL PARKWAY DAYLIGHT GRADING ONTO ADJACENT PROPERTY. OWNER TO OBTAIN GRADING PERMISSION AND GRADING EASEMENT. GRADING PERMIT TO BE OBTAINED FROM COUNTY DAYLIGHT GRADING ONTO ADJACENT PROPERTY. OWNER TO OBTAIN GRADING PERMISSION AND GRADING EASEMENT. GRADING PERMIT TO BE OBTAINED FROM COUNTY GRADING OF DUBLIN BLVD ROAD SUBGRADE TO ASSIST CITY IN CONSTRUCTION OF FUTURE ROADWAY 4.3' HIGH SLOPE BANK BETWEEN PADS 20' MAINTENANCE BENCH MATCH GRADES WITH CROAK PROPERTY CITY OF DUBLIN LIMIT NOTES: 1. MASS GRADING TO OCCUR OVER BRANAUGH, RIGHETTI, AND MONTE VISTA PROPERTIES IN ONE OPERATION TO BALANCE DIRT PRIOR TO CONSTRUCTION OF DUBLIN BLVD AND FOR FUTURE DEVELOPEMENT. FUTURE DEVELOPMENT WILL BALANCE WITHIN EACH "SUPER PAD" SHOWN HERE. "SUPER PADS" DESIGNED AT SLOPES SHOWN TO ACCOMODATE A WIDE VARIETY OF TYPES OF FUTURE DEVELOPMENT AND ALLOW FOR ADA ACCESS WITHIN THEM. 2. TEMPORARY DRAINAGE SOLUTION WILL BE REQUIRED FOR RUNOFF COLLECTED IN J-DITCHES. DESIGN WILL BE DETERMINED IN FINAL DESIGN, BUT MAY INCLUDE TEMPORARY SETTLEMENT AND/OR DETENTION BASINS AT THE LOCATIONS OF THE STORMWATER QUALITY BASINS BEFORE IMPERVIOUS AREA IS CREATED. PARCEL 3PARCEL 4 103 PARCEL 1 PARCEL 2 PARCEL 5 3: 1 3: 1 3 : 1 2:1 2:1 2:1 2:1 2:1 6% 2.5% 2.5% 2.5% 2.5% 2.5% 2.5% 2.5% 2:1 2:1 3 . 4 % 2 : 1 2:1 3: 1 3: 1 3:1 2.5% 2.5% 2.5% 3:1 3:1 3:1 3 : 1 1 . 1 % 6% 2 : 1 2 : 1 GRADING AND TEMPORARY CONSTRUCTION EASEMENT LIMITS GRADING AND TEMPORARY CONSTRUCTION EASEMENT LIMITS 5. 5 % 5 . 3 % ESTIMATED GRADING QUANTITIES CUT (CY)FILL (CY)NET (CY) RIGHETTI 755,352 389,790 365,562 (CUT) BRANAUGH 499,704 704,848 205,144 (FILL) MONTE VISTA 1,236 168,164 166,928 (FILL) TOTAL 1,256,292 1,262,802 6,510 (FILL) SW Q W LEGEND: OVERLAND RELEASE 3:1 20' EX GROUND PAD 2:1 3:1 MA X12' ACCESS ROAD PL FENCE BNDY / CITY LIMITS 172'± MAX GRADING EASEMENT 5' SECTION A NTS 2.5% SECTION B NTS DAYLIGHT DAYLIGHT EX GROUND 160'± MAX GRADING EASEMENT 1' OVERBUILD BNDY / CITY LIMITS 5' 2.5% SECTION C NTS DAYLIGHT EX GROUND 60'± MAX GRADING EASEMENT 1' OVERBUILD BNDY / CITY LIMITS 20'3:1 SECTION D NTS DAYLIGHT EX GROUND STORM WATER QUALITY BASIN 25'± MAX GRADING EASEMENT 5' 3:1 3:1 3:1 2.5% BNDY 2' OVERBUILD SWQ BASIN VARIES 23'± - 34'± 3:1 3:1 2.5%BNDY 2' OVERBUILD SWQ BASIN 40'± - 43'± BNDY2' OVERBUILD 3:1 2.5% BNDY 2' OVERBUILD SWQ BASIN 3:1 3:1 3:1 2.5% BNDY / CITY LIMIT SWQ BASIN 21'± - 41'± SEE NOTE EX GROUND EX GROUND EX GROUND EX GROUND EX GROUND SECTION E NTS SECTION G NTS SECTION H NTS SECTION I NTS SECTION J NTS DAYLIGHT 1' OVERBUILD BNDY 2:1 J-DITCH SEE DETAIL SHEET 6 2.5% SECTION K NTS SECTION