Loading...
HomeMy WebLinkAbout4.12 WashingtonInfrasDBW� F• CITY CLERK File # 1:1026msd AGENDA STATEMENT CITY COUNCIL MEETING DATE: November 20, 2001 SUBJECT: EXHIBITS ATTACHED: RECOMMENDATION:�i� f `� w FINANCIAL STATEMENT: Amendment to Consulting Services Agreement with Washington Infrastructure Services (formerly MK Centennial) for the Widening of Dublin Boulevard from Village Parkway to Sierra Court (Modification to Scope of Work and Additional Compensation) Report Prepared by: Lee S. Thompson, Public Works Director 1) Resolution amending agreement 2) Scope of Work/Fee Proposal from Washington Infrastructure Services (WIS) 3) Amended agreement dated July 18, 2000 4) Budget Change Form Approve Budget Change in the net amount of $98,475 and Adopt Resolution Approving Amendment No. 2 to WIS Contract WIS' current contract with the City for the Dublin Boulevard Widening project is $411,000. In addition to this amount, $40,689 of Gas Tax funds was included in this year's budget to fund the anticipated engineering services needed during construction. Expanding WIS' scope of work (described below and in WIS' letter dated November 13, 2001) will add $139,164 to WIS contract to include services during construction as well as additional services required under the design phase of the project. Staff is recommending a budget change to increase the amount for design services to $139,164 using Developers fees to fund the expanded scope of work. The City has collected an additional $170,340 in Developers Fees specifically designated for this project that is not included in current budget. Staff is also recommending the decrease of $40,689 of Gas Tax funds budgeted for design services this fiscal year for a net increase of $98,475 (see attached budget change form). DESCRIPTION: The plans, specifications and estimates for the Dublin Boulevard Widening Project between Village Parkway and Sierra Court are nearing completion. During the design COPIES TO: James H Lundell, WIS � � 4 0 1 ITEM NO. g: \engr-contract\Wash\AgstW ash2AmendNov20-2001. doc phase, Staff and the consultant had determined the need to expand the eXisting scope of work to include several tasks, which are listed as follows: 1. Revised R/W (additional right of way plats and descriptions required) $ 8,810 2. Supplemental surveys (additional field work required to supplement aerial photo) 1,362 3. Utility Design/Coordination (bridge bracket and opening design required by the 11,100 utility companies as part of the Rule 20A project) 4. DSRSD Coordination and Design (incorporation of recycled waterline project 13,479 into plans and specifications and design coordination) 5. Design of Alamo Canal slope protection and outfall structures (in Coordination 15,330 with Zone 7) 6. Additional Specifications work (revise Caltrans standard specifications in 7,156 compliance with latest federal and state requirements) 7. Left-mm pocket Design Alternatives (to minimize traffic impacts to businesses) 8,701 8. Landscaping Alternatives (bridge landscaping alternatives research by consultant) 5,931 9. Additional Landscaping and Irrigation (limits of landscaping expanded) 13,595 10o Civic Center Drive Entrance Modification (needed to accommodate widening) 2,839 11. Stage Construction Plans, Revised Structural Section & Overlay(not included 5,724 in contract) 12. Drainage Field Survey and Research (drawings not available) 5,782 13. Additional Meetings (Utility meetings, Agency meetings & progress meetings) 11,220 14. Signal Interconnect and Dual Meter Service Design (not included in contract) 2,235 15. Bike Path Retaining Wall (not included in contract) 10,800 16. Engineering Services during construction (not included in contract) 11,000 17. Direct Cost 4,100 Total $139,164 The Dublin San Ramon Services District, so as to minimize construction impacts to the community, has requested inclusion in the City's project of the installation of a six-inch recycled water line and a.four- inch conduit in the utility joint trench for DSRSD's fiber optic facility. The design and utility coordination work associated with this request (Item #4) is included in this expanded scope of work and would be reimbursed by DSRSD. The draft cooperative agreement between Dublin and DSRSD is being reviewed by Staff and will be presented to the Council at a later date. Staff recommends that the City Council approve the attached budget change form and adopt the resolution approving the amendment to the WIS agreement to expand the conSultant's scope of work as described in the letter dated November 13, 2001. Page 2. RESOLUTION NO. - O1 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF DUBLIN APPROVING AMENDED AGREEMENT WITH WASHINGTON INFRASTRUCTURE SERVICES (FORMERLY MK CENTENNIAL) FOR CONSULTING SERVICES FOR THE WIDENING OF DUBLIN BOULEVARD FROM VILLAGE PARKWAY TO SIERRA COURT WHEREAS, the City Council of the City of Dublin approved an agreement for Preliminary Engineering and Environmental Services with Washington Infrastructure Services (formerly known as MK Centennial) for the Dublin Boulevard project from Village Parkway to Sierra Court, on November 16, 1999; and WHEREAS, the City of Dublin amended the agreement on July 18, 2000, to extend the scope of services to include the preparation of Plans, Specifications and Estimates for the said project with an additional compensation in the amount of $267,000 for a total aggregate amount of $411,000; and WHEREAS, the Scope of Work to be performed is proposed to be expanded to include additional right-of-way survey work, bike path wall and creek slope protection design, additional landscaping and signal interconnect design, other miscellaneous work, and design services during construction. NOW, THEREFORE, BE IT RESOLVED that the CitY Council of the City of Dublin does hereby approve Amendment No. 2 to the agreement with Washington Infrastructure Services to expand the scope of work, as described in Exhibit "A", which is attached to this resolution. BE IT FURTHER RESOLVED that the Mayor is authorized to execute the amended agreement. PASSED, APPROVED AND ADOPTED this 20th day of November, 2001. AYES: NOES: ABSENT: ABSTAIN: ATTEST: Mayor City Clerk g.' lengrlmkl OOIResoAmend2Nov20-2001 ' / EXHIBIT "A" OF RESOLUTION -01 - . AMENDMENT TO AGREEMENT BETWEEN CITY OF DUBLIN AND WASHINGTON INFRASTRUCTURE SERVICES (formerly MK Centennial) FOR ENGINEERING SERVICES WI-IEREAS, the City of Dublin (hereinafter referred' to as "CITY") and Washington Infrastructure Services (formerly MK Centennial) (hereinafter referred to as "CONSULTANT"), entered into an agreement on November 16, 1999 for Preliminary Engineering and Environmental Services for the Dublin Boulevard Widening Project between Village Parkway and Sierra Court; and - WHEREAS, the City amended the agreement on July. 18, 2000 to extend the scope of work to include the preparation of Plans, SpecificatiOns and Estimates; and WHEREAS, the Scope of Work to be performed is proposed to be extended to include additional right of way survey work, bike path wall and creek slope protection design, additional landscaping and signal interconnect design, other miscellaneous work, and design services during construction; NOW, THEREFORE, the parties hereto agree as follows: Scope of Work The Scope of Work shall be modified as described in Consultant's Amended Scope of Services - Phase 2 dated November 13, 2001 for the Dublin Boulevard Widening Project between Village Parkway and Sierra Court (attached). Extension of Term The total cost for time-and-materials work under this amendment shall not exceed an additional $139,164. CITY OF DUBLIN ATTEST: Mayor City Clerk WASHINGTON INFRASTRUCTURE SERVICES ~ames H. Vice President Date: Washington November 13,2001 File No. 2262.020 Mr. Ferd Del Rosario, Project Manager City of Dublin 100 Civic Plaza Dublin, CA 94568 Dublin Boulevard Widening Project Amendment No. 2 Dear Ferd: Enclosed is amendment number 2 scope and fee. This amendment is based upon disCussions at the meeting held November 8, 2001 at the City's offices. If you have any questions or need further information, please do not hesitate to call. Sincerely, ~J~es ~:. Lunde Vice President Northern California Operations Enclosures CCi Bruce Zaeni, BCI (w/a) Etty Mercurio, WIS (w/a) \\CEI PLOWOL 1LADMILq~ROJECTSL226.2\LettersL2262L-036-d¢ -- wasmngton Group International, Inc. 2633 Camino Ramon ,, Suit~ Phone: (925) 244-1500 · Fax: (925) 24 EXHIBIT A Professional Services Agreement Between CITY OF DUBLIN (CITY) and WASHINGTON INFRASTRUCTURE SERVICES (formerly MK Centennial) (CONSULTANT) for the DUBLIN BOULEVARD WIDENING PROJECT AMENDMENT NO. 2 SCOPE OF SERVICES INDEX DESCRIPTION PAGE INTRODUCTION ....................................................................................................................................... 2 1. Revised R/W ..................................................................................................................................... 2 2. Supplemental Surveys ...................................................................................................................... 2 3. Utility Design and Coordinatiol~ ...................................................................................................... 2 4. Dublin San Ramon Service District (DSRSD) Coordination and DesigIz ....................................... 2 5. Zone 7 Coordination and Design of Erosion Protection and Ouffalls .............................................. 3 6. Specifications Special Provisions with City Boiler Plate ................................................................. 3 7. Left-turn Pocket Alternatives ........................................................................................................... 3 8. Landscape Alternative~ .................................................................................................................... 3 9. Landscaping and Irrigation ............................................................................................................... 3 10. Civic Center Plaza Design ................................................................................................................ 3 11. Stage Construction Plans, Revised Structural Section and Overlay. ................................................ 4 12: Drainage as-built research, design and details ................................................................................. 4 13. Additional Meetings ......................................................................................................................... 4 14. New SIC and dual meter service pedestals. ...................................................................................... 4 15. Bike path retaining wall .................................................................................................................... 4 16. Design Services During Construction (DSDC) ............................................................................... 5 DUBLIN BOULEVARD WIDENING PROJECT Amended Scope of Services - Amendment No. 2 November 13, 2001 Page 2 INTRODUCTION This scope of services covers the out of scope work for the design phase of the project. An amended schedule that identifies milestones, tasks and sub tasks, review periods, and coordination activities associated with engineering and design is included as Attachment A, "Design Schedule." It shows the amended time phased tasks to be performed for the required work. 1. Revised R/W The original scope was to prepare one set of R/W documents that included appraisal maps, legals descriptions and plats. The CONSULTANT prepared three sets of R/W documents as follows: · R/W documents were prepared for the project based on the approved roadway geometries developed during the environmental clearance phase of the project. · After the first set of R/W documents were issued, the City requested that the roadway geometries be modified to eliminate and reduce required R/W acquisition on three parcels at the beginning of the project. The CONSULTANT modified the roadway geometries and revised and reissued the R/W appraisal maps to reflect the requested changes. · After the second set of R/W documents were issued, the City requested that public service easements be added on four properties for use by the underground utility project work. 2. Supplemental Surveys The original scope of services had additional surveys to supplement aerial topography. During the course of design, additional surveys points have been identified to refine and verify design features within to project such as utilities, bike path, canal and miscellaneous features. Surveys on existing drainage facilities and other appurtenances will be obtained. Only one additional field day of surveys will be required (with two days office time for compilation of said surveys). 3. Utility Design and Coordination Pacific Bell has an existing conduit structure on the south side of the existing bridge. When the bridge is widened, the conduit structure will be temporary relocated and new structure built with the widened bridge. The City requested the CONSULTANT coordinate with Pacific Bell for relocation of their conduit structure. The CONSULTANT coordinated with Pacific Bell to detail a conduit bracket and opening for the existing facilities and a new bracket and utility opening for the new facilities. The CONSULTANT will prepare a segregated construction cost for the CITY to bill Pacific Bell for these construction items. In addition, the City requested the CONSULTANT design utility openings/attachments on the widened bridge for several utilities from the underground utility district including. 4. Dublin San Ramon Service District (DSRSD) Coordination and Design The City requested the CONSULTANT incorporate the sign relocation for DSRSD into the contract documents for the project. In addition, the CONSULTANT will also incorporate the new recycled water line design for DSRSD into the contract documents. DSRSD will provide the CONSULTANT with their design plans and specification notes, and the CONSULTANT will attach the plans to the project plans and special provisions and modify the engineer's estimate and boilerplate accordingly. The City requested the CONSULTANT prepare an engineer's estimate with segregated costs for the two additional packages to be added to the project documents for the utility underground district work and DSRSD reclaimed waterline. J:L2262~kdmin\Contracts\phase2\amend l\amendment scope.doc DUBLIN BOULEVARD WIDENING PROJECT Scope of Services November 13, 2001 Page 3 The CONSULTANT will track these design costs separately. 5. Zone 7 Coordination and Design of Erosion Protection and Outfalls A Zone 7 66-inch RCP within the project limits. The pipe will remain in place during construction under the new widened bridge. The CONSULTANT will straddle the existing pipe. The outfall structure for the existing 66-inch RCP will be reconstructed during construction. The existing Alamo Canal has signs of erosion and scour below the existing bridge structure as well as subsidence along the banks adjacent the bike trail. The City requested the CONSULTANT include scour/erosion protection and repair into the project design. The CONSULTANT will prepare plan, cross- sections and specifications for work in the canal to be submitted to Zone 7 for concurrence, and to Corps of Engineers and Fish and Game for permit application to construct. Three existing outfalls within the canal are approximately 300 mm above bottom of the canal that are aggravating the erosion and scour within the canal. These outfall structures will be evaluated during construction to determine if replacement is required. 6. Specifications Special Provision with City Boiler Plate The original scope of services was to provide Caltrans specifications supplemented with Caltrans special provisions. The City requested the CONSULTANT replace the sections 1 through 9 with the City boilerplate, and incorporate language for "Buy America" and DBE/WBE goals. In addition, the City requested that CONSULTANT replace Caltrans landscaping, signal and lighting specifications with specifications provided by the City. In addition, the CONSULTANT will add two sections to the SSPs: one for the underground joint trench and a second for the DSRSD reclaimed waterline (see item 4 above for work associated with DSRSD). The CITY's consultant for the joint trench will provide special provisions in Microsoft WORD format to be added as a separate section to the SSPs. These SSPs will be in Imperial units consistent with the joint trench work whereas the remainder of the contract documents will be in metric units. 7. Left-turn Pocket Alternatives The City requested the CONSULTANT to evaluate several design alternatives for the left-turn pockets along Dublin Blvd. The CONSULTANT prepared exhibits for the various alternatives for review and comment by the City. 8. Landscaping Alternatives The original scope of services for landscape design was to only landscape the one new median in front of DSRSD property. The City requested the CONSULTANT to prepare landscaping alternatives to show three different landscaping alternatives for the entire project including preliminary cost estimates for the alternatives. The alternatives also included evaluating special architectural features on the widened bridge and to evaluate whether a planter could be placed on the existing bridge (additional dead load evaluation). 9. Landscaping and Irrigation Based on the alternatives, the City selected a preferred alternative that requires new landscaping and irrigation in all medians within the project except for the median on the bridge structure. The CONSULTANT will prepare complete landscaping and irrigation plans for full landscaping within the project. The new landscaping will include new interlocking pavers in the median throughout the project. 10. Civic Center Plaza Design The project will impact the entrance to City Hall that has a special design of interlocking pavers with J:L2262XAdmin\Contmcts\phase2\amend l\amendment scope.doc DUBLIN BOULEVARD WIDENING PROJECT Amended Scope of Services - Amendment No. 2 November 13, 2001 Page 4 concrete bands. Based on a field review and a future widening project, the CONSULTANT will prepare construction details for a modification to the entrance of Civic Center Plaza on the west side only that includes a reconstruction of the median nose, a new concrete band and reconstruction of the existing interlocking paver pattern. The east side of the entrance will not be disturbed. 11. Stage Construction Plans, Revised Structural Section and Overlay The original scope of services did not include staging plans and coordination for the utility underground district work. The City requested the CONSULTANT to prepare construction staging plans that incorporates the utility underground work. In addition, the City requested the project include a full overlay. The stage construction plans will need to incorporate stages for temporary stripping for stage 1 through 3 and a final stage for overlay and final stripping. The City requested the CONSULTANT include plans, details and specifications for a complete overlay of the project. The CONSULTANT will add construction details and revise the typical sections, stage construction plans (see above), quantities and specifications. The City requested the CONSULTANT to revise the plans to show a full depth AC pavement for the project. The CONSULTANT will revise the typical sections, quantities and specifications. 12. Drainage as-built research, design and details The original scope of service assumed that existing as-builts and calculations would be available for the project. The City did not have as-built information for the existing drainage systems within the project. As a result, the City instructed the CONSULTANT to research as-builts at Alameda County and Zone 7 for as-built data. No data was found on these systems. Therefore, the CONSULTANT is required to perform a field survey of the existing system, obtain additional surveys (see supplemental surveys above), and prepare drainage details for a new drainage system in addition to extending the existing drainage systems. 