HomeMy WebLinkAbout4.4 Quarry Lane Performing Arts Center (PLPA-2021-00041)IP
DUBLIN
CALIFORNIA
STAFF REPORT
City Council
Agenda Item 4.4
DATE: October 17, 2023
TO: Honorable Mayor and City Councilmembers
FROM: Linda Smith, City Manager
SU B.ECT : Quarry Lane Performing Arts Center (PLPA-2021-00041)
Prepared by: Jeff Baker, Community Development Director
EXECUTIVE SUMMARY:
On October 3, 2023, the City Council held a public hearing to consider the Quarry Lane School
Performing Arts Center project located at 6237 and 6363 Tassajara Road. The project includes the
construction of a 13,800-square-foot performing art center and related site, landscape, and
parking improvements. The requested approvals include an amendment to the Planned
Development Zoning Stage 1 and 2 Development Plans, Conditional Use Permit and Site
Development Review Permit. The City Council adopted a Supplemental Mitigated Negative
Declaration, approved a Conditional Use Permit and Site Development Review Permit, and
introduced an Ordinance approving amendment to the Planned Development Zoning. The City
Council is now being asked to waive the second reading and adopt the Ordinance approving the
Planned Development Zoning Amendments.
STAFF RECOMMENDATION:
Waive the reading and adopt the Ordinance Amending the Zoning Map and Approving an
Amended Planned Development Zoning District and Related Stage 1 and Stage 2 Development
Plans for the Quarry Lane School.
FINANCIAL IMPACT:
All costs associated with the processing of this application are paid for by the applicant.
DESCRIPTION:
Background
The Quarry Lane School is located on approximately 12.6 acres on the east side of Tassajara Road
at 6237 and 6363 Tassajara Road (Figure 1 below).
Page 1 of 3
1
Figure 1: Project Site
Wallis. Ranch i
Community Pork
y a
V LANE Sa1WL
it
p
%ADM HILL DR
1`mg. r
f
i
•
• • _
itt
Y E21�.� 1 yIy
LEyy� �'Li Rid■
i� s+a liel3
The applicant proposes to construct a 13,800-square-foot performing arts center, a 126-space
parking lot, and related site and landscape improvements. The proposed building will include a
performance hall with seating for up to 350 people, along with drama, music, dance classes, and
rehearsal studios for Quarry Lane School students. The new facility will provide a dedicated space
to host the school's existing performance art shows and events, as well as an improved space for
high school commencement ceremonies. Currently, the school hosts approximately eight events
annually, including the high school graduation ceremony. These events occur in the evenings and
on weekends and are held in existing buildings on the campus. Implementation of the proposed
project will not increase student enrollment capacity or change the frequency or capacity of such
events but will provide a new modernized and dedicated facility to host these events. Attachment
2 includes a complete description of the project.
On October 3, 2023, the City Council held a public hearing and adopted Resolutions adopting a
Supplemental Mitigated Negative Declaration and approving a Conditional Use Permit and Site
Development Review Permit for the proposed performing arts center. The City Council also
introduced an Ordinance adopting companion amendments to the Planned Development Zoning
for the project.
The City Council is being asked to waive the second reading and adopt the Ordinance approving
amendments to the Planned Development Zoning (Attachment 1).
Page 2 of 3
2
NOTICING REQUIREMENTS/PUBLIC OUTREACH:
The City Council Agenda was posted.
STRATEGIC PLAN INITIATIVE:
None.
ATTACHMENTS:
1) Ordinance Amending the Zoning Map and Approving an Amended Planned Development
Zoning District and Related Stage 1 and Stage 2 Development Plans for the Quarry Lane School
2) City Council Staff Report dated October 3, 2023, without attachments
Page 3 of 3
3
Attachment 1
ORDINANCE NO. xx — 23
AN ORDINANCE OF THE CITY COUNCIL
OF THE CITY OF DUBLIN
AMENDING THE ZONING MAP AND APPROVING AN AMENDED PLANNED
DEVELOPMENT ZONING DISTRICT AND RELATED STAGE 1 AND STAGE 2
DEVELOPMENT PLANS FOR THE QUARRY LANE SCHOOL
PLPA-2021-00041
(APNS 985-0072-002-00 AND 985-0002-006-03)
The Dublin City Council does ordain as follows:
SECTION 1: RECITALS
A. The Applicant, Dr. Sabri Arac, is requesting an amendment to the Planned
Development Zoning and related Stage 1 and Stage 2 Development Plans for the
property located at 6237 and 6363 Tassajara Road. The proposed Project would
expand the campus to include a new performing arts center on the Quarry Lane
School. Requested approvals include a Planned Development Rezone with a
related Stage 1 and Stage 2 Development Plan. These planning and implementing
actions are collectively known as the "Quarry Lane Performing Arts Center Project"
or the "Project."
