Loading...
HomeMy WebLinkAboutPC Reso05-47 Rec CC Storm Water Quality Basin Stg2 PD RESOLUTION NO. 05 - 47 A RESOLUTION OF THE PLANNING COMMISSION OF THE CITY OF DUBLIN RECOMMENDING THAT THE CITY COUNCIL ADOPT AN ORDINANCE APPROVING A STAGE 2 DEVELOPMENT PLAN FOR A STORM WATER QUALITY CONTROL BASIN ON AN I I.I96-ACRE SITE WITHIN AREA H OF DUBLIN RANCH LOCATED IN THE EASTERN DUBLIN SPECIFIC PLAN AREA NORTH OF INTERSTATE HIGHWAY 580 AND SOUTH OF THE PROPOSED EXTENSION OF DUBLIN BOULE V ARD P A 05-005 WHEREAS, the Applicant, James Tong (representing Chang Su-O Lin, Hong Yao Lin & Hong Lien Lin), submitted an application for a Stage 2 Development Plan for a I 1. I 93-acre site located within Area H of Dublin Ranch in the Eastern Dublin Specific Plan Area. The Project Site is known as the Storm Water Quality Control Basin (WQCB) (or detention basin). The application also includes a Site Development Review in accordance with the proposed Stage 2 Development Plan; and WHEREAS, the Project Site generally is located north oflnterstate Highway 580 (1-580), south of the proposed extension of Dublin Boulevard and between the proposed extensions of Brannigan and Keegan Streets in an area designated as Tassajara Gateway of the Eastern Dublin Specific Plan area; and WHEREAS, in 2000 an Initial Study was prepared for P A 98-070, the Stage I Planned Development approval for Area H (SCH #99-1120412), and a determination was made that the project is within the scope of the Eastern Dublin Specific Plan and General Plan Amendment, for which a Program EIR was certified (SCH #91-103064) in 1993 including revisions to Part I of the Responses to Comments relating to the Kit Fox, the Addendum to the DEIR dated May 4, 1993, and a DKS Associates Traffic Study dated December 15, 1992 ("Eastern Dublin EIR"). The City also adopted a mitigation-monitoring program, which included numerous measures intended to reduce impacts from the development of the Eastern Dublin area. The timing for implementation of these mitigation measures is summarized in the adopted Mitigation and Monitoring Program matrix; and WHEREAS, the Initial Study prepared for P A 98-070, the Program EIR along with all subsequent Supplements, and the adopted Mitigation and Monitoring Program adequately address anticipated environmental impacts resulting from the proposed project for the purpose of compliance with CEQA; and WHEREAS, a staff report, dated August 9, 2005 and incorporated herein by reference, describes and analyzes the Project; and WHEREAS, the Planning Commission reviewed the staff report and previously prepared environmental documentation at a duly noticed public hearing held on August 9, 2005, at which time all interested parties had the opportunity to be heard. NOW, THEREFORE, BE IT RESOLVED that the foregoing recitals are true and correct and made a part ofthis resolution. A. The Planning Commission of the City of Dublin finds that the proposed Stage 2 Development Plan: is consistent with the: a) General Plan and Eastern Dublin Specific Plan, b) the zoning district of Planned Development Campus Office ad General Commercial, and c) purpose and intent of the Stage I Development Plan for Area H of Dublin Ranch PA 00-070. will be harmonious and compatible with existing and future development in the surrounding area. will occur within the Dublin City limits on a site that is planned to be surrounded by urban uses; will not displace habitat for endangered, rare, or threatened species; will not result in any significant negative effects relating to traffic, noise, air quality, or water quality; and; is an improvement that will satisfy the requirements of the Regional Water Quality Control Board to implement a storm water management plan. BE IT FURTHER RESOLVED that the Planning Commission of the City of Dublin recommends that the City Council approve the ordinance attached as Exhibit A and incorporated herein by reference, which adopts a Stage 2 Development Plan, based on the above-referenced findings. PASSED, APPROVED, AND ADOPTED this 9th day of August, 2005 by the following vote: AYES: NOES: ABSENT: ABSTAIN: H/~-, Planning Commission Chair ATTEST: /~ \ '" Planning anager G:\PA#\2005\05-005 Water Quality Pond Area H\PC Reso CC recommendation.DOC 2