13. Additional Meetings The original scope of services only had budget for a total of six meetings. Additional meetings are required and the estimated number of additional meetings is as follows: Description No. Meetings Progress Meetings 4 Agency Meetings 4 Zone 7 DSRSD Utility Meetings 2 TOTAL 10 14. New SIC and Dual Meter Service Pedestal The CITY requested the installation of new signal interconnect cable (SIC) from Village Parkway to Clark Avenue. The project limits and design drawings currently did not originally include Village Parkway to Clark Avenue. An additional sheet is required to add interconnect plans to show conduit, pull boxes, and connection point to the traffic controller at Village Parkway. 15. Bike Path Retaining Wall At a meeting among the CITY, Zone 7, Kleinfelder and WIS, the CITY requested a retaining wall be added to the scope of services to repair the failing slope along the bike path under Dublin Blvd. Approximately 40 meters (120 feet) of new wall will be added to the contract documents. The new wall J:\2262~4.dmin\Contracts\phase2\amend l\amendment scope.doc DUBLIN BOULEVARD WIDENING PROJECT Amended Scope of Services - Amendment No. 2 November 13, 2001 Page 5 height will be approximately 1 to 1.2 meters (3 to 4 feet) of exposed face. Additional geoteclmical analysis will be required for the pile support and be provided to the designers to complete a retaining wall design. 16. Design Services During Construction (DSDC) The CONSULTANT will provide design services during construction that include response to bidder's questions, response to request for information (RFIs), and response to contract change orders (CCOs). These services will be provided on a time a material basis during construction and are estimated at $10,000. These services exclude work by any subconsultants and do not include as-builts or a record of survey. J:~262~Admin\Contracts\phase2\amend l\amendment scope.doc Dublin Boulevard Widening Project COST PROPOSAL AMENDMENT NO. 2 ?? ORIGINAL CONTRACT AMOUNT = i $ 143,722.28 I ........................................................ '~.'i~-i~'~i'b'~ii~ ~i¥'~ b'."Y:-'T ~' ................ '~';~'~3'~'I R~,ioceted ......... " DESIGN AMENDMENT N~'~. = i $ 1391~64.30 ! OriginalBudget OriginalBudget Total Revised Budget $ 550,164.30 Amendment No. 2 WASHINGTON (MK CENTENNIAL) A, BOR: Classh~cation Hours Rate 'etal Proj Mgr 179 $ 50.00 $ 8,950.00 Sr Eng 214 $ 45.00 $ 9,630.00 Engineer 285 $ 32.00 $ 9,120.00 CADD 208 $ 30.00 $ 6,240.00 Clerical 55.75 $ 19.00 $ 1,059.25 TOTAL DIRECT LABOR 941.75 $ 34,999.25 OVERHEAD (~ 1.69293 $ 59,251.28 SUBTOTAL LABOR + OVERHEAD FOR DESIGN $ 94,250.53 SUBTOTAL LABOR + OVERHEAD FOR CONSI~UC'I1ON SUPPORT SERVt CE~ $ t 0,000.00 WIS DIRECT COSTS: DIRECT COSTS: Mailing, Telephone, Supplies, Photos .... $ 500.00 Reproduction & Presentation Materials $ 3,600.00 Transportation SUBTOTAL MKC DIRECT COSTS $ 4,100.00 Original Budget I Reallocated I Total Revised FEE= $ 10,450.00 Original Budget Budget SUBTOTAL WIS $ 118,800.53 $ 203,716.53I $ 203,716.53I $ 322,517.06 PUBLIC AFFAIRS MANAGEMENT: SUBTOTAL LABOR ~' OVERHEAD FOR CONSTRUCTION SUPPORT SERVICES $ Original Budget Budget SUBTOTAL PAM $ $ 62,283.74 $ 62,283.74 $ 62,283.74 CHAUDHARY & ASSOCIATES SUBTOTAL LA~OR + OVERHEAD FOR CONSTRUCTION SUPPORT SERVICES $ Original Budget Realiocated I Total Revised Original Budget Budget SUBTOTALCHAUDHARY $ $ 78,418.08 $ 78,418.08I $ 78,418.08 KLEINFELDER LABOR: Hours Rate Total Prin Eng 0 $ 46.64 $ Proj Mngr 17 $ 33.65 $ 572.05 Sr Staff Prof 0 $ 25.80 $ =roffesional 0 $ 17.88 $ Drafting/Admin 4 $ 15.60 $ 62.40 ;)IRECT LABOR 21 $ 634.45 OVERHEAD ~. 1.92 $ 1,218.14 SUBTOTAL LABOR + OVERHEAD $ 1,852.59 SUBTOTAL LABOR .i. OVERHEAD FOR CON$TRUCTI ON SUPPORT SERVICES $ DIRECT COSTS: Mileage $ Reproduction & Materials $ SUBTOTAL DIRECT COSTS $ ' Original Budget Realioceted I Total Revised FEE $ 185.26 Original Budget Budget SUBTOTALKLEINFELDER $ 2,037.85 $ 17,368.10 $ 17,368.10I $ 19,405.95 FEHR & PEERS LABOR: Hours Rate Total Proj Prin 0 $ 58.65 $ Sr Engineer 8 $ 33.17 $ 265.36 Engineer 20 $ 23.80 $ 476.00 Technician 4 $ 20.67 $ 82.68 DIRECT LABOR 32 $ 824.04 OVERHEAD {~ 1.4653 $ 1,207.47 SUBTOTAL LABOR + OVERHEAD $ 2,031.51 SUBTOTAL LABOR + OVERHEAD FOR CONSTRUCTION SUPPORT SERVICES $ DIRECT COSTS: Mileage $ Reproduction & Materials $ SUBTOTAL DIRECT COSTS $ - Original Budget Reallocatad I Total Revised FEE $ 203.15 Original Budget Budget SUBTOTAL FEHR & PEERS $ 2,234.66 $ 28,541.63 $ 28,541.63I $ 30,776.29 Revised 11113/2001 1:09 PM J:\2262\admin~contracts~phase2\ENGCST2al.XLS Labor + ODCs Page 1 of 6 Dublin Boulevard Widening Project COST PROPOSAL AMENDMENT NO. 2 ORIGINAL CONTRACT AMOUNT = ~ $ 143,722.28 ~ ........................................................ '~i~'i~'~'b'i~¥'~c~:'7':-'~'~ ~;~'~:~'~ ~ . " ' DESiGN'~MEN'DMENT N~'~ = ['$ 139,164~30 ~ OngtnalBudget OriginalBudget .................................... 'f~'f~['~'6'~'~'~E~"~'~'6'O~"~"~"~ ................. ~'~'~;~'~'~'~, ~.,ooo.oo ~ ~.,ooo.oo Total Rs'vised Budget $ 550,164.30 · IAYGOOD & ASSOCIATES LABOR: Hours Rate Total Proj Prin / Proj Mgr 25 $ 45.00 $ 1,125.00 Landscape Assoc 124 $ 26.00 $ 3,224.00 Jr LandscapeArch 0 $ 15.00 $ CADD Tach 0 $ 25.00 $ Field Tech 0 $ 18.75 $ Clerical 0 $ 15.00 $ DIRECT LABOR 149 $ 4,349.00 OVERHEAD ~ 1.4466 $ 6,291.26 SUBTOTAL LABOR + OVERHEAD $ 10,640.26 SUBTOTAL LABOR + OVERHEAD FOR CONSTRUCTION SUPPORT SERVICES $ ~)IRECT COSTS: Irrigation Subconsultant $ 3,600.00 Reproductions $ 635.00 Delivery Charges $ 36.00 Mileage, tolls, parking $ 115.00 Project Equipment $ I Reallocated Total Revised SUBTOTAL DIRECT COSTSFEE $$ 4,386.001,065.00 Original Budget Original Budget Budget SUBTOTALHAYGOOD $ 16,091.26 $ 20,671.92 $ 20,671.92 $ 36,763.18 Revised 11/13/20{311:09 PM J:~2262\admin\contracts~phase2~ENOCST2al.XLS Labor + ODCs Page 2 of 6 COST PROPOSAL- LABOR ONLY Dublin Boulevard Widening Project Revised: 11/13/2001 1:09 PM - LABOR FOR AMENDMENT NO, 2 ~;~?,~ ~:~?~'~::;~:, :~ ~ ~ ~:~ WASHINGTON INF~STRUCTURE SERVICES {WiS fo~edy MK Centennial) ~,:: ~ Proj Mgr Sr Eng Engineer CADD Clerical '~ ~ ~ ~ ~ $ 30.00 $ ~9.00 ~ ...... ~. ..... ~ ........... ~;~:~= ~[~ $ 50.00 $ 45.00 $ 32.00 ~;~ ~ '[;;~e~tt~[. :,:~ ~;~c ~ ~.'t~ ~ ~,~ ~ ?~, Houm Cost Hours Cost Houm Cost Hours Cost Hours Cost Hours Cost I Revised R~ 16 800 40 1,280 32 960 2 38 90 3,078.00 2 Supplemental Su~eys 2 100 ~ 8 256 4 120 14 476.00 3 Ufili~ Design and Coordination 16 800 40 1,800 20 640 20 600 2 38 98 3,878.00 4 DSRSD Coordina~n and Design 8 400 40 1,800 20 640 20 600 2 38 90 3,478.00 5 Zone 7 Coordination and Design of Erosion Pmte~ion 32 1,600 40 1,800 40 ~,280 20 600 4 76 i 136 5,356.00 6 SSPs wi City Boiler Plate 9 450 30 1,350 10 320 20 380 69 2,500.00 7 Left-turn Po~et Alternatives 16 800 40 1,280 32 960 88 3,040.00 8 Lands~ping Altematives 16 800 16 800.00 9 Lands~ping and I~gation 8 400 8 400.00 10 Civic Center Plaza 16 512 16 480; 32 992.00 11 Stage Construction Plans, Revised Structural Se~ion ~ 8 400 8 ~0 20 640 20 600 56 2,000.00 12 Drainage as-built research, design and details 4 200 32 1,024 24 720 4 76 64 2,020.00 13 Additional Meetings (10) 40 2,000 20 900 20 640 20 380 100 3,920.~ 14 New SIC and dual meter se~i~ pedestals 0 0.00 15 Bike path retaining wall 4 200 36 1,620 19 608 20 600 1.75 33 80.75 3,~1.25 ~;~ ~1 ~ .,.5ol 214 .,~ol 285 9,1201 ~0~ ~,~01 ~.~ ~.o~.1 941.75 34,999.25 v:~ettv\dublin~scoDe~ENGCST2al.XLS Labor Page 3 of 6 Ravi~ed: 11/1312001 1:09 PM COST PROPOSAL- LABOR ONLY Dublin Boulevard Widening Project Revised: 11/13/2OOl 1:09 PM LABOR FOR AMENDMENT NO, 2 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 Revised PJW Supplemental Surveys Utility Design and Coordination DSRSD Coordination and Design Zone 7 Coordination and Design of Erosion Protection SSPs w/City Boiler Plate Left-turn Pocket Alternatives Landscaping Alternatives Landscaping and Irrigation Civic Center Plaza Stage Construction Plans, Revised Structural Section Drainage as-built research, design and details Additional Meetings (10) New SIC and dual meter service pedestals Bike path retaining wall 17 572 17 572 4 62 0 0.00 0 0.00 0 0.00 0 0.00 0 0,00 0 0.00 0 0.00 0 0.00 0 0,00 0 0.00 0 0,00 0 0.00 0 0.00 0 0.00 21 634.45 21 634.45 Page 4 of 6 COST PROPOSAL- LABOR ONLY Dublin Boulevard Widening Project Revised: 11/13/2001 1:09 PM LABOR FOR AMENDMENT NO, 2 1 Revised RNV 2 Supplemental Surveys 3 Utility Design and Coordination 4 DSRSD Coordination and Design 5 Zone 7 Coordination and Design of Erosion Protection 6 SSPs w/City Boiler Plate 7 Left-turn Pocket Alternatives 8 Landscaping Alternatives 9 Landscaping and irrigation 10 Civic Center Plaza 11 Stage Construction Plans, Revised Structural Section ~ 12 Drainage as-built research, design and details 13 Additional Meetings (10) 14 New SIC and dual meter service pedestals 15 Bike path retaining wall 8 265 8 265 20 476 20 476 4 83 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0,00 0 0.00 0 0.00 0 0.00 32 824.04 0 0.00 32 824.04 y:\etty~dublin~scope~ENGCST2al.XLS Labor Page 5 of 6 Revised: 11/13/2001 1:09 PM COST PROPOSAL- LABOR ONLY Dublin Boulevard Widening Project Revised: 11/13/2001 1:09 PM LABOR FOR AMENDMENT NO, 2 I Revised R/W 0 0.00 2 Supplemental Surveys 0 0.00 3 Utility Design and Coordination 0 0.00 4 DSRSD Coordination and Design 0 0.00 5 Zone 7 Coordination and Design of Erosion Protection 0 0.00 6 SSPs w/City Boiler Plate 0 0.00 7 Left-turn Pocket Alternatives 0 0.00 8 Landscaping Alternatives 8 360 24 624 32 984.00 9 Landscaping and Irrigation 17 765 100 2,600 117 3,365.00 10 Civic Center Plaza 0 0.00 11 Stage Construction Plans, Revised Structural Section ~ 0 0.00 12 Drainage as-built research, design and details 0 0.00 13 Additional Meetings (10) 0 0.00 14 New SIC and dual meter service pedestals 0 0.00 15 Bfke path retaining wall 0 0.00 y:~etty\dublin~scope~E NGCST2a 1.XLS Labor Page 6 of 6 ('~ AlVIE~ED STANDARD CONSULTING ENGINEE~G,.SERVICES-AGREEMENT THIS AMENDED AGP. EElvfENT supercedes and replaces in its entirety au existing agreement, between smd parties, that was made on the 16~ of November 1999. (City Couucil Resolution THIS ~ED AGKEEIVIENT is made at Dublin, California, as of 3uly 18, 2000, by and between the C~TY OF DUBLIN, a municipal corporation ("City"), and MK Centennial ("Consultant"), who agree as follows: 1. SERVICES. Subject to the terms and conditions set forth in this Agreement, Consultant shall provide to City the services described in Exhibit A Phase I and Phase II. Consultant shall provide said services at the time, place, and in the mauncr specified in Exhibit A Phases I and II. 2. PAYMENT, City shall pay C'qnsuItant for services rendered pursuant to this A~eement at the time and in the manner set.forth in Exhibit B. The payments spec/fled in Exh/bit B shall be the only payments fo b'~de to C _~.. sultant for services rendered pursuant to this Agreement. Consultant shall submit all billings for said services to City in the manner specified in Exlfibit B; or, manner be specified in Exhibit B, then according to the usual and customary procedures and practices which Consultant uses for billing clients sknilar to City. 3. FACILITIES AND EOUIPMENT. Except as set forth in Exhibit C, Consultant shall, at its sole cost and expense, famish all facilities and equipment wkich may be required for furnishing services pursuant to this Agreement. City shall famish to Consultant only the facilities and equipment Iisted in Exhibit C according to the terms and conditions set forth in Exh/bit C. 4. GENERAL PROVISIONS. The general provisions set forth in Exhibit D are part of this Agreement. In the event of any inconsistency between said general provisions and any other temps or conditions of this Agreement, the other term or condition shall control insofar as it is inconsistent with the general provisions. 5. EXStlBITS. Alt exhibits referred t6 herein are attached hereto and are by this reference incorporated herein. 6. SUBCONTRACTING. The Consaltant shall perform the work contempiated w/th resources avallable within its own organization and no portion offiae work pertinent, to this contract shall be subcontracted wSthout ~¢itten authorization by the City, except that.which is expressly identified in the Consultant's proposal. 7. CHANGES. City-may from time to time require changes in the scope of the services by Consultant to be performed under this Agreement.- Such changes, including any change in the mount of Consultant's'compensation which are mutually a~eed upon by City and Consultant, shalI be effective as amendments to this Agreement only when in writing. Agreement Page 1 of 2 07/10/00 for the duration of the project. There shall be no change in the Project Manager or members of the project team without prior written approval by the City. Thc Project Manager for Consultant shall be Etty Mercurio. 9. CONTRACT ADMINISTRATION. This Agreement shall be administered by LEE S. THOIv[PSON ("Administrator"). All correspondence shall be directed to or through the Administrator or his or designee. 10. NOTICES. Any written notice to Consultant shall be sent to: Err Koenig, Vice President 1VIK Centennial 5000 Hopyard Road, Suite 100 Pleasanton, CA 94588 Any written notice to City shall be scm to: Lee S. Thompson Director of Public Works/City Engineer P. O. Box 2340 Dublin, CA 94568 Executed as of the day first above stated: CITY OF DUBLIN, a municipal corporation 'By "City" Attest: City Clerk Approved as to form: Agreement Page 2 of 2 07/10/00 City Attorney ETCmT~IT A SCOPE OF SERVICES AND SCltEDLrLE PER ADlVfENDED PROPOSAL DATED July 6, 2000 (P_ba.~e I) and Jun~ 2g, 2000 (Phase FROM MI4 Centennial (ATTACHED) Exhibit A Page 1 of 1 07/10/00 A ProfessiOnal Services Agreement Between CITY OF DUBLIN (CITY) and MK CENTENNIAL (CONSULTANT) for the DUBLIN BOULEVARD WIDENING PROJECT SCOPE OF SERVICES PHASE 1 INDEX DESCR/pTION PAGE 100 110 120 130 140 150 160 200 210 220 230 360 310 320 330 340 400 410 420 430 440 450 500 510 520 54O 6OO 610 62O GENERAL ........................................................... 3 Location .......... . .... - ................................................ 3 Description ............................................................ 3 Length of Services ...................................................... 3 Project Scheduling ...................................................... 3 Project Progress Meetings and Monthly Progress Reporting ..................... 4 Design Monitoring and Subconsultant Management ............................ 4 DESIGN REFERENCES ............................................... 4 Caltrans Publications .................................................... 4 AASHTO Publications .................................................. 4 Publications From Other Sources .......................................... 5 DESIGN WORK PERFOR/VIED BY CONSULTANT ........................ 5 Coordination with the CITY and Other: Parties ................................ 5 Data Collection and Field Reviews .................... ' ..................... 5 Site Mapping and Supplemental Field Surveys ................................ 5 Rift-of-way Engineering - Environmental Document ................................................ 6 Environmental pro.am Management .................................... ~.. 6 Confirm Environmental Review Process ..................................... 6 CEQA Initial Study / Mitigated Negative Declaration .......................... 6 Traffic Data and Safety Analysis .................. ~ ........................ 7 Location Hydraulic Study ................................................ 8 Preliminary Engineering .................................................. 8 Structure General Plan .................................................... 8 Project Submittals ...................................................... 8 Design Reviews ........................................................ 9 MATERIALS FURNISHED BY The CITY ................................ 9 Record Documents ...................................................... 9 Base and Miscellaneous Information ........................................ 9 J:L2262~Admin\Contra¢~skS CO?E~$COPE 1 a. WPD I ( DUBLIN BOULEVARD WIDENING, ,¢OJECT Scope of Services July 6, 2000 Page 2 700 710 720 730 740 750 760 770 780 CONTRACT ADMINISTRATION ....................................... 9 The CITY ............................................................. 9 CONSULTANT ........................................................ 9 Project Control ........................................................ 10 Subcontract Services ................................................... 10 Quality Control ....................................................... I0 CONSULTANT Personnel .............................................. 10 Acceptability of the Work ............................................... 10 Design Documentation .................................................. 11 J:!.2262~,dmin\Con tr actors (2OPE~ COPE [a. WPD 2 DUBLIN BOULEVARD WIDENING(' Scope of Services )JECT ( July 6, 2000 Page 3 100 111) 120 130 140 GENERAL Location The project is located in Dublin, California. The City of Dublin is proposing to widen Dublin Boulevard between Village Parkway and Sierra Lane from a four-lane facility to a six-lane facility. The existing street has been improved to a six-lane facility from Village Parkway westerly to San Ramon Road. Current City's Capital Improvement Project will provide for Dublin Boulevard to be six lanes from Dougherty Road to Tassajara Road by the end of next year's Construction Season. The proposed project will extend the six-lane facility to just east of the Sierra Court intersection. The widening of Dublin Boulevard is to both sides of the street to obtain additional roadway width. This will require both demolition and reconstruction of existing improvements on both sides of the street including widening of an existing bridge and repair of the creek slopes below the bridge. During the reconstruction, existing overhead utilities will be placed .underground. Description The CONSULTANT will prepare an Environmental Document, preliminary engineering plans, surveys and right-of-way engineering maps. The design of the project elements described herein, will be in accordance with the CITY, and Caltrans Standards in effect at the time this agreement is executed. The documents will be produced in dual units (metric/imperial). The contract work will consist of the following basic features: · Conduct an environmental field review · Prepare environmental technical studies · Prepare an Environmental Document · Attend project status meetings and City. Council meetings · Conduct field reviews, research and data collection :. · Prepare topographic mapping and conduct supplemental surveys · Prepare preliminary engineering plans in support of the environmental document · Prepare fight-of-way engineering maps Len~h of Services The project will be initiated with a notice to proceed from the CITY. The environmental and preliminary engineering Work would then proceed without delay for 8 months. A four- week review period is scheduled for each review of'the draft and final environmental document packages. The CITY may wish to amend the scope of services to be provided by CONSULTANT. When this occurs the CITY and the CONSULTANT will agree on a revised scope and any adjustments to the project schedule and/or compensation due the CONSULTANT. Project Scheduling The project schedule will include all project activities and milestones. The schedule will .identify alt milestones, tasks and sub tasks, review periods, and coordination activities associated with engineering and design. Attachment A, "Design Schedule," shows the time phased tasks to be performed for the-required work. IA2262~.dmin\ContractsB COPEZSCOPE I a. WPD 3 DUBLIN BOULEVARD WIDENINg Scope of Services DJECT ( July 6, 2000 Page 4 150 160 200 210 220 Project Progress Meetings and Monthly Progress Reporting Monthly progress reports witl be submitted to the CITY with each invoice for payment for engineering services. The report will indicate the tasks that were completed during the preceding period, work planned for the next period, identification of design issues or problems being