B. The 12.63-acre Project site (APN 985-0072-002-00 and 985-0002-006-03) is
located in eastern Dublin, at 6237 and 6363 Tassajara Road.
C. The existing General Plan and Eastern Dublin Specific Plan land use designations
are Medium -Density Residential.
D. On December 19, 2000, the City Council approved the Planned Development (PD)
District Pre -zoning and Annexation application (PA-99-064) and adopted a
Mitigated Negative Declaration (Resolution No. 204-00) for Phase II of the Quarry
Lane School and a PD Pre -zone for the Kobold Property (Ordinance No. 24-00).
E. On June 17, 2014, the City Council adopted an Ordinance (No. 12-14) to amend
the Zoning Map for PD Zoning District rezone and related Stage 1 and 2
Development Plan Amendments for the Quarry Lane School Phase III expansion
and adopted an Initial Study and a CEQA Addendum (Resolution No. 18-14).
Ordinance No. 12-14 replaced Ordinance No. 24-00 except as it pertained to the
Kobold Property (APN 985-0072-002-00).
F. The Project area was previously analyzed in the Eastern Dublin General Plan
Amendment and Specific Plan, which was adopted in 1993 and has a certified
Program EIR (SCH No. 91-103064) and analyzed in the Quarry Lane Master Plan,
which was adopted in 1998 by the County of Alameda and has a certified EIR (SCH
No. 97122109).
G. The City prepared a Supplemental Mitigated Negative Declaration for the Project,
which reflected the City's independent judgment and analysis of the potential
environmental impacts of the Project. Prior CEQA analysis for the Project area
4
includes: the Eastern Dublin General Plan Amendment and Specific Plan, which
was adopted in 1993 and has a certified Program EIR (SCH No. 91-103064) and
analyzed in the Quarry Lane Master Plan, which was adopted in 1998 by the
County of Alameda and has a certified EIR (SCH No. 97122109)
H. Upon completion of the Initial Study, it was determined that there were new
potentially significant impacts associated with the project related to noise and air
quality and therefore a Supplemental Mitigated Negative Declaration was prepared
to analyze those impacts and identify mitigation measures to reduce the impacts
to less than significant.
I. The Supplemental Mitigated Negative Declaration/Initial Study was circulated for
public review from July 5, 2023-August 4, 2023.
J. The City received one comment letter during the public review period.
K. The Planning Commission held a properly noticed public hearing on the Project,
on September 12, 2023, at which time all interested parties had the opportunity to
be heard.
L. On September 12, 2023, the Planning Commission adopted Resolution No. 23-08
recommending that the City Council adopt the Supplemental Mitigated Negative
Declaration and approve amendments to the Planned Development Zoning and
related Stage 1 and Stage 2 Development Plans, a Conditional Use Permit and
Site Development Review Permit, which resolution is incorporated herein by
reference and available for review at City Hall during normal business hours.
M. On October 3, 2023, the City Council held a properly noticed public hearing on the
project and the Supplemental Mitigated Negative Declaration at which time all
interested parties had the opportunity to be heard.
N. A Staff Report dated October 3, 2023, and incorporated herein by reference,
described and analyzed the project, including the amendment to the Planned
Development Zoning District, Site Development Review Permit, and Supplemental
Mitigated Negative Declaration for the City Council.
O. The City Council considered the Supplemental Mitigated Negative Declaration and
all above -referenced reports, recommendations, and testimony before taking any
action on the Project.
P. The City Council did hear and use independent judgment and considered all said
reports, recommendations, and testimony hereinabove set forth.