L NTS DAYLIGHT EX GROUND BNDY 3:1 1' OVERBUILD BNDY 1' OVERBUILD EX GROUND DAYLIGHT 3:1 2.5% SECTION M NTS DAYLIGHT 1' OVERBUILD BNDY 2:1 J-DITCH SEE DETAIL SHEET 6 SECTION N NTS EX GROUND EX GROUND DAYLIGHT 1' OVERBUILD BNDY 2:1 SECTION O NTS EX GROUND 3:1 3:1 SUPER PADSWQ BASIN VARIES3' OVERBUILD 30 ' M A X SECTION T NTS 2:1 6' 5% 30 ' M A X 2:1 5% 6' 2:1 30 ' M A X 2.5% 3:13:1 2' BERM SWQ BASINSWQ BASIN PL SECTION F NTS VARIES 10'± - 47'± SWQ BASIN RESIDENTIAL 4'4' NATIVE GROUND WITH HYDROSEED COMPACTED GRAVEL CONCRETE V-DITCH PER CITY STD. CD-418 INDUSTRIAL INDUSTRIAL BNDY / CITY LIMITS 48' SEE NOTE 1 48'±MIN - 57'± MAX 5'± MIN 21'± MAX CITY LIMIT 48' SEE NOTE 1 CITY LIMIT 51'± MIN - 58'± MAX 5'± - 12'± 51'± MAX/MIN 31'± 3'± - 25'± 64'± MIN- 81'± MAX GC / CO 19'± - 48'± INDUSTRIAL 50'±GC/CO 11'± - 68'± RESIDENTIAL SUPER PAD 3'± - 65'± 3'± - 40'± 2:1 2:1 2:1 2:1 PAD PAD PAD PAD PARK BNDY BNDY BNDY BNDY 5' L/S 8' S/W 3' PSE 1' OVERBUILD 5' L/S 8' S/W3'1' OVERBUILD 1' OVERBUILD EX GROUND EX GROUND EX GROUND EX GROUND 3:1 SECTION P NTS SECTION Q NTS SECTION R NTS SECTION S NTS 1' OVERBUILD DAYLIGHT DAYLIGHT CONFORM TO EX PAVEMENT CONFORM TO EX PAVEMENT 1'± - 24'± 20' PARCEL 2 2' PL INDUSTRIAL 56' FUTURE PUBLIC STREET RESIDENTIAL PARCEL 1 2' ROW ROW/APA LINE NOTE: 1.DEDICATION OF ROW TO VALLEY LINK WILL BE MADE BY SEPARATE INSTRUMENT ONCE FINAL REQUIRED ROW IS DETERMINED. 2.OWNER WOULD LIKE TO OBTAIN REMAINING PORTION OF COLLIER CANYON ROAD FOR USE AS UTILITY CORRIDOR AND STORM WATER QUALITY BASIN IF IT IS NO LONGER REQUIRED FOR ACCESS RESIDENTIAL SUPER PAD 1'± - 6'± 6'± 15'± - 47'± 10' EX CALTRANS/SPRINT UTILITY ESMT 10' SDE CONCRETE V-DITCH PER CITY STD. CD-418 20' 12' ACCESS ROAD PL FENCE4'4' 1' OVERBUILD NOTE: 1.DEDICATION OF ROW TO VALLEY LINK WILL BE MADE BY SEPARATE INSTRUMENT ONCE FINAL REQUIRED ROW IS DETERMINED. 2.OWNER WOULD LIKE TO OBTAIN REMAINING PORTION OF COLLIER CANYON ROAD FOR USE AS UTILITY CORRIDOR AND STORM WATER QUALITY BASIN IF IT IS NO LONGER REQUIRED FOR ACCESS NOTE: DEDICATION OF ROW TO VALLEY LINK WILL BE MADE BY SEPARATE INSTRUMENT ONCE FINAL REQUIRED ROW IS DETERMINED. 2.5%2.5% 3:13:1 52' SECTION Y NTS VARIES VARIES 3:1 2.5% SWQ BASIN SECTION X NTS 3:13:1 2' BERM SWQ BASINSWQ BASIN BNDY SECTION U NTS 1' OVERBUILDBNDY 3:1 SECTION V NTS 2:1 2:1 3:1 18' SWQ BASIN 1' OVERBUILD 30 ' M A X 6' 5% 2.5% 30 ' M A X J-DITCH NTS 2:1 M A X 2% 2.5'1.5'3" 4'FL 6" 6" 2' 4" MI N 1 1 1 1 1' 1' 6"X6"X10 GA MESH 1% 1% 27'± - 41'± SWQ BASIN 3:1 10' PSE 3:1 16' SIDEWALK 8' L/S90' 8' L/S 8' S/W 10' PSE 2.5% EX GROUND 2.5% 130' SECTION