encountered, and a comparison of planned and actual progress. The updated schedule will accompany this report. Monthly reports will be submitted throughout the project duration assumed above. Reports will not be submitted for any period where no work was performed. The CONSULTANT Project Manager will meet with the appointed CITY representatives on a monthly basis to discuss the status of the project design work. These meetings will focus on resolution of any design issues requiring the CITY involvement, the design progress, potential problems, and to address any particular detail of the work previously identified for resolution. Design Monitoring and Subconsultant Management The CONSULTANT Project Manager and each subconsultant principal will monitor the" work Underway to assure it complies with the criteria and standards established for the work, and to ensure that the design work is being accomplished in the most efficient manner possible. The CONSULTANT will establish effective and efficient project procedures to direct and monitor the subconsultants' work. Regular scheduled reviews of the subconsultant design will be performed to ensure compliance with the quality standards established, coordination among team members, and that design operations are being conducted in a timely and efficient manner. DESIGN REFERENCES Caltrans Publications 211 Standard Drawings Bridge Standard Details (Current Edition - Metric) Standard Plans (1999 Edition - Metric) 212 Specifications Standard Specifications (1999 Edition - Metric) 213 Manuals Highway Design Manual, 4th edition (English) Bridge Design Specifications (Current Edition - Metric) Bridge Design Practice (Current Edition) Bridge Memo to Designers (Current Edition) Bridge Design Aids (Current Edition) Bridge Design Details (Current Edition) A. ASHTO Publications A Policy on Geometric-Design of Highways and Streets, 1994 ("Green Book") Standard Specifications for Highway Bridges, with interim revisions through 1997 Manual on Foundation Investigations, t978 j:~2262La, dmin\ContracxakSCOPE~SCOPE 1 a. WPD 4 DUBLIN BOULEVARD WIDENING~ Scope of Services )JECT { July 6, 2000 ~=ege 5 230 300 310 320 330 Guide for Design of Pavemen~tructures,~ 1993 Guide for Specifications and Standards Standard SPecifications for Structural Supports for H!ghway Signs, Luminaries and Traffic Signals, Edition of 1985 and Interim Specifications through 1991 Roadside Design Guide, 1996 An Information Guide for Roadway Lighting, 1984 AASHTO Drainage Guidelines, 1992 Publications From Other Sources City of Dublin Standard Plans Alameda County-Standards Alameda County Flood Control & Water Conservation Zone 7 Standards & Hydrology & Hydroceed Design Criteria Dublin San Ramon Service District (DSRSD) Standards DESIGN WORK PERFORM_ED BY CONSULTANT Coordination with the CITY and Other Parties Design team members will attend the scheduled meetings. The coordination will be conducted during design review submittals, monthly meetings, and at such other times as specific issues need resolution. It wilt be necessary for the CONSULTANT to meet with representatives of the local agencies and The CITY for the purpose of discussing design details. The number of meetings budgeted for this work are as follows: Description Num ber of Meetings Monthly progress meetings 4 City Council Public Meetings .2 Zone 7 Meeting 1 Underground Utility 2 Coordination Meeting (Trench design, by others) The agency contacts anticipated are with Alameda County FC & WCD, Zone 7 and the CITY. Data Collection and Field Reviews The CONSULTANT will meet with the CITY and the local agencies to collect available information pertinent to the project. A review of available information and an on-site investigation will be conducted to further define Site conditions and determine the need for additional investigation and data. The design team members and representatives of the CITY along with any interested parties will field review the work site two times. Site Mapping and Supplemental Field Surveys The CONSULTANT will prepare topographic base mapping at t :500 with 0.5-meter continuous intervals based on 1983 NAD (horizontal control) and 1929 NGVD (vertical control). Mapping standards will be checked by the CONSULTANT and will conform to j:~.262~S, dmln\Contracts~qCOPE,,$COPF, la. WPD 5 DUBLIN BOULEVARD WIDENINg:* Scope of Services .OJECT July 6, 2000 Page 6 340 400 410 420 430 the CITY's survey/mapping standards, as required for this project. The CONSULTANT will conduct field surveys. Work will include conform areas, pavement spot elevations, storm drainage inlets/outlets, selected utilities and potholed Utilities. Potholing is not included in this scope of services. Right-of-Way Engineering The CONSULTANT will order title reports (15 total), prepare right-of-way plats and legal descriptions, and conduct right-of-way surveys. Environmental Document The project wilt require environmental review under both the California Environmental Quality Act (CEQA), as well as, the National Environmental. Policy Act CNEPA). NEPA review is required because federal funds will be used to construct the project. When federal funds from the Federal Highway Administration (FHWA) are used for project construction, Caltrans acts as the reviewing agency of all environmental documents on behalf of the FHWA to ensure that the documents and process comply with NEPA. As a result, the environmental review process outlined below assumes coordination with Caltrans environmental staff throughout the project. Environmental Program Management The CONSULTANT will oversee and coordinate all aspects of the environmental process as described below: Technical Studies Oversee the preparation of ali technical studies Coordinate with technical subconsultants as required Coordinate with The CITY during all phases of the environmentaI process Agency Cooi'dination Conduct early consultation to explain the project and identify any agency concerns. Conduct consultation with agencies to facilitate processing of environmental permits if required. Coordination with Engineering Effort Provide input to preliminary engineering based on the technical reports ~ Analyze design alternatives proposed in Terms of environmental constraints and potentia.1 impacts. Agencies to be consulted will be the CITY, Alameda Cc~unty FC & WCD, Zone 7, U.S. Army Corps of Engineers, U.S. Fish and Wildlife Service, and/or California Department of Fish & Game. Confirm Environmental Review Process The CONSULTANT will conduct a field review meeting with City Staff and Caltrans Project Development and Environmental staff to review the-proposed improvements to Dublin Boulevard, environmental technical studies that will need to be completed, and the appropriate environmental document(s) for the project. CEQA Initial Study/Mitigated Negative Declaration The CONSULTANT will distribute and notice for a proposed Mitigated Negative Declaration/Initial Study including preparation of a-Notice of Intent, mailing of notices to local property owners, interested parties and agencies, and delivery of copies of the Proposed Negative Declaration to the State Clearinghouse. J:k2262~4,dmln~Contr acts\S C OPE'~;COPE I a. WPD 6 DUBLIN BOULEVARD WIDENIN(~ Scope of Services ~JECT (' July 6, 2000 Page 7 440 The CONSULTANT wilt attend one Public Information meeting and City Council'he~ring and meet with City staffas needed throughout the process. The CONSULTANT will file a Notice of Completion with the Alameda County Clerk, State Clearinghouse and payment of California Department of Fish and Game Filing Fees. -.Natural Environment Study The CONSULTANT will prepare a Natural Environment Study pursuant to Caltrans Environmental guidelines and comments from Caltrans Office of Local Assistance environmental staff. It will include a wetland delineation and field verification with the US Army Corps of Engineers. Categorical Exclusion under NEpA This includes submittal of technical information to Caltrans in support of a determination that the project qualifies for a Categorical Exclusion under NEPA. The following technical studies will be provided to Caltrans: N~.tural Environment Study Location Hydraulic Study Traffic memorandum Sonoma State Cultural Resources Literature Search Area of Potential Effect Map Coordination with City and Caltrans as needed regarding Caltrans review of the above. technical information and processing of a Categorical Exclusion through the Federal Highway Administration. Traffic Data and Safety Analysis The CONSULTANT will prepare the transportation element for the environmental document. The impact analysis will be completed with and without the Dublin Boulevard Widening project under both construction year ~ind cumulative ye'~ir conditions for each transportation mode including automobiles, bicycle, and pedestrian travel. The CONSULTANT will collect 24-hoUr traffic count data on Dublin Boulevard at one location within the project limits. The CONSUL,,TANT will collect morning and evening peak period traffic counts at the Dublin Boulevard/Sierra Cour/and Dublin Boulevard/Clark Avenue intersections. The CONSULTANT will also obtain available accident data from Alameda County and the City within the project limits. The CONSULTANT will summarize the setting information including peak hour capacity analyses of the study section of Dublin Boulevard and the Sierra Court and Clark Avenue intersections. Available morning and evening peak hoUr traffic forecasts will be obtained for the study segment of Dublin Boulevard and the Sierra Court and Clark Avenue intersections under each scenario. Peak hour operations analyses will be conducted for each facility to establish a baseline of traffic operations for the corridor. Impacts to bicycle and pedestrian travel will be qualitatively evaluated based on a review of the project's consistency with established policies and standards of adopted documents (i.e., General Plans, Specific Plans, design standards, etc.). Mitigation measures will be identified for significant adverse impacts. The CONSULTANT will prepare the administrative draft transportation section of the environmental document. The CONSULTANT.has budgeted a total of 8 hours to respond J:~.?.6~Admln\Co~uacts~SCOPEk$ C OPE 1 a.WPD 7 Scope of Services .OJECT July 6, 2000 Page 8 77 450 500 510 520 to comments on the administrative draft and draft sections. The CONSULTANT anticipates attendance at up to one meeting during this effort. Location Hydraulic Study The CONSULTANT shall prepare a location hydraulic study in accordance with Caltrans procedures. The CONSULTANT will coordinate with Zone 7 to obtain relevant current hydraulic information for the Alamo Canal. The CONSULTANT will prepare a backwater analysis to supplement the location hydraulic study and will submit copies to Caltrans, the City and Zone 7 for review. Preliminary Engineering The design objective is to provide plans and construction cost estimates in support of the environmental document. CADD digital drawings will be prepared in Microstation format and a format acceptable to the City. The documents will be-produced in metric units and annotated Imperial units. Structure General Plan The CONSULTANT will prepare a structure general pla~ to show structural type and preliminary cost estimates. Project Submittals The design objective is to provide an environmental document and obtain the environmental clearance for the construction of the project. The following environmental documents, if required, will be submitted to the CITY: A maximum of six copies of each Environmental Technical Studies for the CITY and Caltrans review: Natural Environment Study Location Hydraulic Study Traffic memorandum Sonoma State Cultural ResOurces Literature Search Area of Potential Effect Map A maximum of six copies of each Environmental Technical Studies for the CITY, Caltrans and FHWA files: Natural Environment Study Location Hydraulic Study Traffic memorandum Sonoma State Cultural Resources Literature Search Area of Potential Effect Map In conjunction with the environmental document, the CONSULTANT will prepare preliminary engineering documents for the project. CADD digital drawings Will be prepared in Microstation format, or a format acceptable to the CITY in accordance with the CITY procedures. Drawings will be in metric, and annotated Imperial units as established by the CITY. The CONSULTANT will submit a maximum of 10 copies of the preliminary engineering plans consisting of: Strip maps with right-of-way and geometries defined Preliminary Bridge general plan J:~262~,dml n\C ontracff'~ COPE',.S COPE t a. WPD ~ DUBLIN BOULEVARD WIDENINdl Scope of Services JJECT July 6, 2000 Page 9 540 600 610 620 700 710 720 Design Reviews At milestone points, the CONSULTANT will submit mater/als to the CITY and participating local agencies for review and comment. Review periods will be four weeks for all milestones. Each reviewing agency will submit a single set of. coordinated review comments to the CONSULTANT. The CONSULTANT will compile review comments from the reviewing agencies and schedule a meeting with the CITY and the other reviewing agencies to discuss any conflicting comments and to reach a consensus on resolution of any conflicts. Minutes of the resolution meeting will be distributed within five working days of the meeting. The CONSULTANT will incorporate agreed upon resolutions into the reviewed documents. Should future reviews generate comments which require changes to previously agreed upon elements of the documents and such changes result in additional work on the part of the CONSULTANT, such changes will be performed as Additional Services. MATERIALS FURNISHED BY The CITY ' Record Documents - The CITY will provide the following items: · Current standard Drawings, Manuals, Guides, and Procedures that pertain to the project · Available CITY "as-built" plans and specifications of existing conditions including r0~ldways, utilities, drainage improvements, and structures · Available CITY right-of-way plans · Surveying and mapping information including existing monument locations · Sample plans and reports to be used as guidelines for format, organization and content · Access to all records available at the CITY Base and Miscellaneous Information · Entry permission on private parcels CONTRACT ADMINISTRATION The CITY The CITY will: · Conduct ongoing reviews of the CONSULTANT's progress in performing the work and furnish technicaI comments in a timely manner on ail submissions · Review and approve the CONSULTANT's billings in a timely manner · Review, e~alUate and may approve CONSULTANT's requests for extension oftirne and amendments to the agreement · Attend all progress meetings with the CONSULTANT · Attend meetings with the CONSULTANT and others as requested · Conduct public outreach and public relations tasks CONSULTANT The CONSULTANT will: · Establish, furnish and maintain suitable office facilities to serve as the project office for the duration of the project · Maintain an adequate staff of qualified support personnel to perform the work J:~262~.Admi n\Contracm'~ COPE",S COPE 1 a. WPD 9 DUBLJN BOULEVARD WIDENINdl Scope of Services c OJECT July 6, 2000 Page 10 730 740 750 760 770 necessary to complete the project Establish internal accounting methods and procedures for documenting and monitoring project costs acceptable to Caltrans Standards Establish and maintain contract administration procedures which will include amendments, time extensions and subcontracts Maintain a project workbook with all the pertinent information relating to the project to be given to the CITY at the close of the project Attend meetings with other agencies as requested by the CITY. However, if number of meetings exceed those indicated in this scope of services, then those meetings will be performed as Additional Services The CONSULTANT is responsible for the accuracy and completeness of the contract documents and related design prepared under this project and prior to submittals will check all material accordingly. The plans will be reviewed by the CITY for conformity with the CITY.procedures and the terms of the contract. Project Control The CONSULTANT will provide and maintain a Management Information System to monitor costs and manpower and to report progress with the following: · Identify progress against the schedule for each major work item · Forecast completion dates from current progress · Advise the CITY of any work not in this scope or in any area Which is out of the required sequence · Provide updated estimates of time, manpower and dollars required for major work elements Subcontract Services Due to the nature and scope of the required services, the CONSULTANT will subcontract portions of the work. The CONSULTANT will review and coordinate the work of all subconsultants and they will abide by the terms and conditions of this scope as applicable to them. Quality Control The CONSULTANT and subconsukants have total responsibility, for the accuracy and completeness of the plans and related design prepared under this project and will check all such material accordingly. The CONSULTANT will prepare and have a quality control plan in effect during the entire time work is being performed under this contract. The quality control plan will establish a process whereby plans, calculations, and documents that the CONSULTANT submits for review will be clearly marked as fully checked prior to submittals by a qualified individual other than the originator. CONSULTANT Personnel The CONSULTANT's work will be performed and/or directed by the key personnel identified in the CONSULTANT's proposal. Any changes in the indicated key personnel will be subject to review and approval by The CITY. Acceptability of the Work The plans, designs, calculations, reports and other documents furnished under this scope of work will conform to the CITY's standard of quality. The criteria for acceptance will be'a J:~2262~4.d min\Contracts\SCOPEKgCOPE I t W'PD 10 DUBLIN BOULEVARD WIDENING( Scope of Service.~, flJECT ~ ~ July 6, 2000 Page product of neat appearance, well. organized, accurate and complete, technically and grammatically correct, checked and dated in accordance with the Quality Control Plan, and having the originator and checker identified. The minimum standards of appearance, organization, and content of drawing will are similar to the type produced by the CITY. 780 Design Documentation The CONSULTANT will submit all design notes, sketches, worksheets and computations to document the design conclusions. The design notes and computations will be recorded on 8 ½" x t 1" computation sheets, appropriately titled, numbered, dated, indexed, and si~ed by the designer and checker. The data will be bound in a hardback folder or a three- ring binder for submittals to the CITY. Computer output forms and other oversized sheets will be bound or placed in a binder. Design notes and computations will include, but not necessarily be limited to, the following data: · Design criteria used for the project · Geometric design calculations for horizontal and vertical alignment · Quantity calculations · Documentation of decisions reached from meetings, telephone conversations or ~ite visits J':~.26?xA drain%Comracr, s~ COPE~COP E 1 a.'C/PD 1 1 MKCENTENNIAL Dublin Boulevard Widening -Village Parkway to Sierra Court ~ Phase 1 and Phase 2 " ' ' 2000 " 2001 12002 ID TaskName Duration Start Finish ~lan Feb Mar Apr May Jun Jul I^.gls Ploct Ns~lDeclJanlFeblUartAprlUaylJunlJul I^uglSeplOctlNovlDeclJ." FeblUa. 1 NoticeTo Proceed 0 days 219/00 2/9/00 " }* ~ ~ ' ' ' ' ~ ' ~ ' ~ ' ..... ......................................................................................................................................................................................................................... ~ 11..,..~ .............. ~ ............. { ............. [ .............. ~ .......... { ......... ~ .......... } .......... ~ ............. ~ ............ ~ ............. i ............. ~ ............. [ ......................... ~ ............. ~ ............. 2 Project Management 258 days 219108 2/2101 ' _ ...... _ ..... [ ~ · , ....................................................................................................................... ' ~~~ ~~ I ~ , i ~ ~ 3 Prolect Schedule, QA Plan, Sub con,acts 51.~ wk~ ...... ~i6~ ................ ~5>~B'~ ......... I ............. [ ............ [ ............ 1 ............ 1 ........... j ............ 4 K ckoff Meet ng Phase I 0 days 219100 219100 f ~ I ~ ~ ' -~ .......................................................... ~ ....... - ; ' ' ~ .... . ' ~9 i ~ ~ i ~ 5 UIIIi~ Coordination Meetings 51 6 wks ~9/00 212/01 [ ' ~ ..... ~ .................................................. ~ ........................ ~ ............... ~ ............... 7 ~nAoc ~ aeolON 233days 1/1~00 12/1/00 ~ ' i '; IIIr' '" .................... ~ .............. [ ........... ~ ......... , ............. , .................................. l ....................... i ............ i ...................... i ............................ ~ ................... ; ........ ~ ................. 1 ..... .......................................................................................... '' ~ ~ ~ t [ ~ j ~ i i 1 ' ~ E.~ro.~,.t~ ........... ~6'~;~- ................ i~i~ .................... ~'i~' ................. ' ........... ~ ............. ~ .......... ' ............. ~ ........ Ti ....................... ~ ............. ~ ..................... [ .......... ~ .......................... ~'"-' ............ ~ ........... ~ ............. ~ ........................... ~ .................................. ~"'""~ ............ 4 ' 9 Comp ere PES fo~ and ~nsu t wi Cai rahs 2 wks 1/12/00 1/25/00 ~ { ~ I ~ ~ ~ "~ ................ ................................................ ; ................ ~ i ~ ~ ~I ~ t ~ ~ ~o co.au~t~e~ ca ~tu~ e~ ................... ~"~E~ .................... ~ ................ ~6~' .............. ~"i ..................................................... h ....... { ..................... ~ .......................... ~ .............. ~ ....... ~ ......................... ~ ............. { ............ ~ ............................... { ......... ~ .............. ~ ...... ~ ...................... 11 Prepare ED for Cat Ex · 4 wks ............... ~'~'~' ................ ~)~ .............. ~"{ .............. ~ ......... ~ .............. [ ........... ~1'"'"'"'[ ~ ............ ~ .......... ~ ...................................................... 12 · · ' ....................................................................................................................................................... ~ ........... ~ ........... { .............. ~ ............. , ............... ~ ............... ~ ........... ~ ....................... ~ .......... ~ ......... ~ .......... ~ ....... ~ ................ ~ ........ { ..... Pubhc Review Penod 4 wks ~23/00 3/21/00 { ~ ~ .................................................................................. : ............ ~ I ~ ~ I ' ~ ~ . - 13 Public Healing and CRy adopl on of ED ..... i'"~ ..................... ~ .............. ~'~6 ............... ~ ............. ~ .................... ~ ........ ~ ........... ~ ?'""'"~ ............. ?-"'~: ............ ~ ....................................................................... J ............ 1 ........ ' 14 Prepare Final ED ....................................................................................................................................... and submit to Ca trans and C ~ 2 wks 3122/00 4/4/00 ~ ...... ~ .... ~ ..... ~ ............... ~ ............... ~ ........... ~ [ ............... ~ ........... ~ ......... ~ .......... :~ .................... ~ ................. : ~ .......... ~ ............. ~; ...... ................................................................................................................................................................................................ ~ { ~ : ; : ; ~ ~ ~ ~ . ~ .; : , · . 16 Transmit approved ED Io FHWA for approval 1 wk 4/19/~5 "~'~)00 ...... ' ....... : ....... r.-..~.. .......... ~ ............ j """T .... t ...... ; .......... ,-' ~ ....... ~ .................. ~ ......... ~ ........... ~ · . ' .... I .......................................... ........ ................... ................ .... ;" : ! ................................. . . . . : , . ~ ~ . ~ [ ' . 2o ~o~g~t~ ~34~ ........... ~}76~ ................... ~ .......... ~'"'"'~-"7'~ ............ ! ........... ~F'"'"-* ............ ~' ......................... ! ......... t ............. i ....................... ~ ........... ~ ........... ~ ............ ! ........................ I ........ ~ ......... * ~ ....... ~ ...... t ...... ~,-- · .... ~-,.7 · i ~ · . · 21 S~cture Genera P an 4 wks 2/9/00 5/10/00 ~ .......... ~ ...... ;2 ....................... ~ ' "'"; .... ~ ....................... ~ ............. ~ .......... ~ .............. ; ........... r ............ ~ .................................................. I ...... ~ ........... ; ............ 4 ........... ....................................... · . , ~ i~ ~ If i I ~ ~ ~. ~ 22 Prellmlna ~ roadway d~s .......... ,n .................................................. ~'~"~';;;~'; .............. ~,~ .................... ~m,uu;;';';~; ............................. i ~.:~ ....... ............ ~ ........... ...................................... ~ i i-k..---4~ I ~ ........... Ii ............ ii ............ ii ........... ~ ................... i i ii ~['.. il ~" ~ ~ ................... ~ " :' ........... ;~ ........ J ~' ' 23 ............................................................................................................................................................................................................... ~ i i i ~ I J { J ! i ~ I { Mapp ng Suweys and Rlght-oFWay Eng neering 80 days $1~100 8/24/00 ......... ] ........... ] ............. ~ ............. ! .......... ] ........... r ............................... ~ .................... I ............ J ............ 24 Ma pping 4wk~ 515100 6111~ ~ ........... I ............. . ............. ! .......................... i ......... ~ ............. i ............. ~ ............. ~......--:.~ ~ .......... J i .............. I~ ............. ~ ............... ~ ......... ] .................. . 26Ti,e Repods6 wks 6/2/00 ......... ~)li'~5 .................................. ] 't .................................. '~ ~""'"'~ ............. i ............ i ........... ~ .................................. i ........... ~ ............... [ .......... I ........................................................ .......................... ;'x:: .................................................................................................................................................. I ~,~ [ i ! 27 ~w buweys 4 wks R/9~n R/9~/n~'": ...................................................................... ~ .......................... ~ ............... [ ........... ~ ............ I ....................................... ~ ............ f ............. i .............. 4 ......................... ~ ............ ~ .......... ~ ........... [ . [ ..... ~ ................. ~ ........ ......................................................................................................... I , ~I , Plals and legals 6 wks 7/14/00 8/24/00 ~ ~ ~ ~ i ~ ~ ~ - ' i ............ [ ......................... ] ........... I .................. 'i ............................................ ......................................................................................................................................................... i i ~ f ' ~ ~ ~ { : 2~ ~b i~ Outreach ~03 da ys ................................................................................... ~/23/00 1~/1/00 . :'~" ................................. ~~ ~ ~ '~ - ' *~ ......... ~' ................. ~' '~' ............ " ............. ~ ....................... ~ ............ ~ .......... ~ ..................... ~ '~ ....... ~ ' ~ ........ .~ ..... 3o M~eU.~;w~';'(;'~;'~;~;~ ................................................................. -~6"~'~; ~ ...................... ~ ............. ~ ................................... i ...... · 2/~/00 12/1/00 ~ ~ ~ ~ ~ ~ . ' ......... ~ .......... ' " Project: D~LIN12.MPP '~'~)~ ~$~ Date: 7/6/00 8:12 PM Task , ~.~.. ~ ..~z.~ C~li~l Task [~~] Progress II Mileslone ~ Summa~ File: y:~e~s~pe~D U ~.~ 2.M P P. '., . ~ . . MK CENTENNIAL Task Name Duration PHASE 2 DESIGN 175 days 30% Design 60 days Draft foundation report 4 wks 30% plans 6 wks Conslmctton Costs 1 wk QNQC 1 wk Submit 30% plans and estimate 0 days CITY review 4 wks 90% Design Final foundation reporl Permit applications 4 wks 90% plans 6 wks Construction Costs Specilications QNQC Submit 90% PS&E 0 days CITY review 4 wks Final Design S0 days Final plans 4 wks Specllicationa 1 wk QA/QC 1 wk Submit Final PS&E 0 days CITY review ........................... 4 wks CONSTRU~i~ ........................................................... 230 days Advertise and award construclion contract 6 wks Construction 40 wks Dublin Boulevard Widening -Village Parkway to Sierra Court · Phase 1 and Phase 2 2000 2OO2 Slad Finish 10/6100 ! ~ i §/11/00 ] ~ ~ .......... [ "; ............ ~' ................. ', ......... ! ........... 3/11 I00 ! ~ I ' i ' 8'25/00 ,, ! i ~ r ' ', ~ I ..... ........... ........... .......... ............ .......... ................ ~ ...................... ;' ~ '"' ,.l ............................................. , .......................... ~ ....................... , ........................ i .... .~ .............. i ........... t ........... [ .......... ,- ...... ! : ..... J. ././oo ~o/o/0o j lol9100 115/01 ! i ' '"--'[ ...................... ~ ....... i .............. ! ....... i ....... r'"' :" , , ............ 4 ............... , ......... f ........... , ......................... ! ........... , .......... i .......... ! : ........ t .... ' ' 'I' 10/9/00 11/3/00 i ! ! i t i ~ ~ , ,- : ' ,. ' i ............. ~ ......... i ............ ~..' ........... I .............. ', ................. ~ ' 11/20/00 11/24/00 i i 1 ~ , I ~ u i , · 111271OO 1211100 i, i ...................................................... i - i I , ~ .......... i" ............................................ ~ i ! ' I ' ""~' ......... ~ ......... ~ ................ ~1oo ~ ~ ~ ~ .................................... ~ ' ~ ,' ~ i i i ,,~ 128 ..... ~ .......... ~ ........... -' .......................... i .............. ~ .............. i ........ ; .............. ,,.., ............ ~ ............... , .... ~ ~/0t ! , i } ........ ' ............. i ......... i'i~'"'""!" i ........... : ............... ................... ~ ........... ~ .......................... I ............................. ~ ............ ~ ........... : .............. i ......... t .............. " ............ ~: ........... : ........ ~ ............. : ....... ; ...... ~ ......... 2/16101 ! i I ~ ~ I 3116/01 : , i i :! ~ ~ ~ ~ ~ ~ ~ ~! ' + .... : ............... 211102 i i ................................................................ i ........... ! ..................... -'. .............. ' ....... ~ ............. ~ ........... i ......... .i ...... ~ . "'"'"'? ........ i ............ [ ............................. ~12z/01 ' ~ ' ~ i i i ~! i I ! .... ;' '' 2/1/02 ~ ............. ~ . ......................... ~ ......... ~ ............ i .................................· .............. i 7117100 1214/00 ....... ~J~i'~ ....... 12111/00 116101 118/01 2/5/01 2/5/01 2/12/01 2116101 2/19/01 3119101 3/19/01 4/30/01 Projecl: DUBLIN12.MPp I Date: 716/00 8.'.12 PM File: y:\etty\scope\DUBLIN 12.MPp Task Crilical Task L~.~'~] Progress Milestone Summary )ublin Boulevard Widening Proj( COST PROPOSAL ?? MK CENTENNIAL _ABOR: Classificatior{ ~roj Prin ~roj Mgr Sr Eng Engineer CADD Clerical TOTAL DIRECT LABOR MKC DIRECT COSTS: DIRECT COSTS: Hours Rate Total 8 $ 54.00 $ 432.00 164 $ 45.00 $ 7.380.00 136 $ 34.00 $ 4,624.00 100 $ 24.00 $ 2,400.00 56 $ 28.00 $ 1,288.00 30 $ 16.00 $ 480.00 494 $ 18,604.00 OVERHEAD ~ 1.69293 $ 28,109.41 SUBTOTAL LABOR + OVERHEAD $ 44,713.41 Mailing, Telephone, Supplies,.Photos .... Reproduction & Presentation Materials CADD CompuTer Transpor[ation SUBTOTAL MKC DIRECT COSTS FEE ibased on 10%' profit of labor) $ 500.00 $ 305.00 $ $ $ 805.00 $ 4,471.34 SUBTOTAL MKC $ 48,68~.76 J35% Page1 y:\etty~ublin~cope\Engcstl.~s Labor+ ODCs Revised:7~/00 8:10 PM '~ublin Boulevard Widening Proj{ COST PROPOSAL PUBLIC AFFAIRS MANAGEMENT L,~,BOR: Classification Hours Principal - Env 28 Proj M~r - Env 68 Associate - Env 138 Cledca~ 48 Rate Total 50.16 $ 1,404.48 29.57 $ 2,010.62 18.59 $ 2,564.81 20,38 $ 978.28 DIRECT LABOR DIRECT COSTS: 282 OVERHEAD @ 1.44 SUBTOTAL LABOR + OVERHEAD 6,958.20 t0.019.80 16,978.00 Printing, Mailing, Telephone & Supplies $ 3,000.00 Transportation $ 500.00 Graphic Suppor~ $ I 500.00 Subconsuitants $ $, 000.00 SUBTOTAL DIRECT COSTS FEE (based on 10% profit of labor) SUBTOTAL PAM $ 13, D00.00 $ 1, ~97.80 $ 31 ~$75.80.122% Page 2 y:\ei;ty'~du~lin~Scope\Engcstl .xls Labor + ODCs Revised: 7/6/00 8:10 PM ublin Boulevard Widening Proj( COST PROPOSAL Chaudhar¥ & Associates LABOR: Prin Mngr Proj Surveyor Office Surveyor 2-man Field Crew Eng / CADD DIRECT LABOR DIRECT COSTS: Hours Rate Total 20 $ 48.00 $ 960.00 56 $ 37.00 $ 2,072.00 8 $ 28.00 $ 224.00 110 $ 53.97 $ 5,936.70 64 $ 25.00 $ 1"~ 600.00 258 $ 10,792.70 OVERHEAD ~ 1.8612 S 20~087.37 SUBTOTAL LABOR + OVERHEAD $ 30,880.07 Title Reports au cost (assumes 15 total ~ 1000 per title report) SUBTOTAL DIRECT COSTS FEE (based on 10 ¥o Drofit of labor) SUBTOTAL CHAUDHARY Mileage $ 500.00 Reproduction & Materials $ 500.00 .Photogrametdst $ 3,700.00 $ 15,000.00 $ 1@.700.00 $ 3~088.01 $ 53?$68.08 J37% (assumes 5 field oays) Page 3 y:~etty\dublin~scope\Engcstl .xls Labor +OOCs Revised: 7/6/00 5:10 PM f _~ublin Boulevard Widening Proj~., COST PROPOSAL FEHR & PEERS ASSOCIATES LABOR; Proj.Prin Sr Engineer Engineer Technical DIRECT LABOR DIRECT COSTS: Hours Rate Total 14 $ 54.81 $ 27 $ 28.85 $ 52 $ 21.64 $ 14 $ 19.00 $ 767.34 778.95 1,125.28 268.00 107 $ OVERHEAD ¢_. 1.4437 $ SUBTOTAL LABOR + OVERHEAD $ Travel Mileage Printing, Mailing, Telephone & Supplies SUBTOTAL DIRECT COSTS FEE {based on 10% profit of labor) SUBTOTAL FEER & PEERS 2,937.57 4~240.97 7,178.54 $ 250.00 $ 250,00 $ 717.85 $ 8,146,39 [6% Page 4 y:\ett!Adublin~sccpe\Engcstl ,xls Labor + ODCs Revised: 7f6/00 8:10 PM COST PROPOSAL - LABOR ONLY Dublin Boulevard Widening.Project Revised: 1/6/00 8:10 PM ~i;~E~i~iii~=~i~[~i~i~!!i[~!;~[~i~&~!~-~`~:;~ Pro] Prln ProJ Mgr Sr Eng Engine,er CADD Clerical MKC ~;,~',~ N o.~D e sc ~R tlc ~ ~',;~':;~t=~:~'~':~:'~":'~"~;~::::~~:':~:;~t.~;' ~;~[. Hours Cost Hours Cost Hours Cost Hours Cost. Hours Cost Hours Cost Hours Cost PrHect Management &Adminfstratio~ ' ' ' ' ' " Admlnis~a~on I Invoices (4) 2 108 12 540 8 128 22 776.00 Monthly Progress Repods / Sd~edule (4) 2 108 16 720 8 128 26 9~.00 Subconsullant Coordinalion 2 108 40 1,800 4 64 46 1,972.~ Kickoff meeting 8 360 8 272 2 32 18 ~4.~ MeeUngs / Agency Coordina~on (4} 2 108 12 540 12 408 12 288 8 t28 ~ 46 1,472.~ SUBTOTAL 8 432 88 3,960 20 680 12 288 0 30 480 158 5,840.~ ~nvlronmental Confi~ Environmental Do,merit 2 90 2 ~.~ TechnI~l Sludies 8 360 24 816 32 1.176.~ CEQA Initial Study I Neg Dec 8 ;,360 24 816 32 1,176.~ SUBTOTAL 0 18 8~0 48 1,632 O O O 66 2,442,~ Right-or-Way Englneedng & Su~eys ~stlng uUli~ plans & ~ordination 8 360 8 272 8 192 8 184 32 1,008.~ Supplemental Su~eys 8 360 8 272 16 632.00 R~ and Mapping Conirol 8 360 8 272 16 632.~ SUBTOTAL~ 0 24 1,080 24. 816 8 192 8 184 0 64 2,272 )rellmlna~ Engineering Data coltec~on and field reviews 4 · 136 8 . 192 12 328,~ Geometric layout 2 90 20 680 40 ~0 32 736 94 2,4~.00 S~ctum General Plan 8 360 8 272 20 480 16 368 52 1,480.~ Response to ~mments 4 180 4 136 4 96 12 412.~ QNQC 16 720 18 720.~ Estimates 4 t80 8 272 8 192 20 644.~ SUBTOTAL O 34 1,530 44 1,496 80 1,920 48 1.104 O 2~ ~;~ ~ ~N D ~~t~ ~i~:~ ~ ~'~ ~ I 136 4,624 100 56 30 480 494 16,604 COST DI?OPOSAL - LADOI~; O~'4LY ~-~.. Dublin Boulevarc~dening Project Project Management & Admlnls~atlon Adminis~aflon I Invoices (4) Monthly Progress RepoAs I Schedule (4) Subconsultant C~rdinafion ~ff tussling Mee~ngs I Agen~ Coordinalion (4) SUBTOTAL ~vlronmental Confi~ Environmental Document Te~nl~l Studies CEQA Initial Slay / Neg Dec SUBTOTAL Right-of-Way Engineering & Su~eys Existing utility plans & coordinalion Supplemental Su~eys R~ and Mapping ConEol SUBTOTAL Prellmtna~ Engineering Data ~llec~ a~ field m~ews Geometric layo~ S~ture General PLan Response to comments Q~QC Es~males SUBTOTAL 4 201 8 401 16 803 28 1,404 0 4 118 24 710 40 1.183 68 2.011 8 149 40 743 90 1.673 138 2,565 16 16 326 88 32 652 178 48 978 282 0 0 O 0 O O 0 O O O 0 O.OC 0 O.OC 0 O.OC 0 0.00 0 0.00 0.~ 4~?.60 2180.43 4310.17 6958.20 0.00 0.00 0.00 0,00 0.00 O.00 0.O0 0.00 COST PROPOSAL- LABOR ONLY , Dublin Boulevard Widening Project Re~sed: Z/~/OOS:lOPM II · roJect Management & Admlnlslratlo~ Adminis~aaon / Invoices (4) Monthly Progress Reports I ~edu;e (4) Subconsultanl Coordina~on Kick-off mee[ing Meetings I Agency C~rdinaflon H) Environmental Confi~ Environmental Do.merit Te~nlcal Sludies CEQA Ini~al Study I Neg Dec Rlght.o~-Way Englneeflng & Su~eys E~sflng utility plans & coordination Supplemenlal Suweys ~ end Mapping Conbo~ Prellmlna~ Engineering Data collection and ~eld reviews G~ometdc layout SUBTOTAL SUBTOTAL SUBTOTAL 2 98 18 864 20 960 4 148 52 1,924 56 2.072 · ~' 54 224 56 224 110 2.914 3,022 5,937 8 200 50 1,400 64 1,600 0 0,og 0 0.~ 0 0.00 0 0.80 0 0.00 0 0 0.00 0 0.00 0 O.0O 0 0 O.00 68 3.358.38 190 7,434.32 258 10.793 0 0.00 0 0.00 Structure Ganeral Plan j I / - { 0 0.00 { Response lo comments I I I ' ' I o o.oo I o*,oc ' I ' I - I o o.oo I ~'"'~' ~='.-"¢'~'="$!?"i~ ~' :"~'.~.i.'~Q:!~¢i~;:S~i~:,~,~::.,:::~,-j~i¢~i~ ~ ~"~ ............... -; .... ?: ........ ' - .................. ~ ........................................ ~,~ ............... COST PROPO~?~AL - LABOR ONLY 'Dublin Bou evar~d~idening Project Revised:, 7_,~o a:m PM ~roJect Management & Administration AdminlsVafion I Invoi~s (4) 0 Mon~ly Progress Re~s I S~edule (4) 0 0.~ Subconsultant Coordination 0 0.~ Kickoff meeting 3 87 3 Meeangs / Agency Coordina~on (4) 0 0.~ SUBTOTAL 0 3 87 0 0 3 86.55 Environmental Confi~ Environmental ~manl 0 0.~ Te~nical Studies 7 384 12 346 32 692: 8 152 59 1.574.35 CEQA tnllial Study I Nag De~ 7 384 12 346 20 433 SUBTOTAL 14 767 24 692 52 1.~25 14 266 104 2.851.02 Right.of. Way Engineering & Su~eys Exls~ng utilily pl~s & ~oo~inallon 0 0.~ Supplemental Su~eys 0 O.~ R~ and Mapping Control 0 0.~ SUBTOTA~ 0 0 - 0 0 0 Prellmlna~ Engineering Data collec~on and field mvl~,. 0 .0.~ Gaome~c layout 0 0.~ S~clure General Plan -. 0 0.~ Response to comments 0 0.~ Q~C - 0 Estimales 0 0.0o SUBTOTAL 0 '- - 0 0 - 0 0 Page 8 COST PROPOSAL - LABOR ONLY Dublin Boulevard Widenin~ Project Ra,~ssd: 7~6/00 a:m PM ~roJect Management & Administration ' Administrafion I Invoices (4) 22 Mon~ly Progress Reports I S~edule (4) 28 $ 968.00 Subconsultanl Coo~dinaaon 4S $ 1,972.00 Kick-off meefi~g Meetings I Agency Coordination (4) 46 $ 1,472.00 ;~ SUBTOTAL 161 $ 6,927 Environmental Confirm Environmental Documdnt ~8 $ SST.60 Te~nical Studies ~79 $ 4,930,78 CEQA lniUal Study I Neg Dec 255 $ 6,762.84 SUBTOTAL 4S2 $ 12,2Sl Eight*of-Way Englneedng & Su~eys Exisling uBily plans & coordination 32 $ t,008.00 Supplemental Su~eys 84 $ 3,990.38 ~ and Mapping Control 206 $ 8,066.32 SUBTOTAL 322 $ ~ 13,064.70 Prellmlna~ Engineering Data ~fiection and field m~ews 12 $ 328.00 Geome~c layout 94 $ 2,466.00 S~clum Ganeral Plan 52 $ t,480.00 Responseto ~mments 12 $ 4~2.00 Q~C ~6 $ 720.00 EsUmates 20 $ SUBTOTAL 206 $ 6,050 EXHIBIT A Professional Services Agreement Between CITY OF DUBLIN (CITY) and MK CENTENNIAL (CONSULTANT) for the DUBLIN BOULEVARD WIDENING PROJECT SCOPE OF SERVICES PHASE 2 INDEX DESCRIPTION PAGE 100 110 120 140 150 160 t70 180 190 GENERAL ..................:: ............................................ .~ ................... . .................................... 3 Location ...................................................................................................... ; ........................ 3 Description .......................................................................................................................... 