Q. Following a public hearing on October 3, 2023, the City Council adopted Resolution
No. 105-23, approving the Supplemental Mitigated Negative Declaration for the
Quarry Lane Performing Arts Center Project.
R. The City Council considered the Supplemental Mitigated Negative Declaration, and
all above referenced reports, recommendations, and testimony prior to taking action
Ord. No. XX-23, Item X.X, Adopted XX/XX/2023 Page 2 of 8
5
on the Project.
SECTION 2: FINDINGS
A. Pursuant to Section 8.32.070 the Dublin Municipal Code, the City Council finds as follows:
1. The Quarry Lane Performing Arts Center Project ("the Project") Planned Development
zoning meets the purpose and intent of Chapter 8.32 in that it provides a
comprehensive development plan that is consistent with the General Plan and protects
the integrity and character of the area by creating a desirable use of land that is
sensitive to surrounding land uses by virtue of the layout and design of the site plan.
The Project is planned comprehensively and will follow development standards tailored
to the specific needs of the site. These standards will address issues such as building
setbacks, architecture, landscaping and grading. The proposed development will blend
with the natural features unique to the site through the use of design and planning.
2. Development of the Project under the Planned Development zoning will be harmonious
and compatible with existing residential and semi-public development in the
surrounding area in that the site will provide a dedicated performing arts space on an
existing school campus.
B. Pursuant to Sections 8.120.050.A and B of the Dublin Municipal Code, the City Council finds
as follows:
1. The Planned Development zoning for the Project will be harmonious and compatible
with existing and potential development in the surrounding area in that the proposed
site plan has taken into account existing site development and uses and will provide a
new performing arts center.
2. The Project site conditions were documented in the Eastern Dublin General Plan
Amendment and Specific Plan EIR (1993), Eastern Dublin General Plan Amendment
and Specific Plan, which was adopted in 1993 and has a certified Program EIR (SCH
No. 91-103064) and analyzed in the Quarry Lane Master Plan, which was adopted in
1998 by the County of Alameda and has a certified EIR (SCH No. 97122109) and the
Supplemental Mitigated Negative Declaration that was prepared, and the
environmental impacts that have been identified will be mitigated to the greatest degree
possible.
3. The Planned Development zoning is consistent with the General Plan policies and the
City's Zoning Ordinance enacted for the public health, safety and welfare. The Project
will not adversely affect the health or safety of persons residing or working in the vicinity
nor will it be detrimental to public health, safety or welfare. The Project will comply with
all applicable development regulations and standards and will implement all adopted
mitigation measures. Additionally, no noxious odors, hazardous materials, or excessive
noises will be produced.
Ord. No. XX-23, Item X.X, Adopted XX/XX/2023 Page 3 of 8
6
4. The Planned Development zoning is consistent with and in conformance with the Dublin
General Plan land use designation of Medium Density which allows for private school
uses.
SECTION 3. ZONING MAP AMENDMENT
Pursuant to Chapter 8.32, Title 8 of the City of Dublin Municipal Code the City of Dublin Zoning
Map is amended to Rezone the property described below to a Planned Development zoning
district and supersedes and replaces the previously adopted Planned Development Zoning
Ordinance No. 12-14 and Ordinance 24-00:
12.63 acres at 6327 and 6363 Tassajara Road. APN 985-0072-002-00 and 985-0002-006-03
("The Property"). A map of the rezoning area is shown below:
SECTION 4. APPROVAL OF STAGE 1 AND STAGE 2 DEVELOPMENT PLAN
The regulations for the use, development, improvement, and maintenance of the Property are
set forth in the following Stage 1 and Stage 2 Development Plan for the 12.63 acre property,
which is hereby approved. Any amendments to the Stage 1 and Stage 2 Development Plan
shall be in accordance with Section 8.32.080 of the Dublin Municipal Code (DMC) or its
successors.
Ord. No. XX-23, Item X.X, Adopted XX/XX/2023 Page 4 of 8
7
Stage 1 and Stage 2 Development Plan
This is a Stage 1 and Stage 2 Development Plan pursuant to DMC Chapter 8.32. This
Development Plan meets all the requirements for both a Stage 1 and Stage 2 Development
Plan and is adopted as part of the Planned Development Rezone for the Quarry Lane
Performing Arts Center Project (PLPA-2021-00041).
The Planned Development zoning district and this Stage 1 and Stage 2 Development Plan
provides flexibility to encourage innovative development while ensuring that the goals, policies,
and action programs of the General Plan and provisions of DMC Chapter 8.32 are satisfied.
1. Zoning. The Zoning for the subject property is PD-Planned Development (PLPA-2014-
00008).
2. Statement of Permitted Uses.
Permitted Uses (as defined by the Zoning Ordinance):
Private School:
1. Kindergarten through high school grades
2. After school care
3. Recreational play fields
4. Similar and related uses as determined by the Director of Community Development
Conditional Uses:
1. A performing arts center for school programs
2. All conditional uses in the Dublin Zoning Ordinance for the R-1 Residential Zoning
District are conditionally allowed uses in this Planned Development Zoning District.
Prohibited Uses:
1. All those not specifically listed herein as permitted or conditionally permitted.
Ord. No. XX-23, Item X.X, Adopted XX/XX/2023 Page 5 of 8
8
3. Stage 1 and Stage 2 Site Plan.
Ord. No. XX-23, Item X.X, Adopted XX/XX/2023 Page 6 of 8
9
4. Site Area, Proposed Densities, and Development Regulations.
Maximum Student 950 students (200 Preschool and Kindergarten, 600 Elementary
Population and Middle School, 150 High School)
Maximum Faculty and 55
Staff
No. of Classrooms 51
Maximum Building Area 124,402 square feet
Floor to Area Ratio .226
Parking Spaces 149 spaces (minimum required per parking analysis conducted
in 2004) + 117 for the performing arts center
Maximum Building Height: 59 feet
Minimum Lot Size None
Maximum lot coverage 25%
Parking Stall Dimensions Per Chapter 8.76 Off -Street Parking And Loading Regulations of
Standards the Dublin Zoning Ordinance
Minimum Setbacks
20' front yard setback
9'8" side yard setback
20' rear yard setback
5. Phasing Plan. The project site will be developed in one phase.
6. Preliminary Landscape Plan. As shown in the Site Development Review approvals for the
various project phases and the Performing Arts Center (PLPA 99-064, PLPA-2014-0008,
PLPA-2021-00041).
7. Architectural Standards. The design of future buildings on the project site shall be
architecturally compatible with the existing Building 2 (Preschool and Elementary School) and
Building 3 (Middle and High School Building) including the standing seam metal roof with
decorative eave corbels and a simple cement plaster finish painted to match the existing
buildings. The window design and placement on future buildings will also be complementary
to the other buildings on the school campus.
8. Consistency with General Plan and any applicable Specific Plan. The proposed project is
consistent with the General Plan and Eastern Dublin Specific Plan.
9. Inclusionary Zoning Regulations. The Inclusionary Zoning Regulations do not regulate non-
residential projects, so therefore this is not applicable.
10. Aerial Photo. An aerial photo is on file with the Community Development Department.
11. Applicable Requirements of Dublin Zoning Ordinance. Except as specifically provided in
this Stage 1/2 Development Plan, the use, development, improvement and maintenance of the
property shall be governed by the R-1 (Single Family Residential Zoning District) provisions of
the Dublin Zoning Ordinance pursuant to Section 8.32.060.C. No development shall occur on
this property until a Site Development Review permit has been approved for the property.
Ord. No. XX-23, Item X.X, Adopted XX/XX/2023 Page 7 of 8
10
12. Compliance with adopted Mitigation Measures. The Applicant/Developer shall comply with
all applicable action programs and mitigation measures of the Eastern Dublin Specific Plan and
General Plan Amendment EIR, the Quarry Lane EIR, the Quarry Lane School Phase II
expansion Mitigated Negative Declaration, the Quarry Lane School Phase III CEQA
Addendum, and the Supplemental Mitigated Negative Declaration prepared for the Performing
Arts Center Project.