W NTS 12' CLASS 1 TRAIL WITH 2' SHOULDERS ROW ROW INDUSTRIAL 35'± - 42'± FUTURE ENTRANCE ROAD 20' SUPER PAD 56' FUTURE PUBLIC STREET RESIDENTIAL 2' ROW ROW/APA LINEPL CONCRETE V-DITCH PER CITY STD. CD-418 2' OVERBUILD PARCEL 3 PARCEL 1 PARCEL 4 103 PARCEL 2 405 406 PARCEL NN 427 PARCEL FF 425 408 464 458 PARCEL MM 407 459 465 429 PARCEL BB 430 428 PARCEL CC 426 423 424 462 460 461 401 463 PARCEL QQ 475 546 488 489474 STRAW WATTLES TO BE PLACED AT EDGE OF PAVEMENT SILT FENCING TO BE INSTALLED AT TOP OF SLOPE, BOTTOM OF SLOPE AND EVERY 10' VERTICALLY SILT FENCING TO BE INSTALLED AT TOP OF SLOPE, BOTTOM OF SLOPE AND EVERY 10' VERTICALLY CONSTRUCTION ENTRANCE CONSTRUCTION ENTRANCE CONSTRUCTION ENTRANCE SILT FENCING TO BE INSTALLED AT TOP OF SLOPE, BOTTOM OF SLOPE AND EVERY 10' VERTICALLY SILT FENCING TO BE INSTALLED AT TOP OF SLOPE, BOTTOM OF SLOPE AND EVERY 10' VERTICALLY SILT FENCING TO BE INSTALLED AT TOP OF SLOPE, BOTTOM OF SLOPE AND EVERY 10' VERTICALLY SILT FENCING TO BE INSTALLED AT TOP OF SLOPE, BOTTOM OF SLOPE AND EVERY 10' VERTICALLY SWQ BASINS TO BE USED AS TEMPORARY SEDIMENT BASINS (SEE DETAIL BELOW) SWQ BASIN TO BE USED AS TEMPORARY SEDIMENT BASIN (SEE DETAIL BELOW) SWQ BASIN TO BE USED AS TEMPORARY SEDIMENT BASIN (SEE DETAIL BELOW) SILT FENCING TO BE INSTALLED AT TOP OF SLOPE, BOTTOM OF SLOPE AND EVERY 10' VERTICALLY SWQ BASIN TO BE USED AS TEMPORARY SEDIMENT BASIN (SEE DETAIL BELOW) LEGEND STRAW WATTLES HYDROSEED (APPROXIMATE LIMITS) GRAVEL CONSTRUCTION ENTRANCE CATCH BASIN SEDIMENT BARRIER PERIMETER SILT FENCE WATER FERTILIZER (20-20-10) R BINDER WOOD FIBER MULCH SEED MATERIAL TOTAL SEED VARIETY LBS. PER ACRE ROSE CLOVER 8 CAL POPPY 4 BLUE LUPINE 6 75 LBS/AC. (SLOPE MEASURE.) 2,000 LBS 75 LBS 60 LBS 400 LBS AS NEEDED FOR APPLICATION PRELIMINARY HYDROSEED MIX: REGREEN 36 ZORRO 6 BLANDO 15 THE EROSION CONTROL MATERIALS SHALL BE MIXED AND APPLIED IN APPROXIMATELY THE FOLLOWING PROPORTIONS: DEP T H 3"- 4 " SPAC I N G 3' - 4 ' 3"- 4 " SPAC I N G 3' - 4 ' DEP T H 8'-1 0 ' D I A . BIO- D E G R A D E F I B E R S STUF F E D I N A B I O - DEGR A D A B L E ( N O N - P L A S T I C ) CALI F O R N I A S T R A W W O R K S OPEN N E T NOTES: DRAINAGE DIRECTION PARCEL 3 PARCEL 1 PARCEL 4 103 PARCEL 2 DMA 3 DMA 2 DMA 1 SWQ 3 SWQ 2 SWQ 1 STORM DRAIN OUTFALL TO SWQ 3 AT BOTTOM OF SLOPE FROM STORM DRAIN SYSTEM IN PARKING LOT ABOVE STORM DRAIN OUTFALL TO SWQ 2 AT BOTTOM OF SLOPE FROM STORM DRAIN SYSTEM IN PARKING LOT ABOVE OVERFLOW RISER TAKES DRAINAGE TO SDO SYSTEM OVERFLOW RISER TAKES DRAINAGE TO SDO SYSTEM STORM DRAIN OUTFALL TO SWQ 2 AT BOTTOM