3 Design Contract ......................................................................................................... i ........ ;3 Construction Cost ................................................................................................................ 4 Length o£ Services ............................................................................................................... 4 Project Scheduling .............................................................................................................. 4 Project'Progress Meetings and Monthly Progress Reporting ............................................. 4 Design Monitoring and Subconsultant Management .......................................................... 4 200 210 220 240 DESIGN REFERENCES .................................................................................................. 5 Caltrans Publications ........................................................................................................... 5 AASHTO Publications ........................................................................................................ 5 Publications From Other Sources ....................................................................................... 5 300 310 320 330 340 PHASE 1 DESIGN WORK PERFORMt;D BY CONSULTANT ................................ 5 Data Collection and Field Reviews ..................................................................................... 5 Site Mapping and Supplemental Field Surveys .................................................................. 5 Public Outreach ................................................................... -: ............................................... 6 Right-of-Way ...................................................................................................................... 6 400 410 420 430 440 441 442 443 444 445 450 460 470 PHASE 2 DESIGN WORK TO BE PERFORMED BY CONSULTANT ................... 6 Coordination with the CITY and Other Parties .................................................................. 6 Permits ........................................... ; ........................................................................... .......... 6 Geotechnical ........................................................................................................................ P. S. & E. Documents .......................................................................................................... 8 Lighting and Signal Design ................................................................................................. 9 Construction Staging .............................................................. ~ ........................ ~ ................... 9 Utility Plans ......................................................................................................................... 9 Drainage .............................................................................................................................. 9 Landscaping and Irrigation ............................................................................................... 10 Project Submittals ............................................................................................................. I 0 Design Reviews ................................................................................................................. 12 Quantities and Cost Estimates ........................................................... . ................................ t2 ¥',CE I _P L D. VOL l ~C E I D ATLZ2 6 2kAD M IN~ ONTP,.4.CT SkPHAS F,,2~ CO pE2. WPD DUBUN BOULEVARD WIDENIN~[,~ .(OJECT Scope of Services June 28, 2000 Page 2 5OO 510 520 MATERIALS FURNISFi'ED BY The CITY ................................................................. 12 Recoi'd Documents ............................................................................................................ 12 Miscellaneous Information ............................................................................................... 12 600 610 620 630 640 650 660 670 680 CONTRACT ADMINISTRATION ............................................................................... 12 The CITY .......................................................................................................................... 12 CONSULTANT ................................................................................................................ 13 Project Control .................................................................................................................. t 3 Subcontract Services ......................................................................................................... 13 Quality Control .................................................................................................................. 13 CONSULTANT Personnel ................................................................................................ 14 Acceptability of the Work ................................................................................................. 14 Design Documentation ...................................................................................................... 14 B. CEI _P L 1 \VOL I'~C~ELDAT'~2262~,DM TN~CONTR,ACTS~PHA SE2'GCOPE.2 .V/PD 2 DUBLIN BOULEVARD WIDENING~ Scope of Services [ OJECT (' June 28, 2000 Page 3 100 110 120 140 GENERAL Location The project is located in Dublin, California. The City of Dublin is proposing to widen Dublin Boulevard between Village Parkway and Sierra Court/Civic Plaza from a four-lane to a six-lane facility. The existing street has been improved to a six-lane facility from Village Parkway to San Ramon Road. The proposed project will extend the six-lane facility to just east of the Sierra Court intersection. The widening of Dublin Boulevard is to both sides of the street to obtain additional roadway width. This will require both demolition and reconstruction of existing improvements on both sides Of the street including widening of an existing bridge and repair of the creek slopes below the bridge. During the reconstruction, existing overhead utilities will be placed underground. Description The CONSULTANT will prepare final plans, specification and estimates. The design of the project elem.ents described herein, will. be in accordance with The CITY, and Caltrans Standards in effect at the time this agreement is executed. The documents will be produced in metric units. The project will consist of the following basic features: Prepare environmental technical studies and environmental documents required for environmental clearance Attend project status meetings and City Council meetings Prepare contract bid dOCuments (plans, specifications and estimates - PS&E) Design Contract The CONSULTANT services will be divided into three phases of work: Phase 1 was completed under a separate con.~ulting engineering services contract dated November 16, 1999 with the City of Dublin and included: · Environmental documents and clearance · Topographic mapping, title reports, supplemental surveys and right-of-way maps · Field reviews and data collection · Prelimin~ry engineering and design criteria · Right-of-way maps, Plats and legal descriptions including permanent and temporary construction easements (TCE) Phase 2 work will include the following scope of services: Phase 2 Final construction documents: plans, estimate and specifications (one construction bid document) including landscaping and irrigation plans and traffic handling and stage construction plans Assist The CITY with utility relocation and right-of-way coordination V~CE1-PL I S'VOL 1 '~C EIDA'T~2262~D M [N'~C 0 NTKACT S ~u H'A'S E ~SC OPE2 'WP D ' 3 DUBLIN BOULEVARD WIDENIN¢~~ Scope of Services DJECT (' June 28, 2000 Page 4 150 160 170 180 190 Phase 2 (Continuation)' · Assist the CITY with response to bidders' questions as they pertain to design only · Construction support services during construction will be provided by CITY staff Construction Cost The CONSULTANT will prepare cost estimates of the probable construction costs using the CITY and Cattrans unit prices. The estimate will include construction costs for roadway, structures and drainage facilities. Length of Services The project will be initiated with a notice to proceed from the CITY. The engineering work- would then proceed without delay for 8 months. Review periods at the milestones will be: four weeks at the 30% submittal, four weeks at the 90% submittal, and four weeks at the final submittal. A four-week review period is scheduled for each review of the draft and final environmental document packages. The CITY may wish to amend the scope of services to be provided by CONSULTANTi When this occurs the CITY and the CONSULTANT will agree on a revised scope and any adjustments to the project schedule and/or compensation due the CONSULTANT. Project Scheduling The project schedule will include ail project activities and milestones. The schedule will identify all milestones, tasks and sub tasks, review periods, and coordination activities associated with engineering and design. Attachment A, "Design Schedule," shows the time phased tasks to be performed for the required work. Project Progress Meetings and Monthly Progress Reporting Monthly progress reports will be submitted to the CITY with each invoice for payment for engineering services. The report will indicate the tasks that were completed during the preceding.-period, work planned for the next period, identification of design issues or problems being encountered, and a comparison of planned and actual progress. The updated schedule will accompany this report. Monthly reports will be submitted throughout the project duration assumed above. Reports will not be submitted for any period where no work was performed. The CONSULTANT Project Manager will meet with the appointed CITY representatives on a monthly basis to discuss the status'of the project design work. These meetings will focus on resolution of any design issues requiring the CITY involvement, the design progress, potential problems, and to address any particular detail of the work previously identified for resolution. Design Monitoring and Subconsultant Management The CONSULTANT Project Manager and each subconsultant principal will monitor the work underway to assure it complies with the criteria and standards established for the work, and to ensure that the design work is being accomplished in the most efficient manner possible. The CONSULTANT will establish effective and efficient project procedures to direct and monitor the subconsultants' work. Regular scheduled reviews of the subconsultant design ~ICEI_PL I\VOL I \CEIDAT~262~.DMIN~CONTR.ACTS~HASF_.2~SCOPE2. WPD 4 DUBLIN BOULEVARD WlDENIN~,'i" Scope of Services OJECT ~ June 28, 2000 Page 5 200 210 22'0 240 300 310 320 will be performed to ensure compliance with the quality standards established, coox:dination among team members, and that design operations are being conducted in a timely and efficient manner. DESIGN REFERENCES Caltrans Publications 211 Standard Drawings Bridge Standard Details (Current Edition - Metric) Standard Plans (1999 Edition - Metric) 212 Specifications Standard Specifications (1999 Edition - Metric) 213 Manuals Highway Design Manual, 5th edition (Metric) Bridge Design Specifications (Current Edition - Metric) Bridge Design Practice (Current Edition) Bridge Memo to Designers (Current Edition) Bridge Design Aids (Current Edition) Bridge Design Details (Current Edition) AA. SFITO Publications A Policy on Geometric Design of Highways and Streets, 1994 ("Green Book") Standard Specifications for Highway Bridges, with interim revisions through 1997 Manual on Foundation Investigations, 1978 Guide for Design of Pavement Structures, 1993 Guide for Specifications and Standards Standard Specifications for Structural Supports for Highway Signs, Luminaries and Traffic Signals, Edition of 1985 and Interim Specifications through 1991 Roadside Design Guide, 1996 An Information Guide for Roadway Lighting, 1984 AASHTO Drainage Guidelines, 1992 Publications From Other Sources City of Dublin Standard Plans PHASE 1 DESIGN WORK PERFORMED BY CONSULTANT Data Collection and Field Reviews Under phase 1 contract, the CONSULTANT met with the CITY and the local agencies to collect available information pertinent to the project. A review of available information and an on-site investigation was conducted to further define site conditions and determine'the need for additional investigation and data. Site Mapping and Supplemental Field Surveys Under phase 1 contract, the CONSULTANT prepared topo~aphic base mapping at 1:500 with 0.5-meter continuous intervals based on 1983 NAD (horizontal control) and 1929 NGVD (vertical control). Mapping standards will be checked by the CONSULTANT and \~.CEI_PL I '~VO L P,C EI D AT',2262~,D M IN,CONTRA C'TS~H. ASE2~$CO PE2. V~PD 5 DUBLIN BOULEVARD WIDENING~ ~JECT I June.28, 2000 Scope of Services Page 6 330 340 4O0 410 420 will conform to the CITY's survey/mapping standards, as required for this project. The CONSULTANT will conduct field surveys. Work will include conform areas, pavement spot elevations, storm drainage inlets/outlets, selected utilities and potholed utilities. Potholing is not included in this scope of services. Public Outreach Public outreach activities are included in phase 1 contract. Public Outreach activities are assumed to be minimal during the design phase. We have assumed that the City may want to have one to two follow-up meetings with local business owners to review the project status. In addition, we have budgeted for mailings for these two meetings and the preparation and distribution of one (post-card size) project update during the design phase. If the City wishes to conduct additional outreach activities such as newsletters, or .more community meetings, they would be billed on a time and materials basis. Right-of-Way As part of the phase 1 contract, the CONSULTANT will identify right-of-way necessary for the project alternatives based on information derived from existing ri*~ht-of-way information provided by The CITY. The CONSULTANT will prepare right-of-way maps and conduct right-of-way surveys. The CITY will provide right-of-way costs to the CONSULTANT. PHASE 2 DESIGN WORK TO BE PERFORMED BY CONSULTANT Coordination with the CITY and Other Parties In phase 2, the Design team members will continue to attend scheduled meetingS. The coordination wilt be conducted during design review submittals, monthly meetings, and at such other times as specific issues need resolution. It will be necessary for the CONSULTANT to meet with representatives of the local agencies and The CITY for the purpose of discussing design details. The number of meetings budgeted for this work are as follows: Description NumBdr of Meetings Monthly progress 6 meetings and / or utility coordination meetings The agency contacts anticipated are with Zone 7 and the CITY. Permits In phase 2, the CONSULTANT will oversee the application and approval of regulatory permits for the project. These will include permits from the US Army Corps of Engineers, 401 Certification from the Regional Water Quality Control Board, Streambed Alteration Agreement from the California Depm~,ment of Fish and Game, and possibly a Section 7 perm'it from the US Fish and Wildlife Service. The CONSULTANT will utilize the assistance of Barry Anderson and Monk & Associates in preparing applications and consulting with the regu.latory agencies. Coordination with the City and Zone 7 will an integral part of preparing the applications and consultation With the regulatory agencies regarding any mitigation requirements'within the Creek Channel. '~\CEI_PL 1 \ VOL 1 \CE I DAT',2262La. D M lN~CONTRACTSkPHASE33SC 0 PE2..WP D 6 DUBLIN BOULEVARD WIDENING("- Scope of Services '~JECT ( June 28, 2000 Page 7 Task I Obtaining a Corps Permit We are assuming that the project will be eligible for a Nationwide Permit pursuant to Section 404 of the Clean Water Act. It is likely that two permits may be required: Nationwide 14 for linear corridors, and Nationwide 33 for temporary construction impacts. Although these general permits have already been issued by the Corps, the applicant must provide the Corps with a Preconstruction Notification (also known as a PCN). We would prepare PCN and submit it to the Corps. Task 2 Obtaining a 401 Certification or Waiver In California the Regional Water Quality Control Board (RWQCB) in each district administers Section 40t of the Clean Water Act. We believe the project will receive a Certification waiver. We will prepare the necessary forms and submit them to the Board for their review. Also, note that as part of the application package the Board requires adequate California Environmental Quality Act (CEQA) documentation which we are assuming the Negative Declaration approved by the City under the phase 1 contract will be adequate for RWQCB purposes. Task 3 Obtaining a i 603 Streambed Alteration Agreement The California Department of Fish and Game (CDFG) issues Strearnbed Alteration Agreements. for projects that affect the ' bed or bank of creeks and streams in Califorrtia. We will prepare the necessary forms and submit them to the Departmeni for their approval. The applicant or applicants consultant usually meets with the Department in the field to discuss the project and how impacts can be eliminated or reduced. The Department has recently revised its policy on Streambed Alteration Agreements and now requires that the project be in compliance with CEQA. We are assuming that the Negative Declaration approved by the City will be. adequate for CDFG purposes. Task 4 Assisting With'the California Red-legged Frog (CRLF) Permit Monk & Associates has already prepared a CRLF site assessment and submitted it to the U.S. Fish and Wildlife Service for their approval. We do not know what type of permit or permit conditions the Service will require. For small impacts to frog habitat, the Service has a programmatic Section 7 permit that they append to the Corps 404 permit. Ideally, this is what would happen here, and this is what we are providing a budget for. Task 5 Mitigation Plan Because impacts to various resources are small, we are assuming that th~ mitigation requirements will be to reconstruct the bank to its previous extent and hydroseeding bare soil. In this task we will discuss mitigation with the regulatory agencies and prepare a brief(several pages) document describing the methods for restoration. Assumptions Because we do not know the exact permits or requirements the agencies will request, I have made some assumptions that limit .what we are prepared to do for the budget proposed here. CEQA documentation has been prepared by the City. We assume it will be adequate for both the Regional Board and the Department offish and Game. Preparation of new CEQA documents is beyond the scope of this proposal. We assume the project will be eligible for a Corps Nationwide Permit. Preparing an application for an Individual Corps permit is beyond the scope of this proposal. The Fish and Wildlife Service may require a full Section 7 consultation and associated mitigation and monitoring requirements. We assume the proj ect will receive a Programmatic Section 7, and a regular Section 7 (or Section 10) is beyond the scope of this proposal. Ali permits require some sort of mitigation plan. We assume that restoration to the original state of the channel will be all that is required, and preparation of full mitigation and monitoring plans that the agencies could require is beyond the scope of this proposal. We assume the Engineers will provide the necessary engineering drawings that will be required for several of the permits described above. \\CEI_PL BVOL 1 \CE IDA'i'h2 2 6 2 D~D MIN~CO NTKA CTS'~'HAS£2\S COP F._.2.W P D 7 DUBLIN BOULEVARD WIDENIN(~. Scope of Services OJECT ( June 28, 2000 Page 8 430 440 Geotechnical In phase 2; the CONSULTANT will provide pavement section evaluation by first evaluating the existing pavement conditions Of the street and subgrade soils. We will first perform a document search, followed by a brief pavement conditions survey