SECTION 5. SEVERABILITY
The provisions of this Ordinance are severable and if any provision, clause, sentence, word or
part thereof is held illegal, invalid, unconstitutional, or inapplicable to any person or
circumstances, such illegality, invalidity, unconstitutionality, or inapplicability shall not affect or
impair any of the remaining provisions, clauses, sentences, sections, words or parts thereof of
the ordinance or their applicability to other persons or circumstances.
SECTION 6. POSTING OF ORDINANCE
The City Clerk of the City of Dublin shall cause this Ordinance to be posted in at least three (3)
public places in the City of Dublin in accordance with Section 36933 of the Government Code
of the State of California.
SECTION 7. EFFECTIVE DATE
This ordinance shall take effect and be enforced thirty (30) days following its adoption.
PASSED AND ADOPTED BY the City Council of the City of Dublin, on this 17th day of
October 2023, by the following votes:
AYES:
NOES:
ABSENT:
ABSTAIN:
Mayor
ATTEST:
City Clerk
Ord. No. XX-23, Item X.X, Adopted XX/XX/2023 Page 8 of 8
11
Attachment 2
IP
DUBLIN
CALIFORNIA
STAFF REPORT
City Council
DATE: October 3, 2023
TO: Honorable Mayor and City Councilmembers
FROM: Linda Smith, City Manager
SU B.ECT: Quarry Lane Performing Arts Center (PLPA-2021-00041)
Prepared by: Jeff Baker, Community Development Director
EXECUTIVE SUMMARY:
Agenda Item 6.1
The applicant, Dr. Sabri Arac of Quarry Lane School, proposes to construct a 13,800-square-foot
performing arts center and related site, landscape, and parking improvements for the Quarry Lane
School located at 6237 and 6363 Tassajara Road. The requested approvals include an amendment
to the Planned Development Zoning Stage 1 and 2 Development Plans, a Conditional Use Permit,
and a Site Development Review Permit. A Supplemental Mitigated Negative Declaration has been
prepared for consideration as part of the project. The Planning Commission reviewed the project
and unanimously recommended approval.
STAFF RECOMMENDATION:
Conduct the public hearing, deliberate and take the following actions: 1) adopt the Resolution
Adopting a Supplemental Mitigated Negative Declaration and Mitigation Monitoring and Reporting
Program for a New Performing Arts Center at the Quarry Lane School; 2) waive the reading and
INTRODUCE the Ordinance Amending the Zoning Map and Approving an Amended Planned
Development Zoning District and Related Stage 1 and Stage 2 Development Plans for the Quarry
Lane School; and 3) adopt the Resolution Approving a Conditional Use Permit and Site
Development Review Permit for a New Performing Arts Center at the Quarry Lane School.
FINANCIAL IMPACT:
All costs associated with the processing of this application are paid for by the applicant.
Page 1 of 10
12
DESCRIPTION:
Background
The Quarry Lane School is located on approximately 12.6 acres on the east side of Tassajara Road
at 6237 and 6363 Tassajara Road. The school is located within the Eastern Dublin Specific Plan
area and has Planned Development Zoning (Ordinance 12-14 and Ordinance 24-00). The project
site has a General Plan and Eastern Dublin Specific Plan land use designation of Medium Density
Residential. The site is surrounded by open space, parkland, and residential uses as described in
Figure 1 and Table 1 below. This includes an existing riparian area that borders the project site to
the south. In 2020, the Quarry Lane School acquired the 2.6-acre property immediately to the
south of the existing school site with the intent to expand their campus. The site, historically
known as the Kobold Property, has a single-family home and associated outbuildings, which most
recently was used as a landscape supply business. The Kobold Property is highlighted in orange
with the existing school facilities shown immediately to the north on Figure 1.
Figure 1: Project Site
Page 2 of 10
13
Table 1: Surrounding Land Uses
Location Zoning
North PD Medium Density - Residential
(6.1 -14 du/ac)
South PD Open Space and Medium Density
- Residential
(6.1 -14 du/ac)
East PD Open Space
West PD Open Space
General Plan Land Use
Current Use
Single -Family Homes
Open Space and Single -
Family Homes
Open Space
Open Space
In April 1999, prior to the site being annexed to the City of Dublin, Alameda County approved a
Planned Development Zoning District to allow the development of the first phase of the Quarry
Lane School. At the time, the proposed project included a 15,600-square-foot building for a day
care, preschool, and elementary school with a maximum enrollment of 200 students. A
programmatic Environmental Impact Report was certified by Alameda County for the Quarry Lane
School Master Plan.
