HomeMy WebLinkAbout4.04 AcceptanceOfWork 89-5 CITY OF DUBLIN AGENDA STATEMENT City Council Meeting Date: June 12, 1989 SUBJECT: Acceptance of Work - Contract No. 89-5 Pool Pump Replacement (Report by Public Works Director Lee Thompson) EXHIBITS ATTACHED: None RECOMMENDATION: "'7. (J9r-'AccePt improvements constructed under Contract 89-5 t- and authorize retention payment to John Martin in the amount of $795.00 FINANCIAL STATEMENT: Budget authorized: Up to $30,000 for immediate repair work, including cost of pumps, cost of installation, and cost of heating system repairs, to be paid from CIP #9591 Swim Center Renovation. Expenditures: $ $ $ $ $ $ 413.86 $17,639.07 6,569.80 7,950.00 780.41 630.00 1,295.00 Purchase of pumps from Paco Pumps Contract 89-5 The Martin Company Testing of Griswold flow regulators Design & Inspection-Santina & Thompson Design & Inspection-Gus Waegemann Printing of bid plans-Studio Blueprint DESCRIPTION: At its meeting of January 9, 1989, the City Council authorized Staff to advertise for bids for Contract 89-5, replacement of the pumps and motors at the Dublin Community Swim Center. At the March 13th meeting, the City Council authorized Staff to purchase the pumps outright from Paco Pump Co. At the March 27th meeting, Contract 89-5, which included only the installation of the pumps and motors and any other appurtenant work required to make the pumps functional, was awarded to the Martin Company. During the course of construction, a couple of problems were encountered that delayed the work. The first problem was that the pumps barely fit into the pit area, and the access steps had to be modified. The second problem was that the rear bearings on both pumps were extremely noisy and had to be replaced to avoid damaging the units. Neither of these resulted in additional expenditures, but the repairs were not completed as quickly as Staff had hoped. Once these obstacles were overcome, the boiler was checked and determined to be functional for the present time, although the repairperson recommended that the City explore obtaining a newer, more efficient heating device. Staff will take a look at this situation when the renovation plans are drawn up for next fiscal year. The pool was opened to the public on Memorial Day weekend. Staff recommends that the City Council accept the improvements constructed under Contract 89-5 and authorize retention payment to the Martin Company in the amount of $795.00. - - - - - - - - - - - - ¡ - - ~ -,'- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -- ITEM NO. if -', I i COPIES TO: The Martin Company