of the surface of the pavement following Pavement Management Standards (PMS). The pavement section will be based on an R-value of 5 where new pavement section design and reconstruction is needed. Pavement section options will be provided so that the most economic means of paving the road may be selected. To obtain subsurface information for the bridge and abutment design, we will drill a deep .boring at each end of the 1964 bridge. Samples obtained from the borings will be used to provide geotechnical parameters for the bridge in accordance with Caltrans design requirements. The samples will also be used for evaluating the Alamo Creek bank stabilization recommendations and the repair of the bicycle path under the bridge, .In addition, these borings will be used for further information in the evaluation of the existing roadway. We plan to' provide seismic design parameters for use in the upgrade of the bridge. Our scope of work' includes rasearching available information regarding the geology, tectonics, and seismicity of the project site, establishing the controlling seismic source, estimating peak bedrock acceleration using Caltrans Seismic Hazard Map (1996), and recommending the appropriate acceleration response spectra (ARS) curve from the Applied TechnoI.ogy Council publication ATC-32 for the design based on the subsurface soil information from our field investigation. The CONSULTANT will draw upon our extensive local experience with Alameda County Zone 7 as well as that of our staff, in .addressing the Alamo Creek..channel stabilization. We will draw upon Zone 7's Channel Repair Standards as defined by A..lameda County Flood Control and Water Conservation District's Resolution No. t757. We will also consider the concerns of the Army Corps of Engineers and the Fish and Game Depmhnent in assessing stabilization methods. We will include mitigation measures as outlined in the CEQA Negative Declaration into the plans and specifications. The CONSULTANT will also drill three to four shallow borings along the alignment of the proposed joint utility trench. This is so that we can obtain engineering perimeters and identify the subsurface conditions that will be encountered during excavation and construction of the utility vaults, conduits., and trench sections and will also be used for pavement evaluation. Based on our experience the surface soils in the area are generally very expansive clays wiih deeper soils consisting of alluvial silty clays with some sand P.S. & E. Documents The design objective is to provide plans, specifications and construction cost estimates for the construction of the project. CADD digital drawings will be prepared in Microstation format. The documents wilt be produced in metric units. Specifications will be composed of supplements to the Calms Standard Specifications for Construction, with general conditions and contract format, including special provisions, as directed by the CITY. These compositions will be carefully coordinated with the work depictions shown on the plans and the bid items included in the construction cost estimate. Construction cost estimates will be assimilated using Caltrans bid item designations, ¥,CF2[_PL 1 \VOL I\CEIDA'D,2262~M~CO~~S~COP~.WPD ~ DUBLIN BOULEVARD WIDENING~ Scope of Services flJECT ( June 28, 200O Page 9 441 442 443 444 estimating a quantity and expanding it to a cost application of the expected unit price. This estimate will be performed at each to the design submittal stages. The accuracy of the estimate will increase throughout the design process. Lighting and Signal Design In phase 2, plans specifications & estimates (PS&E) documents will be prepared for the following project elements: · Traffic sigaaal modifications at the Dublin Boulevard/Sierra Court and Dublin Boulevard/Clark Avenue intersections; · Traffic signal interconnection along Dublin Boulevard between Village Parkway and Sierra Court; and · Street lighting on 'Dublin Boulevard between Village Parkway and Sierra Court. Available record and/or construction drawings will be obtained f6r each project element. Detailed field verification of as,built existing.conditions will be performed. All work will be conducted in accordance with the current-applicable City, County, and State standards. Electrical load calculations will be prepared and submitted to facilitate verification of service point locations with the utility company. Final design documents will be provided based on comments. 'An internal quality control review will .be conducted prior to each submittal. Technical special provisions will be prepared and submitted at the 90% design stage. A construction cost estimate will be prepared and submitted at the 30%, 90.%, and final design stages. Construction Staging As part of the PS&E package in phase 2, the CONSULTANT will prepare construction staging and traffic handling plans. The existing traffic capacity will be maintained during consl:mction. However, temporary lane closures will be required. CONSULTANT will identify lane closure hour constraints in the specifications. Utility Plans In phase 2, the CONSULTANT will prepare utility maps that identify the existing utilities based on existing as-built data obtained from the CITY and utilities. The CONSULTANT shall coordinate with the utilities to identify, propose final locations, and prepare plans for utilities which are affected by the project and not included in the utility underground district work. Utility owners will desigxa the relocation of their own facilities as identified by the CONSULTANT. Pot holing is not included in this scope of services. The CITY may wish to amend the scope of services to be provided by CONSULTANT for utility relocation design. When this occurs The CITY and CONSULTANT will agree on a revised scope and any adjustments to the project schedule and/or compensation due CONSULTANT. Drainage The CONSULTANT will review the affected sub-basin drainage areas for the project and determine the drainage impacts. The CONSULTANT will then report to the CITY their findings of the drainage impacts. The CITY will review the CONSULTANT'S finding and make a determination on how to proceed with the design of the project's drainage system. The CITY has previously provided the CONSULTANT with record drawings of the exiSting drainage system for the projects. The CITY has researched their existing files and has determined that what was previously provided to the CONSULTANT is the best information · ,,\CEi_PL 1 \VOL Ix, C El DAT!2262XAD M rNXCONTRAC'i'S~HASF-.2~ COPF-2.WPD 9 DUBLIN BOULEVARD WIDENINgl Scope of Services · OJECT June 28, 2000 Page 10 445 450 available. The CONSULTANT will prepare drainage plans as determined and as directed by the CITY. It is assumed that no additional drainage design nor changes to the existing main line system will be required. This does not preclude the necessity of amending the scope of work if this assumption is found to be in error. Landscaping and Irrigation Landscaping and irrigation are included in phase 2 work. The landscape architectural portion ofthe work involves providing construction documents for planting and irrigation for street trees within cut-outs in the city sidewalks and trees, shrubs and ground cover in the new median. The contractor will be instructed to maintain the plants that are to remain during construction. For the property frontages that will be disrupted as a result of the road widening, the contractor will be responsible for repairing and reconnecting existing irrigation systems in these areas' using new equipment comparable to the existing systems, and installing the equipment in such a manner as to provide full'irrigation coverage of the planting bead along the road frontages. In addition to the irrigation along these frontages, the contractor will also be responsible for installing ground cover to match existing materials (e.g. sod, ivy, mulch, crushed rock, etc.) to restore the property,to a neat and clean appearance. Any existing trees and shrubs that are damaged as a result of the construction that are outside of the edge of pavement and are to remain will be replaced by the contractor with new plants of the same species. Direction for this work will be covered in the construction documents. The landscape planning portion of the work will occur concurrently with the public outreach effort. Concept plans will be prepared for presentation to staff at the 30°/0 level of team production. Planting plans will be completed by 90% and will be reviewed by city staff. Upon acceptance of planting plans, irrigation plans will be prepared and submitted at the 100% submittal. The final bid set will incorporate all comments made by the city staff. Project Submittals CONSULTANT will prepare PS&E documents for the project. CADD digital drawings will be prepared in Microstation format in accordance with the CITY procedures. Final plans will be submitted in an electronic format compatible to the CITY's electronic equipment which is AUTOCAD version I4. Drawings will be in dual (Metric/Imperial) units' as established by the CITY. This Scope of Services provides for a design process that will produce several documents that will serve as a record of the design development. Design submittals will be made at'the 30% and 90%. Final design documents will be provided based on comments. An internal quality control review will be conducted prior to each submittal. Technical special provisions and a construction cost estimate will also be prepared and submitted at the 90% design stage. 5 copies of each submittal at 30%, 90% and Final One hard copy to each utility owner and electronic files One print-ready original PS&E for advertisement ~\CEI_P L I IVOL I~CEIDAT~2262~.M3M~,CO1VTIL~C'TS~PHASE2~SCOP~2.WPD 10 DUBLIN BOULEVARD W1DENIN~'~ Scope of' Services OJECT June 28, 2000 Page ll The following doCUments, will be submitted to the CITY at project milestone points: 30% plans consisting of: Title Sheet Typical Cross Sections Key Map and Line Index Layout Utility Plan (existing only) Signal and Lighting Plans Define Right-of-Way Preliminary Construction Cost Estimate List of permits required and draft permit aPPlications Draft Foundation Report Bridge General Plan 90% plans consisting of all ~otan sheets (revised) listed for the 30% submittal and: Construction Details Drainage Plans and Details Utility Plans Stage Construction and Traffic Handling Plans Construction Area Signs Pavement Delineation and Sign Plans. Signal and Lighting Details Planting Plan, Details, Plant List Irrigation Plan and Details Foundation Report Construction Cost Estim ate Permit Applications Exhibits ConsTruction Schedule Specifications Final plans consisting, of all plan sheets (revised). fully cornvleted, listed for the 90% submittal and: Construction Cost Estimate Construction Support Services during construction will be provided by the CITY as stated in section 140 of this scope The CITY' will provide the CONSULTANT with a marked up set of plans that reflect changes that occurred during the construction phase of the project. The CONSULTANT shall transfer the reflected changes to the original set of plans with appropriated annotation that clearly indicates what change occurred during construction. The CONSULTANT shall then label each sheet of the plans as RECORD DRAWINGS. The CONSULTANT shall provide to the CITY a copy of the RECORD DRAWING plans in an electronic median acceptable to the CITY, (AutoCADD Release 14). ".\CEI_PL 1 \VOL l \CEIDA'Ix226-'~'~DM IN~COIqTRACT$~HASF-'2~ COPF-2'WPD 1 t DUBLIN BOULEVARD WIDENIN(~ Scop~ of Services OJECT ( June 28, 2000 Page 17 460 470 500 510 520 600 610 Design Reviews At milestone points, the CONSULTANT will submit materials to the CITY' and participating local agencies for review and comment. Review periods will be four weeksfor all milestones. Each reviewing agency will submit a single set of coordinated review comments to the CONSULTANT. The CONSULTANT will compile review comments from the reviewing agencies and schedule a meeting with The CITY and the other reviewing agencies to discuss any conflicting comments and to reach a consensus on resolution of any conflicts. Minutes of the resolution meeting will be distributed within five working days of the meeting. The CONSULTANT will incorporate agreed upon resolutions into the reviewed documents. Should future reviews generate comments which require changes to previously agreed upon elements of the documents and such changes result in additional work on the part of the CONSULTANT, such changes will be performed as Additional Services. Quantities and Cost Estimate An kern ized cost ~stimate will be prepared based upon the project's required list of Standard Items of Work. The quantity estimate will address general requirements, retaining wails, electrical systems, drainage structures, and all construction work items as applicable. A preliminary' cost estimate will also be prepared that identifies'the various work items, quantities, unit costs, and the project's cost, including allowances for mobilization and contingencies. Quantities and estimates will be updated to respond to each respective submittals's review comments. MATERIALS FURNISHED BY The CITY Record Documents The CITY will provide the following items: · Current standard Drawings, Manuals, Guides, and Procedures ~hat pertain to the project · Available CITY "as-built" plans and specifications of existing conditions including roadways, utilities, drainage improvements, and structures · Available CITY right-of-way plans · Surveying and mapping information including existing monument locations · Sample plans 'and reports to be used as guidelines for format, organization and content · Access to all records available at the CITY Miscellaneous Information · Entry permits on private parcels CONTRACT ADMINISTRATION The CITY The CITY will: · Conduct ongoing reviews of the CONSULTANT's progress in performing the work and furnish technical comments in a timely manner on ali submissions · Review and approve the CONSULTANT's billings in a timely manner · Review, evaluate and may approve CONSULTANT's requests for extension of time and amendments to the agreement ~;CEI -PL P'¥O L 1 ~ClEI DA'I'~26L~'ADMII~CONTRACTS~'HA SI~2~ COP~' WP D ] 2 DUBUN BOULEVARD WIDENINg:' Scope of Services DJECT ( June 28, 2000 Page 73 620 630 64O 650 Attend all progress meetings With the CONSULTANT Attend meetings with the CONSULTANT and others as requested Consultant CONSULTANT will: · Establish, furnish and maintain Suitable office facilities to serve as the project office for the duration of the project · Maintain an adequate staff of qualified support personnel to perform the work necessary to complete the project · Establish internal accounting methods and procedures for documenting and monitoring project costs consistent with the State auditor's requirements. · Establish' and maintain contract administration procedures which will include amendments, time extensions and subcontracts · Maintain a project workbook with ail the pertinent information relating to the project to be given to the CITY at the close of the project · Attehd meetings with other agencies as requested by the CITY. However, if number of meetings exceed tho~e indicated in this scope of services,.then those meetings will be performed as Additional Services The CONSULTANT is responsible for the accuracy and completeness of the contract documents and related design prepared under this project and prior to submittals will check all material accordingly. The plans will be reviewed by the CITY for conformity with the CITY procedures and the terms of the contract. Project Control The CONSULTANT will provide and maintain a Management Information System to monitor costs and manpower and to report progress with the following: · Identify progress against the schedule for each major work item · Forecast completion dates from current progress · Advise the CITY of any work not in this scope or in any area which is out of the required sequence · Provide updated estimates of time, manpower and dollars required for major work elements Subcontract Services Due to the nature and scope of the required services, the CONSULTANT will subcontract portions of the .~vork. The subcontract firm will be approved by the. CITY in writing prior to initiation of any work bY the subconsultant firms. The CONSULTANT will review and coordinate the work of ail subconsultants and they will abide by the terms and conditions of'thi's scope as applicable to them. Quality Control The CONSULTANT and subconsultants have total responsibility for the accuracy and completeness of the plans and related design prepared under this project and will check all such material accordingly. The CONSULTANT will have a quality control plan in effect during the entire time work .is being performed under this contract. The quality control plan will establish a process whereby, plans, calculations, and documents that the CONSULTANT submits for review will be clearly marked as fully checked prior to submittals by a qualified individual other ~han the originator. \'~CEI _ pL i ~,VOL 1 '~C EID A'r~2262LM~MIN~C ON~l-g~. GTSk,°HA$ E2~CO PF--2. W P D I3 DUBLIN BOULEVARD WIDENING( Scope of Services 28, 2000 Page f4 660 6?0 680 CONSULTANT Personnel The CONSULTA2qT's Work will be performed and/or directed by. the key personnel identified in the CONSULTANT's proposal. Any changes in thc indicated key personnel will be subject to review and approval: by The CITY. Acceptability of the Work The plans, designs, calculations, reports and other documents furnished under this scope of work will conform to the CITY's standard of quality. The criteria for acceptance will be a product of neat appearance, well organized, accurate and complete, technically and grammatically correct, checked and dated in accordance with the Quality Control Plan, and having the originator and checker identified. The minimum standards of appearance, organization, and content of drawing will are similar to the type produced by the CITY. Design Documentation The CONSULTANT will submit all design notes, sketches, reports, worksheets and computations to document the design conclusions. The design notes and computations will be recorded on 8 ½ "x 11" computation sheets, appropriately titled, numbered, dated, indexed, and signed by the designer and checker~ The data'will be bound in a hardback folder or a three-ring binder for submittals to the CITY. Computer output forms and other oversized sheets will be bound or placed in a binder. Design notes and computations will include, but not necessarily be limited to, the following data: · Design criteria used for the project · Geometric design calculations for horizontal'and vertical alignment · Quantity calculations · Documentation of decisions reached from meeting, telephone conversations or site visits · Bridge structural calculations [ICEI_PL I~VOL BCEIDAT~262'tA.DMINkCONTR~CTS~PHASE2~COPE2.W PD 1 4 MN CENTENNIAL ' ~' Dublin 'Boulevard Widening - Village Parkway to Sierra Court Phase 1 and Phase 2 ............. 2000 12001 2002 .l~n Feb Mar Apr May Jun Jul ~,~g Sep 0Ct Nov Dec Jan lFeb M;~r'laprlM;,yl'3u. JulI~.ols.pldc~ ...................................................................................... : .......... ~ ............. ) ........... I ............. ~ ........... : ........ ~ ............ ~ ............. ~ . . 2 Project ~anagemen[ 258 days ~100 212101 ~ ~ ~ I II I I I ~ 3 P~J.d Schaduls, QA Pla., Sub contracls 51.6 wks 2/9/00 ~2/01 i ~ ~~ · : : ~ : ~ ~ ~ ~ · { · ~ ........ ~i'~'6g';~i'~;~;~"A.;'ti.~, ..... s~,~' ' 2~/0o i 2~o~' ...... ~~:~ ' 7 PHASE t DES ON 233 days ill2100 12/1/00 ...... l ' I ........................... 6o'~;~; .......... iii'~0~ ...... S~6~ ....... ::: '":'?::::::':";r::"'"'""~ ........... ~ ............. ~ ........... ~ ...... ~ ......... ~ ....... ~ ......... : J ' : ..... : 8 Envlronmen~l ~ . i ................................................................................... ~ ......... ~ ............ ~ ........... ~'-""i ........ ~ .......... ~ .......... ; ..... ~ ................ ~ ......... i ............ ' ..................... ~' ' ; ' ' ; ' · '~ ' ....................................................... ~ .......... I .......... ~ ........ ~ ............ ~ ....... ~ ..... 10 Conduc[ le~nl~l studies 4 wks 1/26~0 2/22/00 ~ t ~ ~ ~ { { ~ ~ ~ ', ~ ~..i .............. i ....................................... i ..................... ~ ....................... { ........ ~ ........... ~ ......... ~ ........... ~ .......... ~ ............ i ........... ~.: ......... , .................... l ........... I .. 11 Prepare ED for Cai Ex 4 wks 1126~0 ~22~0 ~ ~ ~ i j J i i i j i i i J '" ............................ = ............................................................................................................................... ................................................................. ~ ......... ~ ............ i ....................... i .............. t ........ ! ........... ~ .................... i ................................... i ......... i .......... l ............ J ........... i ......... i- '""' '~ .......... ! ........ ~' · ' ~ ..... : ..... 12 Pub c Renew Pegod 4 wks ~23~0 3/21/00 : ~ ~ . . ~ . ~3 ; ................... ~'~"~'H~'~"~az~-~'~a~i'~';i'~6 .......................................... i"~ ............. ~}~"i'~0' .............. ~i&'6' ........................................ ;'"i ................. ' ..... , ...... , ....... ' ............ I ......... ~ ................. ' ........... l ............ i ........... 1 ............. ~ ............. ' ........... · ..... !' ,'"! '" : ; .......................... ~ .............. ~..;.........~ ........ ~ .......... l ....... I ....... J......:..-.~ ............ J ............ j ............ ~ ......................... ~.......~ ......... ' ........ ~ ............. · ............ ~ ............ I ........... i ..... ~ ...... :. :.. t4 Prepare Fna ED and subm [ lo Ca frans and C ~ 2 wks 3122~0 4/4100 j ~ j J ! ; ....... - j . , I , ~ 15 Review ED 2 wks 415/00 4fl 8~ ................. " ........ ' ......................... ~ [ ............ ' ...................... · Ji ............. ~ ............ t ........... J~ .............. ~ .............................. i i J~ ........ ~l ............. ~ .................... i : ! ............ ~ ............. i ............ i ............. ~ ............. i-I .......... l ........... i ............ F':-'""~ ............. ~ ........... ............ l ........... i ......... ! ............ J ............ J .......... J ............... i ....... j ....... t ......... ! ..... j ...1 .... 16 Tmnsmlt approved ED to FHWA lot approval 1 wk 4119~0 4125100 ~ ~ ~ i j j j . j ~ ~ ' -- · ............... ='="'"": ................... :- = ...................................................... ~'"--'~ ...................................... J ............ i ............. i ............. ~ ............. [ ........... H-'---"! ............ i .............. { ........... {.~ ........... i ............. [ ............. ~ ........... ~ ............. { ........... ~ ............ i ............. ~ ........... J'~ .......... i .......... ~ .......... ~ ....... i .... ~.. .................. ................... , ...... ,''' ................ ?' ................................. ~~ 27 .......... ~'S~e~; ............................................................................................. 4 wks 8/2/00 6129~0 ~ ~ , ~' , ....... ~ ..................... : ~l .......... ~ ................. ~' j . .. ~: ;: ....... , : ', 28 Plats and legals · 6 wks 7/14~0 . 8/24/00 ~ i , ~ · . .................................................................................................. : , . ~ ~ ~ ~1~ ~ ...j I ~ ~ ~ ...' . = 2g Public Outreach 203 days 2/23/00 12/1/00 j ~ ~ ~ ~ ..... ; ...... ..................'30 Meetings ' .... wl~ ' ................................................................................................................................... stakeholders 40.6 wks ~23~0 ~ ........................................................................ 1~1~0 ~,,~ ~'"~"~" ~~~ ~ ........................................." '~,,' ~ .......... i~ ......... ,!~'~ ............. ~: ~!{ .................. ~ ~' ..... , j~ ..... ~ ~ ~" :~" ' j~ ' . '. Date: 7/6/00 8:12 PM ' MKCENTENNIAL Du.biln Boulevard Widening. Village Parkway to Sierra Court Phase 1 and Phase 2 ............. 2ooo " 12001 ' 1~0o2 ...... .... 31 PHASE2 DESIGN ' ' ' ....... ' 175 days 711~100 3116/01 .................................................................................................... I . I i ' . ' · · ' [ "' : ................................... ;~": ................. ~ ...................................................... . ~ .... ~33 Geote~ni~l e~lora~on 4wks 7117/00 8/11/00 ~ Draft foundaUon repod 4wk~ 7117/~ 8/11/00 ~ ~,, ~ ~ ~ ~ ~ .{ ~ ~ ~ ~ ; ' ,. , ~ . 35 30% plans . i ~ .' 41 ............ FJ~[~unda~;~ rep~ ........... 2 w~s ' 'lo~J~ 10~2'0~00 I" '~3 ....................... ~'~i~'~' ................................. : ........................................... ~..~ .............. ~0~ .......... ~'~'- j _j . . ; ~ . i ~ : ~ "~ . ...... ~." 1 wk 11/20/00 11/24/00 j ~ . . ~ ~ ~ ~ fl i ~ i . "~ ...... ~ .... ~ ......... , ......... ~" ~ ...... 1 wk 1~4/00 12/8/00 0 days 1~8/00 12/8/00 , ! j i ~ !~ .... i ~ I t . , ~ · ~ , ~ I I I , , ~ ~"~" ~..~, ~ ~ '~~ , .................... ' ......... ~ .......... : ........ ~ ..........~ ~ ......... : ................... ~ ........ ~ ......... ~ .......... ~ .............................. , .... ~- · t Project: DUBLIN12.MPP Date: 7/6/00 8:12 PM Crili~l Task [~~ Progress ~ Mileslone ~ Summa~ ~ .~ File: y:~e~pe~DUB~.MPP ~ .~ ~--.~blin Boulevard Widening Proj~t COST PROPOSAL PHASE 2 WORK MK CENTENNIAL LABOR: Classification Proj Prin Proj Mgr Sr Eng Engineer CADD Clerical TOTAL DIRECT LABOR MKC DIRECT COSTS: DIRECT COSTS: Hours Rate Total 2 $ 54.00 $ 108.00 232 $ 45.00 $ 10,440.00 450 $ 34.00 $ 15,300.00 536 $ 24.00 $ 12,864.00 424 $ 23.00 $ 9,752.00 128 $ 16.00 $ 2~048.00 .. 1772 $ 50,512.00 OVERHEAD @ t.69293 $ 85.513.28 SUBTOTAL LABOR + OVERHEAD $ 136,025.28 Mailing, Telephone. Supplies, Photos .... Reproduction & Presentation Materials CADD Computer Transportation SUBTOTAL MKC DIRECT COSTS FEE ~esed on 10% profit of labor) $ 500.00 $ 3,600.00 4,100.00 13,601.50 SUBTOTAL MKC $ 53,726.78 '157% Revised 8:43 PM 8:43 PM J:~.262~admin~contr~cts~phase2~Engcst2-xls Labor + ODCs Page 1 (~ublin Boulevard Widening Pro~,~ct COST PROPOSAL PHASE 2 WORK PUBLIC AFFAIRS MANAGEMENT LABOR: Classification Hours Rate Principal - Env 54 $ 50.15 Principal -. PI 0 $ 44.88 Proj Mgr - Env 0 $ 29.57 Proj Mgr - PI 0 $ 39.07 Associate. Env 72 $ . · 18.59 Associate - Pi 0 $ 23.23 Clerical 30 $ 20.38 Total $ $ $ $ $ $ $ 3,210.24 1,335.48 611.40 DIRECT LABOR DIRECT COSTS: 166 OVERHEAD ~ 1.6 SUBTOTAL LABOR + OVERHEAD Printing, Mailing, Telephone & Supplies Transportation Graphic Support Miscellaneous Biology' Subconsultant SUBTOTAL DIRECT COSTS FEE ~ased on 10% profit of labor) SUBTOTAL PAM 5,1.60.1,2 8,256.1 g 13,416.31 400.00 250.00 200.00 15~000.00 15,850.00 1 r341.63 30t607,94 111% Revised 8:4.3 PM 8:43 PM J:~2262~admin~contracts~ohase2~ngcst2..xis Labor + ODCs Page ~'~blin Boulevard Widening Proj~"-t COST PROPOSAL PHASE 2 WORK ¸?7 FQ.~AL PROJECT C:O. ST $ 267,519:918._i Chaudhary & Associates LABOR:-' Prin Mr~gr Proj Surveyor Office Surveyor 2-man Field Crew Eng/CADD DIRECT LABOR DIRECT COSTS: Hours Rate 0 $ 48.00 0 $ 37.00 0 $ 28.00 0 $ 53.97 o $ 25.00 To~I $ $ $ $ $ 22,500~00 0 OVERHEAD @ 1.8612 SUBTOTAL LABOR + OVERHEAD Mileage Reproduction & Materials SUBTOTAL DIRECT COSTS FEE (based on 10% proffi of labor) SUBTOTAL CHAUDHARY 2r250.00 24~750.00 19% Revised 8:43 PM: 8:43 PM J:~2262~admin~cont~acts~phase2~Engcst2~Js Labor + OOCs Page 3 (~ ,blin Boulevard Widening Pro~'"t COST PROPOSAL PHASE 2 WORK KLEINFELDER LABOR: Pfin Eng Proj Mng / Eng Snr StaffProf .Professional 'Technician Drafting / Admin DIRECT LABOR DIRECT COSTS: Hours Rate Total 8 $ 46.64 $ 373.12 50 $ 33.65 $ 1,682.50 42 $ 25,80 $ 1.083.60 18 $ 17.88 $ 321.84 7 $ 15.60 $. 109.20 18 $ 18.03 $ 324.54 143 $ 3~894.80 OVERHEAD @ 1.92 $ 7r478.02 SUBTOTAL LABOR + OVERHEAD $ 11,372.82 Drilling Permits & backfill Laboratory testing Ana~sis Data research & materials SUBTOTAL DIRECT COSTS FEE (based on 10% profit of labor) SUBTOTAL KLEINFELDER $ 2,958.00 $ 1,900.00 4,858.00 1,137.28 $ 17~368.10 I6% Revised 8:43 PM 8:43 PM J:~262~admin~contracts~phase2~Engcst2.xts Labor + ODCs Page 4 p,,.blin Boulevard Widening ProJ~r~+ COST PROPOSAL PHASE 2 WORK FOTAL PROJECT COSY $ 267,519.9~"i FEHR & PEERS ASSOCIATES LABOR: Pmj Prin Sr Engineer Engineer Technical DIRECT LABOR DIRECT COSTS: Hours Rate Total 24 $ 58.65 $ 61 $ 33.17 80 $ 23.80 $ 88 $ 20.67 $ 253 $ OVERHEAD @ 1,4553 $ SUBTOTAL LABOR + OVERHEAD 1,407.60 2,023.37 1,904.00 1 ~81.8.96... Printing, Mailing, Telephone & Supplies SUBTOTAL DIRECT COSTS FEE (based on 10% profit of labor) t SUBTOTAL FEER & PEERS Travel Mileage 7,153.93 0,452.65 17,636.58 180.00 815.00 995.00 I ~763.66 20T395.24 18% Revised 8:43 PM 8:43 PM J:~262'admin~contracts~hase2~Engcst2.xls Labor + ODCs Page 5 {~" ~blin BoulevardCosT PROPOsALWidening P roi~--'-t PHASE 2 WORK _~~ PROJECT COST HAYGOOD & ASSOCIATES LABOR: Proj Prin / Proj Mgr Landscape Assoc Jr Landscape Arch CADD Tech Field Tech Clerical DIRECT LABOR DIRECT COSTS: Hours Rate Total 27.5 $ ,45.00 $ 211 $ 26.00 $ 0 $ 15.00 $ 0 ' $ 25.00 $ 0 $ 17.00 $ 0 $ 14.00 $ 1 ~37.50 5,486.00 238.5 OVERHEAD (~ 1.4466 SUBTOTAL LABOR + OVERHEAD Irrigation Subconsultant Horticulture Subconsultant Reproductions Delivery Charges Film Mileage, tolls, parking Per Diem Travel Project Equipment SUBTOTAL DIRECT COSTS FEE (based on 10% profit of labor) SUBTOTAL HAYGOOD $ 6,723.50 9~726.22 18744.9.72 $ 1,700.00 704.88 144.00 28.35 $ 2,577.23 $ 1~644.97 20.671 .g2 j8% " Revised 8:43 PM 8:43 PM J:~2262~admin~contracts~phase2~Engcst2.xls Labor + OOCs Page 6 Dublin Bouleva.~_~rd Widening Project Revised: 7/6/00 8:43 PM ;~;;[~i~-E~:-T`:~!~;~!~t~;i~;ai~;~i~;~;~;[:::~:F;~: ProJ Prln ProJ Mgr Sr Eng Engineer CADD Clerical MKC :~~~..._._. ~i~1~/~5~[~i~;~[~:~,~ = EJ,~2~-.-~ ,~<.-=-~,~ ~-~:~'~ ,~a,~,~ .=~ ................... ~,~ $ 54.00 S. 45.00 $ 34.00 $ 24 00 $ 23.00 $ t6.~ Project Management & Admtnlstrallon '" , ,, Admlnis~afion I Invoices (8) 32 1,440 24 384 56 · 1,824.~ Mon~ly Progress Repo~s I S~edule (8) 32 1,440 Sub~nsultant Coordination 40 1,8~ 40 1,360 24 384 104 3.544.~ ~ffmeeflng (I) . 4. 180 4. 136 4 96 4 ~ 16 476.~ Meea~s I Agen~ Coo~inaEon (4) I 2 ~ 08 20 900 20 480 4 224 I 2.~ SUBTOTAL 2 108 128 5,760 44 1,496 24 578 0 ~ 1,440 2~ 9,3~.~ Pa~lts and Public Outreach Public OuEea~ ' 0 1,988.~0'~ Pe~b (Co~s, Fish[Game, Wale.r ~al ~, Zone 7) 20 900 32 1,088 52 · SUBTOTAL 0 <~ 20 900 32 1,088 0 0 0 52 1,988.~ ~gllty, Right-of-Way Englneeflng & Su~eys U~lity plans & ~ordlnaaon (assumes P~ecslon pla~lng pro,des all pe~nent Info~a~on for reaping) 8 360 20 680 40 ~O 40 g20 1~ 2.g20.~ SUBTOTAL 0 8 3~0 20 680 40 ~O 40 920 O Engineering 108 2,920 Geote~nlcal exploraaon & analysis & repo~s 8 272 - 8 272.~ Geome~c layout 4 180 24 5~6 24 552 52 1,308.~ Cons~cUon details 2 90 24 816 40 ~O 40 g20 2.7~.~ Bddge 20 9~ 120 4.080 160 3.840 160 3.680 460 12.~.~ Chapel e~osion ~n~ol design and plans 2 90 4 136 40 9~ 32 736 78 1.922.~ Bike pa~ romp design and repair al bridge only 2 90 4 136 40 960 32 736 78 1.922.~ Drainage 2 90 10 340 40 960 24 552 76 ~,942.~ J~nt Een~ plans (re~ew only) 2 90 8 272 8 192 2 32 20 588.~ Lands~plng and I~ga~ plans 2 90 8 272 8 192 2 32 20 586.~ Llgh~ and signals 2 90 8 272 8 192 2 32 20 S~ge ~s~on and Eaffic handling 2 90 40 1.360 ~ - 40 920 ' Pavement dellnealt~ 2 90 4 1~ 40 960 32 736 78 1.~2.~ Response to ~mmenls 2 90 24 818 24 576 Q~C 16 ' 720 32 1,o88 4a t.8Oa.~ Spe~aons 8 360 40 t,360 32 512 80 2.232.~ Cons~clion ~st estimates 8 360 20 680 4'0 ~0 68 2,~.~ SUBTOTAL O 76 3.420 354 12.03~ 472 11.328 384 8.832 38 :onstmctlon. Suppod Sewlces 1324 38.224.~ RE file (nol Included In ~ls s~pe of se~ces) Cons~cflon bidding suppo~ (not Included In ~is s~pe of se~a '* ~ O. · .O.~ Post ~ard asslstan~ (~blin to pro~de ~nslm~0n suppo~ .e~' * I ' 0 0.~ , . SUBTOTALi 0 0 0 0 [ ~ ~ ~~s~~-. G · e~ :,~ .... '~ ~:~ :~= ~ '"~ ~=~='~==1 2 108 232 o ~;.-=~-.~=~~,~-:..~t~, . ,. 10,~0 450 15,300 ~36 1~,864 424 9,7S2 t20 2,04= 1,772 ~0,~12 Y:%eflytdublinLscope~,Engcst2.xls Labor Page 7 COST PROPOSAL -LABOR ONLY Dublin Boulevard Widenin[I Project Revised: ?/6/00 8;43 PM PreJect Management & Administration Administration / Invoices (8) Monthly Progress Reports I Schedule (8) SUBTOTAL Subconsultanl Coordination Kick.off meeting (t) . Meetings/Agency Coordination (4) ~ermlts and Public Outreach Public Oub'each Permits (Corps, Fish&Game, Water Quaffiy, Zone 7) SUBTOTAL Jgl]fy, RlgM-of-Wsy Englnee~ng & Surveye UUlity plans & coordination (assumes Pracsion planning provides all parllnent informaUon for mapping) SUBTOTAL Engineering Geotachnlcal exploration & analysts & reports Geom8~o layout Construction details Bddga Channel erosion control design and plans Blke path romp design and repair at bridge only Drainage Joint trench plans (review only) Landscaping and Irrigation plans Lighting and signals Stage construction and traffic handling Pavement dellneaUon Response to comments OA/OC : Sped~caUons Construction cost asUmates SUBTOTAl =onstructlon Support Services RE tile (not included In this scope of services} . ConslmcUon bidding support (not Included in this scop Post award assistance (Dublin to provide conabuction SUBTOTAL 40 2,006 24 1,204 64 3,210 32 40 72 595 744 1,338 0 0 0 18 367 12 245 30 011 9O 76 t66 0.~ 0,~ .Or 2968.12 2192.00 5180.12 0.00 0.00 0.9O 0.00 0.00 0.9O 0.00 O.OC 0.0~ 0.0~ 0.00 .9O 0.00 0.00 0.00 0.00 IXgo 0.9O cost PROPOSAL- ~OOR O~'~L¥ Dublin Boulev~x.d Widening Project " Ra~.'-~.', ~ e:43 PM Admtnls~flon I Invoi~s [8) Monthly Progress Repo~s I S~edule (B) Sub~ns~lant Coo~dina~on Ki~ meeting (~) Mee~ngs/Agency Coordination (4) SUBTOTAL 0 0 and Public Outreach Pubfio ~ea~ Perils (Co~s, Fish&Game, Water Quality, Zone 7) SUBTOTAL 0 0 Right.f-Way Englneeflng & Su~eys Ufilily plans & ~ina~on (assumes ~ecsion planning provides all pennant in[o~a0on ~or mapping) SUBTOTAL 0 0 Engineering Geotachnicel exploration & analysis & reporls Geometric layout Construc§on details Bridge Channel erosion control design and ptans Bike path ramp design and repair at bridge only Drainage Joint trench plans (review only) Landscaping and Irdgatl0n plans Lighting and signals Stage construction and traffic handling Pavement delinealion Response Io comments QA/QC Speclticallons Conslmction cost estimates = SUBTOTAL Constructlon Support ServiCes RE file {nol included In this scope of services} Construction bidding support [~ot included In this scop~ Poet award aselslance (Dublin to provide conelruction ~ SUBTOTAL 0 0 0 0.0~ 0 0.00 0 0.00 0 0.00 o 0 0 0 0 0 0.0~ 0 0.00 0 0.00 0 0 0.00 0 0.00 0 0.00 o 0.~0 0 0.00 0 0 0.00 0 0.00 0 0.00 0 o.oo 0 0.00 0 0 0 0.00 0 0.00 y:~elty~dublintscopa~EngcsL?..xlS Labor Page 9 COST PROPOSAL- LABOR ONLY Dublin Boulevard Widening Project Revised: 7/6t00 8:43 PM Adminlslration I Invoices {8) Monthly Progress Reporls /Schedule (8) Subconsullant Coordination Kick-off meeting (1) Meetings I Agency Coordinallon (4) SUBTOTAl 'ermlts and Public Outreach Public Outreach Permils (Corps, Fish&Qame, Water Quality, Zone 7) SUBTOTAl [Jtlllty, Right-of-Way Engineering & Surveys U~itity plans & coordination (assumes Precslon planning provides all pertinen! intormalion for mapping) SUBTOTAL Engineering Geotechnicel exploration & analysis & repeals Geomelric layout Consl~JCtion delails Bridge Channel erosion control design and plans Bike path ramp design and repair al bridge only Drainage Joint Irench plans (review only) Landscaping and irrlgalion plans · Lighting and signals Stage construction arid traffic: handling Pavemanl delineation Response lo comments QA/QC Specfticetions Construction cost estimates SUt~TOTAL ;onstructlon Support Services RE file (nol included in this scope of services) Conslruction bidding support (Rot included In this scop~ Post award assistance (Ddbtin to provide construction: SUBTOTAL B 373 0 50 1,683 0 42 1.084 0 18 322 8 373 50 1,683 42 1,084 18 322 0 7 109 0 18 325 18 325 7 109 0 0.~ 0 0.~ O 0.~ 0 0.~ 0 0.~ O 0 0.~ 0 0.~ 0 O 0.~ 143 3,894,80 9 0.~ 0 0.~ 0 ~ O 0.~ 0 0.~ 0 0.~ 0 0.~ 0 0.00 0 0.~ 0 0.~ 0 0.~ 143 3,894.80 0 0.~ O 0.~ 0.~ 0 0 o 0 0 0 0 C051 PI;.OPOSAL - LABUfil ONLY Dublin Boul~e~,~d Widening Project 7/8/00 8:43 PM Project Management & Admlnlst~tlon AdminisEaaon / In~l~s (8) 7 0 0.~ Men,fy P~mss Repeals/S~edule (8) . 0 0.~ Su~nsuttant CoordinaUon 0 0.~ ~ff meeUng (1) 3 t~ , 3 99.51 Mee0ngs/Agency Coordlna~on (4) 6 19g 4 83 10 281.70 SUBTOTAL 0 9 2g9 0 4 83 13 Pe~l~ and Public Outreach Public Ou~ea~ ~ 0 Perils (Co~s, Fish&Game, Water Quall~, Zone ?) 0 0.~ SUBTOTAL 0 0 0 0 O U011~, Right.of. Way Eng[neo~ng & Su~eys UUlJty plans & ~o[dinaUoQ (assumes Precsion plannlng pm~des all pe~nenl In~o~aOon for mapHng) . - 0 0.~ SUBTOTAL 0 0 0 0 O 5nglneedng Geote~nl~l exploration & analysis & repeals 0 0.~ Geome~c layout 0 0.~ Cons~ion details 0 0.~ B~dge 0 0,~ Channel erosion conbol design and plans 0 0.~ Bike pa~ ramp design and repair at bridge only 0 0.~ ~alnage Joint lre~ plans (re;law only) ' 0 0.~ 0 0.~ Lands~plng and IMgatlon plans ' O 0.~ Lighting and signals 938 40 1.327 60 1.428 80 1.654 1~ 5,346.80 Stage ~ns~c~on and baf~c handling 0 0.~ Pavement dalinealio~. Resp~ae lo ~mmenls 0 0.~ Q~C 0 0.~ Specifi~lions 4 235 8 265 12 286 2 41 2~ 826.~ Cons~ctton cost estimates 4 235 4 133 8 190 2 SUBTOTAL 24 1,408 52 1,725 80 1,904 84 1.736 240 6,~72.72 :onslmcllon $uppo~ So,Ices RE file (not Included in ~ls scope of $e~s) ' 0 0.~ Cons~c~on bidding suppo~ (not Included tn ~ls scop 0 0.~ Post award ass{slanc9 (Dublin 1o provide ~ns~c~on 0 0.~ , SUBTOTAL 0 0 0 0 v:~etlv~dublin~scooe~Enacst2 xl.~ I nher Page COST PROPOSAL. LABOR ONLY Dub lin Boulevard Widening Project Revised: 7/6/00 8:43 PM ::;f,..,t~:,~;~'.i,!: r~' ~! =~:-~.~:~;!d~:i:l~,i~;~.~ ~;~:,~ ~ t~i;~i~2=:~,~;4~:~:!¢; HAYGOOD &"ASSOCIATEs ~:[:4.!~:~;::~;?? ~f;22 {:;:~;.~; ;:; ¢~'-:.;: ;;:i ~ :~,~,~:~',:;:..~'.;4::;" "::' ": ~.; ;:;: ;,,'?f:':¥~:.:?~:"::: ,:-'~ ProJ Pfln I ProJ Mgr Landscape Assoc Jr Landscape Arch CADD ~ech Field Tach Clerical HAYGOOD Total Adminls~on I Involes (8) . Mon~ty Progress Repods I S~edule (8) O O.~ Su~sullant Coordinaaon O O.~ ~ff meeUng (1) 0 O.~ Mee~ngs I Agen~ C~rdlnaaon (4) 0 O.~. O 0.( SUBTOTAL O O 0 0 0 O and ~ubllc Outreach O Public Pe~ ts (Co~s, F sh&Game, Waler Quali~, Zone 7) 0 0.~ 0 0.~ · · SUBTOTAL O 0 0 O O 0 O ~ght~f-Way Englneeflng & U~lily plans & ~o~fna~on (assumes Pre,ton planning pro,des all ps~nenl Info~a~on for mapping) - ' O O.~ SUBTOTAL 0 - 0 0 O O 0 Englneedng O Geote~nl~l explora~on & analysis & repo~ GeomeMc layout 0 0.~ Cons~on details . · ' 0 O.~ Bddge .O Channel erosion en~l design and plans 0 O.~ Bike pa~ romp design and repair at bddge only . . ' 0 0.~ Drainage O 0.~ J~nl ~en~ plane (re~ew only) O 0.~ Lands~ptng and i~gatlon plans 2T.5 1,238 211 5,486 0 0,~ Ligh~ng and signals 238.5 6,~23,50 Stage ~ns~c~on and kaBc handling . · Pavement delinea~on *' 0 O. Res~se to ~mments 0 0,~ Q~C ' 0 0.~ Spe~fi~gons 0 0.~ Cons~cdon ~sl eslimates 0 0.~ 0 0.~ SUBTOTAL~ 27.5 1,238 211 5,486 0 0 0 Construction Suppo~ Se~lces 238.5 6,723.50 RE file (ne[ Included In ~is s~pe cT sewices) · Cons~on bidding suppo~ (nol Indud~ In ~ls scop~ . 0 0.~ Post award asslstan~ (Dub n to pro,de ~ns~on. . O O.~ SUBTOTAL~ 0 0 0 0 O .............................................................. , ............................... ' ............. ; .... : ......... 7 ..... ~ ' ' - 239 6,724 MKC Job No. 2262 Printed: 7/6/00 8:4~t PM S,U M MARY Dublin Boulevard Widening - Phase 1 and Phase 2 Fee Estimates t Labor 1 ODCs I Fee I TOTAL. Phase 1 (with adjustments for revised scope) MKC $ 44,713.41 I $ 805.00 $ 4,471.34 IS 49,989.75 PAM $ 16,978.00 $ 13,000.00 $ 1,697.80J $ 31,675.80 Chaudhary $ 30,880.07 $ 19,700.00 $ 3,088.01 IS 53,668.08 Kleinfelder $ - $ - $ - $ Fehr&Peers $ 7,178.54 $ 250.00 $ 717.85 $ 8,146.39 Haygood $ - $ - $ - $ - Subtotal Phase 1 $ 99,750.02 $ 33,755.00 $ 9,975.00 $ 143,48,0.02. Phase 2 MKC I $ 136,025.28 I $ 4,100.00 $ 13,601.50 15 ' 153,726.78 PAMt $ 13,416.31 $ 15,850.00 $ 1,341..6315 .~ 30,607.94 Chaudhary $ 22,500.00 $ - $ 2,250.00 IS ' 24,750.00 Kleinfelder $ 11,372.82 $ 4,858.00 $ 1,137.28 $ . 