On December 19, 2000, the City Council adopted a Planned Development District pre -zoning and
annexation application for the Quarry Lane School (Ordinance 24-00). This pre -zoning and
annexation included both the Quarry Lane School and the Kobold Property. The approval included
Phase II of the Quarry Lane School which allowed construction of an additional 66,685-square-
foot middle and high school building, recreation areas, landscaping, and grading. This allowed the
school to increase enrollment to 950 students including middle and high school students. The pre -
zoning for the Kobold Property allowed for interim agricultural uses on the property until such
time the property was redeveloped.
On May 25, 2004, the Planning Commission approved minor amendments to the Planned
Development Zoning and a Site Development Review Permit to allow construction of Phase II of
the Quarry Lane School (Resolution 04-46). These approvals allowed Phase II to be increased to
70,289 square feet of new building area (an increase from the 66,685 square feet approved in
2000). While the building area increased, the total maximum student population remained at 950
students.
On June 17, 2014, the City Council approved a Planned Development Rezone with a Stage 1 and 2
Development Plan (Ordinance 12-14) and a Site Development Review Permit for Phase III of the
Quarry Lane School. These approvals allowed a maximum of 110,602 square feet of development
and construction of the cafeteria and science buildings. The total maximum student population
remained at 950 students.
In 2020, the Quarry Lane School purchased the Kobold Property to expand the campus. A lot
merger was recorded on March 31, 2022 (Application No. M-2022-001, 2022065678), which
merged the existing Quarry Lane School parcel and the Kobold Property to create one 12.6-acre
parcel.
Page 3 of 10
14
The applicant is currently requesting approval to construct a 13,800-square-foot performing arts
center, a 126-space parking lot, and related site and landscape improvements on the former
Kobold property. The requested entitlements include an amendment to the Planned Development
Zoning, a Conditional Use Permit, and a Site Development Review Permit.
Analysis
The proposed building will include a performance hall with seating for up to 350 people, along
with drama, music, dance classes, and rehearsal studios for Quarry Lane School students. The new
facility will provide a dedicated space to host the school's existing performance art shows and
events, as well as an improved space for high school commencement ceremonies. Currently, the
school hosts approximately eight events annually, including the high school graduation ceremony.
These events occur in the evenings and on weekends and are held in existing buildings on the
campus. Implementation of the proposed project will not increase student enrollment capacity or
change the frequency or capacity of such events but will provide a new, modernized, and
dedicated facility to host these events.
Planned Development Zoning
The application includes an amendment to the Planned Development Zoning Stage 1 and Stage 2
Development Plans. The proposed amendment will apply the existing Planned Development
Zoning for the Quarry Lane School to the expanded school site which includes the former Kobold
Property, and amends the Stage 1 and Stage 2 Development Plan to allow for development of the
Performing Arts Center and related improvements.
Page 4 of 10
15
The Planned Development Zoning is proposed to be amended and restated as shown in
Attachment 4. However, the proposed amendments to the Planned Development Zoning are
limited to the following, which enable development of the performing arts center but do not
increase the student enrollment capacity:
• Incorporate in the Planned Development Zoning District the recently acquired 2.6-acre site
immediately to the south of the school, formerly known as the Kobold property
(Attachment 4, Section 3);
• Add a school performing arts center as a conditionally permitted use (Attachment 4,
Section 4.2);
• Increase the Maximum Building Area from 110,602 square feet to 124,402 square feet
(Attachment 4, Section 4.4);
• Decrease the Floor -to -Area Ratio from 0.253 to 0.226 (Attachment 4, Section 4.4); and
• Adjust the Parking Spaces requirement to include the 117 parking spaces required for the
performing arts center (Attachment 4, Section 4.4).
The Ordinance approving the proposed amendments to the Planned Development Zoning is
included as Attachment 4.
Page 5 of 10
16
Conditional Use Permit
The Planned Development Zoning, as amended, allows a performing arts center at the school as a
conditionally permitted use. A Conditional Use Permit enables the City to place conditions of
approval on a project to ensure that the operating characteristics are compatible with
surrounding uses. The proposed project has been reviewed for issues related to operating
characteristics, access and parking. Conditions of approval have been placed on the project, where
appropriate, to ensure compatibility with the surrounding uses.
The proposed performing arts center will provide a dedicated space to host the school's existing
performance art shows and events, as well as an improved space for high school commencement
ceremonies. The new building will be used to support only the existing arts programs at the
school, thus there will be no increase in school enrollment capacity or change in day-to-day
operations.
A new, right -in -only driveway is proposed on Tassajara Road. Vehicles will continue to exit the
school using the existing signalized intersection that provides access to the school. Conditions of
approval have been included to ensure the driveway is designed and operated as a right -in -only
(Attachment 5, Conditions 28 and 29). Parking requirements are regulated by the Zoning
Ordinance (Section 8.76.080.D), which requires one space per three fixed seats, or 117 spaces for
the proposed facility. The proposed project is not anticipated to increase the existing demand for
parking because it will host functions that already occur at the school. However, the proposed
project does include an additional 126 parking spaces, which exceeds the requirement.
The Resolution approving the Conditional Use Permit is included as Attachment 5.
Site Development Review Permit
Site Layout, Circulation & Parking
The proposed 13,800-square-foot performing arts center will be located to the south of the
existing school buildings and the 126 additional parking spaces would be located east and south of
the proposed performing arts center. Access to the site is proposed from Tassajara Road via a new
right -in -only driveway at the southern end of the project site. An internal drive aisle will connect
to the existing school parking lot to the north. Vehicles will continue to exit the site from the
existing signalized entry and exit on Tassajara Road. Figure 3 below shows the proposed project in
context with the existing school. A new auxiliary lane will be provided to facilitate access to this
new driveway. The applicant will construct this auxiliary lane unless the City's Tassajara Road gap
closure project is completed first. The gap closure project is in the planning phase to build
Tassajara Road to its ultimate width in the area of the school.
Paved pedestrian walkways will be provided to connect the parking area with the proposed
performing arts center, as well as to provide pedestrian connections to proposed sidewalks along
Tassajara Road. Safety and security lighting will be provided along pedestrian pathways, around
the new building and in the parking area. Drive aisle and parking area lighting will consist of 15-
foot-high, pole -mounted LED lights. Lighting for pedestrian pathways will consist of three -foot -
high bollards.
Page 6of10
17
The parking requirement for the school is based on the Off -Street Parking and Loading
Regulations in the Zoning Ordinance (Section 8.76.080.D). The requirement is to provide one
space per three fixed seats. The 350-seat performing arts center has a requirement to provide 117
parking spaces. The applicant proposes to provide 126 new parking spaces to accommodate this
requirement.
Figure 3: Proposed Site Plan
Architecture
The architecture for the new building is characterized as modern with simple lines and will be
integrated into the overall campus design (see Figure 4 below). The side and front facades, most
visible from Tassajara Road, consistent of a prominent roofline and large canopy providing cover
for vehicle pickup and drop off. The materials of the new building will match the existing campus
buildings. The stucco siding will be painted to match the existing campus buildings and the
standing seam metal roof color will complement the roof of the other school buildings. The
window design and placement will also compliment the other buildings on the school campus to
create a unified aesthetic.
Page 7 of 10
18
Figure 4: Proposed West Elevation
Landscaping
The proposed landscape design includes a landscape buffer along Tassajara Road with trees and
shrubs, including coast live oak, glossy abelia, Point Reyes creeper, and desert carpet. Existing
street trees on the Tassajara Road frontage would be retained and the landscaping enhanced.
Landscape plantings, including a variety of trees, shrubs, flowering perennials, and grasses would
be provided around the building and in the parking lot. In addition, the proposed project includes
several landscaped stormwater basins totaling approximately 3,460 square feet. Stormwater
basins would include Berkeley sedge, blue rush, and blue wild rye. A three-inch layer of wood
mulch would be provided adjacent to the existing riparian area associated with an unnamed
tributary that borders the project site to the south. A rail fence would be provided along the edge
of a City -required creek setback to prevent intrusion into the riparian area.