OF SLOPE FROM STORM DRAIN SYSTEM IN PARKING LOT ABOVE CHECK DAM AND SPILLWAY (TYP) OVERFLOW RISER TAKES DRAINAGE TO SDO SYSTEM SWQ 1 DRAINAGE FROM RESIDENTIAL SITE ENTERS SWQ 1 THROUGH STORM DRAIN OUTFALLS AT BOTTOM OF SLOPE FROM STORM DRAIN SYSTEM IN PUBLIC STREETS ABOVE SDO D U B L I N B L V D CO L L I E R C A N Y O N R O A D IN T E R S T A T E 5 8 0 TREATED RUNOFF DISCHARGES TO CITY SD SYSTEM IN DUBLIN BLVD SWQ 2 4" PVC PERFORATED SUBDRAIN CLASS 2 PERMEABLE MATERIAL OVERFLOW RISER TYPICAL BIO-RETENTION BASIN SECTION NTS 3:1 M A X 3:1 MA X NATIVE SOIL BIOTREATMENT SOIL MIX WITH INFILTRATION RATE OF 5 IN/HR MIN SWQ 1 - OVERFLOW RISER DETAIL NTS BIORETENTION CELL 3:1 BIORETENTION CELL 3:1 SD PIPE RIP RAP APRON NATIVE MATERIALDRAIN GRATE NOTES: 1.THE CALCULATIONS SHOWN IN TABLE HEREON ARE BASED ON ALAMEDA COUNTY CLEAN WATER PROGRAM, C.3 STORMWATER TECHNICAL GUIDANCE SEPTEMBER 2019. 2.RAINFALL INTENSITY = 0.2 IN/HR 3.BIORETENTION SOIL MIX TO HAVE A MINIMUM 5 IN/HR INFILTRATION RATE 4.THE PRELIMINARY BASIN SIZING IS BASED ON A SIZING CRITERIA OF (0.2 IN/HR)/(5 IN/HR)=0.04 (4%) 5.EACH SITE WILL COMPLY WITH THE C.10 TRASH CAPTURE PROVISION OF THE MMRP. 6.MAINTENANCE ACCESS TO BIORETENTION BASINS WILL BE FROM ADJACENT STREETS DOWN 3:1 SIDE SLOPES. IF FENCES ARE PROVIDED AROUND BIORETENTION BASINS, GATES OR GAPS WILL NEED TO BE PROVIDED. 7.DUBLIN BLVD TO PROVIDE TREATMENT FOR ITSELF WITHIN THE PROPOSED ROW. 8.THE IMPERVIOUS AREA NOTED ABOVE IS ESTIMATED FOR FUTURE USES TO SIZE THE BASINS. NO IMPERVIOUS AREA IS PROPOSED WITH THIS APPLICATION. DRAINAGE MANAGEMENT AREA STORMWATER QUALITY BASIN LIMITS OF DRAINAGE MANAGEMENT AREAS STORM DRAIN OPEN SPACE (SDO) CONVEYS: HIGH FLOW BYPASS FOR DEVELOPED FLOWS AND TREATED BIORETENTION BASIN OUTFLOWS DMA SWQ DMA IMPERVIOUS RATIO IMPERVIOUS AREA (SF) TOTAL AREA (SF) TREATMENT AREA REQUIRED (SF) TREATMENT AREA PROVIDED (SF) 1 0.65 297,083 457,050 11,883 12,238 2 0.8 498,750 623,437 19,950 20,023 3 0.8 263,082 328,853 10,523 10,713 FOR REFERENCE ONLY PARCEL 3 PARCEL 1 PARCEL 4 103 PARCEL 2 FUTURE VESTING TENTATIVE MAP OF RESIDENTIAL PARCEL TO DETAIL FIRE ACCESS, MAINTENANCE BENCHES, WILDFIRE BUFFER LOTS AND FIRE HYDRANT LOCATIONS 427 425 428 426 462 460 461 463 PARCEL QQ 546 545 544 CITY OF DUBLIN LIMITS FUTURE ACCESS FOR RESIDENTIAL PARCEL LEGEND: FIRE DEPARTMENT ACCESS ROUTE CITY LIMITS FIRE HYDRANT NOTES: 1. SITE PLAN SHOWN IS CONCEPTUAL AND SUBJECT TO CHANGE WITH APPROVAL OF A SITE DEVELOPMENT REVIEW PACKAGE. APPLICATION SHOWS SITE PLAN FOR REFERENCE ONLY. NO IMPERVIOUS AREA IS PROPOSED WITH THIS APPLICATION.