17,368.10 Fehr&Peers $' 17,'636.58 $ 995100 $ 1,763.66 $'.. 20,395.24 Haygood $ . 16,449.72 $ 2,577.23 $ 1,644.97 $ 20,671.92 Subtotal Phas'~ 2 $ "217,400.71 $ 28,380.23 $ 21,739.04 $ 2'67.,51~.98- TOTAL= I$ 317,150.73 I $ 62,135.23 I $ 31,714.04 t $ 411,000.00 j:~262~admin\contracts~udget\Total Fixed Fee.xls Sheet1 Dublin Boule_.yv~ard Widening Project R~,~d: l/8~90 8;43 PM : . Y:~atty~dublin~scope~Engcst2,xls Labor Project Management & Admlntslraflon Adminis~atio~ I Invoices (8) 66 $ 1,824.00 Monlhly Progress Repods I Sd)edule (8} ' 56 $ 1,824.00 Sub~nsultant Coordination 104 $ 3,5~.00 Kl~ff meeling (1} 19 MeeUngs IAgen~ C~rdination (4) 66 $ t,993.7o SUBTOTAL 301 $ 9,761 >e~lts and Public Outreach Public Oulma~ 90 $ 2~968.12 Permits (Corps. Fish&Game, Water Quality, Zone 7) 128 $ 4,~80.00 SUBTOTAL 218 $ 7~148 planning provides all pedinent informa~on for . mapping} ~08 $ 2,920.00 SUBTOTAL ~08 $ 2~920.00 Englneerlng Geote~ni~l ~ploration & analysis & reports 151 $ 4~66.80 Geometric layout 52 $ ~,308.00 Construction details 106 $ 2,786.00 B~dge 460 $ 12,500.00 Channel erosion ~n~ml design and plans 7B $ 1,922.00 BiNe palh ramp design and repair at b~dga only 7B $ 1,922.00 Drainage 76 $ 1,9~2.00 Joint ~ench plans (re~ew only) 2D . $ 586.00 Lands~plng and I~gat~on plan~ 258.5 $ 7,309.50 Lighting and signals 216 $ Stage const~lion and traffic handling 82 $ 2,370.00 Pavement delineation 78 $ ~,922.00 Response Io~mments 50 $ ~,482.00 O~QC 48 $ 1~808.00: Spe~catJons 106 Construction ¢osl estimales B6 $ 2,599.02 SUBTOTAL 1945.5 $ 53,615 Construction Support Se~lces RE He (hal included In this scope of se~ices} 0 $ Cons~cUon bidding suppoM (not In~uded in this s~pe 0 $ Post award assistance (Dublin Io provide cons~o~ s 0 SUBTOTAL~ o $ Paoa 15 EXHIBIT Thc method of payment for this contract will be based on actual costs plus fixed fee. Thc City will reimburse the Consultant for actual costs (including labor costs, employee bencfitl, travel, overhead and other direct costs) incurred by thc Consultant in performance of the work, exclusive of any fixed fee, not to exceed the mount of THREE HUNDRED SEVENTY NINE THOUSAND TWO HUNDRED EIGHTY FIVE DOLLARS AND NINTY SIX CENTS ($379,285.96). Actual costs shall be based on the estimated wage rates and other estimated costs set forth in the Consultant's cost proposal unless otherwise authorized by the CiV Council in writing. In addition to thc actual costs, the City will pay the Consultant a fixed fee as set forth and attached hereto in Consultant's (MK Centennial) proposal dated ;[uly 6, 2000 in the amount of THIRTY ONE THOUSAND SEVEN HUNDRED FOUKTEEN AND FOUR ($31,7-14:04). The fixed fcc is nonadjustable for the term of the conu:act except in thc event of a change in thc scope of work and such adjustment is made by contrac'~ amendment. Thc fixed fee shall bc billed monthly at the ration that thc Direct Labor Costs incurred during thc billing period bears to thc maximum total estimated Direct Labor Cost for this Agreement, with any un-bill ~,d f~cd fee being paid upon the satisfactory completion of the scope of services hereunder. The total amount payable by the City, including the fixed fee, shall not exceed FOUR HUNDRED ELEVEN THOUSAND AND ZEKO CENTS ($411,000.00). Consultant shall submit invoices on a monthly basis based of the actual cost for services performed in accordance with the cost e..stimate included in the Consultant's (MK Centennial) proposal dated July 6, 2000. The m_onthly invoices shall also inc!udc a portion of thc fixed fcc determined in accordance with thc provisions of thc second paragraph of this Exhibit B. Thc total amount, actual cost plus fixed fcc stated above, shall be thc total which City shall pay for the services to be rendered by Consultant pursuant to this Agreement. City shall not pay.any additional sum for any expense or cost whatsoever incurred by Consultant in rendering services pursuant 'to this Agreement City shall make.no payment for any extra, further or additional service pursuant t9 this Agreement unless such extra service and' the price therefor is agreed to in writing executcd'$y the City Manager or other designated official of City authorized to obtigatc City thereto prior to the time such extra service is rendered and in no event shall such change order exceed twenty-five percent (25%) of the initial contract price. Thc services to be provided under this Agreement may be terminated without cause at any point in time in the sole and exclusive discretion of City. tf the Agreement is terminated by City, Consultant shall be entitled to r~ceive just and equitable compensation for any satisfactory work completed on such documents and other materials to thc effective date of such termination. In that event, all finished and unfinished documents and other materials shall, at thc option of thc City~ become City's sole and exclusive property. Consultant hereby expressly waives any and all claims for damages or compensation arising under this Agreement. Consultant shall maintain adequate togs and timcsheets in order to verify costs incurred to date. Exhibit B Page 1 of 1 07/10/00 EXI-IIBIT C City shall furnish phySical facilities such as desks, filing cabinets, and conference space, as may be reasonably necessary for Contractor's use while consulting with City employees and reviewing records and the information in possession of City. The location, quantity, and time of furnishing said physical facilities shall be in the sole discretion of City. In no event shall City be obligated to furnish any facility which may involve incurring any direct expense, including, but not limiting the generality of this exclusion, long-distance telephone or other communication charges, vehicles, and reproduction facilities. Exhibit C Page 1 of 1 07/10/00 EXHIBIT D GENERAL PROVISIONS INDEPENDENT CONTRACTOR. At all times during the term oftkis Agreement, Consultant shall be an independent contractor and shall not be an employee of City. City shall have the right to control Consultant only insofar as the results of Consultant's engineering services rendered pursuant to this Agreement; however, City shall not have the right to control the means by which Consultant accomplishes services rendered pursuant to this Agreement. LICENSES; PERMITS; ETC. Consultant represents and warrants to City that he has all licenses, permits, qualifications and approvals of whatsoever nature, which are legally required for Consultant to practice, his profession. Consultant represents and warrants to City that Consultant shall, at his sole cost and expense, keep in effect at all times during the term of this Agreement any licenses, permits, and approvals which are legally required for Consultant to practice his profession. o TIME. Consultant shall devote such time to the performance of services pursuant to this Agreement as may be reasonably necessary for satisfactory performance, of Consultant's obligations pursuant to this Agreement. INSURANCE REQUIREMENTS. Consultant shall procure and maintain for the duration of the contract insurance against claims for injuries to persons or damages to property which may arise from or in connection with the performance of the work hereunder by the Consultant, his agents, representatives, employees or subcontractors. The cost of such insurance shall be included in the Consultant's bid. A. Minimum Scope of Insurance. Coverage shall be at least as broad as: (1) Insurance Services Office form number GL 0002 (Ed. 1/73) covering comprehensive General Liability and Insurance Services Office form number GL 0404 covering Broad Form Comprehensive General Liability; or Insurance Services Office Commercial General Liability coverage ("occurrence" form CG 0001). (2) - Insurance Services Office form number CA 0001 (Ed. 1/78) coVering Automobile Liability, code 1 "any auto" and endorsement CA 0025. (3) Worker's Compensation insurance as required by the Labor Code of the State of California and Employers Liability Insurance. B. Minimum Limits of Insurance. Consultant shall maintain limits no less than: (1) General Liability: $1,000,000 combined single limit per occurrence for bodily injury, personal injury and property damage. If commercial General Liability Exhibit D Page 1 of 5 07/10/00 Do Exhibit D Page 2 of 5 07/10/00 Insurance or other form with a general aggregate limit is used, either the general aggregate limit shall apply separately to this project/location or the general aggregate limit shall be twice the required occurrence limit. (2) Automobile Liability: $1,000,000 combined single limit per accident for bodily injUry and property damage. Workers Compensation and Employers Liability: Workers Compensation limits as required by the Labor Code of the State of California and Employers Liability limits of $1,000,000 per accident. Deductibles and Self-Insured-Retentions. Any deductibles or self-insured retentions must be declared to and approved by' the City. At the option of the City, either the insurer shall reduce or eliminate such deductibles or self-insured retentions as respects the City, its _ officers, officials and employees; or the Consultant shall procure a bond guaranteeing payment of losses and related investigations, claim administration and defense expenses. Other Insurance Provisions. The policies are to contain, or be endorsed to contain, the following provisions: (1) General L~ability and Automobile Liability Coverages. (a) The City, its officers, officials, employees and volunteers are to be covered as insureds-as respects: liability.arising out of activities performed by or on behalf of the Consultant; products and completed operations of the Consultant, premises owned, occupied or used by the Consultant, or automobiles owned, leased, hired or borrowed by the Consultant. The coverage shall contain no special limitations on the scope of the protection afforded to the City, its officers, officials, employees or volunteers. (b) The Consultant's insurance coverage shall be primary insurance as respects the City, its officers, officials, employees and volunteers. Any insurance or self-insurance maintained by the City, its officerS, officials, employees or volunteers shall be excess of the Consultant's insurance and shall not -contribute with it. (c) An~ failure to comply with reporting provisions of the policies shall not affect coverage provided to the City, its officers, officials;employees or volunteers. (d) The Consultant's insurance shall apply separately to each insured against whom claim is made or suit is brought, except with respect to the limits of the insurer's liability. .( o (2) Worker's Compensation and Employers Liability Coverage. The insurer shall agree to waive all' fights of subrogation against the City, its officers, officials, employees and volunteers for losses arising from work performed by the Consultant for the City. (3) Professional Liability. Consultant shall carry professional liability insurmnce in an amount deemed by the City. to adequately protect the City against liability caused by negligent acts, errors or omissions on the part of the Consultant in the course of performance of the services specified in this Agreement. (4) All Coverages. Each insurance policy required by this clause shall be endorsed to state that coverage shall not be suspended, voided, cancelled by either'party, reduced in coverage or in limits except after thirty (30) days prior written notice, by certified mail, return receipt requested, has been given to the City. Acceptability of Insurers. Insurance is to be placed with insurers with a Bests' rating of no less than A:VIII. Verification of Coverage. Consultant shall furnish City with certificates ofinsm:ance and with original endorsements effecting coverage required by this clause. The certificates and endorsements for each insurance policy are to be signed by a person authorized by thaf insurer to bind coverage on its behalf. The certificates and endorsements are to be received and approved by the City before work commences. The City reserves the fight to require complete, certified copies of all required insuranCe' policies, at any"fime. The Risk Manager of City may approve a variation of those inSurance requirements upon a determination that the coverages, scope, limits 'and forms of such insurance are either not commercially available or that the City's interests are otherwise fully protected. CONSULTANT NO AGENT. Except as City may specify in writing, Consultant shall have no authority, express or implied, to act on behalf of City in any capacity whatsoever as an agent. Consultant shall have no authority, express or implied, pursuant to this Agreement to bind City to any obligation whatsoever. ASSIGNMENT PROHIBITED. No party to this A~eement may assign any right or obligation pursuant to this Agreement. Any attempted or purported assignment of an), right Or obligation pursuant to this Agreement shall be void and of no effect. Exhibit Page 3 of 07/10/00 o 10. PERSONrNEL. Consultant shall assign only competent personnel to perform services pursuant to this Agreement. In the event that City, in its sole discretion, at any time during the term of this Agreement, desires the removal of any such persons, Consultant shall, immediately upon receiving notice from City of such desire of City, cause the removal of such person or persons. STANDARD OF PERFORMANCE. Consultant shall perform all services required pursuant to this Agreement in the manner and according to the st.andards observed by a competent 'practitioner of the profession in which Consultant is engaged in the geographical area in which Consultant practices his profession. All instrUments of service of whatsoever nature which Consultant delivers to City pursuant to this Agreement shall be prepared in a substantial, f~rst class and wot ..kmanlike manner and conform to the standards of quality normally observed by a person practicing in Consultant's profession. HOLD HARMLESS AND RESPONSIBILITY OF CONSULTANTS. Consultant shall take ail responsibility for the work, shall bear all losses and damages directly or indirectly resulting to him, to any subconsultant, to the City, to City officers and employees, or to parties designated by the City, on account of the negligent performance, unforeseen difficulties, accidents, occurrences or other causes predicated on active or passive negligence of the Consultant or of his subconsultant. Consultant shall indemnify, defend and hold harmless the City, its officers, officials, directors, employees and agents from and against any or all loss, liability, expense, claim, costs (including costs of defense), suits, and damages of evew kind, nature and description directly or indirectly arising from the negligent performance of the work. This paragraph shall not be construed to exempt the City, its employees and officers from its own fraud, willful injury or violation of taw whether willful or negligent. For purposes of Section 2782 of the Civil 'Code the parties hereto recognize and agree that this Agreement is not a construction contract. By execution of this Agreement Consultant acknowledges and agrees that he has read and understands the provisions hereof and that this paragraph:is a material element of consideration. Approval of the insurance contracts does not relieve th~" Consultant or sub-consultants from liability under this paragraph. GOVERNMENTAL REGULATIONS. To the extent that this Agreement may be funded by fiscal assistance from another governmental entity, Consultant shall comply with all applicable rules and regulations to which City is bound by the terms of such fiscal assistance program. This may included but not limited to: a) Representatives of the City, State of California Department of Transportation (Caltrans) or the Federal Highway Administration (FHWA) shall have access to review alt:' relative documents to the project, including but not limited to accounting records, design reports, design calculations, construction documents and other documents as outlined in paragraph 11 DOCUMENTS. Exhibit D Page 4 of 5 07/10/00 11. b) The Consultant. agrees that the Contract Cos~ Principles and Procedures, 48 CFR, Federal Acquisition Regulations STstem, Chapter 1, Part 31 et seq., shall be used to determine the allowability ofindividual items of cost to be paid by City to Consultant. c) The Consultant also agrees to comply with Federal procedures in accordance with 49 CFR, Part 18, Uniform Administrative Requirements for Grants and Cooperative Agreements to State and Local Governments. d) Any costs for which payment has been made to consultant that are determined bY subsequent audit to be unallowable under 48 CFK, Federal Acquisition Kegulations System, Chapter 1, Pan 31 et seq., or 49 CFR, Part 1.8, uniform Administrative Requirements for Ch'ants and Cooperative Agreements to State and Local Governments shall be repaidby Consultant to City.. e) For the purpose of determining compliance with Public Contract Code Section 10115, ct.seq[ and Title 21, California Code of Regulations, Chapter 21 Section 2500 et seq., When applicable, and o~cr matters connected with the performance of the contract pursuant to Governmental Code Section 8546.7, the Consultant, sub-consultants and the City shal] maintain all books, document% papers, accoUnting record, and other evidence pe~aining to the performance of the conir_a.ct, including but' not limited to: thc costs of administering the contract... Ail par/des shall make such materials available at their' respective offices ai all reasonable times during the contract period and for three yc~s from the date of final payment under the contract. Thc City, State, the State Auditor, FHWA, or any duJy authorized representative of thc Federal government having jurisdiction under Federal laws or regulation (including the basis of Federal funding in whole or in pan) shall have access to any books, records, and documents of the Consultant that arc pertinent to the contract for audits, examinations, excerpts, and i~ansactions, and copies thereof shall bc furnished if requested. f) Any subcontract entered into as a result of this contract shall contain all of thc provisions of this article, paragraph 10 GOVEKNMENTAL KEGULATIONS. DOCUMENTS. All reports, data, maps, models, chans, designs, plans; studies, surveys, photographs, memoranda or other written documents or materials prepared by Consultant pUrsuant to' this A~ccment shall become the property of City upon completion of thc work to be performed hereunder or upon termination of the Agreement. No such materials o[ properties produced in whole or in part under this Agreement shall .be subject to private use, copyrights, or patent rights by Consultant in thc United States or in any other country without the express written consent of City, City shall have unrestricted authority to publish, disclose (as may be limited by the provisions of the California Public Kecords Act), distribute, and otherwise use, copyright or patent, in whole or in part, any such reports, studies, data, statistics, forms or other materials or properties produced under this Agreement. Exhibit D Page 5 of 5 07/10/00 CITY OF DUBLIN BUDGET CHANGE FORM New Appropriations (City Council Approval Required): X From Unappropriated Reserves From New Revenues CHANGE FORM # Budget Transfers: From Budgeted Contingent Reserve (1080-799.000) Within Same Department Activity Between Departments (City Council Approval Required) Other Name: Name: I Dublin Boulevard Widening Project fi.om Dublin Boulevard Widening Project from Village Parkway to Sierra Court (Engr- $40,689 Village Parkway to Sierra Court (Engr- $139,164 Design) Design) Account#: 206-96920-740-078 Adcount#: 300-96920-740-078 Name: Name: Account #: City Manager: Date: Signature REASON FOR BUDGET CHANGE ENTRY: The budget change is required to amend WashingtOn Infrastructure Services agreement to expand the scope of work and provide additional compensation. Existing gas tax funds budgeted for design work will be replaced with Developers Fees specifically designated for this Project. Finance Mgr: (-._~.~-r~--~ ~ Date: \\ \ \~6~, Signature Mayor: Date: Signature Posted By: Date: Signature G : engrlhqe~budgch~;,g, doc