The Resolution approving the Site Development Review Permit is included as Attachment 5 with
the project plans included at Attachment 6.
PLANNING COMMISSION REVIEW:
The Planning Commission held a public hearing on September 12, 2023 to consider the proposed
project. Four community members spoke in support of the project. The Planning Commission
voted unanimously to recommend that the City Council approve the project (Attachment 7).
ENVIRONMENTAL DETERMINATION:
Development of the project site was previously addressed in the Eastern Dublin General Plan
Amendment (EDGPA) and the Eastern Dublin Specific Plan Environmental Impact Report (EDSP
EIR) for which the City Council certified an Environmental Impact Report (EIR) and an addendum
on August 22, 1994. Pursuant to Resolution No. 53-93, the City Council adopted a Mitigation
Measures and Monitoring Program, which continue to apply to development in Eastern Dublin.
The City Council also adopted a Statement of Overriding Considerations in connection with
certification of the 1993 EDGPA/EDSP Environmental Impact Report.
Page 8of10
19
Consistent with the requirements of the California Environmental Quality Act (CEQA) including
Section 21166 and related CEQA Guidelines Sections 15162 and 15163, the City prepared an
Initial Study to determine whether additional environmental review was required for the
proposed Quarry Lane School Performing Arts Center Project. Pursuant to CEQA Guidelines
Section 15163, the City determined that the environmental impacts associated with the proposed
project would be the same as or similar to those identified in the EDSP EIR and mitigated to less -
than -significant levels with implementation of the mitigation measures identified in the EDSP EIR.
New impacts were identified in the following environmental areas: air quality and noise. None of
these impacts would result in significant effects that cannot be mitigated to less -than -significant
levels with implementation of project -specific mitigation measures, the Initial
Study/Supplemental Mitigated Negative Declaration. Therefore, the City has determined that the
proposed project requires a Supplemental Mitigated Negative Declaration, in compliance with
Public Resource Code Section 21166 and CEQA Guidelines Section 15163. The Supplemental
Mitigated Negative Declaration/Initial Study was circulated for a public review period from July 5,
2023, to August 4, 2023. One comment letter was received from Zone 7.
The resolution adopting a supplemental mitigated negative declaration and mitigation monitoring
and reporting program for the performing arts center is attached as Attachment 1, with the
Supplemental Mitigated Negative Declaration included as Attachment 2 and the Mitigation and
Monitoring Program included as Attachment 3.
NOTICING REQUIREMENTS/PUBLIC OUTREACH:
A Planning Application sign was posted on the project site and the project was also included on
the City's development projects webpage.
Two City -led Community Meetings were held on August 8 and August 9, 2023, to provide Dublin
residents with information about the proposed project. Four residents attended the meeting on
August 8 and three residents attended the meeting on August 9. Staff provided a presentation that
included an overview of the proposed project.
In accordance with State law, a public notice was mailed to all property owners and occupants
within 300 feet of the proposed project to advertise the project and this public hearing. A public
notice was also published in the East Bay Times and posted at several locations throughout the
City. This Staff Report was made available on the City's website and a copy provided to the
Applicant. The City Council Agenda was posted.
STRATEGIC PLAN INITIATIVE:
None.
ATTACHMENTS:
1) Resolution Adopting a Supplemental Mitigated Negative Declaration and Mitigation Monitoring
and Reporting Program for a New Performing Arts Center at the Quarry Lane School
2) Exhibit A to the Resolution - Supplemental Mitigated Negative Declaration
Page 9of10
20
3) Exhibit B to the Resolution - Mitigation Monitoring and Reporting Program
4) Ordinance Amending the Zoning Map and Approving an Amended Planned Development
Zoning District and Related Stage 1 and Stage 2 Development Plans for the Quarry Lane School
5) Resolution Approving a Conditional Use Permit and Site Development Review Permit for a
New Performing Arts Center at the Quarry Lane School
6) Exhibit A to the Resolution - Plans Prepared by BKBC Architects Inc.
7) Planning Commission Resolution Recommending the City Council Approve Performing Arts
Center at Quarry Lane School
Page 10 of 10
21