Loading...
HomeMy WebLinkAboutReso 198-01 DubBlWid WashInfraRESOLUTION NO. 198 - 01 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF DUBLIN APPROVING AMENDED AGREEMENT WITH WASHINGTON INFRASTRUCTURE SERVICES (FORMERLY MK CENTENNIAL) FOR CONSULTING SERVICES FOR THE WIDENING OF DUBLIN BOULEVARD FROM VILLAGE PARKWAY TO SIERRA COURT WHEREAS, the City Council of the City of Dublin approved an agreement for Preliminary Engineering and Environmental Services with Washington Infrastructure Services (formerly known as MK Centennial) for the Dublin Boulevard project from Village Parkway to Sierra Court, on November 16, 1999; and WHEREAS, the City of Dublin amended the agreement on July 18, 2000, to extend the scope of services to include the preparation of Plans, Specifications and Estimates for the said project with an additional compensation in the amount of $267,000 for a total aggregate amount of $411,000; and WHEREAS, the Scope of Work to be performed is proposed to be expanded to include additional right-of-way survey work, bike path wall and creek slope protection design, additional landscaping and signal interconnect design, other miscellaneous work, and design services during construction. NOW, THEREFORE, BE IT RESOLVED that the City Council of the City of Dublin does hereby approve Amendment No. 2 to the agreement with Washington Infrastructure Services to expand the scope of work, as described in Exhibit "A", which is attached to this resolution. BE IT FURTHER RESOLVED that the Mayor is authorized to execute the amended agreement. PASSED, APPROVED AND ADOPTED this 20th day of November, 2001. AYE S: Counciimembers McCormick, Oravetz and Zika and Mayor Lockhart NOES: None ABSENT: None ABSTAIN: None ATTEST: Mayor k2/G/11-20-01/reso-washington agmt.doc (Item 4.12) g: lengrCnkl O01ResoAmend2Nov20-2001 EXItIBIT "A" OF RESOLUTION it~t~ -01 AMENDMENT TO AGREEMENT BETWEEN CITY OF DUBLIN AND WASHINGTON INFRASTRUCTURE SERVICES (formerly MK Centennial) FOR ENGINEERING SERVICES WHEREAS, the City of Dublin (hereinafter referred to as "CITY") and Washington Infrastructure Services (formerly MK Centennial) (hereinafter referred to as "CONSULTANT"), entered into an agreement on November 16, 1999 for Preliminary Engineering and Environmental ServiceS for the Dublin Boulevard Widening Project between Village Parkway and Sierra Court; and WHEREAS, the City amended the agreement on July 18, 2000 to extend the scope of work to include the preparation of Plans, Specifications and Estimates; and WHEREAS, the Scope of Work to be performed is proposed to be extended to include additional right of way survey work, bike path wall and creek slope protection design, additional landscaping and signal interconnect design, other miscellaneous work, and design services during construction; NOW, THEREFORE, the parties hereto agree as follows: Scope of Work The Scope of Work shall be modified as described in Consultant's Amended Scope of Services - Phase 2 dated November 13, 2001 for the Dublin Boulevard Widening Project between Village Parkway and Sierra Court (attached). Extension of Term The total cost for time-and-materials work under this amendment shall not exceed an additional $139,164. CITY OF DUBLIN ? - ~James H. Lundell, Vice President Date: