HomeMy WebLinkAboutReso 198-01 DubBlWid WashInfraRESOLUTION NO. 198 - 01
A RESOLUTION OF THE CITY COUNCIL
OF THE CITY OF DUBLIN
APPROVING AMENDED AGREEMENT WITH
WASHINGTON INFRASTRUCTURE SERVICES (FORMERLY MK CENTENNIAL)
FOR CONSULTING SERVICES FOR THE WIDENING OF
DUBLIN BOULEVARD FROM VILLAGE PARKWAY TO SIERRA COURT
WHEREAS, the City Council of the City of Dublin approved an agreement for Preliminary
Engineering and Environmental Services with Washington Infrastructure Services (formerly known as
MK Centennial) for the Dublin Boulevard project from Village Parkway to Sierra Court, on November
16, 1999; and
WHEREAS, the City of Dublin amended the agreement on July 18, 2000, to extend the scope of
services to include the preparation of Plans, Specifications and Estimates for the said project with an
additional compensation in the amount of $267,000 for a total aggregate amount of $411,000; and
WHEREAS, the Scope of Work to be performed is proposed to be expanded to include additional
right-of-way survey work, bike path wall and creek slope protection design, additional landscaping and
signal interconnect design, other miscellaneous work, and design services during construction.
NOW, THEREFORE, BE IT RESOLVED that the City Council of the City of Dublin does hereby
approve Amendment No. 2 to the agreement with Washington Infrastructure Services to expand the scope
of work, as described in Exhibit "A", which is attached to this resolution.
BE IT FURTHER RESOLVED that the Mayor is authorized to execute the amended agreement.
PASSED, APPROVED AND ADOPTED this 20th day of November, 2001.
AYE S:
Counciimembers McCormick, Oravetz and Zika and Mayor Lockhart
NOES: None
ABSENT: None
ABSTAIN: None
ATTEST:
Mayor
k2/G/11-20-01/reso-washington agmt.doc (Item 4.12)
g: lengrCnkl O01ResoAmend2Nov20-2001
EXItIBIT "A" OF RESOLUTION it~t~ -01
AMENDMENT TO AGREEMENT
BETWEEN CITY OF DUBLIN AND WASHINGTON INFRASTRUCTURE SERVICES
(formerly MK Centennial) FOR ENGINEERING SERVICES
WHEREAS, the City of Dublin (hereinafter referred to as "CITY") and Washington
Infrastructure Services (formerly MK Centennial) (hereinafter referred to as "CONSULTANT"), entered
into an agreement on November 16, 1999 for Preliminary Engineering and Environmental ServiceS for the
Dublin Boulevard Widening Project between Village Parkway and Sierra Court; and
WHEREAS, the City amended the agreement on July 18, 2000 to extend the scope of
work to include the preparation of Plans, Specifications and Estimates; and
WHEREAS, the Scope of Work to be performed is proposed to be extended to include
additional right of way survey work, bike path wall and creek slope protection design, additional
landscaping and signal interconnect design, other miscellaneous work, and design services during
construction;
NOW, THEREFORE, the parties hereto agree as follows:
Scope of Work
The Scope of Work shall be modified as described in Consultant's Amended Scope of Services -
Phase 2 dated November 13, 2001 for the Dublin Boulevard Widening Project between Village Parkway
and Sierra Court (attached).
Extension of Term
The total cost for time-and-materials work under this amendment shall not exceed an additional
$139,164.